Attachment B.pdf
PDF 225 KB Posted
- Solicitation number
- 12760421Q0013_1
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment D.pdf | ||
| SEND Bill of Materials 11222020.xlsx | XLSX spreadsheet | |
| Attachment E.pdf | ||
| Attachment A.pdf | ||
| Attachment C.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Satellite Emergency Notification Device (SEND) and Supporting Data Plans United States
Department of Agriculture, Forest Service Office of the Chief Information Officer (CIO)
ATTACHMENT B
November 18, 2020 and Supporting Data Plans
5 Performance Requirements Summary
The Performance Requirements Summary (PRS) table describes the acceptable quality level of performance expected by the Government and the means by which the Government may use to validate acceptable services.
PWS
Mapping
Required Service Performance Standards
Acceptable Quality Level
(AQL)
Monitoring Method
Task 4.1.: Project/Contract Management
4.1.2 Participate in contract
Kickoff Meeting Provide draft meeting agenda;
attend meeting in person or virtually.
Agenda received as scheduled.
Data is accurate and no errors are noted on the Final Work Plan.
Affirmation of meeting attendance.
COR/designee review of deliverable and confirmation of meeting attendance.
4.1.3 Contractor Project
Work Plan
Project Work Plan is delivered in a timely manner and adequately addresses all required elements including a data-collection process that minimizes the collection burden for Forest Service staff.
Then update as needed.
Plan received as scheduled.
Data is accurate and no errors are noted on the final Work Plan.
COR/designee review of deliverable.
4.1.4 Bill of Materials Bill of Material
provided to Forest Service in timely manner
BOM received as scheduled.
Data is current.
COR/designee review of deliverable.
4.1.5 Contractor Quality
Control Plan
Submit plan within 30 calendar days after Kickoff Meeting; then update as needed.
Plan received as scheduled.
Data is accurate and no errors are noted 95% of the time on the final plan.
COR/designee review of deliverable.
PWS
Mapping
Required Service Performance Standards
Acceptable Quality Level
(AQL)
Monitoring Method
4.1.6 Quality Assurance
Surveillance Plan
Submit plans within 30 calendar days
Plan received as scheduled.
COR/designee review of deliverable.
after Kickoff Meeting; then update as needed.
Data is accurate and no errors are noted 95% of the time on the final plan.
4.1.13 Monthly Project
Status Report
(MPSR)
MPSR delivered on time; monthly
All required report topics are detailed 100% of the time. Data is accurate and no errors are noted 95% of the time on the report
COR/designee review of deliverable.
4.1.14 Meeting Minutes Meeting Minutes
delivered in timely manner.
Data is accurate and no errors are noted 95% of the time.
COR/designee review of deliverable.
4.1.15; and
Contractor submit a invoices with no errors
Follow The Department of Treasury’s, Invoice Processing Platform
(IPP), FAR 32.309,
and paragraph 20 of the PWS for instructions and requirements for invoicing.
Data is accurate and no errors are noted 100% of the time.
Otherwise invoices may be required to be “rejected” for correction.
COR/designee conducts inspection.
4.1.16
Provide SEND Report: Submit MSSD Report – Contractor will provide monthly usage reports detailing number of messages sent (SOS, Check-In, Status Updates, Help, and Custom Messages) per ESN upon request
Contractor provide a proposal on method and type of reporting.
Report(s) shall provide at a minimum an aggregated analysis and raw data indicating how and where the devices are being used; Report(s) meet applicable 508 and ICT requirements
All required report topics are detailed 100% of the time. Data is accurate and no errors are noted 97% of the time on the report
COR/designee review of deliverable.
PWS
Mapping
Required Service Performance Standards
Acceptable Quality Level
(AQL)
Monitoring Method
4.1.16
SEND Reports:
Submit ICR Report(s)
Report(s) shall include:
Monthly SEND hardware purchase details, Accounts subscription services details, and Monthly IDIQ Utilization details. Report shall comply with applicable 508 and ICT requirements
All required report topics are detailed 100% of the time. Data is accurate and no errors are noted 97% of the time on the report
COR/designee review of deliverable.
Task 4.2.: SEND Hardware/Software: Technical Specifications/Capabilities
PWS
Mapping Required Service Performance
Standards Acceptable
Quality Level
(AQL)
Monitoring Method
4.2.1 through
4.2.6
SEND devices meet specifications
SEND hardware and software specifications
100% COR/designee review of Contractor technical specifications; random inspection Task 4.3.: SEND Subscription Services
PWS
Mapping
Required Service Performance Standards
Acceptable Quality Level
(AQL)
Monitoring Method
4.3.1 SEND devices
services options
SEND devices services specifications
100% COR/designee review of Contractor’s proposal
Task 4.4.: SEND Technical and Training Support Services
PWS
Mapping
Required Service Performance Standards
Acceptable Quality Level
(AQL)
Monitoring Method
4.4.1 SEND devices
technical support services
SEND devices technical support services specifications
100% COR/designee review of Contractor’s proposal; random inspection
4.4.2 SEND devices
technical training services
SEND devices technical training services specifications
100% COR/designee review of Contractor’s proposal; random inspection
Task 4.5.: SEND Order Fulfillment and Reporting Services
PWS
Mapping
Required Service Performance Standards
Acceptable Quality Level
(AQL)
Monitoring Method
4.5.1 Contractor shall
provide a method to pay for devices and services which do not exceed $2,500 with a Federal Government credit card through an automated website
Solution complies with Government Purchase card authorities
100% COR/designee review of deliverable
4.5.1 Contractor shall also
provide a method to pay for larger amount of devices and services that exceed $2,500 via individual Purchase Orders.
Solution complies with Government procurement and payment authorities
100% COR/designee review of deliverable
4.5.2 Provide USDA Web
Portal
Solution meets requirements in 4.5.2.1.1-4.5.2.2.8
100% COR/designee review of deliverable
Task 4.6.: SEND Transition Out
PWS
Mapping
Required Service Performance Standards
Acceptable Quality Level
(AQL)
Monitoring Method
4.6.1 Prepare a plan that
details how it will prepare for and transition out services when the contract ends.
Plan details how the Contractor will perform requirements in 4.6.1.1
100% COR/designee review of deliverable
4.6.2 Execute the plan
during the transition period
30 days in duration 100% COR/designee review of deliverable
Incentives/Disincentives: Contractor Performance Assessment Report (CPAR) results, and the subsequent exercise of contract options by the government are contingent upon the Contractor’s adherence to the contract, and satisfactory achievement of Management, Schedule, Quality, Reporting, and Service Performance standards specified in this PWS.
| 1 Purpose |
| 2 Background |
| 3 Objectives |
| 4 Scope |
| 5 Performance Requirements Summary |
| 6 Deliverables |
| 7 Government Quality Assurance |
| 8 Award Instrument Type |
| 9 Period of Performance |
| 10 Place of Performance and Holidays |
| 11 Standard Business Hours |
| 12 Government Provided Information |
| 13 |
| 13 Key Personnel (AGAR 452.237-74) |
| 14 Contracting Officer’s Representative (COR) |
| 15 Non-Disclosure Agreement |
| 16 Data Rights |
| 17 Section 508 Compliance and Required Security Language |
| 18 Security Language |
| 19 Compliance with Internet Protocol version 6 (IPv6) |
| 20 Payment |
| 21 Additional Information |
| 22 List of Attachments |
| ATTACHMENT A: Annual Hardware and Services Requirements Estimates: |
| ATTACHMENT B: Evaluation and Award Criteria of Offerors |
| ATTACHMENT C: Quality Assurance Surveillance PLAN (QASP) Template |
| ATTACHMENT D: Schedule of Items |
File details come from the government source that posted it. Updated .