About this file
This document package includes a Contract Data Requirements List (CDRL) and details for a federal contract opportunity. The CDRL outlines eight required data items for an evaluation of inner door armor layers on armored vehicles. Deliverables include presentation materials, meeting minutes, a management plan, monthly status reports, system design documents, test plans and reports, and a contract summary report. Submission due dates and formats are specified for each deliverable.
The related federal contract opportunity is to conduct research and analysis on the standard door armoring procedure for the Department of State's armored vehicles. The objective is to evaluate the effectiveness of a single layer armor system compared to the required two-layer system, to determine if weight and cost reductions are possible while maintaining equal ballistic and blast protection. Interested parties are directed to the attachments for RFQ package details including terms, submission instructions, and basis for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19AQMM23Q0059 AMD 002 Questions.pdf | ||
| RFQ 19AQMM23Q0059 AMD 001.pdf | ||
| Attch 2 Small Business Subcontracting Plan.docx | DOCX document | |
| Bidders - Approved DD-254 - 19AQMM-23-Q-0059.pdf | ||
| 19AQMM23Q0059 - Armored Vehicle Inner Door Armor Layer Evaluation.pdf | ||
| Attachment 1 AV Inner Door Armor Layer PWS_02-28-23.pdf | ||
| Attachment A AV Spec REV 5.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G. PREPARED BY
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
INNER DOOR ARMOR LAYER EVALUATION
A001 Presentation Material
DI-ADMN-81373 DS/C/PSP/DEAV
NO
YES
30 Days after award
Contractor format is acceptable. Presentations to be provided electronically in .pdf or .pptx file formats.
1. Kickoff Meeting presentation must be delivered 3 business prior to the kick off meeting.
2. Weekly Design Review presentations must be provided by close of business on the business day prior to the meeting.
3. Preliminary Design Review presentation must be delivered 3 business prior to the meeting.
4. Critical Design Review presentation must be delivered 3 business prior to the meeting.
5. Test Readiness Review presentation must be delivered 3 business prior to the meeting.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
Program Analyst X ds_av_cap@state.gov X
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
A002 Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.)
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
3 Days after Kickoff Meeting
Contractor format is acceptable. Meeting minutes to be provided electronically in .pdf or .docx file formats.
Meeting minutes must be submitted 3 business days after each of the following Meetings
• Kickoff Meeting
• Weekly Design Review Meetings
• Monthly Status Meetings
• Preliminary Design Review
• Critical Design Review
• Test Readiness Review
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
DI-ADMN-81505
Program Analyst X
INNER DOOR ARMOR LAYER EVALUATION
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
A003 Management Plan
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
3 Days prior to Kickoff Meeting
Contractor format is acceptable. Management Plan to be provided electronically in .pdf or .docx file formats.
Management plant must be submitted 3 business days Prior to the kick off meeting. The contractor must update the management plan throughout the program as directed by the Government.
Management plan must include include a project schedule with a gantt chart.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
4. AUTHORITY (Data Acquisition Document No.)
Program Analyst X
DI-MGMT-80004
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
A004 Monthly Status Report
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
See Remarks
Contractor format is acceptable. Monthly reports to be provided electronically in .pdf or .docx file formats.
The first Monthly Report must be submitted on the last business day of the first complete calendar month after contract award.
Subsequent Monthly reports must be submitted 3 business days prior to the monthly status meetings. Dates for monthly status meetings will be proposed by the Contractor.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80227
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
A005
2. TITLE OF DATA ITEM
SYSTEM/SUBSYSTEM DESIGN DESCRIPTION
(SSDD)
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
See Remarks
Contractor format is acceptable. SSDD must be provided electronically in .pdf or .doc file formats.
Draft due 5 business days prior to the Preliminary Design Review. The Government may have comments or revisions that must be addressed or resolved. Revision due 5 business days prior to the Critical Design Review.
Final Due 10 business days after Critical Design Review.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
XX
X X
4. AUTHORITY (Data Acquisition Document No.)
ds_av_cap@state.gov X X
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
A006 Test and Evaluation Master Plan
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
See Remarks
Contractor format is acceptable. Test and Evaluation Master Plan must be provided electronically in .pdf or .xlsx file formats.
The Test and Evaluation Master Plan must be submitted 10 business days prior to the test readiness review.
The Government may have comments or revisions that must be addressed or resolved. The Government will have 10 business days to provide comments.
The final Test and Evaluation Master Plan must be delivered 10 business days after receipt of Government request for revision.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
XX
X X
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-81284
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
A007 Test Report
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
See Remarks
Contractor format is acceptable. Test Report must be provided electronically in .pdf or .xlsx file formats.
The Test Report must be submitted 20 business days after the conclusion of test conduct.
The Government may have comments or revisions that must be addressed or resolved. The Government will have 10 business days to provide comments. The final Test and Report must be delivered 10 business days after receipt of Government request for revision.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
XX
X X
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80809B
ds_av_cap@state.gov X X
(1 Data Item)
16. REMARKS
C. CATEGORY:
TDP ________ TM _______ OTHER _________________________
Form Approved OMB No. 0704-0188
15. TOTAL
PREVIOUS EDITION MAY BE USED.DD FORM 1423-1, AUG 96 (EG) Page ____ of ____ Pages
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
H. DATE J. DATEI. APPROVED BY
Designed using Perform Pro, WHS/DIOR, Aug 96
001 X
A008 Contract Summary Report
DS/C/PSP/DEAV
NO
YES
12. DATE OF FIRST SUBMISSION
30 Days prior to end of POP
Contractor format is acceptable. Contract Summary Report to be provided electronically in .pdf or .docx file formats. Draft must be submitted 30 days prior to the end of the Period of Performance. The Government may have comments or revisions that must be addressed or resolved. The Government will have 10 business days to provide comments.
The final Test and Report must be delivered 10 business days after receipt of Government request for revision.
See Remarks
Sarah Gregory 29 June 2022 Richard Crum 29 June 2022
COR X
CO X
NO
Program Analyst X
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-80447A
| CDRLs All |
| DD-1423-A1 Presentation Material |
| DD-1423-A2 Meeting Minutes |
| DD-1423-A3 Project Management Plan |
| DD-1423-A4 Monthly Status Report |
| DD-1423-A5 System Design Document |
| DD-1423-A6 Requirements Verification and Traceability Matrix |
| DD-1423-A7 Configuration Management Plan |
| DD-1423-A8 Test and Evaluation Master Plan |
| DD-1423-A9 Test Report |
| DD-1423-A10 OEM Manuals |
| DD-1423-A11 Armored Vehicle Manual |
| DD-1423-A12 Contract Summary Report |
| DD-1423-A13 Technical Data Package |
| DD-1423-A14 Failure Analysis |
| Door Armor CDRLs_3.pdf |
| CDRLs All |
| DD-1423-A1 Presentation Material |
| DD-1423-A2 Meeting Minutes |
| DD-1423-A3 Project Management Plan |
| DD-1423-A4 Monthly Status Report |
| DD-1423-A5 System Design Document |
| DD-1423-A6 Requirements Verification and Traceability Matrix |
| DD-1423-A7 Configuration Management Plan |
| DD-1423-A8 Test and Evaluation Master Plan |
| DD-1423-A9 Test Report |
| DD-1423-A10 OEM Manuals |
| DD-1423-A11 Armored Vehicle Manual |
| DD-1423-A12 Contract Summary Report |
| DD-1423-A13 Technical Data Package |
DD-1423-A14 Failure Analysis
File details come from the government source that posted it. Updated .