Attachment B - Cost Summary Task 2- Field Work.pdf

PDF 136 KB Posted

Attached to
FUSRAP/HTRW Verification & Laboratory Services Federal contract opportunity
Solicitation number
W912P923R0009
Issued by
Department of the Army Corps of Engineers Engineering District St Louis

About this file

This document is a cost summary attachment for a solicitation seeking FUSRAP/HTRW verification and laboratory services. The U.S. Army Corps of Engineers Engineering District St. Louis is soliciting proposals for field work related to three sites in Missouri and one in Iowa under Task 2. The cost summary provides loaded hourly rates by labor category for a base year and option period. Key labor categories include engineers, scientists, technicians, and various professional services. It includes a breakdown of other direct costs such as travel, equipment, and supplies. The total cost is to be provided for each year and site. The related federal contract opportunity provides additional details on solicitation number W912P923R0009 for the required hazardous waste verification and laboratory support services.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Summary

RFP W912P9‐23‐R‐0009

Task 2 ‐ Field Work

Disciplines

Sub‐Task 1.1.1 St. Louis North County Sites

Sub‐Task 1.1.2 St Louis

Downtown Site

Sub‐Task 1.1.3 Iowa Army Ammunition

Plant Total Hours **Base Year Loaded Rate Base Year Total

**Option Period Loaded

Rate Option Period Total Program Man 0 Project Man 0 Engineer Sr 0 Engineer Mid 0 Engineer Jr 0 Scientist Sr 0 Scientist Mid 0 Scientist Jr 0 Technician Sr 0 Technician Mid 0 Technician Jr 0 IT/Comm 0 Business/Finance 0 Admin 0 Sr. Professional 0 GIS Operator 0 CADD/Draftsperson 0 Driller 0 Laborer 0

*ODC's ‐ Travel Total Costs for Task 2 ‐$ ‐$ ‐$

*ODC's Repairs/Calibration Training Registration Drill Rig/Materials Field Supplies

**Base year and Option Period loaded rates must include a breakdown to include employees hourly rate plus all appliciable cost included in the loaded rates.

Hours Costs

CUI

Task 2, Page 1 of 1 May 4, 2022

File details come from the government source that posted it. Updated .