Attachment B - Construction Cost Estimate Breakdown.xls
XLS spreadsheet 45 KB Posted
- Attached to
- Z1LB--2023 Roadway Painting and Restriping
- Solicitation number
- 36C24623Q0462
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24623Q0462 0001.docx | DOCX document | |
| McGUIRE 2022.pdf | ||
| Attachment C - Contractor EMR Certification Form 2022.docx | DOCX document | |
| Wage Determination VA20230155 01132023 Building.pdf | ||
| 36C24623Q0462 RFQ.pdf | ||
| Attachment A - RFI Form Q0462.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Breakdown
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |||||||||||
| CONTRACTOR: | ADDRESS: | ||||||||||
| CITY: | STATE: | ZIP: | |||||||||
| CONTRACT or MODIFICATION FOR (Work to be performed): | PROPOSED CHANGE ORDER TOTAL PRICE: | $ | |||||||||
| QUOTATION/PROPOSAL #: | PROJECT NUMBER: | WORK LOCATION: | |||||||||
| DATE PREPARED: | PROJECT TITLE: | ||||||||||
| UNIT OF MEASURE (2) | QUANTITY (3) | MATERIAL COST | LABOR COSTS | OTHER DIRECT COSTS (9) | LINE TOTAL (10) | ||||||
| UNIT COST ($) | TOTAL (5) | LABOR HOURS (6) | HOURLY RATE (7) | TOTAL (8) | |||||||
| LINE | ITEM | ||||||||||
| NO | |||||||||||
| (1) | |||||||||||
| 1 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 2 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 3 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 4 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 5 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 6 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 7 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 8 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 9 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 10 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 11 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 12 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 13 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 14 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 15 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 16 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 17 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| 18 | 0.00 | $ - 0 | $ - 0 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| TOTALS | PROVIDE OVERHEAD AND PROFIT RATES ON REVERSE | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Cost Breakdown Total
| INSTRUCTIONS FOR COMPLETING CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit | ||||||
| itemizing of all direct costs. | ||||||
| Col 2 Units of Measure. Description of the unit in which each item is to be estimated (examples - square yards - SY, cubic yards - CY, square feet - SF, | ||||||
| linear feet - LF, board feet - BF, each - EA, pound - LB). | ||||||
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be furnished by the | ||||||
| Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, | ||||||
| the contractor is responsible for determining quantity estimates. | ||||||
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of the material to be supplied and total cost (col 5); for item listed in column 1. | ||||||
| Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. | ||||||
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of | ||||||
| significant dollar value. | ||||||
| Col 10 Line Total. Self-explanatory. | ||||||
| NOTE: | In addition to other totals derived on various pages, the grand total of column 10, plus overhead and profit will be shown on the last | |||||
| page as follows | ||||||
| TOTAL MATERIAL COSTS | $ - 0 | (enter total material cost from previous sheet) | ||||
| TOTAL LABOR COSTS | $ - 0 | (enter total labor costs from previous sheet) | ||||
| TOTAL OTHER DIRECT COSTS | $ - 0 | (enter other direct costs from previous sheet) | ||||
| TOTAL DIRECT COSTS | $ - 0 | |||||
| OVERHEAD | 0.00% | (enter your OH rate) | $ - 0 | |||
| SUBTOTAL | $ - 0 | |||||
| PROFIT | 0.00% | (enter your Profit rate) | $ - 0 | |||
| TOTAL PRICE | $ - 0 | |||||
| DATE | FIRM NAME | |||||
| TITLE | BY | |||||
| (Signature) | ||||||
| INSTRUCTIONS TO OFFERORS | ||||||
| 1. | The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and | |||||
| estimated costs (and attached supporting information) suitable for detailed review and analysis. Prior to the award of a contract or mod resulting from | ||||||
| this proposal the offeror may be required to submit a certificate of current cost or pricing data or other than certified cost or pricing date if the | ||||||
| thresholds and requirements of the Truth In Negotiating Act requirement do not apply. | ||||||
| 2. | In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this | |||||
| form any additional data, supporting schedules, or substantiation which are reasonable required for the conduct of an appropriate review and | ||||||
| analysis in the light of the specific facets of this procurement. For effective negotiations, it is essential that there be a clear understanding of | ||||||
| a. | The existing, verifiable data. | |||||
| b. | The judgmental factors applied in projecting from known data to the estimate, and | |||||
| c. | The contingencies used by the offeror in his proposed price. | |||||
| In short, the offeror's estimating process itself needs to be disclosed. | ||||||
| 3. | When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), | |||||
| and made available to the contracting officer his authorized representative upon request. | ||||||
| 4. | By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the | |||||
| purpose of verifying the cost or pricing data submitted, or other than cost or pricing data as the case may be, those books, records, documents | ||||||
| and other supporting data which will permit evaluation of such cost or pricing data, along with the computations and projections used therein. | ||||||
| This right may be exercised in connection with any negotiations prior to contract award or execution of modification. |