Attachment_B_-_Bid_Plans.pdf
PDF 6 MB Posted
- Attached to
- Chase SFL - Drawdown Tower Project
- Solicitation number
- EVT0010359
- Issued by
- Chautauqua County, Kansas
About this file
The document is a set of engineering design plans for the Chase State Fishing Lake Drawdown Tower Improvements project, prepared by the Kansas Department of Wildlife and Parks (KDWP) and engineered by Alfred Benesch & Company. The project is located in Cottonwood Falls, Kansas, and involves comprehensive improvements to the existing dam and lake infrastructure, including replacing the 24" sluice gate and manual actuator, replacing the 4" gate valve and stem, removing rocks and debris from the bottom of the drawdown tower, relocating and extending lake outlet and inlet structures, and clearing approximately 200 feet of drainage channel. The project also includes installing a new locking strap assembly for tower access and CIPP (Cured-In-Place Pipe) lining of the existing 24" outlet pipe.
The design plans provide detailed technical specifications, site layouts, and construction notes, with a total of seven sheets covering title information, general notes, site improvements, and reservoir plans. The project references the 2022 Chase County State Lake Dam Improvements project by CFS Engineers and includes specific instructions for contractors regarding site access, tree removal, drainage channel clearing, and coordination with utility services. The documents indicate careful planning for infrastructure resilience, including precise elevation measurements, drainage area boundaries, and specific construction requirements to minimize environmental impact and ensure proper installation of new infrastructure components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| EVT0010359_-_Drawdown_Tower_Project_-_RFQ.pdf | ||
| Attachment_A_-_Project_Manual.pdf | ||
| Chase_SFL_-_Drawdown_Tower_Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
130648.00
SHEET NO.
DATE
PROJECT
08/15/2023 of
N O
R
E V
I S
I O
N S
K A
N S
A S
D
E P
A R
T M
E N
T
O
F
W
I L D
L I F
E
A N
D
P
A R
K S
C H
A S
E
S
T A
T
F
I S
H I N
G
L A
K E
D R
A W
D O
W N
O W
R
M
P R
O V
E M
E N
T
L
H E
COTTONWOOD FALLS, KANSAS
KANSAS DEPARTMENT OF WILDLIFE AND PARKS
CHASE STATE FISHING LAKE
DRAWDOWN TOWER IMPROVEMENTS
D A
T E
SHEET INDEX
TITLE SHEET
GENERAL NOTES AND CONTROL POINTS
GENERAL LAYOUT
SITE IMPROVEMENTS
SITE DETAILS
EXISTING DAM - PROFILE AND SECTION
RESERVOIR PLAN
N
APPROVED BY:
ALFRED J. TOLOZA, P.E.
BRETT BLACKBURN, CHIEF ENGINEER DATE
DATE
VICINITY MAP
PROJECT CONTACTS
Know what'sbelow.
before you dig.Call
R
ALFRED BENESCH & COMPANY
SUBMITTED BY:
KDWP REGIONAL
OFFICE
KDWP CHIEF
ENGINEER/
REPRESENTATIVE
UTILITY LOCATION
ENGINEER
KANSAS ONE-CALL SYSTEM
TELE. 1-800-344-7233
ALFRED BENESCH & COMPANY
11010 HASKELL AVENUE, SUITE 200
KANSAS CITY, KANSAS 66109
ALFRED TOLOZA, P.E.
913-213-5167
6232 E. 29TH ST. N
WICHITA, KS 67220
TELE. 316-683-8069
BRETT BLACKBURN
1020 KANSAS AVENUE
ROOM 200
TOPEKA, KS 66212-1237
TELE. 785-296-8404
CHASE STATE FISHING LAKE DAM
LOCATION MAP
NOT TO SCALE
NOT TO SCALE
S30-T19S-R8E
DRAINAGE AREA BOUNDARY
(2,690 ACRES OR 4.2 SQ. MILES)
LAKE ROAD
APPROXIMATE LATITUDE/LONGITUDE
WHERE DAM CENTERLINE CROSSES
THE STREAM CENTERLINE:
38.370000, -96.580000
S P
R I N
G
C
R E
K
A
D
S31-T19S-R8E
S06-T20S-R8E
S07-T20S-R8E
S12-T20S-R7E
S1-T20S-R7E
S36-T19S-R7E
S25-T19S-R7E
S26-T19S-R7E
S35-T19S-R7E
S2-T20S-R7E
S11-T20S-R7E
CHASE STATE
FISHING LAKE
A l f r e d
B e n e s c h
C o m p a n y
H a s k e l l
A v e n u e
S u i t e
K a n s a s
C i t y
K a n s a s
DATE
PROJECT
08/15/2023 of
N O
R
E V
I S
I O
N S
K A
N S
P
A R
T M
E N
T
O
F
W
I L D
L I F
E
A N
D
P
A R
K S
C H
A S
E
S
T A
S
H I N
G
L A
K E
D R
A W
D O
W
P R
O V
E M
E N
T S
N
0 100
HORIZONTAL SCALE: 1"=100'
D A
T E
L
A
C
E
A
D
A l f r e d
B e n e s c m p a n y
H a s k e l l
A v e n u e
S u i t e
K a n s a s
C i t y
K a n s a s
G E
N E
R A
L
N
O T
D
C O
N T
R O
L
P
O I N
T S
1. ALL CONSTRUCTION FOR THIS PROJECT SHALL COMPLY WITH THE
SPECFICATIONS WITHIN THE PROJECT MANUAL.
2. CONSTRUCTION STAKING SHALL BE PROVIDED BY THE CONTRACTOR.
3. PRIOR TO ANY CONSTRUCTION ACTIVITIES, CALL 811 - KANSAS ONE-CALL
SYSTEM.
4. THE CONTRACTOR SHALL SUBMIT A PROPOSED CONSTRUCTION
SCHEDULE AT THE PRE-CONSTRUCTION MEETING.
5. UNLESS STATED OTHERWISE IN THE PLANS OR SPECIFICATIONS, ALL
AREAS DISTURBED AND ALL ITEMS DAMAGED BY CONSTRUCTION SHALL
BE RESTORED TO THEIR ORIGINAL CONDITION FOLLOWING THE
COMPLETION OF CONSTRUCTION.
6. THE CONTRACTOR SHALL TEMPORARILY RELOCATE SIGNAGE AS
REQUIRED BY CONSTRUCTION. AT THE END OF CONSTRUCTION,
SIGNAGE SHALL BE INSTALLED AT IT'S ORIGINAL LOCATION OR AS
DIRECTED BY THE ENGINEER.
7. THE CONTRACTOR SHALL DETERMINE EXCAVATION REQUIREMENTS
ACCORDING TO OSHA REGULATIONS.
8. THE CONTRACTOR SHALL REMOVE AND LEGALLY DISPOSE OF ALL
CONSTRUCTION DEBRIS. RUBBLE FROM THE REMOVAL OF
MISCELLANEOUS STRUCTURES, EXCESS EXCAVATION OR PAVEMENT
REMOVAL, WHICH IS TO BE WASTED, SHALL BE DISPOSED OF OFF SITE
AT LOCATIONS PROVIDED BY THE CONTRACTOR. THESE SITES SHALL BE
APPROVED BY THE OWNER AS TO SUITABILITY, APPEARANCE, AND SITE
LOCATION. LOCATIONS THAT, IN THE OPINION OF THE OWNER, WILL
LEAVE AN UNSIGHTLY APPEARANCE OR CONTRIBUTE TO AN
ENVIRONMENTAL HAZARD, WILL NOT BE PERMITTED.
9. MAINTENANCE OF SURFACE DRAINAGE SHALL BE THE RESPONSIBILITY
OF THE CONTRACTOR. THE CONTRACTOR SHALL KEEP TRENCHES
CLEAN AND DRY. OPEN TRENCHES SHALL BE KEPT TO A MINIMUM AND
FENCED AT ALL TIMES THAT THE CONTRACTOR IS NOT ON SITE.
10. TRAFFIC CONTROL SHALL BE PER KDOT STANDARDS AND THE MANUAL
OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
11. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF ALL
PERMITS.
12. THE CONTRACTOR SHALL NOTIFY THE KANSAS DIVISION OF WATER
RESOURCES (DWR) CHIEF ENGINEER, THE KANSAS DEPARTMENT OF
WILDLIFE AND PARKS PROJECT MANAGER, OR KANSAS DEPARTMENT OF
WILDLIFE AND PARKS PUBLIC LANDS MANAGER AT LEAST 48 HOURS
PRIOR TO COMMENCING ANY STAGE OF CONSTRUCTION AND SHALL
OBTAIN APPROVAL OF THE DWR CHIEF ENGINEER BEFORE PROCEEDING
WITH THE FOLLOWING:
12.1. STARTING CONSTRUCTION;
12.2. PLACING BACKFILL AROUND ANY CONDUIT THAT EXTENDS
THROUGH THE DAM EMBANKMENT AND EXITS THE DOWNSTREAM
SLOPE;
12.3. STARTING ANY STAGE OF CONSTRUCTION FOR WHICH THE PERMIT
REQUIRES THAT THE DWR CHIEF ENGINEER SHALL BE NOTIFIED.
12.4. CIPP LINING OF THE OUTLET PIPE.
13. AN INSPECTOR WILL BE PROVIDED BY THE ENGINEER. THE
CONTRACTOR SHALL CONTACT THE INSPECTOR AT LEAST 24 HOURS IN
ADVANCE PRIOR TO BEGINNING CONSTRUCTION. THE INSPECTOR MUST
BE ON THE SITE DURING ALL CONSTRUCTION ACTIVITIES EXCEPT AS
FOLLOWS:
13.1. REMOVAL OF TREES FROM THE UPSTREAM AND DOWNSTREAM
SLOPES
13.2. RESTORATION
CHASE STATE
FISHING LAKE
SURVEY CONTROL (BY OTHERS)
SURVEY CONTROL 21-1064
NAD 83 KRCS ZONE 9
NAVD 88
(SEE KDWP CHASE COUNTY STATE LAKE DAM IMPROVEMENTS
PROJECT (2022) BY CFS ENGINEERS)
CP #101:
SET 5/8" REBAR W/ CAP (CFS CONTROL)
N. 252461.618;E. 9476872.413; EL. 1264.97
1) IN UPPER ℄ DAM TOP
2) TO ℄ TEST STATION 136.23' NW
3) TO SW COR VALVE STRUCTURE 68.77' SE
CP #102
SET 5/8" REBAR W/ CAP (CFS CONTROL)
N. 252997.706;E. 9476139.037; EL. 1261.77
1) IN UPPER ℄ DAM TOP
2) TO SOUTH GATE POST WEST END DAM78.33' WNW
3) TO NORTH GATEPOST WEST END DAM 77.86' NW
BM EC
'SQUARE' CUT SW COR. CONC. VALVE STRUCTURE
EL. 1261.74
GENERAL NOTES:
CONTROL POINTS
CP #101
BM EC
CP #102
T
P
R
I
V
C
E
S
S
LAKE ROAD
ENTRANCE AND EXIT TO
CHASE STATE FISHING LAKE
MAIN CONSTRUCTION
ACCESS ROUTE TO DAM
ALTERNATE CONSTRUCTION
ACCESS ROUTE TO DAM
APPROXIMATE BENCHMARK LOCATIONS
(BY OTHERS)
MAIN CONSTRUCTION ACCESS ROUTE
ALTERNATE CONSTRUCTION ACCESS ROUTE
LEGEND
DATE
PROJECT
08/15/2023 of
N O
R
E V
I S
I O
N S
K A
N S
P
A R
T M
E N
T
O
F
W
I L D
L I F
E
A N
D
P
A R
K S
C H
A S
E
S
T A
S
H I N
G
L A
K E
D R
A W
D O
W
P R
O V
E M
E N
T S
N
0 50
HORIZONTAL SCALE: 1"=50'
D A
T E
C
H
A
A
S
H
I
G
C
E
A
D
A l f r e d
B e n e s c m p a n y
H a s k e l l
A v e n u e
S u i t e
K a n s a s
C i t y
K a n s a s
G
N E
R A
L
L A
Y O
U
DRAWDOWN TOWER (APPROXIMATELY 50-FEET DEEP)
· REPLACE 24" SLUICE GATE AND MANUAL ACTUATOR (SEE SHEET 4)
· REPLACE 4" GATE VALVE AND STEM (SEE SHEET 4)
· REMOVE ROCKS AND DEBRIS FROM BOTTOM OF TOWER (SEE SHEET 4)
SERVICE SPILLWAY
CHASE STATE
FISHING LAKE
LAKE OUTLET STRUCTURE RELOCATION AND
EXTENSION OF 4" DRAIN PIPE AND 24" OUTLET PIPE
(INSTALLED BY OTHERS).
(SEE SHEET 4)
LAKE INLET STRUCTURE
· REMOVE TEMPORARY METAL PLATE AND
RE-INSTALL EXISTING TRASH RACK
(SEE INLET STRUCTURE DETAIL ON SHEET 5)
T
R
I
C
E
S
S
P
R
A
T
H
E
E
K
24" CMP INLET PIPE
· REMOVE SANDBAG FROM PIPE (SEE SHEET 4)
155± LF OF EXISTING 24" CMP OUTLET PIPE AND 15± LF
OF NEW 24" CMP (INSTALLED BY OTHERS)
· CIPP ENTIRE OUTLET PIPE
· REFERENCE AND COORDINATE WITH 2022 CHASE
COUNTY STATE LAKE DAM IMPROVEMENTS
PROJECT BY CFS ENGINEERS
REMOVE NECESSARY TREES FROM
UPSTREAM SLOPE OF DAM.
CONTRACTOR TO RECEIVE APPROVAL
FROM ENGINEER AND OWNER PRIOR
TO REMOVAL OF TREES.
REMOVE NECESSARY TREES FROM
DOWNSTREAM SLOPE OF DAM.
CONTRACTOR TO RECEIVE
APPROVAL FROM ENGINEER AND
OWNER PRIOR TO REMOVAL OF
TREES.
CONTRACTOR TO CLEAR AN
APPROXIMATE 200-FOOT LONG,
20-FOOT WIDE EXISTING DRAINAGE
CHANNEL TO PROVIDE PROPER
DRAINAGE AWAY FROM NEW
OUTLET STRUCTURE TO PRATHER
CREEK WITH 10-FOOT WIDE
MAINTENANCE PATH ON TOP OF
BERM WEST OF DRAINAGE PATH.
CONTRACTOR TO INSTALL
TEMPORARY CONSTRUCTION FENCING
AROUND THE DRAWDOWN TOWER
EXISTING BERM ON DOWNSLOPE SIDE OF DAM
IS APPROXIMATELY 15-FEET WIDE.
DATE
PROJECT
08/15/2023 of
N O
R
E V
I S
I O
N S
K A
N S
P
A R
T M
E N
T
O
F
W
I L D
L I F
E
A N
D
P
A R
K S
C H
A S
E
S
T A
S
H I N
G
L A
K E
D R
A W
D O
W
P R
O V
E M
E N
T S
D A
T E
A l f r e d
B e n e s c m p a n y
H a s k e l l
A v e n u e
S u i t e
K a n s a s
C i t y
K a n s a s
T
E
I M
P R
O V
E M
E N
REMOVE SANDBAG FROM 24" INLET PIPE
DRAWDOWN TOWER IMPROVEMENTS
REMOVE ROCK AND DEBRIS
REMOVE ROCK AND DEBRIS
REPLACE EXISTING SLIDE
GATE AND STEM
(SEE DRAWDOWN TOWER
DETAIL ON SHEET 5)
REPLACE EXISTING SLIDE GATE
ACTUATOR AND PEDESTAL
(SEE DETAIL ON SHEET 5)
TOP OF DRAWDOWN TOWER BOTTOM OF DRAWDOWN TOWER
PLUG INLET PIPE OPENING PRIOR TO
REPLACEMENT OF SLUICE GATE AND
GATE VALVE AND CIPP OF THE 24"
OUTLET PIPE
UTILITY DIVING SERVICES, INC.
SHALL REMOVE SANDBAG
PRIOR TO RE-INSTALLATION OF
THE EXISTING TRASH RACK AS
PART OF THIS PROJECT.
OUTLET STRUCTURE IMPROVEMENTS
OUTLET STRUCTURE
CIPP EXISTING 24" CMP
OUTLET PIPE AND NEW
24" PIPE EXTENSION
(INSTALLED BY OTHERS)
PRIOR TO REPLACEMENT
OF 24" SLUICE GATE
DOWNSTREAM OF
OUTLET STRUCTURE
CONTRACTOR TO GRADE DRAINAGE
CHANNEL DOWNSTREAM OF NEW OUTLET
STRUCTURE IN ORDER TO PREVENT
PONDING AT OUTLET STRUCTURE.
RE-SEED DISTURBED AREAS WITH
APPROVED SEEDING, AS NECESSARY.
SEE SHEET 3 FOR APPROXIMATE
LOCATION FOR GRADING LIMITS.
REPLACE 4" GATE VALVE AND STEM
(SEE DRAWDOWN TOWER
DETAIL ON SHEET 5)
INSTALL LOCKING STRAP ASSEMBLY
FOR EXISTING 4" GATE VALVE
OPERATING NUT ACCESS.
MANUFACTURER TO PROVIDE VALVE
KEYS TO OWNER.
REFERENCE CHASE COUTY STATE LAKE DAM
IMPROVEMENTS PROJECT (2022) BY CFS ENGINEERS FOR
NEW OUTLET STRUCTURE LOCATION AND EXTENSION OF
4" AND 24" DRAIN PIPE AND OUTLET PIPE, RESPECTIVELY.
(SEE EXISTING OUTLET STRUCTURE DETAIL ON SHEET 5)
INSTALL LOCKING STRAP ASSEMBLY
FOR DRAWDOWN TOWER
ACCESS MANHOLE
REFERENCE CHASE COUTY STATE LAKE DAM
IMPROVEMENTS PROJECT (2022) BY CFS ENGINEERS FOR
NEW INSTALLATION OF 4 TONS OF (LIGHT STONE) RIPRAP
AT NEW OUTLET STRUCTURE LOCATION.
DATE
PROJECT
08/15/2023 of
N O
R
E V
I S
I O
N S
K A
N S
P
A R
T M
E N
T
O
F
W
I L D
L I F
E
A N
D
P
A R
K S
C H
A S
E
S
T A
S
H I N
G
L A
K E
D R
A W
D O
W
P R
O V
E M
E N
T S
D A
T E
A l f r e d
B e n e s c m p a n y
H a s k e l l
A v e n u e
S u i t e
K a n s a s
C i t y
K a n s a s
T
E
D
E T
A I
DRAWDOWN TOWER DETAIL CONSTRUCTION NOTES:
1. EXISTING DETAIL COMES FROM THE 1954 RECORD DRAWINGS. THE
ENGINEER AND OWNER ASSUME NO LIABILITY FOR THE ACCURACY OF
THIS DETAIL.
2. INLET PIPE INVERT IN THE DRAWDOWN TOWER TO BE PLUGGED PRIOR
TO STARTING DRAWDOWN TOWER IMPROVEMENTS AND CIPP
INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS FOR THE NEW 24"
SLUICE GATE AND 4" GATE VALVE INSTALLATIONS.
4. CONTRACTOR TO INSTALL SLUICE GATE AND GATE VALVE PER THE
APPROVED MANUFACTURER'S SUBMITTAL AND INSTALLATION
INSTRUCTIONS.
OUTLET STRUCTURE DETAIL
INLET STRUCTURE DETAIL
DRAWDOWN TOWER DETAIL
INLET STRUCTURE DETAIL CONSTRUCTION NOTES:
1. EXISTING DETAIL COMES FROM THE 1954 RECORD DRAWINGS. THE
ENGINEER AND OWNER ASSUME NO LIABILITY FOR THE ACCURACY OF
THIS DETAIL.
2. THE STEEL PLATE THAT WAS INSTALLED IN 2019 SHALL BE REMOVED BY
UTILITY DIVING SERVICES, INC. AND RETURNED TO OWNER.
3. THE EXISTING TRASH RACK SHALL BE RE-INSTALLED BY UTILITY DIVING
SERVICES, INC. ALL NECESSARY MATERIAL FOR RE-INSTALLATION SHALL
BE PROVIDED BY DIVE TEAM.
4. UTILITY DIVING SERVICES, INC. SHALL NOT BEGIN THE REMOVAL OF THE
STEEL PLATE OR INSTALLATION OF THE TRASH RACK UNTIL ALL OTHER
IMPROVEMENTS HAVE BEEN COMPLETED AND APPROVED BY THE
OWNER AND ENGINEER.
OUTLET STRUCTURE DETAIL CONSTRUCTION NOTES:
1. EXISTING DETAIL COMES FROM THE 1954 RECORD DRAWINGS. THE
ENGINEER AND OWNER ASSUME NO LIABILITY FOR THE ACCURACY OF
THIS DETAIL.
2. REFERENCE CHASE COUNTY STATE LAKE DAM IMPROVEMENT PROJECT
(2023) BY CFS ENGINEERS FOR NEW OUTLET STRUCTURE LOCATION AND
EXTENSION OF 4" AND 24" DRAIN PIPE AND OUTLET PIPE, RESPECTIVELY.
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
INSTALL STEM GUIDES
(TYP.)
INSTALL VALVE STEM
COUPLER (TYP.)
EXISTING ACCESS FOR 4" GATE
VALVE OPERATING NUT
INSTALL VALVE STEM FOR NEW
4" RESILIENT WEDGE GATE
VALVE
INSTALL 4" RESILIENT WEDGE
GATE VALVE TO EXISTING 4"
CIP DRAIN PIPE
APPROXIMATE LOCATION OF
EXISTING 4" CIP DRAIN PIPE
INSTALL CHAINS WITH LATCH OR
HOOK TO KEEP OUT UNAUTHORIZED
ACCESS TO TOP OF DRAWDOWN
TOWER STRUCTURE
EXISTING 26" X 34" TRASH RACK
TO BE PROVIDED BY OWNER TO
UTILITY DIVING SERVICES, INC.
INSTALL SLIDE GATE
FRAME AND SLIDE
INSTALL SLIDE GATE
VALVE STEM
REPLACE SLIDE GATE MANUAL
OPERATOR AND PEDESTAL
REPLACE EXISTING WALL
BRACKET FOR NEW SLIDE
GATE MANUAL OPERATOR
AND PEDESTAL
DAM ELEV: 1262.7± @ C/L DAM (LOWEST POINT)
DAM ELEV: 1262.7± @ C/L DAM (LOWEST POINT)
SERVICE SPILLWAY FLOOR ELEV: 1251.4±
ELEV. 1262.7± 8.5' RT. C\L DAM
ELEV. 1262.7± 8.5' LT. C\L DAM
T O
P
O
F
D
D
H
F
T
E L E
V
M
L
O W
E S
T
P
O I N
T
O
F
D
A M
BERM WIDTH = 11-FT±
BERM ELEV. 1252.0±
OUTLET TOWER RIM ELEV. 1261.8±
OUTLET ELEV. 1210.2±
INLET ELEV. 1210.5±
110± LF OF 24" CMP 155± LF OF 24" CMP
CHASE STATE FISHING LAKE
130648.00
SHEET NO.
DATE
PROJECT
08/15/2023 of
N O
R
E V
I S
I O
N S
K A
N S
P
A R
T M
E N
T
O
F
W
I L D
L I F
E
A N
D
P
A R
K S
C H
A S
E
S
T A
S
H I N
G
L A
K E
D R
A W
D O
W
P R
O V
E M
E N
T S
D A
T E
A l f r e d
B e n e s c m p a n y
H a s k e l l
A v e n u e
S u i t e
K a n s a s
C i t y
K a n s a s
X
I S
T I N
G
D
O
F I
HORIZONTAL SCALE: 1"=50'
0 50 100
VERTICAL SCALE: 1"=5'
10+00 11+00
TYPICAL EXISTING DAM SECTION
EXISTING DAM PROFILE
12+00
HORIZONTAL SCALE: 1"=50'
0 50 100
VERTICAL SCALE: 1"=5'
0+00 10+001+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00
12+00 13+00 14+00 15+00
11+0010+00
*EXISTING LOWEST POINT ON TOP OF DAM
**RESERVOIR CAPACITY TABLE DATA FROM 2023 DAM IMPROVEMENT
9+00
PROJECT BY CFS ENGINEERS
NOTE:
1. DAM ELEVATION IS THE PROPOSED LOWEST POINT ON DAM.
(SEE 2023 CHASE COUNTY STATE LAKE DAM IMPROVEMENT
PROJECT CONSTRUCTION PLANS PROVIDED BY CFS
ENGINEERS)
NOTE:
1. DAM ELEVATION IS THE PROPOSED LOWEST POINT ON DAM.
(SEE 2023 CHASE COUNTY STATE LAKE DAM IMPROVEMENT
PROJECT CONSTRUCTION PLANS PROVIDED BY CFS
ENGINEERS)
0+00
DATE
PROJECT
08/15/2023 of
N O
R
E V
I S
I O
N S
K A
N S
P
A R
T M
E N
T
O
F
W
I L D
L I F
E
A N
D
P
A R
K S
C H
A S
E
S
T A
S
H I N
G
L A
K E
D R
A W
D O
W
P R
O V
E M
E N
T S
D A
T E
A l f r e d
B e n e s c m p a n y
H a s k e l l
A v e n u e
S u i t e
K a n s a s
C i t y
K a n s a s
S E
R V
O
0 200
HORIZONTAL SCALE: 1"=200'
CHASE STATE
FISHING LAKE
SPILLWAY CREST ELEV. = 1251.4±
DRAWDOWN
TOWER
OUTLET
STRUCTURET
C
E
A
D
T
E
DESIGN STORM
WATER SURFACE ELEV. = 1259.4±
NOTE:
1. TOP OF DAM ELEVATION IS THE PROPOSED LOWEST POINT ON DAM.
(SEE 2023 CHASE COUNTY STATE LAKE DAM IMPROVEMENT
PROJECT CONSTRUCTION PLANS PROVIDED BY CFS ENGINEERS)
2. CONTOURS SHOWN IN PLAN VIEW ARE 2-FT CONTOURS.
| Sheets and Views |
| 1 Title Sheet |
| 2 General Notes and Control Points |
| 3 General Layout |
| 4 Site Improvements |
| 5 Site Details |
| 6 Existing Dam Profile |
| 7 Reservoir Plan |
File details come from the government source that posted it. Updated .