Attachment B_Acceptable Quality Level.pdf
PDF 121 KB Posted
- Solicitation number
- 19AQMM25N0064
About this file
This document is an Acceptable Quality Level (AQL) attachment that outlines specific performance requirements and standards for a federal contract, likely related to satellite communications equipment. The document details six key performance areas: On-time Delivery (99% of orders delivered within 45 days), Repair and Return (99.5% of items repaired correctly within 30 days), Warranty Support (90% of single unit items must operate properly), Certificate of Conformity, Counterfeit Parts Prevention, and Limited Life Materials requirements.
Notable technical specifications include requirements for product traceability, manufacturing and expiry date documentation, and strict guidelines for electrical and electronic components. The document mandates that suppliers provide detailed Certificates of Conformity, ensure full traceability of procurement sources, maintain product quality, and report any faulty products within 30 days of discovery. Specific provisions address potential issues like obsolescence of components, requirement for original unaltered products, and compliance with the John S. McCain National Defense Authorization Act for Fiscal Year 2019.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| US Dept of State Sources Sought Notice GTC 2025.pdf | ||
| Attachment A_REACH Legacy Equipment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requirement Acceptable Quality Level
On-time Delivery
Deliver 99% of all orders on time (within 45 days of placing the order). The contractor is responsible for informing the COR in writing if delivery will be delayed for any reason. The contractor shall provide a reason for the delay no later than 10 days before the order’s due date
Repair and Return
Repair 99.5% of all items returned for repair correctly and within 30 days of receipt.
The contractor shall inform the COR no later than 3 days prior to the repair’s due date and provide a reason for the delay.
Warranty Support
90% of all single unit items shall operate properly in accordance with contract and product specifications during the warranty period.
If it is determined that ten percent or more of the new radios are not meeting the manufacturer’s specifications (and the contract requirements) the Contractor shall pay for all transportation (to and from the government facility) and correct the deficiencies at no cost to the Government.
In addition, the Contractor shall submit a plan to correct the deficiencies within 14 days of notification and the Government will approve the plan within 14 days of receipt. The contractor shall implement the plan within 90 days of notification.
Certificate of Conformity
The supplier shall provide for each supply a Certificate of Conformity (CoC) certifying that the product complies with the contractual requirements. The CoC shall include the following information as a minimum:
• Reference to the REACH PO number
• Manufacturer’s Part Number
• Applicable data for product traceability (quantity, S/N, batch nr, manufacturing date, … etc.)
• Explicit declaration of compliance with contractual requirements
• Shipment date of the supply
• Compliance with John S. McCain National Defense Authorization Act for Fiscal Year 2019 - Sec 889
Counterfeit Parts
To prevent the supply of counterfeit parts, the supplier shall ensure REACH has the full traceability of the sources used for the procurement of materials and components, and the availability of the related documentation chain.
Limited Life Materials
Residual life:
Unless otherwise requested in the PO, limited life materials shall have, upon receipt in REACH, a residual life of not less than 80% of the useful life indicated by the manufacturer.
Manufacturing and Expiry Date:
In the case of limited life materials, the manufacturing date and the expiry date shall be indicated on the product or on the packaging of each individual item.
Acceptance of the Supply
The supplier will conduct final tests to certify the conformity of the supply to the PO requirements.
Reporting Of Faulty Products
The supplier shall notify REACH, within 30 days of discovery of any defects found on products already delivered previously. The requirement applies to all possible defects detected by the manufacturer, the distributor (if different from the manufacturer), or other users of the same product.
Specific Requirements for Electrical and Electronic Components
Date of shipment:
Unless otherwise indicated in the PO, less than 1 year shall have elapsed between the manufacturing date and the shipping date.
Obsolescence:
For electrical / electronic components that have entered the obsolescence phase, it is required that this status be declared together with the production end date.
Requirements for the distributor
Original products:
The products supplied shall be original and shall not be subject to alteration or modification respect to those made by the manufacturer.
File details come from the government source that posted it. Updated .