About this file

This document outlines design submission requirements for a 95% design development package for a federal construction project. The required deliverables include narrative reports updating the 65% design submission and identifying potential bid alternatives and recommended construction phasing. It also requires full-size and half-size AutoCAD drawings, updated cost estimates by specification section and VA criteria, custom edited master specifications and submittal list, color boards showing interior design schemes for approval, and drawings and specifications in AutoCAD, PDF and Word formats provided on CDs and via FTP site.

The related federal contract opportunity is to provide design services to correct findings from a Facility Condition Assessment and modernize the electrical system at a Veterans Affairs medical center. Services will include schematics, design development, construction documents, technical specifications, construction period services, site visits, cost estimates, as-built documentation and other information for the project. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6.

View the file

Other files for this federal contract opportunity

Other files attached to C222--Correct FCA Electrical Gaps, newest first.
File Type Posted
Attachment D 659-24-900.pdf PDF
36C24624R0035.docx DOCX document
Attachment E 659-24-900.pdf PDF
Attachment C 659-24-900.pdf PDF
Attachment A 659-24-900.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B 659‐24‐900

Design Development 95% Submission Requirements

Deliver the following (labeled with 95% submission) and include this attachment as a checklist with your submission:

2 copies of a narrative report forwarding the design develop 65% submission addressing items listed in the design requirements and any additional A/E recommendations. The report should include identifying potential bid deduct alternatives, recommended construction phasing based upon discussions with the program manager and any design calculations or analysis.

3 sets of all drawings updating all previous comments required by project produced on Auto

CAD 2013/2019 software. Provide 2 full size sets and 1 half size set of working drawings.

2 copies of updated itemized cost estimate by spec section or trade (labor, material and equipment) and also by VA criteria, NRM, Minor, BSER and BSEA.

2 copies of custom edited VA Master Specifications of sections to be used for this project and a master submittal list identifying all the submittals required to be submitted by the contractor for review.

1 copy of each color board showing the finalized interior design scheme (fabrics, finishes, furniture layout and plans) for each area, include an inventory of materials/manufacturers recommended for use for approval and prepared for order by the VA Interior Designer, if modifications of finished spaces are required for the completion of this project (depending upon chosen phasing scheme).

1 copy of drawings in AutoCAD 2013/2019 and PDF format, and specifications in Microsoft

Word 2010/2019 on (CD)

1 copy of drawings in AutoCAD 2013/2019 and in PDF and specifications in Microsoft Word

2010 on AE FTP Site. All CAD drawings are to be bound files with the engineering / architect stamps removed.

Provide 2 CDs of entire submittal package with delivery of hard copy design layouts and documents