This document is an attachment to a federal solicitation for the Replacement of the Fiberglass Chilled Water Piping in Building 170 at the Eugene J. Towbin Veterans Affairs Healthcare Center, Project #598-22-151. The solicitation is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with an anticipated contract award date of approximately 30 days or less after receipt of proposals. The recommended period of performance is 365 calendar days after issuance of the Notice to Proceed. The Contractor will be responsible for providing all necessary services to meet the project objectives and requirements and to provide the required outcome in terms of overall quality, timeliness and documentation. The magnitude of construction is between $5,000,000.00 and $10,000,000.00, and the NAICS code is 236220 Commercial and Institutional Building Construction. Interested offerors must register in the System for Award Management (SAM) database and have the Veterans Small Business Certification.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E.G.W.
COVER SHEET
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114
Revisions: Date:
CENTRAL ARKANSAS VETERANS
HEALTHCARE SYSTEM
D.L.E.
598-22-151
GI-01
FIBERGLASS PIPING
REPLACEMENT B170
BID DOCUMENTS
06/24/2024
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
N/A
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS
AutoCAD SHX Text
EUGENE J. TOWBIN VA HEALTHCARE CENTER
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text
PROJECT NO. 598-22-151
AutoCAD SHX Text
NORTH LITTLE ROCK, AR
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
LOCATION MAP SCALE: NOT TO SCALE
AutoCAD SHX Text
FIBERGLASS PIPING REPLACEMENT B170
AutoCAD SHX Text
FAYETTEVILLE
AutoCAD SHX Text
JONESBORO
AutoCAD SHX Text
EL DORADO
AutoCAD SHX Text
PROJECT LOCATION LITTLE ROCK, AR
AutoCAD SHX Text GENERAL GI-01 COVER SHEET COVER SHEET CIVIL CS-01 CAMPUS SITE PLAN CAMPUS SITE PLAN PHASING GC-100 BUILDING 170 GROUND FLOOR PHASING PLAN 1 BUILDING 170 GROUND FLOOR PHASING PLAN 1 GC-101 BUILDING 170 GROUND FLOOR PHASING PLAN 2 BUILDING 170 GROUND FLOOR PHASING PLAN 2 GC-102 BUILDING 170 GROUND FLOOR PHASING PLAN 3 BUILDING 170 GROUND FLOOR PHASING PLAN 3 GC-103 BUILDING 170 GROUND FLOOR PHASING PLANS 4 & 5 BUILDING 170 GROUND FLOOR PHASING PLANS 4 & 5 GC-104 BUILDING 170 GROUND FLOOR PHASING PLAN 6 BUILDING 170 GROUND FLOOR PHASING PLAN 6 GC-105 BUILDING 170 GROUND FLOOR PHASING PLAN 7 BUILDING 170 GROUND FLOOR PHASING PLAN 7 GC-106 BUILDING 170 GROUND FLOOR PHASING PLAN 8 BUILDING 170 GROUND FLOOR PHASING PLAN 8 GC-107 BUILDING 170 FIRST FLOOR PHASING PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR PHASING PLANS 1,2,3,4 & 5 GC-108 BUILDING 170 FIRST FLOOR PHASING PLAN 6 BUILDING 170 FIRST FLOOR PHASING PLAN 6 GC-109 BUILDING 170 FIRST FLOOR PHASING PLAN 7 BUILDING 170 FIRST FLOOR PHASING PLAN 7 GC-110 BUILDING 170 SECOND FLOOR PHASING PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR PHASING PLANS 1,2,3,4,5,6,7,8 & 9 GC-111 BUILDING 170 THIRD FLOOR PHASING PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR PHASING PLANS 1,2,3,4,5,6,7,8 & 9 GC-112 BUILDING 170 ROOF PHASING PLANS 1,2,3,4,5 & 6 BUILDING 170 ROOF PHASING PLANS 1,2,3,4,5 & 6 GC-113 BUILDING 170 ROOF PHASING PLANS 7,8 & 9 BUILDING 170 ROOF PHASING PLANS 7,8 & 9 ICRA ICRA-01 ICRA & LIFE SAFETY GENERAL REQUIREMENTS ICRA & LIFE SAFETY GENERAL REQUIREMENTS ICRA-02 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 1 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 1 ICRA-03 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 2 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 2 ICRA-04 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 3 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 3 ICRA-05 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLANS 4 & 5 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLANS 4 & 5 ICRA-06 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 6 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 6 ICRA-07 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 7 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 7 ICRA-08 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 8 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 8 ICRA-09 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4 & 5 ICRA-10 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLAN 6 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLAN 6 ICRA-11 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLAN 7 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLAN 7 ICRA-12 BUILDING 170 SECOND FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4,5,6,7,8 & 9 ICRA-13 BUILDING 170 THIRD FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4,5,6,7,8 & 9
AutoCAD SHX Text MECHANICAL M-001 GENERAL MECHANICAL SYMBOLS & NOTES GENERAL MECHANICAL SYMBOLS & NOTES M-002 GENERAL MECHANICAL ABBREVIATIONS GENERAL MECHANICAL ABBREVIATIONS MD-100 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 1 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 1 MD-101 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 2 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 2 MD-102 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 3 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 3 MD-103 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLANS 4 & 5 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLANS 4 & 5 MD-104 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 6 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 6 MD-105 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 7 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 7 MD-106 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 8 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 8 MD-107 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4 & 5 MD-108 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN 6 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN 6 MD-109 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN 7 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN 7 MD-110 BUILDING 170 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 MD-111 BUILDING 170 THIRD FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 MD-112 BUILDING 170 ROOF MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5 & 6 BUILDING 170 ROOF MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5 & 6 MD-113 BUILDING 170 ROOF MECHANICAL PIPING DEMOLITION PLANS 7,8 & 9 BUILDING 170 ROOF MECHANICAL PIPING DEMOLITION PLANS 7,8 & 9 MH-100 BUILDING 170 GROUND FLOOR MECHANICAL HVAC NEW WORK PLAN BUILDING 170 GROUND FLOOR MECHANICAL HVAC NEW WORK PLAN MP-100 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 1 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 1 MP-101 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 2 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 2 MP-102 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 3 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 3 MP-103 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLANS 4 & 5 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLANS 4 & 5 MP-104 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 6 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 6 MP-105 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 7 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 7 MP-106 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 8 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 8 MP-107 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4 & 5 MP-108 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN 6 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN 6 MP-109 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN 7 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN 7 MP-110 BUILDING 170 SECOND FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 MP-111 BUILDING 170 THIRD FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 MP-112 BUILDING 170 ROOF MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5 & 6 BUILDING 170 ROOF MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5 & 6 MP-113 BUILDING 170 ROOF MECHANICAL PIPING NEW WORK PLANS 7,8 & 9 BUILDING 170 ROOF MECHANICAL PIPING NEW WORK PLANS 7,8 & 9 MP-500 MECHANICAL DETAILS 1 MECHANICAL DETAILS 1 MP-501 MECHANICAL DETAILS 2 MECHANICAL DETAILS 2 MP-502 MECHANICAL DETAILS 3 MECHANICAL DETAILS 3 MP-600 MECHANICAL SCHEDULES MECHANICAL SCHEDULES MI-601 DDC- CONTROL POINTS LIST & MECHANICAL SCHEDULES DDC- CONTROL POINTS LIST & MECHANICAL SCHEDULES MI-602 CONTROL SCHEMATICS & SEQUENCE CONTROL SCHEMATICS & SEQUENCE ELECTRICAL E-001 GENERAL ELECTRICAL SYMBOLS, NOTES & ABBREVIATIONS GENERAL ELECTRICAL SYMBOLS, NOTES & ABBREVIATIONS ED-100 BUILDING 170 GROUND FLOOR ELECTRICAL DEMOLITION PLAN BUILDING 170 GROUND FLOOR ELECTRICAL DEMOLITION PLAN EP-100 BUILDING 170 GROUND FLOOR ELECTRICAL NEW WORK PLAN BUILDING 170 GROUND FLOOR ELECTRICAL NEW WORK PLAN E-500 ELECTRICAL DETAILSELECTRICAL DETAILS
AutoCAD SHX Text HAZARDOUS MATERIALS HA-001 GENERAL ASBESTOS SYMBOLS & NOTES GENERAL ASBESTOS SYMBOLS & NOTES HA-002 BUILDING 170 GROUND FLOOR RISER/CHASE LOCATIONS BUILDING 170 GROUND FLOOR RISER/CHASE LOCATIONS HA-003 BUILDING 170 FIRST FLOOR RISER/CHASE LOCATIONS BUILDING 170 FIRST FLOOR RISER/CHASE LOCATIONS HA-004 BUILDING 170 SECOND FLOOR RISER/CHASE LOCATIONS BUILDING 170 SECOND FLOOR RISER/CHASE LOCATIONS HA-005 BUILDING 170 THIRD FLOOR RISER/CHASE LOCATIONS BUILDING 170 THIRD FLOOR RISER/CHASE LOCATIONS HA-100 BUILDING 170 GROUND FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4,5,6 & 7 BUILDING 170 GROUND FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4,5,6 & 7 HA-101 BUILDING 170 FIRST FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4 & 5 HA-102 BUILDING 170 FIRST FLOOR ASBESTOS ABATEMENT PLANS 6,7,8 & 9 BUILDING 170 FIRST FLOOR ASBESTOS ABATEMENT PLANS 6,7,8 & 9 HA-103 BUILDING 170 SECOND FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4 & 5 BUILDING 170 SECOND FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4 & 5 HA-104 BUILDING 170 SECOND FLOOR ASBESTOS ABATEMENT PLANS 6,7,8 & 9 BUILDING 170 SECOND FLOOR ASBESTOS ABATEMENT PLANS 6,7,8 & 9 HA-105 BUILDING 170 THIRD FLOOR ASBESTOS ABATEMENT PLANS 1,2,3 & 4 BUILDING 170 THIRD FLOOR ASBESTOS ABATEMENT PLANS 1,2,3 & 4 HA-106 BUILDING 170 THIRD FLOOR ASBESTOS ABATEMENT PLANS 5,6,7,8 & 9 BUILDING 170 THIRD FLOOR ASBESTOS ABATEMENT PLANS 5,6,7,8 & 9 ARCHITECTURAL AD-100 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 1 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 1 AD-101 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 2 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 2 AD-102 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 3 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 3 AD-103 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLANS 4 & 5 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLANS 4 & 5 AD-104 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 6 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 6 AD-105 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 7 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 7 AD-106 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 8 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 8 AD-107 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4 & 5 AD-108 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN 6 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN 6 AD-109 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN 7 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN 7 AD-110 BUILDING 170 SECOND FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 AD-111 BUILDING 170 THIRD FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 AE-100 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 1 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 1 AE-101 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 2 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 2 AE-102 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 3 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 3 AE-103 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLANS 4 & 5 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLANS 4 & 5 AE-104 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 6 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 6 AE-105 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 7 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 7 AE-106 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 8 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 8 AE-107 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4 & 5 AE-108 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLAN 6 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLAN 6 AE-109 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLAN 7 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLAN 7 AE-110 BUILDING 170 SECOND FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 AE-111 BUILDING 170 THIRD FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 FIRE PROTECTION FX-001 GENERAL FIRE PROTECTION NOTES GENERAL FIRE PROTECTION NOTES
K.E.B.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114
Revisions: Date:
CENTRAL ARKANSAS VETERANS
HEALTHCARE SYSTEM
D.L.E.
598-22-151
CS-01
FIBERGLASS PIPING
REPLACEMENT B170
BID DOCUMENTS
06/24/2024
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
N/A
CAMPUS SITE PLAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
VAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FORT ROOTS HISTORICAL GROUNDS
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
NORTH DRIVE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
HILL ROAD
AutoCAD SHX Text
EAST DRIVE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
MAIN CIRCLE DRIVE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
SCENIC DRIVE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
THIRD STREET
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
GOLF COURSE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
FIRST STREET
AutoCAD SHX Text
CYPRESS STREET
AutoCAD SHX Text
ATHLETIC FIELD
AutoCAD SHX Text
PINE STREET
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
FOURTH STREET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LAYDOWN AREA
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
KEY SYMBOL AREA OF WORK
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CAMPUS SITE PLAN
AutoCAD SHX Text 1"=120'
AutoCAD SHX Text
AutoCAD SHX Text
CS-01
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING DIRECTORY
AutoCAD SHX Text 1.
AutoCAD SHX Text
ENGINEERING OFFICES
AutoCAD SHX Text 7.
AutoCAD SHX Text
ENG. TRAINING CTR. STORAGE
AutoCAD SHX Text 26.
AutoCAD SHX Text
ENGINEERING SHOPS
AutoCAD SHX Text 34.
AutoCAD SHX Text
ENGINEERING TRAINING CENTER
AutoCAD SHX Text 37.
AutoCAD SHX Text
HUMAN RESOURCES MANAGEMENT
AutoCAD SHX Text 58.
AutoCAD SHX Text
X-RAY TRAINING & SWITCHBOARD
AutoCAD SHX Text 65.
AutoCAD SHX Text
REGIONAL OFFICE
AutoCAD SHX Text 66.
AutoCAD SHX Text
EYE CLINIC, PHARMACY, COMPENSATION & PENSION, IMAGING
AutoCAD SHX Text 68.
AutoCAD SHX Text
ADMINISTRATION; CENTRAL BUSINESS OFFICE; COMMUNITY CARE; EEO
AutoCAD SHX Text 69.
AutoCAD SHX Text
BOILER PLANT
AutoCAD SHX Text 76.
AutoCAD SHX Text
INPATIENT DINING FACILITY
AutoCAD SHX Text 80.
AutoCAD SHX Text
ENGINEERING SHOPS
AutoCAD SHX Text 89.
AutoCAD SHX Text
PROSTHETICS & SENSORY AIDS
AutoCAD SHX Text 101.
AutoCAD SHX Text M.H.S., O.R.M., E.M.P.
AutoCAD SHX Text 102.
AutoCAD SHX Text
OFFICE OF INFO. MANAGEMENT
AutoCAD SHX Text 103.
AutoCAD SHX Text
STAFF EDUCATION/NEW EMPLOYEE ORIENTATION
AutoCAD SHX Text 105.
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text 111.
AutoCAD SHX Text
AUDIOLOGY & SPEECH PATHOLOGY
AutoCAD SHX Text 115.
AutoCAD SHX Text
ENGINEERING SHOPS
AutoCAD SHX Text 159.
AutoCAD SHX Text
LAUNDRY
AutoCAD SHX Text 170.
AutoCAD SHX Text
EUGENE J. TOWBIN HEALTHCARE CENTER
AutoCAD SHX Text 182.
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text 190.
AutoCAD SHX Text
VA LAW ENFORCEMENT TRAINING CENTER
AutoCAD SHX Text 191.
AutoCAD SHX Text
SECURITY TRAINING CENTER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
480 FT
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114
Revisions: Date:
CENTRAL ARKANSAS VETERANS
HEALTHCARE SYSTEM
D.L.E.
598-22-151
GC-100
FIBERGLASS PIPING
REPLACEMENT B170
BID DOCUMENTS
06/24/2024
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
BUILDING 170 GROUND FLOOR
PHASING PLAN 1
AutoCAD SHX Text
CGH1-170 CORRIDOR
AutoCAD SHX Text
CGM1-170 VESTIBULE
AutoCAD SHX Text
CGK1-170 CORRIDOR
AutoCAD SHX Text
GJ100-170 MEDICAL RECORDS
AutoCAD SHX Text
GJ100B-170 BREAKROOM
AutoCAD SHX Text
GJ100D-170 FILE SUPERVISOR
AutoCAD SHX Text
GJ100C-170 SCANNERS
AutoCAD SHX Text
GJ101-170 MECH. ROOM
AutoCAD SHX Text
GJ100E-170 MEDICAL RECORDS
AutoCAD SHX Text
GJ100EA-170 MECH. ROOM
AutoCAD SHX Text
GJ104-170 POWER ROOM
AutoCAD SHX Text
GJ103-170 MECH ROOM
AutoCAD SHX Text
GJ103A-170 ALARM ROOM
AutoCAD SHX Text
GJ103B-170 OFFICE
AutoCAD SHX Text
GJ102-170 HOLDING DOCK
AutoCAD SHX Text
GH109B-170 STORAGE
AutoCAD SHX Text
GH121A-170 VAVS RECREATION
AutoCAD SHX Text
CGJ1-170 CORRIDOR
AutoCAD SHX Text
GH115-170 WOMEN'S RR
AutoCAD SHX Text
GH116-170 MEN'S RR
AutoCAD SHX Text
GJ106-170 JANITOR
AutoCAD SHX Text
GJ105B-170 STORAGE
AutoCAD SHX Text
GJ105A-170 OFFICE
AutoCAD SHX Text
GJ105-170 BOWLING ALLEY
AutoCAD SHX Text
GH114A-170 SECRETARY
AutoCAD SHX Text
GH114B-170 C.U. MANAGER
AutoCAD SHX Text
GH114-170 SECRETARY
AutoCAD SHX Text
GH109-170 CHAPEL
AutoCAD SHX Text
CGJ2-170 CORRIDOR
AutoCAD SHX Text
CGJ3-170 VESTIBULE
AutoCAD SHX Text
GH122-170 STORAGE
AutoCAD SHX Text
GH123-170 VAVS/HV
AutoCAD SHX Text
GH110-170 SACRISTY
AutoCAD SHX Text
GH114C-170 STAFF OFFICE
AutoCAD SHX Text
GH114D-170 STORAGE
AutoCAD SHX Text
GJ100A-170 FILTER ROOM
AutoCAD SHX Text
LOADING DOCK
AutoCAD SHX Text
SG12-170 STAIR 12
AutoCAD SHX Text
ELEV. P-5
AutoCAD SHX Text
ELEV. P-6
AutoCAD SHX Text
AutoCAD SHX Text
AHU-19
AutoCAD SHX Text
AutoCAD SHX Text
AHU-10
AutoCAD SHX Text
CWP
AutoCAD SHX Text
EX
AutoCAD SHX Text
CWP
AutoCAD SHX Text
EX
AutoCAD SHX Text
VFD
AutoCAD SHX Text
EX
AutoCAD SHX Text
VFD
AutoCAD SHX Text
EX
AutoCAD SHX Text
6" CHS,CHR
AutoCAD SHX Text
GJ102A-170
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
MATCHLINE 1/GC-106 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
MATCHLINE 1/GC-101 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
PHASING PLAN 1
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
GC-100
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text 1"=200'
AutoCAD SHX Text
GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING 170
AutoCAD SHX Text
8" CHS,CHR
AutoCAD SHX Text
10" CHS,CHR
AutoCAD SHX Text
2" CHS,CHR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
24 FT
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text I.
AutoCAD SHX Text PHASE ONE SHALL OCCUR DURING THE FIRST HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES SHALL BE INSTALLED THROUGHOUT THE SYSTEM DURING THIS PHASE.
AutoCAD SHX Text
II.
AutoCAD SHX Text PHASE TWO SHALL OCCUR DURING THE COOLING SEASON (APRIL THROUGH OCTOBER). DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES INSTALLED DURING PHASE ONE SHALL BE UTILIZED TO ISOLATE INDIVIDUAL SECTIONS OF PIPING AND LIMIT SYSTEM INTERRUPTIONS DURING PIPING REPLACEMENT.
AutoCAD SHX Text
III.
AutoCAD SHX Text PHASE THREE SHALL OCCUR DURING THE SECOND HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING.
AutoCAD SHX Text
IV.
AutoCAD SHX Text PIPING IN ANY PHASE CANNOT BE DEMOLISHED UNLESS REPLACEMENT PIPING AND ALL ASSOCIATED APPURTENANCES REQUIRED FOR INSTALLATION ARE ONSITE PRIOR TO THE BEGINNING OF DEMOLITION.
AutoCAD SHX Text V.
AutoCAD SHX Text ALL SPECIFIED CHILLED WATER PIPING WITHIN WORK AREA SHALL BE DRAINED COMPLETELY PRIOR TO DEMOLITION.
AutoCAD SHX Text
VI.
AutoCAD SHX Text CONTRACTOR SHALL COORDINATE PHASING PLANS WITH MECHANICAL DEMOLITION, MECHANICAL NEW WORK, AND ALL OTHER ASSOCIATED DISCIPLINES.
AutoCAD SHX Text
VII.
AutoCAD SHX Text HEATING AND COOLING SEASONS NOTED ARE ANTICIPATED. HEATING AND COOLING SEASON CHANGEOVERS MUST BE CLOSELY MONITORED WITH THE VA COR.
AutoCAD SHX Text
VIII.
AutoCAD SHX Text REFER TO MECHANICAL NEW WORK PLANS FOR ISOLATION VALVE INSTALLATION LOCATIONS TO OCCUR DURING PHASE ONE.
AutoCAD SHX Text
IX.
AutoCAD SHX Text INSTALLATION OF ISOLATION VALVES DURING PHASE ONE SHALL OCCUR AFTER HOURS ON WEEKDAYS (5:00PM TO 5:00AM) OR ON WEEKENDS.
AutoCAD SHX Text X.
AutoCAD SHX Text PIPING SHOWN IN PHASING PLANS IS EXISTING. REFER TO NEW WORK PLANS FOR PIPING LOCATIONS AND SIZES.
AutoCAD SHX Text
XI.
AutoCAD SHX Text PIPING WILL BE REPLACED STARTING WITH THE EASTWARD BRANCH LEAVING ROOM GJ100 DURING PHASE TWO AND WILL CONTINUE TO FOLLOW THE MAIN DISTRIBUTION UNTIL THE ENTIRETY OF THE GROUND FLOOR LOOP IS REPLACED. ISOLATION VALVES FOR EACH SECTION OF PIPING WILL BE OPENED AFTER REPLACEMENT IS COMPLETE OF EACH INDIVIDUAL SECTION TO PREVENT SYSTEM DOWNTIME.
AutoCAD SHX Text
XII.
AutoCAD SHX Text THE BYPASS LOCATED IN CORRIDOR CGE1 WHICH CONNECTS THE NORTHERN AND EASTWARD BRANCHES SHOWN LEAVING ROOM GJ100 SHALL BE UTILIZED DURING PHASE TWO TO FEED SYSTEM FROM BOTH DIRECTIONS WHILE INDIVIDUAL SECTIONS OF PIPING ARE BEING REPLACED.
AutoCAD SHX Text
XIII.
AutoCAD SHX Text CONTRACTOR SHALL DEVELOP A PCRA PLAN FOR EACH PHASE OF THE PROJECT PRIOR TO THE START OF WORK.
AutoCAD SHX Text
HATCH LEGEND
AutoCAD SHX Text
DENOTES PHASE 1
AutoCAD SHX Text
DENOTES PHASE 2
AutoCAD SHX Text
DENOTES PHASE 3
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text NOTED PIPING SHALL REPLACED DURING JANUARY OF PHASE ONE TO MINIMIZE THE IMPACT OF HAVING THE AIR HANDLING UNIT OFFLINE DURING REPLACEMENT.
AutoCAD SHX Text ISOLATION VALVES INSTALLED IN THIS SECTION OF PIPING DURING PHASE ONE SHALL BE UTILIZED TO REPLACE THIS SECTION OF PIPING FIRST AT THE START OF PHASE TWO.
AutoCAD SHX Text
PIPING SHALL BE UTILIZED TO FEED GROUND FLOOR PIPING DURING PHASE TWO.
AutoCAD SHX Text
AutoCAD SHX Text
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114
Revisions: Date:
CENTRAL ARKANSAS VETERANS
HEALTHCARE SYSTEM
D.L.E.
598-22-151
GC-101
FIBERGLASS PIPING
REPLACEMENT B170
BID DOCUMENTS
06/24/2024
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
BUILDING 170 GROUND FLOOR
PHASING PLAN 2
AutoCAD SHX Text
GK111-170 PROGRAM SUPPORT CLERK
AutoCAD SHX Text
GK111B-170 FILE ROOM
AutoCAD SHX Text
CGL1-170 CORRIDOR
AutoCAD SHX Text
GL109-170 RETAIL STORAGE
AutoCAD SHX Text
GL111-170 SOILED LINEN RM
AutoCAD SHX Text
GL112-170 TRASH CHUTE RM
AutoCAD SHX Text
CGM2-170 SERVICE VEST
AutoCAD SHX Text
GK102-170 ELECTRICAL
AutoCAD SHX Text
GK101-170 TELEPHONE
AutoCAD SHX Text
GK100-170 HAC
AutoCAD SHX Text
GK103-170 CLEAN LINEN ROOM
AutoCAD SHX Text
GK109-170 GENRTR RM
AutoCAD SHX Text
SG13-170 STAIR 13
AutoCAD SHX Text
CGK3-170 VEST
AutoCAD SHX Text
GK104-170 MECH ROOM
AutoCAD SHX Text
GK106-170
AutoCAD SHX Text
GK108-170 BMS SUPPLY ROOM
AutoCAD SHX Text
CGK2-170 CORRIDOR
AutoCAD SHX Text
GP101-170 ELEV EQUIP ROOM
AutoCAD SHX Text
CGP1-170 CORRIDOR
AutoCAD SHX Text
GP100-170 OXYGEN STOR
AutoCAD SHX Text
SG14-170 STAIR 14
AutoCAD SHX Text
CGP2-170 VEST
AutoCAD SHX Text
GK113-170 SUPPLY & DISTRIBUTION INVENTORY MGMNT TEAM
AutoCAD SHX Text
GK113D-170 SPD CLEANING STORAGE
AutoCAD SHX Text
GK113C-170 SPD MEDICAL STORAGE
AutoCAD SHX Text
GK113A-170 MATERIAL MGMNT OFFICE
AutoCAD SHX Text
GK106A-170 MECH ROOM
AutoCAD SHX Text
GK106-170 PLUMBING SHOP/MECH ROOM
AutoCAD SHX Text
GK107-170 TELEPHONE EQUIP ROOM
AutoCAD SHX Text
GK105-170 ELECTRICAL
AutoCAD SHX Text
GL118-170 VEST
AutoCAD SHX Text
GL118B-170 MEN'S RESTROOM
AutoCAD SHX Text
GL117B-170 WOMEN'S RESTROOM
AutoCAD SHX Text
CGL2-170 SERVICE VEST
AutoCAD SHX Text
GL113-170 HAC
AutoCAD SHX Text
GL117-170 WOMEN'S LOUNGE
AutoCAD SHX Text
GK111D-170 INTERVIEW RM.
AutoCAD SHX Text
GK111E-170 CRIMINAL INVESTIGATOR
AutoCAD SHX Text
GK111F-170 CHIEF OF POLICE
AutoCAD SHX Text
GK111C-170 STORAGE
AutoCAD SHX Text
GK111A-170 ARMS ROOM
AutoCAD SHX Text
GK111G-170 ASSIS'T CHIEF
AutoCAD SHX Text P-S-14
AutoCAD SHX Text
CGN2-170 VESTIBULE
AutoCAD SHX Text L-S-11
AutoCAD SHX Text L-S-12
AutoCAD SHX Text
AutoCAD SHX Text
AHU-17
AutoCAD SHX Text
AutoCAD SHX Text
FCU-EX
AutoCAD SHX Text
AutoCAD SHX Text
AHU-9
AutoCAD SHX Text
AutoCAD SHX Text
AHU-18
AutoCAD SHX Text
AutoCAD SHX Text
AHU-14
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
PHASING PLAN 2
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
GC-101
AutoCAD SHX Text
MATCHLINE 1/GC-102 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text 1"=200'
AutoCAD SHX Text
GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING 170
AutoCAD SHX Text
MATCHLINE 1/GC-100 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
MATCHLINE 1/GC-103 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
10" CHS,CHR
AutoCAD SHX Text
3" CHS,CHR
AutoCAD SHX Text
10" CHS,CHR
AutoCAD SHX Text
2" CHS,CHR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
24 FT
AutoCAD SHX Text
KEYED NOTES
AutoCAD SHX Text NOTED PIPING SHALL REPLACED DURING JANUARY OF PHASE ONE TO MINIMIZE THE IMPACT OF HAVING THE AIR HANDLING UNIT OFFLINE DURING REPLACEMENT.
AutoCAD SHX Text
AutoCAD SHX Text
HATCH LEGEND
AutoCAD SHX Text
DENOTES PHASE 1
AutoCAD SHX Text
DENOTES PHASE 2
AutoCAD SHX Text
DENOTES PHASE 3
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text I.
AutoCAD SHX Text PHASE ONE SHALL OCCUR DURING THE FIRST HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES SHALL BE INSTALLED THROUGHOUT THE SYSTEM DURING THIS PHASE.
AutoCAD SHX Text
II.
AutoCAD SHX Text PHASE TWO SHALL OCCUR DURING THE COOLING SEASON (APRIL THROUGH OCTOBER). DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES INSTALLED DURING PHASE ONE SHALL BE UTILIZED TO ISOLATE INDIVIDUAL SECTIONS OF PIPING AND LIMIT SYSTEM INTERRUPTIONS DURING PIPING REPLACEMENT.
AutoCAD SHX Text
III.
AutoCAD SHX Text PHASE THREE SHALL OCCUR DURING THE SECOND HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING.
AutoCAD SHX Text
IV.
AutoCAD SHX Text PIPING IN ANY PHASE CANNOT BE DEMOLISHED UNLESS REPLACEMENT PIPING AND ALL ASSOCIATED APPURTENANCES REQUIRED FOR INSTALLATION ARE ONSITE PRIOR TO THE BEGINNING OF DEMOLITION.
AutoCAD SHX Text V.
AutoCAD SHX Text ALL SPECIFIED CHILLED WATER PIPING WITHIN WORK AREA SHALL BE DRAINED COMPLETELY PRIOR TO DEMOLITION.
AutoCAD SHX Text
VI.
AutoCAD SHX Text CONTRACTOR SHALL COORDINATE PHASING PLANS WITH MECHANICAL DEMOLITION, MECHANICAL NEW WORK, AND ALL OTHER ASSOCIATED DISCIPLINES.
AutoCAD SHX Text
VII.
AutoCAD SHX Text HEATING AND COOLING SEASONS NOTED ARE ANTICIPATED. HEATING AND COOLING SEASON CHANGEOVERS MUST BE CLOSELY MONITORED WITH THE VA COR.
AutoCAD SHX Text
VIII.
AutoCAD SHX Text REFER TO MECHANICAL NEW WORK PLANS FOR ISOLATION VALVE INSTALLATION LOCATIONS TO OCCUR DURING PHASE ONE.
AutoCAD SHX Text
IX.
AutoCAD SHX Text INSTALLATION OF ISOLATION VALVES DURING PHASE ONE SHALL OCCUR AFTER HOURS ON WEEKDAYS (5:00PM TO 5:00AM) OR ON WEEKENDS.
AutoCAD SHX Text X.
AutoCAD SHX Text PIPING SHOWN IN PHASING PLANS IS EXISTING. REFER TO NEW WORK PLANS FOR PIPING LOCATIONS AND SIZES.
AutoCAD SHX Text
XI.
AutoCAD SHX Text PIPING WILL BE REPLACED STARTING WITH THE EASTWARD BRANCH LEAVING ROOM GJ100 DURING PHASE TWO AND WILL CONTINUE TO FOLLOW THE MAIN DISTRIBUTION UNTIL THE ENTIRETY OF THE GROUND FLOOR LOOP IS REPLACED. ISOLATION VALVES FOR EACH SECTION OF PIPING WILL BE OPENED AFTER REPLACEMENT IS COMPLETE OF EACH INDIVIDUAL SECTION TO PREVENT SYSTEM DOWNTIME.
AutoCAD SHX Text
XII.
AutoCAD SHX Text THE BYPASS LOCATED IN CORRIDOR CGE1 WHICH CONNECTS THE NORTHERN AND EASTWARD BRANCHES SHOWN LEAVING ROOM GJ100 SHALL BE UTILIZED DURING PHASE TWO TO FEED SYSTEM FROM BOTH DIRECTIONS WHILE INDIVIDUAL SECTIONS OF PIPING ARE BEING REPLACED.
AutoCAD SHX Text
XIII.
CONTRACTOR SHALL DEVELOP A PCRA PLAN FOR EACH PHASE OF THE PROJECT PRIOR TO THE START OF WORK.
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114
Revisions: Date:
CENTRAL ARKANSAS VETERANS
HEALTHCARE SYSTEM
D.L.E.
598-22-151
GC-102
FIBERGLASS PIPING
REPLACEMENT B170
BID DOCUMENTS
06/24/2024
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
BUILDING 170 GROUND FLOOR
PHASING PLAN 3
AutoCAD SHX Text
GL101A-170 VENDING STORAGE
AutoCAD SHX Text
CGA6-170 CORRIDOR
AutoCAD SHX Text
GA100-170 RECREATION CENTER
AutoCAD SHX Text
GL108A-170 DRESSING ROOM
AutoCAD SHX Text
GL118C-170 MEN'S LOCKERS
AutoCAD SHX Text
GL118A-170 MEN'S SHOWERS
AutoCAD SHX Text
GL117A-170 WOMEN'S SHOWERS
AutoCAD SHX Text
GL117C-170 WOMEN'S LOCKERS
AutoCAD SHX Text
GL109A-170 RETAIL STORAGE
AutoCAD SHX Text
GL113A-170 MORGUE
AutoCAD SHX Text
GL107-170 MECH ROOM
AutoCAD SHX Text
GL106A-170 WALK-IN COOLER
AutoCAD SHX Text
GL106B-170 WALK-IN FREEZER
AutoCAD SHX Text
GL106E-170 VENDING CLERK
AutoCAD SHX Text
GL106F-170 STORAGE
AutoCAD SHX Text
GL106D-170 HAC
AutoCAD SHX Text
GL105A-170 STORAGE
AutoCAD SHX Text
GL105-170 FOOD SERVICE AREA
AutoCAD SHX Text
GL103-170 CAFETERIA
AutoCAD SHX Text
GL102-170 CAFETERIA
AutoCAD SHX Text
GL100-170 VESTIBULE
AutoCAD SHX Text
GL101-170 VENDING
AutoCAD SHX Text
GL106-170 KITCHEN
AutoCAD SHX Text
GL106C-170 OFFICE
AutoCAD SHX Text
CGL3-170 CORRIDOR
AutoCAD SHX Text
GL114-170 WOMEN'S RESTROOM
AutoCAD SHX Text
GL115-170 MEN'S RESTROOM
AutoCAD SHX Text
CGL4-170 VEST
AutoCAD SHX Text
SG16-170 STAIR 16
AutoCAD SHX Text
GL116-170 ELECTRICAL
AutoCAD SHX Text
GA105-170 MECH ROOM
AutoCAD SHX Text
GA104-170 TELEPHONE
AutoCAD SHX Text
GA103-170 STORAGE
AutoCAD SHX Text
GA102-170 OFFICE
AutoCAD SHX Text
GA101-170 KITCHEN
AutoCAD SHX Text
GA101A-170 STORAGE
AutoCAD SHX Text
CGA3-170 VESTIBULE
AutoCAD SHX Text
GA112A-170 RESTROOM
AutoCAD SHX Text
GL110-170 OFFICE
AutoCAD SHX Text
GL108-170 RETAIL STORE
AutoCAD SHX Text
GL104-170 DISHROOM
AutoCAD SHX Text
GL105B-170 VESTIBULE
AutoCAD SHX Text
AutoCAD SHX Text
AHU-1A
AutoCAD SHX Text
AutoCAD SHX Text
AHU-8
AutoCAD SHX Text
4" CHS,CHR
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
MATCHLINE 1/GC-104 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
MATCHLINE 1/GC-101 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
MATCHLINE 1/GC-106 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
PHASING PLAN 3
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
GC-102
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text 1"=200'
AutoCAD SHX Text
GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING 170
AutoCAD SHX Text
8" CHS,CHR
AutoCAD SHX Text
10" CHS,CHR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
24 FT
AutoCAD SHX Text
HATCH LEGEND
AutoCAD SHX Text
DENOTES PHASE 1
AutoCAD SHX Text
DENOTES PHASE 2
AutoCAD SHX Text
DENOTES PHASE 3
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text I.
AutoCAD SHX Text PHASE ONE SHALL OCCUR DURING THE FIRST HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES SHALL BE INSTALLED THROUGHOUT THE SYSTEM DURING THIS PHASE.
AutoCAD SHX Text
II.
AutoCAD SHX Text PHASE TWO SHALL OCCUR DURING THE COOLING SEASON (APRIL THROUGH OCTOBER). DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES INSTALLED DURING PHASE ONE SHALL BE UTILIZED TO ISOLATE INDIVIDUAL SECTIONS OF PIPING AND LIMIT SYSTEM INTERRUPTIONS DURING PIPING REPLACEMENT.
AutoCAD SHX Text
III.
AutoCAD SHX Text PHASE THREE SHALL OCCUR DURING THE SECOND HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING.
AutoCAD SHX Text
IV.
AutoCAD SHX Text PIPING IN ANY PHASE CANNOT BE DEMOLISHED UNLESS REPLACEMENT PIPING AND ALL ASSOCIATED APPURTENANCES REQUIRED FOR INSTALLATION ARE ONSITE PRIOR TO THE BEGINNING OF DEMOLITION.
AutoCAD SHX Text V.
AutoCAD SHX Text ALL SPECIFIED CHILLED WATER PIPING WITHIN WORK AREA SHALL BE DRAINED COMPLETELY PRIOR TO DEMOLITION.
AutoCAD SHX Text
VI.
AutoCAD SHX Text CONTRACTOR SHALL COORDINATE PHASING PLANS WITH MECHANICAL DEMOLITION, MECHANICAL NEW WORK, AND ALL OTHER ASSOCIATED DISCIPLINES.
AutoCAD SHX Text
VII.
AutoCAD SHX Text HEATING AND COOLING SEASONS NOTED ARE ANTICIPATED. HEATING AND COOLING SEASON CHANGEOVERS MUST BE CLOSELY MONITORED WITH THE VA COR.
AutoCAD SHX Text
VIII.
AutoCAD SHX Text REFER TO MECHANICAL NEW WORK PLANS FOR ISOLATION VALVE INSTALLATION LOCATIONS TO OCCUR DURING PHASE ONE.
AutoCAD SHX Text
IX.
AutoCAD SHX Text INSTALLATION OF ISOLATION VALVES DURING PHASE ONE SHALL OCCUR AFTER HOURS ON WEEKDAYS (5:00PM TO 5:00AM) OR ON WEEKENDS.
AutoCAD SHX Text X.
AutoCAD SHX Text PIPING SHOWN IN PHASING PLANS IS EXISTING. REFER TO NEW WORK PLANS FOR PIPING LOCATIONS AND SIZES.
AutoCAD SHX Text
XI.
AutoCAD SHX Text PIPING WILL BE REPLACED STARTING WITH THE EASTWARD BRANCH LEAVING ROOM GJ100 DURING PHASE TWO AND WILL CONTINUE TO FOLLOW THE MAIN DISTRIBUTION UNTIL THE ENTIRETY OF THE GROUND FLOOR LOOP IS REPLACED. ISOLATION VALVES FOR EACH SECTION OF PIPING WILL BE OPENED AFTER REPLACEMENT IS COMPLETE OF EACH INDIVIDUAL SECTION TO PREVENT SYSTEM DOWNTIME.
AutoCAD SHX Text
XII.
AutoCAD SHX Text THE BYPASS LOCATED IN CORRIDOR CGE1 WHICH CONNECTS THE NORTHERN AND EASTWARD BRANCHES SHOWN LEAVING ROOM GJ100 SHALL BE UTILIZED DURING PHASE TWO TO FEED SYSTEM FROM BOTH DIRECTIONS WHILE INDIVIDUAL SECTIONS OF PIPING ARE BEING REPLACED.
AutoCAD SHX Text
XIII.
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114
Revisions: Date:
CENTRAL ARKANSAS VETERANS
HEALTHCARE SYSTEM
D.L.E.
598-22-151
GC-103
FIBERGLASS PIPING
REPLACEMENT B170
BID DOCUMENTS
06/24/2024
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
BUILDING 170 GROUND FLOOR
PHASING PLANS 4 & 5
AutoCAD SHX Text
GN106-170 OFFICE
AutoCAD SHX Text
GN104-170 KINESIOTHERAPY OFFICE
AutoCAD SHX Text
GN102-170 KINESIOTHERAPY CLINIC
AutoCAD SHX Text
GN108-170 OCCUPATIONAL THERAPY
AutoCAD SHX Text
SG15-170 STAIR 15
AutoCAD SHX Text
GN109-170 MECH ROOM
AutoCAD SHX Text
GN103-170 HAC
AutoCAD SHX Text
GN105-170 FUNCT RESTOR UNIT PRGRM MGR
AutoCAD SHX Text
CGN1-170 CORRIDOR
AutoCAD SHX Text
GN101-170 STAFF RESTROOM
AutoCAD SHX Text
AutoCAD SHX Text
AHU-13
AutoCAD SHX Text
CGG1-170 CORRIDOR
AutoCAD SHX Text
GG102A-170 AC SHOP
AutoCAD SHX Text
GG102-170 ELEC EQUIP REPAIR/MECH ROOM
AutoCAD SHX Text
AutoCAD SHX Text
FCU-EX
AutoCAD SHX Text
AutoCAD SHX Text
FCU-EX
AutoCAD SHX Text
AutoCAD SHX Text
AHU-12
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
MATCHLINE 1/GC-101 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
MATCHLINE 1/GC-104 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
PHASING PLAN 4
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
GC-103
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
PHASING PLAN 5
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
GC-103
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text 1"=200'
AutoCAD SHX Text
GROUND FLOOR
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
BUILDING 170
AutoCAD SHX Text
3" CHS,CHR
AutoCAD SHX Text
6" CHS,CHR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
24 FT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
24 FT
AutoCAD SHX Text
HATCH LEGEND
AutoCAD SHX Text
DENOTES PHASE 1
AutoCAD SHX Text
DENOTES PHASE 2
AutoCAD SHX Text
DENOTES PHASE 3
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text I.
AutoCAD SHX Text PHASE ONE SHALL OCCUR DURING THE FIRST HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES SHALL BE INSTALLED THROUGHOUT THE SYSTEM DURING THIS PHASE.
AutoCAD SHX Text
II.
AutoCAD SHX Text PHASE TWO SHALL OCCUR DURING THE COOLING SEASON (APRIL THROUGH OCTOBER). DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES INSTALLED DURING PHASE ONE SHALL BE UTILIZED TO ISOLATE INDIVIDUAL SECTIONS OF PIPING AND LIMIT SYSTEM INTERRUPTIONS DURING PIPING REPLACEMENT.
AutoCAD SHX Text
III.
AutoCAD SHX Text PHASE THREE SHALL OCCUR DURING THE SECOND HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING.
AutoCAD SHX Text
IV.
AutoCAD SHX Text PIPING IN ANY PHASE CANNOT BE DEMOLISHED UNLESS REPLACEMENT PIPING AND ALL ASSOCIATED APPURTENANCES REQUIRED FOR INSTALLATION ARE ONSITE PRIOR TO THE BEGINNING OF DEMOLITION.
AutoCAD SHX Text V.
AutoCAD SHX Text ALL SPECIFIED CHILLED WATER PIPING WITHIN WORK AREA SHALL BE DRAINED COMPLETELY PRIOR TO DEMOLITION.
AutoCAD SHX Text
VI.
AutoCAD SHX Text CONTRACTOR SHALL COORDINATE PHASING PLANS WITH MECHANICAL DEMOLITION, MECHANICAL NEW WORK, AND ALL OTHER ASSOCIATED DISCIPLINES.
AutoCAD SHX Text
VII.
AutoCAD SHX Text HEATING AND COOLING SEASONS NOTED ARE ANTICIPATED. HEATING AND COOLING SEASON CHANGEOVERS MUST BE CLOSELY MONITORED WITH THE VA COR.
AutoCAD SHX Text
VIII.
AutoCAD SHX Text REFER TO MECHANICAL NEW WORK PLANS FOR ISOLATION VALVE INSTALLATION LOCATIONS TO OCCUR DURING PHASE ONE.
AutoCAD SHX Text
IX.
AutoCAD SHX Text INSTALLATION OF ISOLATION VALVES DURING PHASE ONE SHALL OCCUR AFTER HOURS ON WEEKDAYS (5:00PM TO 5:00AM) OR ON WEEKENDS.
AutoCAD SHX Text X.
AutoCAD SHX Text PIPING SHOWN IN PHASING PLANS IS EXISTING. REFER TO NEW WORK PLANS FOR PIPING LOCATIONS AND SIZES.
AutoCAD SHX Text
XI.
AutoCAD SHX Text PIPING WILL BE REPLACED STARTING WITH THE EASTWARD BRANCH LEAVING ROOM GJ100 DURING PHASE TWO AND WILL CONTINUE TO FOLLOW THE MAIN DISTRIBUTION UNTIL THE ENTIRETY OF THE GROUND FLOOR LOOP IS REPLACED. ISOLATION VALVES FOR EACH SECTION OF PIPING WILL BE OPENED AFTER REPLACEMENT IS COMPLETE OF EACH INDIVIDUAL SECTION TO PREVENT SYSTEM DOWNTIME.
AutoCAD SHX Text
XII.
AutoCAD SHX Text THE BYPASS LOCATED IN CORRIDOR CGE1 WHICH CONNECTS THE NORTHERN AND EASTWARD BRANCHES SHOWN LEAVING ROOM GJ100 SHALL BE UTILIZED DURING PHASE TWO TO FEED SYSTEM FROM BOTH DIRECTIONS WHILE INDIVIDUAL SECTIONS OF PIPING ARE BEING REPLACED.
AutoCAD SHX Text
XIII.
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
2200 FORT ROOTS DRIVE
NORTH LITTLE ROCK, AR 72114
Revisions: Date:
CENTRAL ARKANSAS VETERANS
HEALTHCARE SYSTEM
D.L.E.
598-22-151
GC-104
FIBERGLASS PIPING
REPLACEMENT B170
BID DOCUMENTS
06/24/2024
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
BUILDING 170 GROUND FLOOR
PHASING PLAN 6
AutoCAD SHX Text
GE118-170 ELECTRICAL
AutoCAD SHX Text
CGE4-170 CORRIDOR
AutoCAD SHX Text
GE110-170 HAC/STORAGE
AutoCAD SHX Text
GA111-170 STORAGE
AutoCAD SHX Text
GA110-170 WOMEN'S RESTROOM
AutoCAD SHX Text
GA109-170 MEN'S RESTROOM
AutoCAD SHX Text
GA108-170 STORAGE
AutoCAD SHX Text
GA107-170 ELECTRICAL
AutoCAD SHX Text
GA106-170 MECH ROOM
AutoCAD SHX Text
CGE5-170 SERVICE VEST
AutoCAD SHX Text
GE115-170 WOMEN'S LOUNGE
AutoCAD SHX Text
GE121-170 WOMEN'S RESTROOM
AutoCAD SHX Text
GE117-170 TELEPHONE
AutoCAD SHX Text
GE119-170 OFFICE
AutoCAD SHX Text
GE120-170 MEN'S RESTROOM
AutoCAD SHX Text
GE114A-170 PHARMACY CACHE
AutoCAD SHX Text
GE114B-170 SWING OFFICE
AutoCAD SHX Text
GE114B-170 SATELLITE
AutoCAD SHX Text
GE114C-170 WASHETERIA
AutoCAD SHX Text
GE115C-170 WOMEN'S LOCKERS
AutoCAD SHX Text
GE115B-170 WOMEN'S SHOWERS
AutoCAD SHX Text
GE115A-170 WOMEN'S RESTROOM
AutoCAD SHX Text
GE116A-170 MEN'S RESTROOM
AutoCAD SHX Text
GE116C-170 MEN'S SHOWERS
AutoCAD SHX Text
GE116-170 MEN'S LOUNGE
AutoCAD SHX Text
GE116B-170 MEN'S LOCKERS
AutoCAD SHX Text
GE109-170 ECSS
AutoCAD SHX Text
GE111-170 COMP OFFICE
AutoCAD SHX Text
GE104A-170 REPAIR SHOP
AutoCAD SHX Text
GE101C-170 KITCHEN
AutoCAD SHX Text
CGE2-170 SERVICE VESTIBULE
AutoCAD SHX Text
GE104-170 SOILED LINEN
AutoCAD SHX Text
GE105-170 TRASH CHUTE RM
AutoCAD SHX Text
CGE1-170 CORRIDOR
AutoCAD SHX Text
GE106-170 BLDG MGMNT SVC
AutoCAD SHX Text
GE107-170 PAP SPRVSR
AutoCAD SHX Text
GE108-170 CLOTHING STORE
AutoCAD SHX Text
CGE3-170 CORRIDOR
AutoCAD SHX Text
GE101D-170 ASST PROG MGR FRU RMS
AutoCAD SHX Text
GE101-170 OCCUPATIONAL THERAPY/KINESIOTHERAPY
AutoCAD SHX Text
GE112I-170 VESTIBULE
AutoCAD SHX Text
GE112A-170 EXAM ROOM
AutoCAD SHX Text
GE112B-170 EXAM ROOM
AutoCAD SHX Text
GE112C-170 EXAM ROOM
AutoCAD SHX Text
GE112E-170 OFFICE
AutoCAD SHX Text
GE112D-170 EXAM ROOM
AutoCAD SHX Text
GE122-170 MECH ROOM
AutoCAD SHX Text
GE119B-170 STORAGE
AutoCAD SHX Text
GE119A-170 OFFICE
AutoCAD SHX Text
GE113-170 KITCHEN
AutoCAD SHX Text
GE113A-170 STORAGE
AutoCAD SHX Text
GE112F-170 OFFICE
AutoCAD SHX Text
GE112G-170 OFFICE
AutoCAD SHX Text
GE112H-170 OFFICE
AutoCAD SHX Text
GE112-170 PATIENT EDUC/CONF RM
AutoCAD SHX Text
GE100-170 PHYSICAL THERAPY GENERAL PURPOSE
AutoCAD SHX Text
GE101I-170 CHIEF PM&RS
AutoCAD SHX Text
GE101J-170 LT/KT OFFICE
AutoCAD SHX Text
GE101H-170 PM&RS SECRETARY
AutoCAD SHX Text
GE101E-170 PHYS MED & REHAB SVC
AutoCAD SHX Text
GE101G-170 PM&RS PHYSICIAN
AutoCAD SHX Text
GE101F-170 PM&RS PHYSICIAN
AutoCAD SHX Text
GE123-170 PRU THERAPIST
AutoCAD SHX Text
GE123A-170 PROG MGR PHYS RESTOR
AutoCAD SHX Text
ELEV. F-S-7
AutoCAD SHX Text
AutoCAD SHX Text
AHU-1
AutoCAD SHX Text
AutoCAD SHX Text
AHU-1B
AutoCAD SHX Text
6" CHS,CHR
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
MATCHLINE 1/GC-102 BUILDING 170 GROUND FLOOR
AutoCAD SHX Text
MATCHLINE 1/GC-105 BUILDING 170 GROUND…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .