Attachment B_598-22-151 - CAVHS - Bid Documents - Drawings.pdf

PDF 34 MB Posted

Attached to
Y1DA--598-22-151 B170 FG Chilled Water Piping Replacement
Solicitation number
36C25624R0117
Issued by

About this file

This document is an attachment to a federal solicitation for the Replacement of the Fiberglass Chilled Water Piping in Building 170 at the Eugene J. Towbin Veterans Affairs Healthcare Center, Project #598-22-151. The solicitation is a 100% Set-Aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with an anticipated contract award date of approximately 30 days or less after receipt of proposals. The recommended period of performance is 365 calendar days after issuance of the Notice to Proceed. The Contractor will be responsible for providing all necessary services to meet the project objectives and requirements and to provide the required outcome in terms of overall quality, timeliness and documentation. The magnitude of construction is between $5,000,000.00 and $10,000,000.00, and the NAICS code is 236220 Commercial and Institutional Building Construction. Interested offerors must register in the System for Award Management (SAM) database and have the Veterans Small Business Certification.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E.G.W.

COVER SHEET

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114

Revisions: Date:

CENTRAL ARKANSAS VETERANS

HEALTHCARE SYSTEM

D.L.E.

598-22-151

GI-01

FIBERGLASS PIPING

REPLACEMENT B170

BID DOCUMENTS

06/24/2024

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

N/A

AutoCAD SHX Text

DEPARTMENT OF VETERANS AFFAIRS

AutoCAD SHX Text

EUGENE J. TOWBIN VA HEALTHCARE CENTER

AutoCAD SHX Text D

AutoCAD SHX Text U

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text T

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text E

AutoCAD SHX Text

PROJECT NO. 598-22-151

AutoCAD SHX Text

NORTH LITTLE ROCK, AR

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

LOCATION MAP SCALE: NOT TO SCALE

AutoCAD SHX Text

FIBERGLASS PIPING REPLACEMENT B170

AutoCAD SHX Text

FAYETTEVILLE

AutoCAD SHX Text

JONESBORO

AutoCAD SHX Text

EL DORADO

AutoCAD SHX Text

PROJECT LOCATION LITTLE ROCK, AR

AutoCAD SHX Text GENERAL GI-01 COVER SHEET COVER SHEET CIVIL CS-01 CAMPUS SITE PLAN CAMPUS SITE PLAN PHASING GC-100 BUILDING 170 GROUND FLOOR PHASING PLAN 1 BUILDING 170 GROUND FLOOR PHASING PLAN 1 GC-101 BUILDING 170 GROUND FLOOR PHASING PLAN 2 BUILDING 170 GROUND FLOOR PHASING PLAN 2 GC-102 BUILDING 170 GROUND FLOOR PHASING PLAN 3 BUILDING 170 GROUND FLOOR PHASING PLAN 3 GC-103 BUILDING 170 GROUND FLOOR PHASING PLANS 4 & 5 BUILDING 170 GROUND FLOOR PHASING PLANS 4 & 5 GC-104 BUILDING 170 GROUND FLOOR PHASING PLAN 6 BUILDING 170 GROUND FLOOR PHASING PLAN 6 GC-105 BUILDING 170 GROUND FLOOR PHASING PLAN 7 BUILDING 170 GROUND FLOOR PHASING PLAN 7 GC-106 BUILDING 170 GROUND FLOOR PHASING PLAN 8 BUILDING 170 GROUND FLOOR PHASING PLAN 8 GC-107 BUILDING 170 FIRST FLOOR PHASING PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR PHASING PLANS 1,2,3,4 & 5 GC-108 BUILDING 170 FIRST FLOOR PHASING PLAN 6 BUILDING 170 FIRST FLOOR PHASING PLAN 6 GC-109 BUILDING 170 FIRST FLOOR PHASING PLAN 7 BUILDING 170 FIRST FLOOR PHASING PLAN 7 GC-110 BUILDING 170 SECOND FLOOR PHASING PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR PHASING PLANS 1,2,3,4,5,6,7,8 & 9 GC-111 BUILDING 170 THIRD FLOOR PHASING PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR PHASING PLANS 1,2,3,4,5,6,7,8 & 9 GC-112 BUILDING 170 ROOF PHASING PLANS 1,2,3,4,5 & 6 BUILDING 170 ROOF PHASING PLANS 1,2,3,4,5 & 6 GC-113 BUILDING 170 ROOF PHASING PLANS 7,8 & 9 BUILDING 170 ROOF PHASING PLANS 7,8 & 9 ICRA ICRA-01 ICRA & LIFE SAFETY GENERAL REQUIREMENTS ICRA & LIFE SAFETY GENERAL REQUIREMENTS ICRA-02 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 1 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 1 ICRA-03 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 2 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 2 ICRA-04 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 3 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 3 ICRA-05 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLANS 4 & 5 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLANS 4 & 5 ICRA-06 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 6 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 6 ICRA-07 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 7 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 7 ICRA-08 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 8 BUILDING 170 GROUND FLOOR ICRA CLASSIFICATION PLAN 8 ICRA-09 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4 & 5 ICRA-10 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLAN 6 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLAN 6 ICRA-11 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLAN 7 BUILDING 170 FIRST FLOOR ICRA CLASSIFICATION PLAN 7 ICRA-12 BUILDING 170 SECOND FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4,5,6,7,8 & 9 ICRA-13 BUILDING 170 THIRD FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR ICRA CLASSIFICATION PLANS 1,2,3,4,5,6,7,8 & 9

AutoCAD SHX Text MECHANICAL M-001 GENERAL MECHANICAL SYMBOLS & NOTES GENERAL MECHANICAL SYMBOLS & NOTES M-002 GENERAL MECHANICAL ABBREVIATIONS GENERAL MECHANICAL ABBREVIATIONS MD-100 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 1 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 1 MD-101 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 2 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 2 MD-102 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 3 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 3 MD-103 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLANS 4 & 5 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLANS 4 & 5 MD-104 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 6 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 6 MD-105 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 7 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 7 MD-106 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 8 BUILDING 170 GROUND FLOOR MECHANICAL PIPING DEMOLITION PLAN 8 MD-107 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4 & 5 MD-108 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN 6 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN 6 MD-109 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN 7 BUILDING 170 FIRST FLOOR MECHANICAL PIPING DEMOLITION PLAN 7 MD-110 BUILDING 170 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 MD-111 BUILDING 170 THIRD FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 MD-112 BUILDING 170 ROOF MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5 & 6 BUILDING 170 ROOF MECHANICAL PIPING DEMOLITION PLANS 1,2,3,4,5 & 6 MD-113 BUILDING 170 ROOF MECHANICAL PIPING DEMOLITION PLANS 7,8 & 9 BUILDING 170 ROOF MECHANICAL PIPING DEMOLITION PLANS 7,8 & 9 MH-100 BUILDING 170 GROUND FLOOR MECHANICAL HVAC NEW WORK PLAN BUILDING 170 GROUND FLOOR MECHANICAL HVAC NEW WORK PLAN MP-100 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 1 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 1 MP-101 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 2 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 2 MP-102 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 3 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 3 MP-103 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLANS 4 & 5 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLANS 4 & 5 MP-104 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 6 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 6 MP-105 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 7 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 7 MP-106 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 8 BUILDING 170 GROUND FLOOR MECHANICAL PIPING NEW WORK PLAN 8 MP-107 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4 & 5 MP-108 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN 6 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN 6 MP-109 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN 7 BUILDING 170 FIRST FLOOR MECHANICAL PIPING NEW WORK PLAN 7 MP-110 BUILDING 170 SECOND FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 MP-111 BUILDING 170 THIRD FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 MP-112 BUILDING 170 ROOF MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5 & 6 BUILDING 170 ROOF MECHANICAL PIPING NEW WORK PLANS 1,2,3,4,5 & 6 MP-113 BUILDING 170 ROOF MECHANICAL PIPING NEW WORK PLANS 7,8 & 9 BUILDING 170 ROOF MECHANICAL PIPING NEW WORK PLANS 7,8 & 9 MP-500 MECHANICAL DETAILS 1 MECHANICAL DETAILS 1 MP-501 MECHANICAL DETAILS 2 MECHANICAL DETAILS 2 MP-502 MECHANICAL DETAILS 3 MECHANICAL DETAILS 3 MP-600 MECHANICAL SCHEDULES MECHANICAL SCHEDULES MI-601 DDC- CONTROL POINTS LIST & MECHANICAL SCHEDULES DDC- CONTROL POINTS LIST & MECHANICAL SCHEDULES MI-602 CONTROL SCHEMATICS & SEQUENCE CONTROL SCHEMATICS & SEQUENCE ELECTRICAL E-001 GENERAL ELECTRICAL SYMBOLS, NOTES & ABBREVIATIONS GENERAL ELECTRICAL SYMBOLS, NOTES & ABBREVIATIONS ED-100 BUILDING 170 GROUND FLOOR ELECTRICAL DEMOLITION PLAN BUILDING 170 GROUND FLOOR ELECTRICAL DEMOLITION PLAN EP-100 BUILDING 170 GROUND FLOOR ELECTRICAL NEW WORK PLAN BUILDING 170 GROUND FLOOR ELECTRICAL NEW WORK PLAN E-500 ELECTRICAL DETAILSELECTRICAL DETAILS

AutoCAD SHX Text HAZARDOUS MATERIALS HA-001 GENERAL ASBESTOS SYMBOLS & NOTES GENERAL ASBESTOS SYMBOLS & NOTES HA-002 BUILDING 170 GROUND FLOOR RISER/CHASE LOCATIONS BUILDING 170 GROUND FLOOR RISER/CHASE LOCATIONS HA-003 BUILDING 170 FIRST FLOOR RISER/CHASE LOCATIONS BUILDING 170 FIRST FLOOR RISER/CHASE LOCATIONS HA-004 BUILDING 170 SECOND FLOOR RISER/CHASE LOCATIONS BUILDING 170 SECOND FLOOR RISER/CHASE LOCATIONS HA-005 BUILDING 170 THIRD FLOOR RISER/CHASE LOCATIONS BUILDING 170 THIRD FLOOR RISER/CHASE LOCATIONS HA-100 BUILDING 170 GROUND FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4,5,6 & 7 BUILDING 170 GROUND FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4,5,6 & 7 HA-101 BUILDING 170 FIRST FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4 & 5 HA-102 BUILDING 170 FIRST FLOOR ASBESTOS ABATEMENT PLANS 6,7,8 & 9 BUILDING 170 FIRST FLOOR ASBESTOS ABATEMENT PLANS 6,7,8 & 9 HA-103 BUILDING 170 SECOND FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4 & 5 BUILDING 170 SECOND FLOOR ASBESTOS ABATEMENT PLANS 1,2,3,4 & 5 HA-104 BUILDING 170 SECOND FLOOR ASBESTOS ABATEMENT PLANS 6,7,8 & 9 BUILDING 170 SECOND FLOOR ASBESTOS ABATEMENT PLANS 6,7,8 & 9 HA-105 BUILDING 170 THIRD FLOOR ASBESTOS ABATEMENT PLANS 1,2,3 & 4 BUILDING 170 THIRD FLOOR ASBESTOS ABATEMENT PLANS 1,2,3 & 4 HA-106 BUILDING 170 THIRD FLOOR ASBESTOS ABATEMENT PLANS 5,6,7,8 & 9 BUILDING 170 THIRD FLOOR ASBESTOS ABATEMENT PLANS 5,6,7,8 & 9 ARCHITECTURAL AD-100 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 1 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 1 AD-101 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 2 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 2 AD-102 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 3 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 3 AD-103 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLANS 4 & 5 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLANS 4 & 5 AD-104 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 6 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 6 AD-105 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 7 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 7 AD-106 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 8 BUILDING 170 GROUND FLOOR ARCHITECTURAL DEMOLITION PLAN 8 AD-107 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4 & 5 AD-108 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN 6 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN 6 AD-109 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN 7 BUILDING 170 FIRST FLOOR ARCHITECTURAL DEMOLITION PLAN 7 AD-110 BUILDING 170 SECOND FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 AD-111 BUILDING 170 THIRD FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR ARCHITECTURAL DEMOLITION PLANS 1,2,3,4,5,6,7,8 & 9 AE-100 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 1 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 1 AE-101 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 2 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 2 AE-102 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 3 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 3 AE-103 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLANS 4 & 5 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLANS 4 & 5 AE-104 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 6 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 6 AE-105 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 7 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 7 AE-106 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 8 BUILDING 170 GROUND FLOOR ARCHITECTURAL NEW WORK PLAN 8 AE-107 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4 & 5 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4 & 5 AE-108 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLAN 6 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLAN 6 AE-109 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLAN 7 BUILDING 170 FIRST FLOOR ARCHITECTURAL NEW WORK PLAN 7 AE-110 BUILDING 170 SECOND FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 SECOND FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 AE-111 BUILDING 170 THIRD FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 BUILDING 170 THIRD FLOOR ARCHITECTURAL NEW WORK PLANS 1,2,3,4,5,6,7,8 & 9 FIRE PROTECTION FX-001 GENERAL FIRE PROTECTION NOTES GENERAL FIRE PROTECTION NOTES

K.E.B.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114

Revisions: Date:

CENTRAL ARKANSAS VETERANS

HEALTHCARE SYSTEM

D.L.E.

598-22-151

CS-01

FIBERGLASS PIPING

REPLACEMENT B170

BID DOCUMENTS

06/24/2024

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

N/A

CAMPUS SITE PLAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

VAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FORT ROOTS HISTORICAL GROUNDS

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

NORTH DRIVE

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

HILL ROAD

AutoCAD SHX Text

EAST DRIVE

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

MAIN CIRCLE DRIVE

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

SCENIC DRIVE

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

THIRD STREET

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

GOLF COURSE

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

FIRST STREET

AutoCAD SHX Text

CYPRESS STREET

AutoCAD SHX Text

ATHLETIC FIELD

AutoCAD SHX Text

PINE STREET

AutoCAD SHX Text

PARKING

AutoCAD SHX Text

FOURTH STREET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

LAYDOWN AREA

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

KEY SYMBOL AREA OF WORK

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CAMPUS SITE PLAN

AutoCAD SHX Text 1"=120'

AutoCAD SHX Text

AutoCAD SHX Text

CS-01

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING DIRECTORY

AutoCAD SHX Text 1.

AutoCAD SHX Text

ENGINEERING OFFICES

AutoCAD SHX Text 7.

AutoCAD SHX Text

ENG. TRAINING CTR. STORAGE

AutoCAD SHX Text 26.

AutoCAD SHX Text

ENGINEERING SHOPS

AutoCAD SHX Text 34.

AutoCAD SHX Text

ENGINEERING TRAINING CENTER

AutoCAD SHX Text 37.

AutoCAD SHX Text

HUMAN RESOURCES MANAGEMENT

AutoCAD SHX Text 58.

AutoCAD SHX Text

X-RAY TRAINING & SWITCHBOARD

AutoCAD SHX Text 65.

AutoCAD SHX Text

REGIONAL OFFICE

AutoCAD SHX Text 66.

AutoCAD SHX Text

EYE CLINIC, PHARMACY, COMPENSATION & PENSION, IMAGING

AutoCAD SHX Text 68.

AutoCAD SHX Text

ADMINISTRATION; CENTRAL BUSINESS OFFICE; COMMUNITY CARE; EEO

AutoCAD SHX Text 69.

AutoCAD SHX Text

BOILER PLANT

AutoCAD SHX Text 76.

AutoCAD SHX Text

INPATIENT DINING FACILITY

AutoCAD SHX Text 80.

AutoCAD SHX Text

ENGINEERING SHOPS

AutoCAD SHX Text 89.

AutoCAD SHX Text

PROSTHETICS & SENSORY AIDS

AutoCAD SHX Text 101.

AutoCAD SHX Text M.H.S., O.R.M., E.M.P.

AutoCAD SHX Text 102.

AutoCAD SHX Text

OFFICE OF INFO. MANAGEMENT

AutoCAD SHX Text 103.

AutoCAD SHX Text

STAFF EDUCATION/NEW EMPLOYEE ORIENTATION

AutoCAD SHX Text 105.

AutoCAD SHX Text

AUDITORIUM

AutoCAD SHX Text 111.

AutoCAD SHX Text

AUDIOLOGY & SPEECH PATHOLOGY

AutoCAD SHX Text 115.

AutoCAD SHX Text

ENGINEERING SHOPS

AutoCAD SHX Text 159.

AutoCAD SHX Text

LAUNDRY

AutoCAD SHX Text 170.

AutoCAD SHX Text

EUGENE J. TOWBIN HEALTHCARE CENTER

AutoCAD SHX Text 182.

AutoCAD SHX Text

WAREHOUSE

AutoCAD SHX Text 190.

AutoCAD SHX Text

VA LAW ENFORCEMENT TRAINING CENTER

AutoCAD SHX Text 191.

AutoCAD SHX Text

SECURITY TRAINING CENTER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

480 FT

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114

Revisions: Date:

CENTRAL ARKANSAS VETERANS

HEALTHCARE SYSTEM

D.L.E.

598-22-151

GC-100

FIBERGLASS PIPING

REPLACEMENT B170

BID DOCUMENTS

06/24/2024

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

BUILDING 170 GROUND FLOOR

PHASING PLAN 1

AutoCAD SHX Text

CGH1-170 CORRIDOR

AutoCAD SHX Text

CGM1-170 VESTIBULE

AutoCAD SHX Text

CGK1-170 CORRIDOR

AutoCAD SHX Text

GJ100-170 MEDICAL RECORDS

AutoCAD SHX Text

GJ100B-170 BREAKROOM

AutoCAD SHX Text

GJ100D-170 FILE SUPERVISOR

AutoCAD SHX Text

GJ100C-170 SCANNERS

AutoCAD SHX Text

GJ101-170 MECH. ROOM

AutoCAD SHX Text

GJ100E-170 MEDICAL RECORDS

AutoCAD SHX Text

GJ100EA-170 MECH. ROOM

AutoCAD SHX Text

GJ104-170 POWER ROOM

AutoCAD SHX Text

GJ103-170 MECH ROOM

AutoCAD SHX Text

GJ103A-170 ALARM ROOM

AutoCAD SHX Text

GJ103B-170 OFFICE

AutoCAD SHX Text

GJ102-170 HOLDING DOCK

AutoCAD SHX Text

GH109B-170 STORAGE

AutoCAD SHX Text

GH121A-170 VAVS RECREATION

AutoCAD SHX Text

CGJ1-170 CORRIDOR

AutoCAD SHX Text

GH115-170 WOMEN'S RR

AutoCAD SHX Text

GH116-170 MEN'S RR

AutoCAD SHX Text

GJ106-170 JANITOR

AutoCAD SHX Text

GJ105B-170 STORAGE

AutoCAD SHX Text

GJ105A-170 OFFICE

AutoCAD SHX Text

GJ105-170 BOWLING ALLEY

AutoCAD SHX Text

GH114A-170 SECRETARY

AutoCAD SHX Text

GH114B-170 C.U. MANAGER

AutoCAD SHX Text

GH114-170 SECRETARY

AutoCAD SHX Text

GH109-170 CHAPEL

AutoCAD SHX Text

CGJ2-170 CORRIDOR

AutoCAD SHX Text

CGJ3-170 VESTIBULE

AutoCAD SHX Text

GH122-170 STORAGE

AutoCAD SHX Text

GH123-170 VAVS/HV

AutoCAD SHX Text

GH110-170 SACRISTY

AutoCAD SHX Text

GH114C-170 STAFF OFFICE

AutoCAD SHX Text

GH114D-170 STORAGE

AutoCAD SHX Text

GJ100A-170 FILTER ROOM

AutoCAD SHX Text

LOADING DOCK

AutoCAD SHX Text

SG12-170 STAIR 12

AutoCAD SHX Text

ELEV. P-5

AutoCAD SHX Text

ELEV. P-6

AutoCAD SHX Text

AutoCAD SHX Text

AHU-19

AutoCAD SHX Text

AutoCAD SHX Text

AHU-10

AutoCAD SHX Text

CWP

AutoCAD SHX Text

EX

AutoCAD SHX Text

CWP

AutoCAD SHX Text

EX

AutoCAD SHX Text

VFD

AutoCAD SHX Text

EX

AutoCAD SHX Text

VFD

AutoCAD SHX Text

EX

AutoCAD SHX Text

6" CHS,CHR

AutoCAD SHX Text

GJ102A-170

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

MATCHLINE 1/GC-106 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

MATCHLINE 1/GC-101 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

PHASING PLAN 1

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-100

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 1"=200'

AutoCAD SHX Text

GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING 170

AutoCAD SHX Text

8" CHS,CHR

AutoCAD SHX Text

10" CHS,CHR

AutoCAD SHX Text

2" CHS,CHR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

24 FT

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text I.

AutoCAD SHX Text PHASE ONE SHALL OCCUR DURING THE FIRST HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES SHALL BE INSTALLED THROUGHOUT THE SYSTEM DURING THIS PHASE.

AutoCAD SHX Text

II.

AutoCAD SHX Text PHASE TWO SHALL OCCUR DURING THE COOLING SEASON (APRIL THROUGH OCTOBER). DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES INSTALLED DURING PHASE ONE SHALL BE UTILIZED TO ISOLATE INDIVIDUAL SECTIONS OF PIPING AND LIMIT SYSTEM INTERRUPTIONS DURING PIPING REPLACEMENT.

AutoCAD SHX Text

III.

AutoCAD SHX Text PHASE THREE SHALL OCCUR DURING THE SECOND HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING.

AutoCAD SHX Text

IV.

AutoCAD SHX Text PIPING IN ANY PHASE CANNOT BE DEMOLISHED UNLESS REPLACEMENT PIPING AND ALL ASSOCIATED APPURTENANCES REQUIRED FOR INSTALLATION ARE ONSITE PRIOR TO THE BEGINNING OF DEMOLITION.

AutoCAD SHX Text V.

AutoCAD SHX Text ALL SPECIFIED CHILLED WATER PIPING WITHIN WORK AREA SHALL BE DRAINED COMPLETELY PRIOR TO DEMOLITION.

AutoCAD SHX Text

VI.

AutoCAD SHX Text CONTRACTOR SHALL COORDINATE PHASING PLANS WITH MECHANICAL DEMOLITION, MECHANICAL NEW WORK, AND ALL OTHER ASSOCIATED DISCIPLINES.

AutoCAD SHX Text

VII.

AutoCAD SHX Text HEATING AND COOLING SEASONS NOTED ARE ANTICIPATED. HEATING AND COOLING SEASON CHANGEOVERS MUST BE CLOSELY MONITORED WITH THE VA COR.

AutoCAD SHX Text

VIII.

AutoCAD SHX Text REFER TO MECHANICAL NEW WORK PLANS FOR ISOLATION VALVE INSTALLATION LOCATIONS TO OCCUR DURING PHASE ONE.

AutoCAD SHX Text

IX.

AutoCAD SHX Text INSTALLATION OF ISOLATION VALVES DURING PHASE ONE SHALL OCCUR AFTER HOURS ON WEEKDAYS (5:00PM TO 5:00AM) OR ON WEEKENDS.

AutoCAD SHX Text X.

AutoCAD SHX Text PIPING SHOWN IN PHASING PLANS IS EXISTING. REFER TO NEW WORK PLANS FOR PIPING LOCATIONS AND SIZES.

AutoCAD SHX Text

XI.

AutoCAD SHX Text PIPING WILL BE REPLACED STARTING WITH THE EASTWARD BRANCH LEAVING ROOM GJ100 DURING PHASE TWO AND WILL CONTINUE TO FOLLOW THE MAIN DISTRIBUTION UNTIL THE ENTIRETY OF THE GROUND FLOOR LOOP IS REPLACED. ISOLATION VALVES FOR EACH SECTION OF PIPING WILL BE OPENED AFTER REPLACEMENT IS COMPLETE OF EACH INDIVIDUAL SECTION TO PREVENT SYSTEM DOWNTIME.

AutoCAD SHX Text

XII.

AutoCAD SHX Text THE BYPASS LOCATED IN CORRIDOR CGE1 WHICH CONNECTS THE NORTHERN AND EASTWARD BRANCHES SHOWN LEAVING ROOM GJ100 SHALL BE UTILIZED DURING PHASE TWO TO FEED SYSTEM FROM BOTH DIRECTIONS WHILE INDIVIDUAL SECTIONS OF PIPING ARE BEING REPLACED.

AutoCAD SHX Text

XIII.

AutoCAD SHX Text CONTRACTOR SHALL DEVELOP A PCRA PLAN FOR EACH PHASE OF THE PROJECT PRIOR TO THE START OF WORK.

AutoCAD SHX Text

HATCH LEGEND

AutoCAD SHX Text

DENOTES PHASE 1

AutoCAD SHX Text

DENOTES PHASE 2

AutoCAD SHX Text

DENOTES PHASE 3

AutoCAD SHX Text

KEYED NOTES

AutoCAD SHX Text NOTED PIPING SHALL REPLACED DURING JANUARY OF PHASE ONE TO MINIMIZE THE IMPACT OF HAVING THE AIR HANDLING UNIT OFFLINE DURING REPLACEMENT.

AutoCAD SHX Text ISOLATION VALVES INSTALLED IN THIS SECTION OF PIPING DURING PHASE ONE SHALL BE UTILIZED TO REPLACE THIS SECTION OF PIPING FIRST AT THE START OF PHASE TWO.

AutoCAD SHX Text

PIPING SHALL BE UTILIZED TO FEED GROUND FLOOR PIPING DURING PHASE TWO.

AutoCAD SHX Text

AutoCAD SHX Text

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114

Revisions: Date:

CENTRAL ARKANSAS VETERANS

HEALTHCARE SYSTEM

D.L.E.

598-22-151

GC-101

FIBERGLASS PIPING

REPLACEMENT B170

BID DOCUMENTS

06/24/2024

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

BUILDING 170 GROUND FLOOR

PHASING PLAN 2

AutoCAD SHX Text

GK111-170 PROGRAM SUPPORT CLERK

AutoCAD SHX Text

GK111B-170 FILE ROOM

AutoCAD SHX Text

CGL1-170 CORRIDOR

AutoCAD SHX Text

GL109-170 RETAIL STORAGE

AutoCAD SHX Text

GL111-170 SOILED LINEN RM

AutoCAD SHX Text

GL112-170 TRASH CHUTE RM

AutoCAD SHX Text

CGM2-170 SERVICE VEST

AutoCAD SHX Text

GK102-170 ELECTRICAL

AutoCAD SHX Text

GK101-170 TELEPHONE

AutoCAD SHX Text

GK100-170 HAC

AutoCAD SHX Text

GK103-170 CLEAN LINEN ROOM

AutoCAD SHX Text

GK109-170 GENRTR RM

AutoCAD SHX Text

SG13-170 STAIR 13

AutoCAD SHX Text

CGK3-170 VEST

AutoCAD SHX Text

GK104-170 MECH ROOM

AutoCAD SHX Text

GK106-170

AutoCAD SHX Text

GK108-170 BMS SUPPLY ROOM

AutoCAD SHX Text

CGK2-170 CORRIDOR

AutoCAD SHX Text

GP101-170 ELEV EQUIP ROOM

AutoCAD SHX Text

CGP1-170 CORRIDOR

AutoCAD SHX Text

GP100-170 OXYGEN STOR

AutoCAD SHX Text

SG14-170 STAIR 14

AutoCAD SHX Text

CGP2-170 VEST

AutoCAD SHX Text

GK113-170 SUPPLY & DISTRIBUTION INVENTORY MGMNT TEAM

AutoCAD SHX Text

GK113D-170 SPD CLEANING STORAGE

AutoCAD SHX Text

GK113C-170 SPD MEDICAL STORAGE

AutoCAD SHX Text

GK113A-170 MATERIAL MGMNT OFFICE

AutoCAD SHX Text

GK106A-170 MECH ROOM

AutoCAD SHX Text

GK106-170 PLUMBING SHOP/MECH ROOM

AutoCAD SHX Text

GK107-170 TELEPHONE EQUIP ROOM

AutoCAD SHX Text

GK105-170 ELECTRICAL

AutoCAD SHX Text

GL118-170 VEST

AutoCAD SHX Text

GL118B-170 MEN'S RESTROOM

AutoCAD SHX Text

GL117B-170 WOMEN'S RESTROOM

AutoCAD SHX Text

CGL2-170 SERVICE VEST

AutoCAD SHX Text

GL113-170 HAC

AutoCAD SHX Text

GL117-170 WOMEN'S LOUNGE

AutoCAD SHX Text

GK111D-170 INTERVIEW RM.

AutoCAD SHX Text

GK111E-170 CRIMINAL INVESTIGATOR

AutoCAD SHX Text

GK111F-170 CHIEF OF POLICE

AutoCAD SHX Text

GK111C-170 STORAGE

AutoCAD SHX Text

GK111A-170 ARMS ROOM

AutoCAD SHX Text

GK111G-170 ASSIS'T CHIEF

AutoCAD SHX Text P-S-14

AutoCAD SHX Text

CGN2-170 VESTIBULE

AutoCAD SHX Text L-S-11

AutoCAD SHX Text L-S-12

AutoCAD SHX Text

AutoCAD SHX Text

AHU-17

AutoCAD SHX Text

AutoCAD SHX Text

FCU-EX

AutoCAD SHX Text

AutoCAD SHX Text

AHU-9

AutoCAD SHX Text

AutoCAD SHX Text

AHU-18

AutoCAD SHX Text

AutoCAD SHX Text

AHU-14

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

PHASING PLAN 2

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-101

AutoCAD SHX Text

MATCHLINE 1/GC-102 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 1"=200'

AutoCAD SHX Text

GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING 170

AutoCAD SHX Text

MATCHLINE 1/GC-100 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

MATCHLINE 1/GC-103 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

10" CHS,CHR

AutoCAD SHX Text

3" CHS,CHR

AutoCAD SHX Text

10" CHS,CHR

AutoCAD SHX Text

2" CHS,CHR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

24 FT

AutoCAD SHX Text

KEYED NOTES

AutoCAD SHX Text NOTED PIPING SHALL REPLACED DURING JANUARY OF PHASE ONE TO MINIMIZE THE IMPACT OF HAVING THE AIR HANDLING UNIT OFFLINE DURING REPLACEMENT.

AutoCAD SHX Text

AutoCAD SHX Text

HATCH LEGEND

AutoCAD SHX Text

DENOTES PHASE 1

AutoCAD SHX Text

DENOTES PHASE 2

AutoCAD SHX Text

DENOTES PHASE 3

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text I.

AutoCAD SHX Text PHASE ONE SHALL OCCUR DURING THE FIRST HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES SHALL BE INSTALLED THROUGHOUT THE SYSTEM DURING THIS PHASE.

AutoCAD SHX Text

II.

AutoCAD SHX Text PHASE TWO SHALL OCCUR DURING THE COOLING SEASON (APRIL THROUGH OCTOBER). DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES INSTALLED DURING PHASE ONE SHALL BE UTILIZED TO ISOLATE INDIVIDUAL SECTIONS OF PIPING AND LIMIT SYSTEM INTERRUPTIONS DURING PIPING REPLACEMENT.

AutoCAD SHX Text

III.

AutoCAD SHX Text PHASE THREE SHALL OCCUR DURING THE SECOND HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING.

AutoCAD SHX Text

IV.

AutoCAD SHX Text PIPING IN ANY PHASE CANNOT BE DEMOLISHED UNLESS REPLACEMENT PIPING AND ALL ASSOCIATED APPURTENANCES REQUIRED FOR INSTALLATION ARE ONSITE PRIOR TO THE BEGINNING OF DEMOLITION.

AutoCAD SHX Text V.

AutoCAD SHX Text ALL SPECIFIED CHILLED WATER PIPING WITHIN WORK AREA SHALL BE DRAINED COMPLETELY PRIOR TO DEMOLITION.

AutoCAD SHX Text

VI.

AutoCAD SHX Text CONTRACTOR SHALL COORDINATE PHASING PLANS WITH MECHANICAL DEMOLITION, MECHANICAL NEW WORK, AND ALL OTHER ASSOCIATED DISCIPLINES.

AutoCAD SHX Text

VII.

AutoCAD SHX Text HEATING AND COOLING SEASONS NOTED ARE ANTICIPATED. HEATING AND COOLING SEASON CHANGEOVERS MUST BE CLOSELY MONITORED WITH THE VA COR.

AutoCAD SHX Text

VIII.

AutoCAD SHX Text REFER TO MECHANICAL NEW WORK PLANS FOR ISOLATION VALVE INSTALLATION LOCATIONS TO OCCUR DURING PHASE ONE.

AutoCAD SHX Text

IX.

AutoCAD SHX Text INSTALLATION OF ISOLATION VALVES DURING PHASE ONE SHALL OCCUR AFTER HOURS ON WEEKDAYS (5:00PM TO 5:00AM) OR ON WEEKENDS.

AutoCAD SHX Text X.

AutoCAD SHX Text PIPING SHOWN IN PHASING PLANS IS EXISTING. REFER TO NEW WORK PLANS FOR PIPING LOCATIONS AND SIZES.

AutoCAD SHX Text

XI.

AutoCAD SHX Text PIPING WILL BE REPLACED STARTING WITH THE EASTWARD BRANCH LEAVING ROOM GJ100 DURING PHASE TWO AND WILL CONTINUE TO FOLLOW THE MAIN DISTRIBUTION UNTIL THE ENTIRETY OF THE GROUND FLOOR LOOP IS REPLACED. ISOLATION VALVES FOR EACH SECTION OF PIPING WILL BE OPENED AFTER REPLACEMENT IS COMPLETE OF EACH INDIVIDUAL SECTION TO PREVENT SYSTEM DOWNTIME.

AutoCAD SHX Text

XII.

AutoCAD SHX Text THE BYPASS LOCATED IN CORRIDOR CGE1 WHICH CONNECTS THE NORTHERN AND EASTWARD BRANCHES SHOWN LEAVING ROOM GJ100 SHALL BE UTILIZED DURING PHASE TWO TO FEED SYSTEM FROM BOTH DIRECTIONS WHILE INDIVIDUAL SECTIONS OF PIPING ARE BEING REPLACED.

AutoCAD SHX Text

XIII.

CONTRACTOR SHALL DEVELOP A PCRA PLAN FOR EACH PHASE OF THE PROJECT PRIOR TO THE START OF WORK.

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114

Revisions: Date:

CENTRAL ARKANSAS VETERANS

HEALTHCARE SYSTEM

D.L.E.

598-22-151

GC-102

FIBERGLASS PIPING

REPLACEMENT B170

BID DOCUMENTS

06/24/2024

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

BUILDING 170 GROUND FLOOR

PHASING PLAN 3

AutoCAD SHX Text

GL101A-170 VENDING STORAGE

AutoCAD SHX Text

CGA6-170 CORRIDOR

AutoCAD SHX Text

GA100-170 RECREATION CENTER

AutoCAD SHX Text

GL108A-170 DRESSING ROOM

AutoCAD SHX Text

GL118C-170 MEN'S LOCKERS

AutoCAD SHX Text

GL118A-170 MEN'S SHOWERS

AutoCAD SHX Text

GL117A-170 WOMEN'S SHOWERS

AutoCAD SHX Text

GL117C-170 WOMEN'S LOCKERS

AutoCAD SHX Text

GL109A-170 RETAIL STORAGE

AutoCAD SHX Text

GL113A-170 MORGUE

AutoCAD SHX Text

GL107-170 MECH ROOM

AutoCAD SHX Text

GL106A-170 WALK-IN COOLER

AutoCAD SHX Text

GL106B-170 WALK-IN FREEZER

AutoCAD SHX Text

GL106E-170 VENDING CLERK

AutoCAD SHX Text

GL106F-170 STORAGE

AutoCAD SHX Text

GL106D-170 HAC

AutoCAD SHX Text

GL105A-170 STORAGE

AutoCAD SHX Text

GL105-170 FOOD SERVICE AREA

AutoCAD SHX Text

GL103-170 CAFETERIA

AutoCAD SHX Text

GL102-170 CAFETERIA

AutoCAD SHX Text

GL100-170 VESTIBULE

AutoCAD SHX Text

GL101-170 VENDING

AutoCAD SHX Text

GL106-170 KITCHEN

AutoCAD SHX Text

GL106C-170 OFFICE

AutoCAD SHX Text

CGL3-170 CORRIDOR

AutoCAD SHX Text

GL114-170 WOMEN'S RESTROOM

AutoCAD SHX Text

GL115-170 MEN'S RESTROOM

AutoCAD SHX Text

CGL4-170 VEST

AutoCAD SHX Text

SG16-170 STAIR 16

AutoCAD SHX Text

GL116-170 ELECTRICAL

AutoCAD SHX Text

GA105-170 MECH ROOM

AutoCAD SHX Text

GA104-170 TELEPHONE

AutoCAD SHX Text

GA103-170 STORAGE

AutoCAD SHX Text

GA102-170 OFFICE

AutoCAD SHX Text

GA101-170 KITCHEN

AutoCAD SHX Text

GA101A-170 STORAGE

AutoCAD SHX Text

CGA3-170 VESTIBULE

AutoCAD SHX Text

GA112A-170 RESTROOM

AutoCAD SHX Text

GL110-170 OFFICE

AutoCAD SHX Text

GL108-170 RETAIL STORE

AutoCAD SHX Text

GL104-170 DISHROOM

AutoCAD SHX Text

GL105B-170 VESTIBULE

AutoCAD SHX Text

AutoCAD SHX Text

AHU-1A

AutoCAD SHX Text

AutoCAD SHX Text

AHU-8

AutoCAD SHX Text

4" CHS,CHR

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

MATCHLINE 1/GC-104 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

MATCHLINE 1/GC-101 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

MATCHLINE 1/GC-106 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

PHASING PLAN 3

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-102

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 1"=200'

AutoCAD SHX Text

GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING 170

AutoCAD SHX Text

8" CHS,CHR

AutoCAD SHX Text

10" CHS,CHR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

24 FT

AutoCAD SHX Text

HATCH LEGEND

AutoCAD SHX Text

DENOTES PHASE 1

AutoCAD SHX Text

DENOTES PHASE 2

AutoCAD SHX Text

DENOTES PHASE 3

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text I.

AutoCAD SHX Text PHASE ONE SHALL OCCUR DURING THE FIRST HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES SHALL BE INSTALLED THROUGHOUT THE SYSTEM DURING THIS PHASE.

AutoCAD SHX Text

II.

AutoCAD SHX Text PHASE TWO SHALL OCCUR DURING THE COOLING SEASON (APRIL THROUGH OCTOBER). DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES INSTALLED DURING PHASE ONE SHALL BE UTILIZED TO ISOLATE INDIVIDUAL SECTIONS OF PIPING AND LIMIT SYSTEM INTERRUPTIONS DURING PIPING REPLACEMENT.

AutoCAD SHX Text

III.

AutoCAD SHX Text PHASE THREE SHALL OCCUR DURING THE SECOND HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING.

AutoCAD SHX Text

IV.

AutoCAD SHX Text PIPING IN ANY PHASE CANNOT BE DEMOLISHED UNLESS REPLACEMENT PIPING AND ALL ASSOCIATED APPURTENANCES REQUIRED FOR INSTALLATION ARE ONSITE PRIOR TO THE BEGINNING OF DEMOLITION.

AutoCAD SHX Text V.

AutoCAD SHX Text ALL SPECIFIED CHILLED WATER PIPING WITHIN WORK AREA SHALL BE DRAINED COMPLETELY PRIOR TO DEMOLITION.

AutoCAD SHX Text

VI.

AutoCAD SHX Text CONTRACTOR SHALL COORDINATE PHASING PLANS WITH MECHANICAL DEMOLITION, MECHANICAL NEW WORK, AND ALL OTHER ASSOCIATED DISCIPLINES.

AutoCAD SHX Text

VII.

AutoCAD SHX Text HEATING AND COOLING SEASONS NOTED ARE ANTICIPATED. HEATING AND COOLING SEASON CHANGEOVERS MUST BE CLOSELY MONITORED WITH THE VA COR.

AutoCAD SHX Text

VIII.

AutoCAD SHX Text REFER TO MECHANICAL NEW WORK PLANS FOR ISOLATION VALVE INSTALLATION LOCATIONS TO OCCUR DURING PHASE ONE.

AutoCAD SHX Text

IX.

AutoCAD SHX Text INSTALLATION OF ISOLATION VALVES DURING PHASE ONE SHALL OCCUR AFTER HOURS ON WEEKDAYS (5:00PM TO 5:00AM) OR ON WEEKENDS.

AutoCAD SHX Text X.

AutoCAD SHX Text PIPING SHOWN IN PHASING PLANS IS EXISTING. REFER TO NEW WORK PLANS FOR PIPING LOCATIONS AND SIZES.

AutoCAD SHX Text

XI.

AutoCAD SHX Text PIPING WILL BE REPLACED STARTING WITH THE EASTWARD BRANCH LEAVING ROOM GJ100 DURING PHASE TWO AND WILL CONTINUE TO FOLLOW THE MAIN DISTRIBUTION UNTIL THE ENTIRETY OF THE GROUND FLOOR LOOP IS REPLACED. ISOLATION VALVES FOR EACH SECTION OF PIPING WILL BE OPENED AFTER REPLACEMENT IS COMPLETE OF EACH INDIVIDUAL SECTION TO PREVENT SYSTEM DOWNTIME.

AutoCAD SHX Text

XII.

AutoCAD SHX Text THE BYPASS LOCATED IN CORRIDOR CGE1 WHICH CONNECTS THE NORTHERN AND EASTWARD BRANCHES SHOWN LEAVING ROOM GJ100 SHALL BE UTILIZED DURING PHASE TWO TO FEED SYSTEM FROM BOTH DIRECTIONS WHILE INDIVIDUAL SECTIONS OF PIPING ARE BEING REPLACED.

AutoCAD SHX Text

XIII.

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114

Revisions: Date:

CENTRAL ARKANSAS VETERANS

HEALTHCARE SYSTEM

D.L.E.

598-22-151

GC-103

FIBERGLASS PIPING

REPLACEMENT B170

BID DOCUMENTS

06/24/2024

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

BUILDING 170 GROUND FLOOR

PHASING PLANS 4 & 5

AutoCAD SHX Text

GN106-170 OFFICE

AutoCAD SHX Text

GN104-170 KINESIOTHERAPY OFFICE

AutoCAD SHX Text

GN102-170 KINESIOTHERAPY CLINIC

AutoCAD SHX Text

GN108-170 OCCUPATIONAL THERAPY

AutoCAD SHX Text

SG15-170 STAIR 15

AutoCAD SHX Text

GN109-170 MECH ROOM

AutoCAD SHX Text

GN103-170 HAC

AutoCAD SHX Text

GN105-170 FUNCT RESTOR UNIT PRGRM MGR

AutoCAD SHX Text

CGN1-170 CORRIDOR

AutoCAD SHX Text

GN101-170 STAFF RESTROOM

AutoCAD SHX Text

AutoCAD SHX Text

AHU-13

AutoCAD SHX Text

CGG1-170 CORRIDOR

AutoCAD SHX Text

GG102A-170 AC SHOP

AutoCAD SHX Text

GG102-170 ELEC EQUIP REPAIR/MECH ROOM

AutoCAD SHX Text

AutoCAD SHX Text

FCU-EX

AutoCAD SHX Text

AutoCAD SHX Text

FCU-EX

AutoCAD SHX Text

AutoCAD SHX Text

AHU-12

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

MATCHLINE 1/GC-101 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

MATCHLINE 1/GC-104 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

PHASING PLAN 4

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-103

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

PHASING PLAN 5

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

GC-103

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 1"=200'

AutoCAD SHX Text

GROUND FLOOR

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

BUILDING 170

AutoCAD SHX Text

3" CHS,CHR

AutoCAD SHX Text

6" CHS,CHR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

24 FT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

24 FT

AutoCAD SHX Text

HATCH LEGEND

AutoCAD SHX Text

DENOTES PHASE 1

AutoCAD SHX Text

DENOTES PHASE 2

AutoCAD SHX Text

DENOTES PHASE 3

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text I.

AutoCAD SHX Text PHASE ONE SHALL OCCUR DURING THE FIRST HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES SHALL BE INSTALLED THROUGHOUT THE SYSTEM DURING THIS PHASE.

AutoCAD SHX Text

II.

AutoCAD SHX Text PHASE TWO SHALL OCCUR DURING THE COOLING SEASON (APRIL THROUGH OCTOBER). DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING. ISOLATION VALVES INSTALLED DURING PHASE ONE SHALL BE UTILIZED TO ISOLATE INDIVIDUAL SECTIONS OF PIPING AND LIMIT SYSTEM INTERRUPTIONS DURING PIPING REPLACEMENT.

AutoCAD SHX Text

III.

AutoCAD SHX Text PHASE THREE SHALL OCCUR DURING THE SECOND HEATING SEASON (NOVEMBER THROUGH MARCH) OF THE PROJECT. DURING THIS PHASE SECTIONS OF THE SYSTEM SHALL BE SHUT DOWN TO REMOVE EXISTING PIPING AND NEW PIPING SHALL BE INSTALLED IN PLACE OF THE EXISTING.

AutoCAD SHX Text

IV.

AutoCAD SHX Text PIPING IN ANY PHASE CANNOT BE DEMOLISHED UNLESS REPLACEMENT PIPING AND ALL ASSOCIATED APPURTENANCES REQUIRED FOR INSTALLATION ARE ONSITE PRIOR TO THE BEGINNING OF DEMOLITION.

AutoCAD SHX Text V.

AutoCAD SHX Text ALL SPECIFIED CHILLED WATER PIPING WITHIN WORK AREA SHALL BE DRAINED COMPLETELY PRIOR TO DEMOLITION.

AutoCAD SHX Text

VI.

AutoCAD SHX Text CONTRACTOR SHALL COORDINATE PHASING PLANS WITH MECHANICAL DEMOLITION, MECHANICAL NEW WORK, AND ALL OTHER ASSOCIATED DISCIPLINES.

AutoCAD SHX Text

VII.

AutoCAD SHX Text HEATING AND COOLING SEASONS NOTED ARE ANTICIPATED. HEATING AND COOLING SEASON CHANGEOVERS MUST BE CLOSELY MONITORED WITH THE VA COR.

AutoCAD SHX Text

VIII.

AutoCAD SHX Text REFER TO MECHANICAL NEW WORK PLANS FOR ISOLATION VALVE INSTALLATION LOCATIONS TO OCCUR DURING PHASE ONE.

AutoCAD SHX Text

IX.

AutoCAD SHX Text INSTALLATION OF ISOLATION VALVES DURING PHASE ONE SHALL OCCUR AFTER HOURS ON WEEKDAYS (5:00PM TO 5:00AM) OR ON WEEKENDS.

AutoCAD SHX Text X.

AutoCAD SHX Text PIPING SHOWN IN PHASING PLANS IS EXISTING. REFER TO NEW WORK PLANS FOR PIPING LOCATIONS AND SIZES.

AutoCAD SHX Text

XI.

AutoCAD SHX Text PIPING WILL BE REPLACED STARTING WITH THE EASTWARD BRANCH LEAVING ROOM GJ100 DURING PHASE TWO AND WILL CONTINUE TO FOLLOW THE MAIN DISTRIBUTION UNTIL THE ENTIRETY OF THE GROUND FLOOR LOOP IS REPLACED. ISOLATION VALVES FOR EACH SECTION OF PIPING WILL BE OPENED AFTER REPLACEMENT IS COMPLETE OF EACH INDIVIDUAL SECTION TO PREVENT SYSTEM DOWNTIME.

AutoCAD SHX Text

XII.

AutoCAD SHX Text THE BYPASS LOCATED IN CORRIDOR CGE1 WHICH CONNECTS THE NORTHERN AND EASTWARD BRANCHES SHOWN LEAVING ROOM GJ100 SHALL BE UTILIZED DURING PHASE TWO TO FEED SYSTEM FROM BOTH DIRECTIONS WHILE INDIVIDUAL SECTIONS OF PIPING ARE BEING REPLACED.

AutoCAD SHX Text

XIII.

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

2200 FORT ROOTS DRIVE

NORTH LITTLE ROCK, AR 72114

Revisions: Date:

CENTRAL ARKANSAS VETERANS

HEALTHCARE SYSTEM

D.L.E.

598-22-151

GC-104

FIBERGLASS PIPING

REPLACEMENT B170

BID DOCUMENTS

06/24/2024

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

BUILDING 170 GROUND FLOOR

PHASING PLAN 6

AutoCAD SHX Text

GE118-170 ELECTRICAL

AutoCAD SHX Text

CGE4-170 CORRIDOR

AutoCAD SHX Text

GE110-170 HAC/STORAGE

AutoCAD SHX Text

GA111-170 STORAGE

AutoCAD SHX Text

GA110-170 WOMEN'S RESTROOM

AutoCAD SHX Text

GA109-170 MEN'S RESTROOM

AutoCAD SHX Text

GA108-170 STORAGE

AutoCAD SHX Text

GA107-170 ELECTRICAL

AutoCAD SHX Text

GA106-170 MECH ROOM

AutoCAD SHX Text

CGE5-170 SERVICE VEST

AutoCAD SHX Text

GE115-170 WOMEN'S LOUNGE

AutoCAD SHX Text

GE121-170 WOMEN'S RESTROOM

AutoCAD SHX Text

GE117-170 TELEPHONE

AutoCAD SHX Text

GE119-170 OFFICE

AutoCAD SHX Text

GE120-170 MEN'S RESTROOM

AutoCAD SHX Text

GE114A-170 PHARMACY CACHE

AutoCAD SHX Text

GE114B-170 SWING OFFICE

AutoCAD SHX Text

GE114B-170 SATELLITE

AutoCAD SHX Text

GE114C-170 WASHETERIA

AutoCAD SHX Text

GE115C-170 WOMEN'S LOCKERS

AutoCAD SHX Text

GE115B-170 WOMEN'S SHOWERS

AutoCAD SHX Text

GE115A-170 WOMEN'S RESTROOM

AutoCAD SHX Text

GE116A-170 MEN'S RESTROOM

AutoCAD SHX Text

GE116C-170 MEN'S SHOWERS

AutoCAD SHX Text

GE116-170 MEN'S LOUNGE

AutoCAD SHX Text

GE116B-170 MEN'S LOCKERS

AutoCAD SHX Text

GE109-170 ECSS

AutoCAD SHX Text

GE111-170 COMP OFFICE

AutoCAD SHX Text

GE104A-170 REPAIR SHOP

AutoCAD SHX Text

GE101C-170 KITCHEN

AutoCAD SHX Text

CGE2-170 SERVICE VESTIBULE

AutoCAD SHX Text

GE104-170 SOILED LINEN

AutoCAD SHX Text

GE105-170 TRASH CHUTE RM

AutoCAD SHX Text

CGE1-170 CORRIDOR

AutoCAD SHX Text

GE106-170 BLDG MGMNT SVC

AutoCAD SHX Text

GE107-170 PAP SPRVSR

AutoCAD SHX Text

GE108-170 CLOTHING STORE

AutoCAD SHX Text

CGE3-170 CORRIDOR

AutoCAD SHX Text

GE101D-170 ASST PROG MGR FRU RMS

AutoCAD SHX Text

GE101-170 OCCUPATIONAL THERAPY/KINESIOTHERAPY

AutoCAD SHX Text

GE112I-170 VESTIBULE

AutoCAD SHX Text

GE112A-170 EXAM ROOM

AutoCAD SHX Text

GE112B-170 EXAM ROOM

AutoCAD SHX Text

GE112C-170 EXAM ROOM

AutoCAD SHX Text

GE112E-170 OFFICE

AutoCAD SHX Text

GE112D-170 EXAM ROOM

AutoCAD SHX Text

GE122-170 MECH ROOM

AutoCAD SHX Text

GE119B-170 STORAGE

AutoCAD SHX Text

GE119A-170 OFFICE

AutoCAD SHX Text

GE113-170 KITCHEN

AutoCAD SHX Text

GE113A-170 STORAGE

AutoCAD SHX Text

GE112F-170 OFFICE

AutoCAD SHX Text

GE112G-170 OFFICE

AutoCAD SHX Text

GE112H-170 OFFICE

AutoCAD SHX Text

GE112-170 PATIENT EDUC/CONF RM

AutoCAD SHX Text

GE100-170 PHYSICAL THERAPY GENERAL PURPOSE

AutoCAD SHX Text

GE101I-170 CHIEF PM&RS

AutoCAD SHX Text

GE101J-170 LT/KT OFFICE

AutoCAD SHX Text

GE101H-170 PM&RS SECRETARY

AutoCAD SHX Text

GE101E-170 PHYS MED & REHAB SVC

AutoCAD SHX Text

GE101G-170 PM&RS PHYSICIAN

AutoCAD SHX Text

GE101F-170 PM&RS PHYSICIAN

AutoCAD SHX Text

GE123-170 PRU THERAPIST

AutoCAD SHX Text

GE123A-170 PROG MGR PHYS RESTOR

AutoCAD SHX Text

ELEV. F-S-7

AutoCAD SHX Text

AutoCAD SHX Text

AHU-1

AutoCAD SHX Text

AutoCAD SHX Text

AHU-1B

AutoCAD SHX Text

6" CHS,CHR

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

MATCHLINE 1/GC-102 BUILDING 170 GROUND FLOOR

AutoCAD SHX Text

MATCHLINE 1/GC-105 BUILDING 170 GROUND…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .