This document is a Hot Work Policy for Independence National Historical Park (INDHP), a National Park Service facility in Philadelphia, Pennsylvania, effective March 26, 2021.

The policy establishes procedures for controlling fire hazards during hot work operations involving open flames, sparks, or heat-generating activities such as welding, cutting, brazing, grinding, torch soldering, and torch-applied roofing. The policy applies to all INDHP staff and contractors performing work in existing buildings, new construction in existing buildings, or new construction attached to existing buildings. Before any hot work commences, personnel must complete and obtain approval for a Hot Work Permit from the Safety Office, Chief of Project Management, Deputy Chief of Asset Preservation and Maintenance, or Chief of Asset Preservation and Maintenance. The permit is valid only for the specified date and must be displayed at the work site. All precautions outlined in the permit must be satisfied prior to work initiation. Key safety requirements include positioning a dedicated Fire Watch person for the duration of work and a minimum of 90 minutes afterward, moving flammable materials at least 35 feet from the hot work area or covering them with fire-resistant material, disabling automatic fire detection systems during work, ensuring proper ventilation, protecting building occupants, sealing cracks or holes in floors and walls, and having fire extinguishing equipment available. Upon completion, the work area must be inspected for fire damage or fire potential for a minimum of 30 minutes. The completed permit must be returned to the worker's supervisor and filed with the Safety Office for one year. The policy assigns specific responsibilities to the Superintendent, Chief of Asset Preservation and Maintenance, Safety Office, supervisors, project managers, and employees to ensure compliance and proper implementation of hot work safety procedures.

View the file

Other files

File Type Posted
Sol_140P2126R0010_Amd_0003.pdf PDF
REVISED_Attachment_C_-_Cost-Amd_03_0003.xlsx XLSX spreadsheet
Amd_-_02_REVISED_Attachment_C_-_Cost-Price_Sheet_0002.xlsx XLSX spreadsheet
Sol_140P2126R0010_Amd_0002.pdf PDF
Sol_140P2126R0010_Amd_0001.pdf PDF
RFIs_for_Amendment_01_0001.pdf PDF
REVISED_Attachment_C_-_Cost-Price_Sheet_0001.xlsx XLSX spreadsheet
Attachment_A_-_As-Built_Drawings_INDE.pdf PDF
Attachment_C_-_Cost-Price_Sheet.xlsx XLSX spreadsheet
Sol_140P2126R0010.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hot Work Policy

SUPT-033 (3-26-2021)

Distribution: All Employees

Approved:

Cynthia Macleod, Superintendent Date

143 S. 3rd Street

Philadelphia, PA 19106

215-597-7120 phone 215-597-1003 fax

Independence National Historical Park

Hot Work Policy

Hot Work Policy

CYNTHIA

MACLEOD

Digitally signed by

CYNTHIA MACLEOD

Date: 2021.03.27 09:15:51 -04'00'

Appendix

H

P RM

D

M TB PO DO B

DT DD T

IN E OF FIRE OR WORKER INJURIE

mbu n F

NP fety fetyM n

Ο fe P 1

이

Ο 1

00M

44M 8 4

P Mn OR

Oh N m & Numb

File details come from the government source that posted it. Updated .