Attachment A~8.pdf

PDF 116 KB Posted

Attached to
27-DOC-1000-ISS
Solicitation number
BD-27-1025-DOCCF-1043-134584
Issued by
Massachusetts

About this file

This is a pricing sheet attachment for the Massachusetts Department of Correction's Integrated Security System (ISS) maintenance and support contract at Souza Baranowski Correctional Center. The contract covers maintenance, diagnosis, corrective repair, preventive maintenance, and technical support for the existing ISS system for the period of July 1, 2027 through June 30, 2029. The pricing sheet requires bidders to submit hourly rates for four personnel categories: Project Manager, Senior Engineer, Engineer, and Technician. Rates must be provided for three service level tiers: scheduled support during standard business hours (7AM-5PM), on-call support during evening and early morning hours (5PM-7AM), and emergency response for weekends and holidays. Bidders must also project the annual number of hours anticipated for each personnel category and service level combination.

The contract establishes a fixed ceiling or maximum price structure with no hidden costs permitted beyond those explicitly outlined on the pricing sheet. All potential expenses including reimbursement, travel expenses, freight, shipping, and fuel must be included within the proposed hourly rates or clearly identified as separate line items. The contract does not authorize design, procurement, installation, or commissioning of a replacement ISS system, limiting scope to support and maintenance of existing infrastructure only.

View the file

Other files

File Type Posted
ResponseForm A~1.pdf PDF
Bid Intent. Waiver.pdf PDF
Appendix_A.pdf PDF
RFR. ISS Final.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A Page 1 of 1 27-DOC-1000-ISS

Agency Document Number (RFR)

27-DOC-1000-ISS

Document Title

SBCC Integrated Security System (ISS)

Pricing Sheets 07/01/2027 – 06/30/2029

Company Name: _____________________________________________

Hourly Rates Personnel

Scheduled Support

7AM-5PM

On-Call Support

5PM-7AM

Emergency Response

Weekend/Holiday

Projected Number of Hours Annually

Project Manager

Senior Engineer

Engineer

Technician

Rate Contract with a maximum obligation. This contract will include an annual and overall fixed ceiling or maximum price/cost.

No hidden cost will be paid if they are not outlined below. Including but not limited to reimbursement, travel expenses, freight, shipping, fuel etc..

Company Name:
7AM 5PM:
5PM 7AM:
WeekendHoliday:
of Hours Annually:
Scheduled Support 7AM 5PMSenior Engineer:
On Call Support 5PM 7AMSenior Engineer:
Emergency Response WeekendHolidaySenior Engineer:
Projected Number of Hours AnnuallySenior Engineer:
Scheduled Support 7AM 5PMEngineer:
On Call Support 5PM 7AMEngineer:
Emergency Response WeekendHolidayEngineer:
Projected Number of Hours AnnuallyEngineer:
Scheduled Support 7AM 5PMTechnician:
On Call Support 5PM 7AMTechnician:
Emergency Response WeekendHolidayTechnician:
Projected Number of Hours AnnuallyTechnician:
limited to reimbursement travel expenses freight shipping fuel etc:

File details come from the government source that posted it. Updated .