Attachment_A1_SBI_Sign_Drawings.pdf
PDF 19 MB Posted
- Attached to
- CHIS Sign fabrication and delivery Federal contract opportunity
- Solicitation number
- 140P2124R0003
About this file
This file is an attachment to a federal solicitation for sign fabrication and delivery services. The National Park Service is seeking to award a contract under solicitation number 140P2124R0003 to fabricate and deliver various signs. Responses are due by the date listed on SAM.gov or FedBizOpps.gov. The contractor will be required to fabricate signs adhering to specifications in the attachment and deliver them to multiple National Park sites. Pricing is to be provided on a firm fixed price basis by sign type and location. This opportunity is set aside for small business concerns only.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P2124R0003_Amd_0002.pdf | ||
| Sol_140P2124R0003_Amd_0001.pdf | ||
| Attachment_B_Fabrication_Details_0001.pdf | ||
| Attachment_A3_SRI_Sign_Drawings.pdf | ||
| Attachment_A4_Park_Designed_Signs.pdf | ||
| Sol_140P2124R0003.pdf | ||
| Attachment_D_CHIS_Sign_Fabrication_Estimate_Template.xlsx | XLSX spreadsheet | |
| Attachment_A2_SMI_Sign_Drawings.pdf | ||
| Attachment_C_List_of_Signs.pdf | ||
| Attachment_B_HOFU_location_information_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Comprehensive Sign Plan - Santa Barbara Island
Channel Islands National Park
02-27-2023
0909-807-CHIS
NPS Sign Program Harpers Ferry Center
Harpers Ferry, WV 25425
National Park Service | Harpers Ferry Center | NPS Sign Program
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 1.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
8" 8"
SBI-1.0 - VIS Trail Direction - Elevation Drawing
Qty: 1
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 1.0
Scale
3" = 1' - 0"
Page
SBI-1.0S - VIS - 14” x 8”
Qty: 1
SBI-1.0W - VIS - 14” x 8”
Qty: 1
SBI-1.0N - VIS - 14” x 8”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 2.0
Scale
As Indicated
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
5"
SBI-2.0 - VIS Trail Direction - Elevation Drawing - Scale 1/2”=1’-0”
Qty: 1
SBI-2.0N - VIS Trail Direction - 10” x 5” - Scale 3”=1’-0”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 3.0
Scale
As Indicated
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
8"
SBI-3.0 - VIS Trail Direction - Elevation Drawing - Scale 1/2”=1’-0”
Qty: 5
SBI-3.0 - VIS Trail Direction - 12” x 8” - Scale 3”=1’-0”
Qty: 5
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 4.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
5"
SBI-04.0 - VIS Trail Direction - Elevation Drawing
Base Contract Qty: 20 Option B Qty: 30
GL
Front Back
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 4.0
Scale
3" = 1' - 0"
Page
SBI-4.0 - VIS Trail Direction - 4” x 5” - Double Sided (2 panels per post)
Base Contract Qty: 20 (40 panels and 20 posts) Option B Qty: 30 (60 panels and 30 posts)
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 5.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
5"
SBI-5.0 - VIS Trail Direction - Elevation Drawing
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 5.0
Scale
3" = 1' - 0"
Page
SBI-5.0S - VIS Trail Direction - 14” x 5”
Qty: 1
SBI-5.0N - VIS Trail Direction - 14” x 5”
Qty: 1
SBI-5.0E - VIS Trail Direction - 14” x 17”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 6.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
6"
SBI-6.0 - VIS Trail Direction - Elevation Drawing
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 6.0
Scale
1.5" = 1' - 0"
Page
SBI-6.0S - VIS Trail Direction - 14” x 10”
Qty: 1
SBI-6.0W - VIS Trail Direction - 14” x 6”
Qty: 1
SBI-6.0N - VIS Trail Direction - 14” x 10”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 7.0
Scale
As indicated
Page
SBI-7.0E - VIS Trail Direction - 9” x 4” - Scale 3”=1’-0”
Qty: 1
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
4"
SBI-7.0 - VIS Trail Direction - Elevation Drawing - Scale 1/2”=1’-0”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 8.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
9"
SBI-8.0 - VIS Trail Direction - Elevation Drawing
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 8.0
Scale
3" = 1' - 0"
Page
SBI-8.0N - VIS Trail Direction - 14” x 13”
Qty: 1
SBI-8.0S - VIS Trail Direction - 14” x 13”
Qty: 1
SBI-8.0W - VIS Trail Direction - 14” x 9”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 9.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
SBI-9.0 - VIS Trail Direction - Elevation Drawing
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 9.0
Scale
1-1/2" = 1' - 0"
Page
SBI-9.0W - VIS Trail Direction - 14” x 16”
Qty: 1
SBI-9.0S - VIS Trail Direction - 14” x 16”
Qty: 1
SBI-9.0N - VIS Trail Direction - 14” x 16”
Qty: 1
SBI-9.0E - VIS Trail Direction - 14” x 16”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 10.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
9"
SBI-10.0 - VIS Trail Direction - Elevation Drawing
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 10.0
Scale
3" = 1' - 0"
Page
SBI-10.0W - VIS Trail Direction - 14” x 9”
Qty: 1
SBI-10.0S - VIS Trail Direction - 14” x 10”
Qty: 1
SBI-10.0N - VIS Trail Direction - 14” x 10”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 11.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
9" 9"
SBI-11.0 - VIS Trail Direction - Elevation Drawing
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 11.0
Scale
3" = 1' - 0"
Page
SBI-11.0W - VIS - 14” x 9”
Qty: 1
SBI-11.0E - VIS - 14” x 9”
Qty: 1
SBI-11.0S - VIS - 14” x 9”
Qty: 1
Webster Point
Landing Cove
Arch Point
Landing Cove
.2 mi
1.8 mi
1.4 mi
1.6 mi
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 12.0
Scale
1/2" = 1' - 0"
Page
SBI-12.0 - VIS Trail Direction - Elevation Drawing
Qty: 1
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
East West
4"
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 1.0
Scale
3" = 1' - 0"
Page
SBI-12.0W - VIS Trail Direction - 10” x 4”
Qty: 1
SBI-12.0E - VIS Trail Direction - 10” x 4”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 31.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
3"
3"
SBI-13.0 - VIS Trail Direction - Elevation Drawing
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 1.0
Scale
3" = 1' - 0"
Page
SBI-13.0E - VIS Trail Direction - 6” x 3”
Qty: 1
SBI-13.0S - VIS Trail Direction - 6” x 3”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 14.0
Scale
1/2" = 1' - 0"
Page
SBI-14.0 - VIS Trail Direction - Elevation Drawing
Qty: 50
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
3"
3"
SBI-14.0N - VIS Trail Direction - 6” x 3”
SBI-14.0W - VIS Trail Direction - 6” x 3”
Qty: 1
National Park Service | Harpers Ferry Center | NPS Sign Program
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 14.0
Scale
3" = 1' - 0"
Page
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 15.0
Scale
1/2" = 1' - 0"
Page
Trail direction sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
North South East West
7" 7"
SBI-15.0 - VIS Trail Direction
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 15.0
Scale
3" = 1' - 0"
Page
SBI-15.0E - VIS Trail Direction - 14” x 7”
Qty: 1
SBI-15.0W - VIS Trail Direction - 14” x 7”
Qty: 1
SBI-15.0S - VIS Trail Direction - 14” x 7”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 16.0
Scale
As Indicated
Page
VIS Regulation sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
GL
8"
SBI-16.0 - VIS Trail Direction - Elevation Drawing - Scale 1/2”=1’-0”
Qty: 1
SBI-16.0 - VIS Regulation - 12” x 8”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s)
Scale
1/2" = 1' - 0"
Page
Intaglio process aluminum Identity Sign panel - see Fabrication Details page B.0. Cleats to mount to pier railing - see pier railing details, Sign Fabrication Details, page B.2.
SBI-100 - Island Identity Fabrication Example - 82” x 37” - Cap Height 4”
Qty: 1
GL
A rr o w h ea d
82"
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s)
Scale
1" = 1' - 0"
Page
Intaglio process aluminum Identity Sign panel, see Fabrication Details page B.0. Cleats to mount to pier railing - see pier railing details on page B.2, Sign Fabrication Details.
SBI-100 - Island Identity - 82” x 37” - Cap Height 4”
Intaglio process aluminum Identity sign with cleats to mount to wall. See Fabrication Details page B.0.
SBI-101.0 - Facility ID - Front Elevation
Scale: 1/2”=1’-0”
GL
National Park Service | Harpers Ferry Center | NPS Sign Program
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s)
Scale
3" = 1' - 0"
Page
SBI-101 - Facility ID - 35” x 16”
Channel Islands National Park Description | Notes
Santa Rosa Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
10-18-2021
Location Number(s)
Scale
3" = 1' - 0"
Page
SMI-200.1 - VIS Regulations - 10.5” x 14” mount with VHB tape
Base Contract Qty: 10
Option B Qty: 10
SMI-200.2 - VIS Regulations - 10.5” x 14” mount with VHB tape
Base Contract Qty: 10
Option B Qty: 10
VIS Regulation sign assembly:Direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.1. VHB tape for mounting.
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 10.0
Scale
Full Scale
Page
Black text, transparent outdoor-grade vinyl decal.
SBI-202 - Vinyl Decal - 4” x 2”
Qty: 20
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s)
Scale
As Indicated
Page
SBI-300 - VIS Campsite Marker - Elevation Drawing - 1/2” = 1’-0”
Qty: 1
SBI-300 - VIS Campsite Marker - 4” x 6”
Qty: 1
Scale: 1/2 scale
Front Back
GL
6"
VIS campsite marker sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 15.0
Scale
3" = 1' - 0"
Page
SBI-300.1 - VIS Campsite Marker - 4” x 6”
Qty: 1
SBI-300.2 - VIS Campsite Marker - 4” x 6”
Qty: 1
SBI-300.4 - VIS Campsite Marker - 4” x 6”
Qty: 1
SBI-300.5 - VIS Campsite Marker - 4” x 6”
Qty: 1
SBI-300.6 - VIS Campsite Marker - 4” x 6”
Qty: 1
SBI-300.3 - VIS Campsite Marker - 4” x 6”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 15.0
Scale
3" = 1' - 0"
Page
SBI-300.9 - VIS Campsite Marker - 4” x 6”
Qty: 1
SBI-300.7 - VIS Campsite Marker - 4” x 6”
Qty: 1
SBI-300.8 - VIS Campsite Marker - 4” x 6”
SBI-301.0 - VIS Restroom - Front Elevation
Scale: 1/2”=1’-0”
GL
National Park Service | Harpers Ferry Center | NPS Sign Program
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s)
Scale
3" = 1' - 0"
Page
Trail direction sign assembly: Direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.1, wood screws.
SBI-301.0 - VIS Restroom - 9” x 10” - Cap Height 1”
Qty: 3
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s)
Scale
3" = 1' - 0"
Page
SBI-302.0 - VIS Regulation - 15” x 9” - Cap Height 1.5”
Qty: 3
Trail direction sign assembly: Direct-imaged aluminum panel(s) as shown in Fabrication Details pages A.0-A.1, contractor to design mounting cleat. Hardware must not pass through panel front.
GL
SBI-302.0 - VIS Regulation - Elevation Drawing
1/2” =1’-0”
SBI-400.0 - VIS Warning - 18’ x 12”
National Park Service | Harpers Ferry Center | NPS Sign Program
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s)
Scale
3" = 1' - 0"
Page
Trail direction sign assembly: Direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.1, wood screws.
WARNING
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s)
Scale
3" = 1' - 0"
Page
Trail direction sign assembly: Direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.1, wood screws.
SBI-401 - Warning - 18” x 12”
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s)
Scale
3" = 1' - 0"
Page
SBI-402.0 - VIS Warning - 18” x 12”
Qty: 3
SBI-403.0 - VIS Warning - 12” x 8”
Base Contract Qty: 15 Option B Qty: 15
National Park Service | Harpers Ferry Center | NPS Sign Program
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 15.0
Scale
1/2" = 1' - 0"
Page
GL
8"
SBI-403.0 - VIS Warning - Elevation Drawing
Base Contract Qty: 15 Option B Qty: 15
VIS Warning sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 15.0
Scale
1/2" = 1' - 0"
Page
SBI-404.0 - VIS Warning - Elevation Drawing
Base Contract Qty: 20 Option B Qty: 20
VIS Warning sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
SBI-404.0 - VIS Warning - 12” x 8”
Base Contract Qty: 20 Option B Qty: 20
Channel Islands National Park Description | Notes
Santa Barbara Island Master Plan
Project Number
0909-807-CHIS
Drawing Date
02-27-2023
Location Number(s) 15.0
Scale
1/2" = 1' - 0"
Page
GL
8"
SBI-405.0 - VIS Warning - Elevation Drawing
Base Contract Qty: 10 Option B Qty: 10
VIS Warning sign assembly: Corten steel post, direct-imaged aluminum panel(s), and all necessary hardware as shown in Fabrication Details pages A.0-A.4.
SBI-405.0 - VIS Warning - 12” x 8”
Base Contract Qty: 10 Option B Qty: 10
File details come from the government source that posted it. Updated .