Attachment_A-WellfieldExpansionDec2023asAttachment.pdf
PDF 5 MB Posted
- Attached to
- Reverse Osmosis Water Treatment Plant Wellfield Production Expansion Progressive Design Build to 20 MGD
- Solicitation number
- 0009-24-RSQ
- Issued by
- Lee County, Fort Lauderdale City, Florida
About this file
This document is a GIS map titled "Fort Myers Wellfield Expansion" created by the City of Fort Myers, dated 12/4/2023. The map depicts an expansion plan for production wells across the city's water infrastructure, specifically focusing on the Six Mile Cypress Slough area. The map categorizes production wells into three status types: existing (green), under construction (blue), and proposed (orange), with a total of approximately 30-40 well locations marked. The expansion plan includes various well designations such as P-series (P-1E through P-29), ASR-1, and PH-series wells, indicating a comprehensive water infrastructure development project.
The map provides a scale of 1:16,000 and includes a reference to an existing Raw Water Treatment Plant (ROWTP) marked with a red star. The document includes a disclaimer that the map is for reference only and not a survey, with the City of Fort Myers expressly disclaiming liability for potential errors or omissions. The expansion appears to be part of a broader municipal water infrastructure enhancement initiative, likely aimed at increasing water production capacity and improving water resource management for the Fort Myers community.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Map for reference only. This is not a Survey.
The City of Fort Myers makes no claims or guarantees about the accuracy or currency of the information contained on this map, and expressly disclaims liability for errors and omissions.
Date: 12/4/2023 Author: M. De La Vega
Document Path: Q:\CFM WELLS\Wells2023_ArcPro.aprx
Source: City of Fort Myers GIS, FORT MYERS WELLFIELD EXPANSION
13 14
P-1E
P-2Ea P-2Eb
P-5E P-3E
P-4E
P-6E P-7E
P-21 P-22
P-28
P-23
P-26
P-27
P-24
ASR-1
P-25
P-1S
P-2S
P-5S
P-29
P-30
P-3S
P-4S
P-31
PH5D
PH6B
PH5E
PH6C
PH5B
PH5C
PH5A
PH6A
Six Mile Cypress Slough
Expansion Plan Production Well
Existing
Under Construction
Proposed
Existing Raw WM
ROWTP
Scale: 1:16,000
0 0.5 10.25
Miles
ROWTP
oAttachment A
File details come from the government source that posted it. Updated .