ATTACHMENT A VOLUME 11B SITE ELECTRICAL Updated 12.04.12.pdf
PDF 23 MB Posted
- Solicitation number
- 36C24825Q0923
About this file
This document is a comprehensive set of architectural and engineering drawings for the New Orlando VA Medical Center, consisting of 13 volumes of detailed design specifications across multiple disciplines including architecture, structure, mechanical, electrical, plumbing, fire suppression, communications, and site design. The drawings cover a large, multi-level hospital and clinic complex, with detailed plans for areas labeled A through E across six primary levels, an interstitial level, and roof levels. The volumes include construction plans, reflected ceiling plans, electrical and power plans, communications layouts, life safety plans, equipment plans, and numerous technical details for systems and components throughout the facility.
The drawings, dated June 4, 2010, were prepared by DFA Architects and include extensive technical documentation for the Veterans Affairs project in Orlando, Florida. The design encompasses multiple building components including a hospital, clinic, parking structures, central energy plant, domiciliary, chapel, community living center, warehouse, and associated site infrastructure. Each volume provides granular technical specifications, with multiple drawings per sheet covering different zones, levels, and building systems, reflecting a comprehensive approach to the medical center's architectural and engineering design.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 36C24825Q0923 0002.pdf | ||
| S06 36C24825Q0923 0001.pdf | ||
| S02 36C24825Q0923.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RLF / ELLERBE BECKET
C. ALLAN BAMFORTH
2207 HAMPTON BLVD.
NORFOLK, VA 23517
757/ 627-7079
LOVETT CONSULTANTS
4455 MORRIS PARK DRIVE SUITE H
MINT HILL, NC 28227
704/ 545-8383
WARNER CONSTRUCTION
CONSULTANTS, INC.
2273 RESEARCH BLVD. # 500
ROCKVILLE, MD 20850
301/ 670-9020
CONSTRUCTION COST
SYSTEMS, INC.
1815 SOUTH MEYERS ROAD
SUITE 200
OAKBROOK TERRACE, IL 60181
630/ 678-0808
WOODBURN &
ASSOCIATES, INC.
3808 ANNANDALE ROAD
ANNANDALE, VA 22003
703/ 658-1350
ARCHITECTURAL
ENERGY CORP.
2540 FRONTIER AVE, #201
BOULDER, CO 80301
303/ 444-4149
COMMISSIONING
2231 CRYSTAL DRIVE #400
ARLINGTON, VA 22202
703/ 522-3800
LAMMERS & ASSOCIATES
11130TIMBERLAND LANE
RESTON, VA 20191
703/ 476-8400
MATERIALS MANAGEMENT & AUTO.
TRANSPORTATION
PHASING
LIFE SAFETY / CODECIVIL
CONSTRUCTION COST ESTIMATING
FOODSERVICE
LEED CONSULTANT SECURITY CONSULTANT
SEBESTA BLOMBERG
LANDSCAPE ARCHITECT
MAI
605 DELANEY AVENUE
ORLANDO, FL 32801
407/ 428-0654
11400 ROCKVILLE PIKE, #505
NORTH BETHESDA, MD 20852
301/ 770-3520
A/E
1001 G STREET NW #1000
WASHINGTON, DC 20001
202/ 654-9202
145 LINCOLN AVE.
WINTER PARK, FL 32790
407/ 647-1039
NIKA TECHNOLOGIES, INC.
STRUCTURAL
1280 PALMETTO AVENUE
WINTER PARK, FLORIDA
407/ 628-5282
ALLAN & CONRAD
PARKING CONSULTANT
10305 NW 41ST STREET, SUITE 201
MIAMI, FL 33178
305/ 592-7123
TIM HAAHS & ASSOCIATES
WAYFINDING / SIGNAGE
ONE AVENUE OF THE ARTS
WILMINGTON, DE 19801
302/ 594-9400
MITCHELL ASSOCIATES, INC.
OFFICE OF
FACILITIES
MANAGEMENT
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
NEW ORLANDO VA
MEDICAL CENTER
ORLANDO, FLORIDA
FINAL SUBMITTAL - JUNE 04, 2010
HOSPITAL / CLINIC AND ASSOCIATED WORK
PACKAGE 4
VOLUME 11
SECTION REFERENCE
REFERENCE FOR DETAIL
OR ENLARGED PLAN
ELEVATION REFERENCE
DETAIL/SECTION NUMBER
SHEET WHERE DRAWN
SIM
TARGET NOTE(SIM, TYP, OH)
TYPICAL:
LEADER OR NOTATION
REVISION
KEY NOTES
FINISH NOTES
009250.A01 MATERIAL NOTES
SPECIFICATION SECTION
PREFIX
INDEPENDENT SUFFIX MATERIAL OR
NOTE INDENTIFIER FOR CONDOC LIST
M1800Z JSN NUMBER
COLUMN REFERENCE
AND GRID LINES
NORTH ORIENTATION
IN PLAN
3A226 ROOM NUMBER ABOVE
ROOM NAME BELOWCLEAN LINEN
60/55 630505
X X
EXTRA INFORMATION
(TYPICALLY TURNED OFF)
LINE NUMBER
PFD NUMBER/DESIGN NUMBER
PARTIAL PLAN
REFERENCE LINE
PLAN SHEET NUMBERH-AE1.1FA1A
BUILDING DESIGNATOR
'SECTOR' DESIGNATOR (1/4")
SHEET TYPE DESIGNATOR
TYPICAL TITLE:
1/8" = 1'-0"
DRAWING TITLE
H-AE3.101
H-AE4.101
H-AE1.101
H-AE4.101
3945-026 ATTAINIA NUMBER
H1 HA
'ZONE' DESIGNATOR (1/8")
'AREA' DESIGNATOR (1/16")
PLAN LEVEL DESIGNATOR
DISCIPLINE DESIGNATOR
SHEET NUMBERH-AE2.101
SHEET SEQUENCE NUMBER
BUILDING NORTH
TRUE NORTH
KEY PLAN LEGEND:
H
N C
KEY PLAN
N
H
E
D
W
P-W P-E H
G2
G1
N
REF LINE
A101
ALTERNATE
AIR CONDITIONED
AREA DRAIN
AIR HANDLING UNIT
AMPERES
ACCESS OPENING
APPROXIMATELY
ARCHITECTURAL
ASPHALT TILE
ACOUSTIC TILE CEILING
ALUMINUM
A.C.
A.D.
ALT.
A.O.
A.T.
A.T.C.
ALUM.
ARCH.
AMP., A.
APPROX.
A.H.U.
A
ANTI-TERROR /
FORCE PROTECTION
AT/FP
BOARD
BLANK
BOTTOM
BEAM
BALANCE
BUILDING
BEARING
BRITISH THERMO UNIT/HOUR
BLDG.
BLK.
BOT.
BM.
BRG.
B.T.U.H.
BAL.
BD.
B
BOTTOM OFB.O.
CENTRAL ENERGY PLANTCEP
CABINET
CAPACITY
CIRCUIT BREAKER
CEMENT
CERAMIC
CEILING DIFFUSER
CIRCULATING
CONTROL JOINT
CHECKERED
CLOSET
CEILING
COLUMN
CLEAN OUT
CONDENSATE
CONCRETE
CENTER LINE
CIRCUIT
CONCRETE MASONRY UNIT
CONSTRUCTION
CONTINUOUS
CONTRACTION JOINT
CERAMIC TILE
CERAMIC TILE BASE
CONNECTION
C.F.S.
C.T.B.
CIRC.
CK'D
C.J.
CL.
CEIL.
C.O.
COL.
CKT.
CONC.
COND.
C.M.U.
CONT.
C.T.
CONTR. JT.
CONST.
CONN.
CAB.
CAP.
C/B C.D.
CEM.
CER.
C
CUBIC FEET PER MINUTEC.F.M.
COLD FORMED STEEL
CENTERC.
CL
DETAIL
DISCONNECT
DIFFUSER
DIMENSION
DIAMETER
DOWN
DRAWER
DOOR
DOWN SPOUT
DRAWING(S)
DUMMY JOINT
DWG.(S)
DET.
DIFF.
DISC.
DIM.
DIA.
DN.
DR
DO
D.S.
D.J.
D
EACH
EMPTY CONDUIT
EXHAUST FAN
ELEVATION
ELECTRIC WATER COOLER
ELECTRIC
EQUIPMENT
EXHAUST
EXISTING
EXTERIOR
EXPANSION JOINT
E.C.
EA.
EL.
E.F.
ELEC.
E.W.C.
EXH.
EXT.
EXIST.
EQUIP.
EXP. JT.
E
FLOOR
FOOTING
FINISH
FOOT, FEET
FLEXIBLE CONNECTION
FLOOR DRAIN
FIRE ALARM
FIRE EXTINGUISHER CABINET
F.C.
FEC
F.D.
FLR.
FT.
FTG.
FIN.
F.A.
F
FINISH FLOOR ELEVATIONF.F.E.
GOVERNMENT FURNISHED
GA.
GAL.
G.F.E.
GALV.
GL.
GOV'T
GND.
G.P.M.
G.W.B.
GYP.
GR.
G.P.H.
GAGE
GALLON
GLASS
GROUND
GYPSUM
GRILLE
GALLONS/MINUTE
GYPSUM WALL BOARD
GOVERNMENT
GALLONS/HOUR
GALVANIZED
EQUIPMENT
G
HEATING AND VENTILATING
H.B.
HT.
H.C.
H.P.
HTG.
HR.
H.&V.
HYD.
HW.
HTR.
H.M.
H.
HEIGHT
HEATING
HOUR
HEATER
HARDWARE
HYDRANT
HOLLOW METAL
HORSE POWER
HOSE BIBB
HANDICAP ACCESSIBLE
HIGH
H
HORIZ. HORIZONTAL
IN.
I.E.
INSUL.
INCAND.
INT.
INCHES
INTERIOR
INSULATION
INVERT ELEVATION
INCANDESCENT
I.D. INSIDE DIAMETER
I
J.B.
JCT.
JT. JOINT
JUNCTION
JUNCTION BOX
J
JSN JOINT SCHEDULE NUMBER
KW
KVA
KILOWATT
KILOVOLT AMPERE
K
LB.,#
L.P.
LG.
LTG.
POUND
LONG
LIGHTING
LIGHTING PANEL
L
MECHANICAL VENTILATION
MAIN DISTRIBUTION PANEL
MECH. MECHANICAL
MISC.
MIN.
MTL.
M.O.
M.T.
MTD.
MTG.
M.V.
M.G.T.
METAL
MINIMUM
MATT GLAZE TILE
MISCELLANEOUS
MASONRY OPENING
METAL THRESHOLD
MOUNTED
MOUNTING
MAX.
MAINT.
M.D.P.
M.
MAXIMUM
MOTOR
MAINTENANCE
M
N.A.
N.I.C.
NO. NUMBER
NOT IN CONTRACT
NOT APPLICABLE
N
O.C.
O.H.
OL.
O.D.
OPNG.
OPP.
O.S.D.
O.A.
OPENING
OUTDOOR AIR
OUTSIDE DIAMETER
OPPOSITE HAND
ON CENTER
OVERLOAD
OPPOSITE
OPEN SIGHT DRAIN
O
OPH OPPOSITE HAND
PAPER
PARTITION
PLATE
PERIMETER
PLYWOOD
PANEL
POINT
PAINTED
POUNDS/SQUARE FOOT
POUNDS/SQUARE INCH
PRESSURE
PLUMBING
POUNDS/SQUARE INCH GAGE
PART.
L, PL.
PER.
PLYW'D
PRESS.
PNL.
PTD.
PSIG
PSF
PLBG.
PSI
PT.
P.
P
P
PROGRAM FOR DESIGNPFD
QUARTER
QUANTITY
QTR.
QUAN.
Q
RETURNRET.
RETURN GRILLE
REVOLUTION/MINUTE
R.G.
RM.
R.P.M.
ROOM
RADIUS
ROUND
RECESSED
RETURN AIR
RECIRCULATING
REGISTER
REQUIRED
RECEPTACLE
REINFORCING
RAD.
REC'D.
RD.
R.A.
RECIRC.
RECP.
REG.
REINF.
REQ.
R. RISER
R
REFERENCEREF.
SCHEDULE
SECTION
SUPPLY
SUPPLY AIR
SHEET
SERVICE
SHELF
STORAGE
STEEL
SLIP JOINT
SPECIFICATIONS
SQUARE FEET
SWITCH
SUSPENDED
STRUCTURAL
SQ. FT.
STOR.
SUSP.
SW.
STRUC.
STL.
SCH.
SECT.
S.A.
SERV.
SHT.
S.J.
SPEC.
SH
S.
S
SIMILARSIM.
TOILET
TELEPHONE
TOILET
TOP OF REVEAL
THICKNESS
THRESHOLD
TEMPERATURE
TEL.
THK.
TOIL.
THD.
T.O.R.
TEMP.
T.
T
TOP OFT.O.
UNDER COUNTER BASEU/C/B
U
UNLESS OTHERWISE NOTEDU.O.N.
VERTICAL
VINYL ASBESTOS TILE
VENTILATION
VENT THRU ROOF
V.A.T.
VERT.
VENT.
VTR
V. VOLT
V
WAINSCOATING
WATER
WEATHERPROOF
WELDED WIRE FABRIC
WATER GAGE
WIDE FLANGE
WINDOW DIMENSION
WITHW/
WD.
WP.
W.G.
W.W.F.
WTR.
W.D.
WC
WF
WOOD
W. WATT
W
GLAZING AND LOUVER PREFIXS:
W = WINDOW
IG = INTERIOR GLASS WALL
IW = INTERIOR WINDOW
L = LOUVER
S = STOREFRONT
B = BORROWED LITE
PARTITION TYPE:
(SUFFIX "A,B,C," ETC.
INDICATES VARIATION OF
A TYPE.)
DOOR NUMBERS:
PRIMARY DOOR NUMBER IS THE ROOM
NUMBER AND IS TYPICALLY NOT SHOWN
GRAPHICALLY FOR SINGLE DOOR ROOMS.
A DECIMAL IS ADDED TO DISTINGUISH
ADDITIONAL DOORS IN A ROOM
LEVEL LINE - USED IN ELEVATIONS AND
SECTIONS
1A
1.
NAME
ELEVATION
3B
GENERAL ABBREVIATIONS ARCHITECTURAL SYMBOLS MATERIAL SYMBOLSGENERAL SYMBOLS
EARTH
GRANULAR FILL
GRAVEL
CONCRETE
STONE
CONCRETE MASONRY UNIT
BRICK
FINISHED WOOD
ROUGH WOOD (CONTINUOUS)
ALSO INDICATES WEEP HOLE
IN BRICK OR CONCRETE
WHERE ACCOMPANIED BY
MATERIAL NOTE 04200.J30
ROUGH WOOD
(NOT CONTINUOUS)
PLYWOOD
PARTICLE BOARD
GWB/PLASTER/
STUCCO/GROUT
COMP FILLER
RIGID INSULATION
BATT INSULATION
STEEL
ALUMINUM
GLASS
ACOUSTICAL TILE
SUB-COMPACTSCO
FIRE WALL LEGEND:
ONE HOUR FIRE AND SMOKE BARRIER WALL
ONE HOUR FIRE WALL
TWO HOUR FIRE WALL
TWO HOUR FIRE AND SMOKE BARRIER WALL
LE LOW EMISSIONS
FUEL EFFICIENTFE
BUILDING
NUMBER
DRAWING
PREFIX
BUILDING
NAME
HOSPITAL02
P PARKING WEST03
P PARKING EAST04
E CENTRAL ENERGY PLANT07
D DOMICILIARY09
C CHAPEL10
N COMMUNITY LIVING CENTER11
W WAREHOUSE05
G1 GATEHOUSE MAIN ENTRY06
H CLINIC/ATRIUM01
G2 GATEHOUSE SERVICE ENTRY08
FLAG POLE12
FLAG POLE
CAR POOLCP
ROTATEDRTD
ICF INSULATED CONCRETE FORM
COLD METAL FRAMECMF
DEGREEDEG.
STAINLESS STEELST. STL.
SIGNAGE SYMBOLS:
EXTERIOR SIGN LOCATIONS
INTERIOR SIGN LOCATIONS
HPT HIGH POINT
LPT LOW POINT
SECURITY FIRE EXTINGUISHER CABINETFECK
BUBBLE TYPE FIRE EXTINGUISHERFECP
FIRE EX. CABINET, SURFACE MOUNTEDFECS
ODR OVERFLOW DRAIN
ROOF DRAINRDR
SC SECONDARY SECURITY
CONTROL CENTER
FEC: FIRE EXTINGUISHER CABINET
FECP: SECURITY FIRE EXTINGUISHER CABINET
FECK: BUBBLE TYPE FIRE EXTINGUISHER CABINET
FECS: FIRE EXTINGUISHER CABINET, SURFACE MOUNTED
SMOKE EVAC DOORS
SMOKE
EQUIPMENT LINE TYPES:
CONTRACTOR FURNISHED, CONTRACTOR INSTALLED (CC):
VA FURNISHED, CONTRACTOR INSTALLED (VC):
VA FURNISHED, VA INSTALLED (VV):
ABOVEABV
FIRE HOSE VALVEFHV
A ALIGN
FLOOR DRAIN
FLOOR SINK (OPEN SITE DRAIN)
EDGE OF SLABE.O.S.
TYPICALTYP.
A. SPRAY FOAM INSULATION AT EXTERIOR WALLS SHALL HAVE
AN AVERAGE R-VALUE OF 22 - TYPICAL.
B. RIGID ROOF INSULATION FOR ALL ROOFS EXCLUDING
SUPERROOF SHALL HAVE AN AVERAGE R-VALUE OF 30.
C. PROVIDE 10 MIL ASTM D437 VAPOR BARRIER IMMEDIATELY
BENEATH ALL INTERIOR SLABS ON GRADE.
D. REFER TO 1/H-AE5.201 FOR TYPICAL FIRE EXTINGUISHER
CABINET DETAIL.
12104
D
F A
ETS
ER
IGE
R
TS
T OE RID
TIHCRA
CE
T
A
OF L
SA
NFORD L. COHN
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 4322
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB / RLF
NOTES:
SHEET NOTES:
HOSPITAL / CLINIC
01 AND 02
BKH
GENERAL ABBREVATIONS AND
ARCHITECTURAL SYMBOLS
G-011
No. Description Date
12104
D
F A
ETS
ER
IGE
R
TS
T OE RID
TIHCRA
CE
T
A
OF L
S
AN
FORD L. COH
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 4322
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
on e ei gh th in ch o ne fo ot th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB / RLF
HOSPITAL / CLINIC
01 AND 02
BKH
INDEX OF DRAWINGS
VOLUME 1
G-021
VOLUME 1 -
HOSPITAL / CLINIC - CIVIL & LANDSCAPE
SECURITY GUARDHOUSES & SECONDARY SECURITY CONTROL CENTER
SECURITY GUARDHOUSE SITE PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE LEVEL ONE CONSTRUCTION PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE ROOF PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE EXTERIOR ELEVATIONS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS PERSPECTIVES
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS CONNECTOR ENLARGED PLANS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS CONNECTOR ENLARGED
SECTION AND ELEVATION - BID ALTERNATE NO. 6
SECURITY GUARDHOUSE BUILDING SECTIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE BUILDING SECTIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE WALL SECTIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE FLOOR PLAN ENLARGED
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS ENLARGED FLOOR PLAN TRELLISES
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS TRELLIS SECTIONS AND ELEVATIONS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS CANOPY DETAILS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS CANOPY SECTION ELEVATION
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS ENLARGED DETAIL
BID ALTERNATE NO.6
VAMC SITE BUILDINGS FENCE DETAILS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS FENCE SECTIONS AND ELEVATIONS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS STRUCTURAL FOUNDATION DETAILS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE PRECAST PANEL JOINTS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE ROOF DETAILS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE ENLARGED DETAILS
BIDALTERNATE NO. 6
SECURITY GUARDHOUSE PARTITION TYPES
BID ALTERNATE No. 6
SECURITY GUARDHOUSE STORE FRONT DETAILS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE DOOR SCHEDULE
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE REFLECTED CEILING PLAN
BID ALTERNATE NO. 6
ARCHITECTURE
G1-AE1.100-A
G1-AE1.101-A
G1-AE1.102-A
G1-AE2.101-A
G1-AE2.102-A
G1-AE2.103-A
G1-AE2.104-A
G1-AE3.101-A
G1-AE3.102-A
G1-AE3.201-A
G1-AE4.101-A
G1-AE4.102-A
G1-AE4.103-A
G1-AE5.101-A
G1-AE5.102-A
G1-AE5.103-A
G1-AE5.121-A
G1-AE5.122-A
G1-AE5.123-A
G1-AE5.125-A
G1-AE5.131-A
G1-AE5.140-A
G1-AE5.201-A
G1-AE5.301-A
G1-AE6.110-A
G1-AI1.101-A
SECURITY NORTH
SECURITY GUARDHOUSE ARCHITECTURAL SITE PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE LEVEL ONE FLOOR PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE ROOF PLANS & REFLECTED CEILING PLANS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE EXTERIOR ELEVATIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE BUILDING SECTIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE INTERIOR ELEVATIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE FINISH AND CASEWORK SCHEDULES AND
KEY TO FINISHES - BID ALTERNATE NO. 6
SECURITY GUARDHOUSE / FOUNDATION AND ROOF FRAMING PLANS
BID ALTERNATE NO.6
SECURITY EAST STAFF / SERVICE ENTRANCE SECURITY EQUIPMENT
LAYOUT PLAN - BID ALTERNATE NO.6
SECURITY BUILDINGS SECURITY DETAILS
BID ALTERNATE NO.6
SECURITY BUILDINGS RISER DIAGRAM
BID ALTERNATE NO.6
SECURITY GUARDHOUSE MECHANICAL ABBREVIATIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE MECHANICAL SYMBOLS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE HVAC AND PIPING TYPICAL SHEET NOTES
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE LEVEL ONE HVAC PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE MECHANICAL SCHEDULES
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE PLUMBING SYMBOLS AND ABBREVIATIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE LEVEL ONE PLUMBING PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE LIGHTING PLAN
BID ALTERNATE NO.6
SECURITY GUARDHOUSE LIGHTING FIXTURE DETAILS
BID ALTERNATE NO.6
SECURITY GUARDHOUSE POWER/COMMUNICATIONS PLAN
BID ALTERNATE NO.6
SECURITY GUARDHOUSE ELEC. SCHEDULES AND SINGLE LINE DIAGRAM
BID ALTERNATE NO.6
ARCHITECTURE
G2-AE1.101-A
G2-AE1.201-A
G2-AE1.301-A
G2-AE2.101-A
G2-AE3.101-A
INTERIORS
G2-AI2.202-A
G2-IN6.201-A
STRUCTURE
G2-SF1.1-A
SECURITY
S-PS1.1-A
S-PS3.01-A
S-PS3.02-A
MECHANICAL
G2-MH0.001-A
G2-MH0.002-A
G2-MH0.003-A
G2-MH1.1-A
G2-MH6.001-A
PLUMBING
G2-PL0.001-A
G2-PL1.1-A
ELECTRICAL
G2-EL1.1-A
G2-EL5.001-A
G2-EP1.1-A
G2-EP8.001-A
SECURITY EAST
Sheet Title
COVER SHEET - VOLUME 1
GENERAL ABBREVIATIONS AND
ARCHITECTURAL SYMBOLS
INDEX OF DRAWINGS - VOLUME 1
INDEX OF DRAWINGS - VOLUME 2
INDEX OF DRAWINGS - VOLUME 3
INDEX OF DRAWINGS - VOLUME 4
INDEX OF DRAWINGS - VOLUME 5
INDEX OF DRAWINGS - VOLUME 6
INDEX OF DRAWINGS - VOLUME 7
INDEX OF DRAWINGS - VOLUME 8
INDEX OF DRAWINGS - VOLUME 9
INDEX OF DRAWINGS - VOLUME 10
INDEX OF DRAWINGS - VOLUME 11
INDEX OF DRAWINGS - VOLUME 12
INDEX OF DRAWINGS - VOLUME 13
PHASING DIAGRAM
NAS SAMPLE DRAWING
Sht#
G-011
G-021 G-022 G-023 G-024 G-025 G-026 G-027 G-028 G-029 G-030 G-031 G-032 G-033
PHASING
G-101 G-102
FURNISHING SCHEDULE & NOTES
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING PLAN
FURNISHING DETAILS
FURNISHING DETAILS
FURNISHING DETAILS
FURNISHING DETAILS
HARDSCAPE SCHEDULE & NOTES
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
HARDSCAPE LAYOUT PLAN
BID ALTERNATE NO. 6 HARDSCAPE LAYOUT PLAN
HARDSCAPE DETAILS
HARDSCAPE DETAILS
HARDSCAPE DETAILS
HARDSCAPE DETAILS
HARDSCAPE DETAILS
HARDSCAPE DETAILS
HARDSCAPE DETAILS
HARDSCAPE DETAILS
LANDSCAPE
LF001
LF101
LF102
LF103
LF104
LF105
LF106
LF107
LF108
LF109
LF110
LF111
LF112
LF113
LF201
LF202
LF203
LF204
LH001
LH101
LH102
LH103
LH104
LH105
LH106
LH107
LH108
LH109
LH110
LH111
LH112
LH201
LH202
LH203
LH204
LH205
LH206
LH207
LH208
LEGEND & NOTES
KEY PLANS
KEY PLANS - BID ALTERNATE 6
LAYOUT CONTROL PLAN
EXISTING SANITARY SCHEDULE
EXISTING STORM SCHEDULE
EXISTING STORM SCHEDULE
EXISTING STORM SCHEDULE
EXISTING STORM SCHEDULE
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN - BID ALTERNATE 6
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN - BID ALTERNATE 6
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN - BID ALTERNATE 6
EXISTING CONDITIONS, EROSION CONTROL,
& DEMOLITION PLAN
NEW SANITARY SCHEDULE
NEW SANITARY SCHEDULE - BID ALTERNATE 6
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
LAYOUT & UTILITY PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
CIVIL
H-CD0.01
H-CD0.02
H-CD0.02-A
H-CD0.03
H-CD0.04
H-CD0.05
H-CD0.06
H-CD0.07
H-CD0.08
H-CD1.01
H-CD1.02
H-CD1.03
H-CD1.04
H-CD1.05
H-CD1.06
H-CD1.07
H-CD1.08
H-CD1.09
H-CD1.10
H-CD1.11
H-CD1.12
H-CD1.13
H-CD1.14
H-CD1.15
H-CD1.16
H-CD1.17
H-CD1.18
H-CD1.19
H-CD1.20
H-CD1.21
H-CD1.22
H-CD1.23-A
H-CD1.24-A
H-CD1.25-A
H-CD1.26-A
H-CS0.01
H-CS0.02-A
H-CS1.01
H-CS1.02
H-CS1.03
H-CS1.04
H-CS1.05
H-CS1.06
H-CS1.07
H-CS1.08
H-CS1.09
H-CS1.10
H-CS1.11
H-CS1.12
H-CS1.13
H-CS1.14
H-CS1.15
H-CS1.16
H-CS1.17
H-CS1.18
H-CS1.19
H-CS1.20
H-CS1.21
H-CS1.22
H-CS1.23
H-CS1.24
H-CS1.25
H-CS1.26
H-CS1.27
H-CS1.28
H-CS1.29
H-CS1.30
H-CS1.31
H-CS1.32
H-CS1.33
H-CS1.34
H-CS1.35
SECURITY BUILDINGS & PERIMETER FENCE
VAMC SITE BUILDINGS SECURITY BUILDINGS AND PERIMETER FENCE
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS TYPICAL FENCES - BID ALTERNATE NO. 6
VAMC SITE BUILDINGS TYPICAL FENCES - BID ALTERNATE NO. 6
VAMC SITE BUILDINGS NORTH MAIN ENTRY PEDESTRIAN
BRIDGE / FLAG POLE
VAMC SITE BUILDINGS NORTH MAIN ENTRY PEDESTRIAN
BRIDGE / FLAG POLE
VAMC SITE BUILDINGS BRIDGE / FLAG POLE SECTION DETAILS
VAMC SITE BUILDINGS BRIDGE / FLAG POLE SECTION DETAILS
VAMC SITE BUILDINGS COVERED WALKWAYS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS COVERED WALKWAYS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS COVERED WALKWAYS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS ENLARGED PLANS
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS COVERED WALKWAY CONNECTOR
BID ALTERNATE NO. 6
VAMC SITE BUILDINGS COVERED WALKWAY ENLARGED PLANS
BID ALTERNATE NO. 6
ARCHITECTURAL SITE
H-AS1.100-A
H-AS1.101-A
H-AS1.102-A
H-AS2.001
H-AS2.002
H-AS2.003
H-AS2.004
H-AS2.101-A
H-AS2.102-A
H-AS2.103-A
H-AS2.201-A
H-AS2.301-A
H-AS2.302-A
Sheet Title
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
PAVEMENT MARKING & SIGNAGE PLAN
OVERALL SITE IMPROVEMENT PLAN - BID ALTERNATE 6
LAYOUT & UTILITY PLAN - BID ALTERNATE 6
LAYOUT & UTILITY PLAN - BID ALTERNATE 6
LAYOUT & UTILITY PLAN - BID ALTERNATE 6
LAYOUT & UTILITY PLAN - BID ALTERNATE 6
LAYOUT & UTILITY PLAN - BID ALTERNATE 6
PAVEMENT MARKING & SIGNAGE PLAN - BID ALTERNATE 6
PAVEMENT MARKING & SIGNAGE PLAN - BID ALTERNATE 6
TRELLIS SITE IMPROVEMENT PLAN - BID ALTERNATE 6
TRELLIS SITE IMPROVEMENT PLAN - BID ALTERNATE 6
NEW STORM SCHEDULE
NEW STORM SCHEDULE
NEW STORM SCHEDULE - BID ALTERNATE 6
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
GRADING, DRAINAGE AND EROSION CONTROL PLAN
BID ALTERNATE 6
GRADING, DRAINAGE AND EROSION CONTROL PLAN
BID ALTERNATE 6
GRADING, DRAINAGE AND EROSION CONTROL PLAN
BID ALTERNATE 6
GRADING, DRAINAGE AND EROSION CONTROL PLAN
BID ALTERNATE 6
GRADING, DRAINAGE AND EROSION CONTROL PLAN
BID ALTERNATE 6
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
PROFILES
DETAILS
DETAILS
DETAILS
DETAILS
DETAILS
DETAILS
DETAILS
DETAILS
DETAILS - BID ALTERNATE 6
DETAILS - BID ALTERNATE 6
Sht#
CIVIL - CONT.
H-CS1.36
H-CS1.37
H-CS1.38
H-CS1.39
H-CS1.40
H-CS1.41
H-CS1.42
H-CS1.43
H-CS1.44
H-CS1.45-A
H-CS1.46-A
H-CS1.47-A
H-CS1.48-A
H-CS1.49-A
H-CS1.50-A
H-CS1.51-A
H-CS1.52-A
H-CS1.53-A
H-CS1.54-A
H-CG0.01
H-CG0.02
H-CG0.03-A
H-CG1.01
H-CG1.02
H-CG1.03
H-CG1.04
H-CG1.05
H-CG1.06
H-CG1.07
H-CG1.08
H-CG1.09
H-CG1.10
H-CG1.11
H-CG1.12
H-CG1.13
H-CG1.14
H-CG1.15
H-CG1.16
H-CG1.17
H-CG1.18
H-CG1.19
H-CG1.20
H-CG1.21
H-CG1.22
H-CG1.23-A
H-CG1.24-A
H-CG1.25-A
H-CG1.26-A
H-CG1.27-A
H-CG3.01
H-CG3.02
H-CG3.03
H-CG3.04
H-CG3.05
H-CG3.06
H-CG3.07
H-CG3.08
H-CG3.09
H-CG3.10
H-CG3.11
H-CG3.12
H-CG3.13
H-CG3.14
H-CG5.01
H-CG5.02
H-CG5.03
H-CG5.04
H-CG5.05
H-CG5.06
H-CG5.07
H-CG5.08
H-CG5.09-A
H-CG5.10-A
DFAS BUILDING SYMBOLS AND ABBREVIATIONS, SECURITY
EQUIPMENT LAYOUT PLAN
DFAS BUILDING LEVEL 1 SECURITY EQUIPMENT LAYOUT PLAN
DFAS BUILDING RISER DIAGRAM AND SECURITY DETAILS
SECURITY - DFAS BUILDING
SC-PSG.01
SC-PS1.1
SC-PS3.01
SECONDARY SECURITY CONTROL CENTER
Sheet Title
SECOND SECURITY CONTROL CENTER FLOOR PLANS
SECOND SECURITY CONTROL CENTER SCHEDULES AND DETAILS
Sht#
ARCHITECTURE
SC-AE1.101
SC-AE6.201
SECONDARY S.C.C. MECHANICAL ABBREVIATIONS
SECONDARY S.C.C. MECHANICAL SYMBOLS
SECONDARY S.C.C. HVAC AND PIPING TYPICAL SHEET NOTES
SECONDARY S.C.C. LEVEL 1 HVAC DEMOLITION PLAN
SECONDARY S.C.C. LEVEL 1 HVAC PLAN
SECONDARY S.C.C. LEVEL 1 PIPING PLAN
SECONDARY S.C.C. MECHANICAL SCHEDULES
SECONDARY S.C.C. CONTROL SCHEMATICS
SECONDARY S.C.C. CONTROL SCHEMATICS
MECHANICAL
SC-MH0.001
SC-MH0.002
SC-MH0.003
SC-MD1.101
SC-MH1.101
SC-MP1.101
SC-MH6.001
SC-MH8.001
SC-MH8.002
SECURITY CONTROL CENTER ELECTRICAL PLANS
SECURITY CONTROL CENTER ELECTRICAL DETAILS AND DIAGRAMS
SECURTIY CONTROL CENTER ELECTRICAL SCHEDULES
ELECTRICAL
SC-EP1.101
SC-EP6.001
SC-EP7.001
SECONDARY SECURITY CONTROL CENTER
FIRE SUPPRESSION SYMBOLS AND ABBREVIATIONS
SECONDARY SECURITY CONTROL CENTER
FIRE SUPPRESSION FLOOR PLANS
SECONDARY SECURITY CONTROL CENTER
FIRE SUPPRESSION DETAILS
FIRE SUPPRESSION
SC-FX0.001
SC-FX1.101
SC-FX5.001
Sheet Title
LANDSCAPE NOTES AND LEGEND
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
LANDSCAPE PLAN
BID ALTERNATE NO.6 LANDSCAPE PLAN
LANDSCAPE PLANTING DETAILS
LANDSCAPE PLANTING DETAILS
LANDSCAPE PLANTING DETAILS
LANDSCAPE PLANTING DETAILS
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
IRRIGATION PLAN
BID ALTERNATE NO.6 IRRIGATION PLAN
IRRIGATION DETAILS
Sht#
LANDSCAPE - CONT.
LP001
LP101
LP102
LP103
LP104
LP105
LP106
LP107
LP108
LP109
LP110
LP111
LP112
LP113
LP201
LP202
LP203
LP204
LP301
LP302
LP303
LP304
LP305
LP306
LP307
LP308
LP309
LP310
LP311
LP312
LP313
LP401
Sheet Title
SECURITY GUARDHOUSE INTERIOR ELEVATIONS & MILLWORK SECTIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE LEVEL ONE WALL FINISH / PROTECTION PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE FINISH AND CASEWORK SCHEDULES AND
KEY TO FINISHES - BID ALTERNATE NO. 6
SECURITY GUARDHOUSE EQUIPMENT PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE / STRUCTURAL NOTES AND ABBREVIATIONS
BID ALTERNATE NO.6
SECURITY GUARDHOUSE / STRUCTURAL NOTES CONTINUED
BID ALTERNATE NO.6
SECURITY GUARDHOUSE / FOUNDATION AND ROOF FRAMING PLANS
BID ALTERNATE NO.6
SECURITY GUARDHOUSE / ENLARGED PLAN VIEWS
BID ALTERNATE NO.6
SECURITY GUARDHOUSE / SECTIONS AND DETAILS
BID ALTERNATE NO.6
SECURITY GUARDHOUSE / SECTIONS AND DETAILS
BID ALTERNATE NO.6
SECURITY GUARDHOUSE / SCHEDULES AND DIAGRAMS
BID ALTERNATE NO.6
SECURITY BUILDINGS SYMBOLS AND ABBREVIATIONS
BID ALTERNATE NO.6
SECURITY NORTH VISITOR/PATIENT ENTRANCE
SECURITY EQUIPMENT LAYOUT PLAN - BID ALTERNATE NO.6
SECURITY BUILDINGS SECURITY DETAILS
BID ALTERNATE NO.6
SECURITY BUILDINGS RISER DIAGRAM
BID ALTERNATE NO.6
SECURITY GUARDHOUSE MECHANICAL ABBREVIATIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE MECHANICAL SYMBOLS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE HVAC AND PIPING TYPICAL SHEET NOTES
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE LEVEL ONE HVAC PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE MECHANICAL SCHEDULES
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE PLUMBING SYMBOLS AND ABBREVIATIONS
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE LEVEL ONE PLUMBING PLAN
BID ALTERNATE NO. 6
SECURITY GUARDHOUSE LIGHTING PLAN
BID ALTERNATE NO.6
SECURITY GUARDHOUSE LIGHTING FIXTURE DETAILS
BID ALTERNATE NO.6
SECURITY GUARDHOUSE POWER/COMMUNICATIONS PLAN
BID ALTERNATE NO.6
SECURITY GUARDHOUSE ELEC. SCHEDULES AND SINGLE LINE DIAGRAM
BID ALTERNATE NO.6
SECURITY GUARDHOUSE COMMUNICATIONS RISER DIAGRAMS
BID ALTERNATE NO.6
Sht#
INTERIORS
G1-AI2.201-A
G1-IN1.101-A
G1-IN6.201-A
EQUIPMENT
G-QH4.101-A
STRUCTURE
G1-SG1.1-A
G1-SG1.2-A
G1-SF1.1-A
G1-SF4.1-A
G1-SF5.1-A
G1-SF5.2-A
G1-SF6.1-A
SECURITY
S-PSG.01-A
S-PS1.2-A
S-PS3.01-A
S-PS3.02-A
MECHANICAL
G1-MH0.001-A
G1-MH0.002-A
G1-MH0.003-A
G1-MH1.1-A
G1-MH6.001-A
PLUMBING
G1-PL0.001-A
G1-PL1.1-A
ELECTRICAL
G1-EL1.1-A
G1-EL5.001-A
G1-EP1.1-A
G1-EP8.001-A
G1-ET6.001-A
Dwg#
Dwg#
Dwg#
Dwg#
Sht#
0235a
0238a
0250a
0258a
No. Description Date
F A
ETS
ER
IGE
R
TS
T OE RID
TIHCRA
CE
T
A
OF L
S
AN
FORD L. COH
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of 4322
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB / RLF
HOSPITAL / CLINIC
01 AND 02
BKH
INDEX OF DRAWINGS
VOLUME 2
G-022
Sheet Title
COVER SHEET - VOLUME 2
GENERAL ABBREVIATIONS AND ARCHITECTURAL SYMBOLS
INDEX OF DRAWINGS - VOLUME 1
INDEX OF DRAWINGS - VOLUME 2
INDEX OF DRAWINGS - VOLUME 3
INDEX OF DRAWINGS - VOLUME 4
INDEX OF DRAWINGS - VOLUME 5
INDEX OF DRAWINGS - VOLUME 6
INDEX OF DRAWINGS - VOLUME 7
INDEX OF DRAWINGS - VOLUME 8
INDEX OF DRAWINGS - VOLUME 9
INDEX OF DRAWINGS - VOLUME 10
INDEX OF DRAWINGS - VOLUME 11
INDEX OF DRAWINGS - VOLUME 12
INDEX OF DRAWINGS - VOLUME 13
Sht#
G-011 G-021 G-022 G-023 G-024 G-025 G-026 G-027 G-028 G-029 G-030 G-031 G-032 G-033
VOLUME 2 -
HOSPITAL / CLINIC - STRUCTURE & ARCHITECTURE
HOSPITAL / CLINIC LEVEL 0, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 0, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 0, AREA C LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 0, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 0, AREA E LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 1, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 1, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 1, AREA C LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 1, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 1, AREA E LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 1, INTERSTITIAL, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 1, INTERSTITIAL, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 1, INTERSTITIAL, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 1, INTERSTITIAL, AREA E LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 2, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 2, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 2, AREA C LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 2, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 2, AREA E LIFE SAFETY PLAN
ARCHITECTURE
LIFE SAFETY PLANS
H-LS1.0FA
H-LS1.0FB
H-LS1.0FC
H-LS1.0FD
H-LS1.0FE
H-LS1.1FA
H-LS1.1FB
H-LS1.1FC
H-LS1.1FD
H-LS1.1FE
H-LS1.1NA
H-LS1.1NB
H-LS1.1ND
H-LS1.1NE
H-LS1.2FA
H-LS1.2FB
H-LS1.2FC
H-LS1.2FD
H-LS1.2FE
Sheet Title
HOSPITAL / CLINIC LEVEL 1, AREA A, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA A, ZONE 1, CONSTRUCTION PLAN
BID ALTERNATE NO.8
HOSPITAL / CLINIC LEVEL 1, AREA A, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA A, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA A, ZONE 4 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA B, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA B, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA C, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA C, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA D, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA D, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA D, ZONE 3 CONSTRUCTION PLAN
BID ALTERNATE NO. 3
HOSPITAL / CLINIC LEVEL 1, AREA D, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA D, ZONE 4 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA D, ZONE 4 CONSTRUCTION PLAN
BID ALTERNATE NO. 3
HOSPITAL / CLINIC LEVEL 1, AREA D, ZONE 5 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA D, ZONE 5 CONSTRUCTION PLAN
BID ALTERNATES NO. 2 AND NO. 3
HOSPITAL / CLINIC LEVEL 1, AREA D, ZONE 6 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA E, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA E, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA E, ZONE 2 CONSTRUCTION PLAN
BID ALTERNATE NO. 2
HOSPITAL / CLINIC LEVEL 1, AREA E, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1, AREA E, ZONE 3 CONSTRUCTION PLAN
BID ALTERNATE NO. 2
HOSPITAL / CLINIC LEVEL 1, AREA E, ZONE 4 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 1M, AREA D, ZONE 6 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA A, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA A, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA A, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA A, ZONE 4 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA B, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA B, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA C, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA C, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA D, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA D, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA D, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA D, ZONE 4 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA D, ZONE 5 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA D, ZONE 5 CONSTRUCTION PLAN
BID ALTERNATE NO. 7
HOSPITAL / CLINIC LEVEL 2, AREA D, ZONE 6 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA E, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA E, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA E, ZONE 2 CONSTRUCTION PLAN
BID ALTERNATE NO. 7
HOSPITAL / CLINIC LEVEL 2, AREA E, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 2, AREA E, ZONE 3 CONSTRUCTION PLAN
BID ALTERNATE NO. 7
HOSPITAL / CLINIC LEVEL 2, AREA E, ZONE 4 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA A, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA A, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA A, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA B, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA B, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA C, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA C, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA D, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA D, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA D, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA D, ZONE 4 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA D, ZONE 5 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA D, ZONE 6 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA E, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA E, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 3, AREA E, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA A, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA A, ZONE 1, CONSTRUCTION PLAN
BID ALTERNATE NO. 5
HOSPITAL / CLINIC LEVEL 4, AREA A, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA A, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA B, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA B, ZONE 1, CONSTRUCTION PLAN
BID ALTERNATE NO. 4
HOSPITAL / CLINIC LEVEL 4, AREA B, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA B, ZONE 2, CONSTRUCTION PLAN
BID ALTERNATE NO. 4
HOSPITAL / CLINIC LEVEL 4, AREA C, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA C, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA D, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA D, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA D, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA D, ZONE 4 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA D, ZONE 5 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA D, ZONE 6 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA E, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA E, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 4, AREA E, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA A, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA A, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA A, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA B, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA B, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA C, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA C, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA D, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA D, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA D, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA D, ZONE 4 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA D, ZONE 5 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA D, ZONE 6 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA E, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA E, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5, AREA E, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 6, AREA A, ZONE 3 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 6, AREA C, ZONE 1 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 6, AREA C, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5M, AREA D, ZONE 2 CONSTRUCTION PLAN
HOSPITAL / CLINIC LEVEL 5M, AREA D, ZONE 5 CONSTRUCTION PLAN
Sht#
CONSTRUCTION PLANS - CONT.
H-AE1.1FA1
H-AE1.1FA1-A
H-AE1.1FA2
H-AE1.1FA3
H-AE1.1FA4
H-AE1.1FB1
H-AE1.1FB2
H-AE1.1FC1
H-AE1.1FC2
H-AE1.1FD1
H-AE1.1FD2
H-AE1.1FD2-A
H-AE1.1FD3
H-AE1.1FD4
H-AE1.1FD4-A
H-AE1.1FD5
H-AE1.1FD5-A
H-AE1.1FD6
H-AE1.1FE1
H-AE1.1FE2
H-AE1.1FE2-A
H-AE1.1FE3
H-AE1.1FE3-A
H-AE1.1FE4
H-AE1.1MFD6
H-AE1.2FA1
H-AE1.2FA2
H-AE1.2FA3
H-AE1.2FA4
H-AE1.2FB1
H-AE1.2FB2
H-AE1.2FC1
H-AE1.2FC2
H-AE1.2FD1
H-AE1.2FD2
H-AE1.2FD3
H-AE1.2FD4
H-AE1.2FD5
H-AE1.2FD5-A
H-AE1.2FD6
H-AE1.2FE1
H-AE1.2FE2
H-AE1.2FE2-A
H-AE1.2FE3
H-AE1.2FE3-A
H-AE1.2FE4
H-AE1.3FA1
H-AE1.3FA2
H-AE1.3FA3
H-AE1.3FB1
H-AE1.3FB2
H-AE1.3FC1
H-AE1.3FC2
H-AE1.3FD1
H-AE1.3FD2
H-AE1.3FD3
H-AE1.3FD4
H-AE1.3FD5
H-AE1.3FD6
H-AE1.3FE1
H-AE1.3FE2
H-AE1.3FE3
H-AE1.4FA1
H-AE1.4FA1-A
H-AE1.4FA2
H-AE1.4FA3
H-AE1.4FB1
H-AE1.4FB1-A
H-AE1.4FB2
H-AE1.4FB2-A
H-AE1.4FC1
H-AE1.4FC2
H-AE1.4FD1
H-AE1.4FD2
H-AE1.4FD3
H-AE1.4FD4
H-AE1.4FD5
H-AE1.4FD6
H-AE1.4FE1
H-AE1.4FE2
H-AE1.4FE3
H-AE1.5FA1
H-AE1.5FA2
H-AE1.5FA3
H-AE1.5FB1
H-AE1.5FB2
H-AE1.5FC1
H-AE1.5FC2
H-AE1.5FD1
H-AE1.5FD2
H-AE1.5FD3
H-AE1.5FD4
H-AE1.5FD5
H-AE1.5FD6
H-AE1.5FE1
H-AE1.5FE2
H-AE1.5FE3
H-AE1.6FA3
H-AE1.6FC1
H-AE1.6FC2
H-AE1.5MFD2
H-AE1.5MFD5
HOSPITAL/CLINIC GENERAL NOTES AND ABBREVIATIONS
HOSPITAL/CLINIC TYPICAL DETAILS
HOSPITAL/CLINIC TYPICAL DETAILS
HOSPITAL/CLINIC TYPICAL DETAILS
HOSPITAL/CLINIC GEOMETRY PLAN AREA A
HOSPITAL/CLINIC GEOMETRY PLAN AREA B
HOSPITAL/CLINIC GEOMETRY PLAN AREA C
HOSPITAL/CLINIC GEOMETRY PLAN AREA D
HOSPITAL/CLINIC GEOMETRY PLAN AREA E
HOSPITAL/CLINIC LEVEL 1, AREA A, ZONE 1
HOSPITAL/CLINIC LEVEL 1, AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 1, AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 1, AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 1, AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 1, AREA C, ZONE 1
HOSPITAL/CLINIC LEVEL 1, AREA C, ZONE 2
HOSPITAL/CLINIC LEVEL 1, AREA D, ZONE 1
HOSPITAL/CLINIC LEVEL 1, AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 1, AREA D, ZONE 3
HOSPITAL/CLINIC LEVEL 1, AREA D, ZONE 4
HOSPITAL/CLINIC LEVEL 1, AREA D, ZONE 5
HOSPITAL/CLINIC LEVEL 1, AREA D, ZONE 6
HOSPITAL/CLINIC LEVEL 1, AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 1, AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 1, AREA E, ZONE 3
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA A, ZONE 1
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA D, ZONE 1
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA D, ZONE 3
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA D, ZONE 4
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA D, ZONE 5
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA D, ZONE 6
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 1 INTERSITIAL, AREA E, ZONE 3
HOSPITAL/CLINIC LEVEL 2, AREA A, ZONE 1
HOSPITAL/CLINIC LEVEL 2, AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 2, AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 2, AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 2, AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 2, AREA C, ZONE 1
HOSPITAL/CLINIC LEVEL 2, AREA C, ZONE 2
HOSPITAL/CLINIC LEVEL 2, AREA D, ZONE 1
HOSPITAL/CLINIC LEVEL 2, AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 2, AREA D, ZONE 3
HOSPITAL/CLINIC LEVEL 2, AREA D, ZONE 4
HOSPITAL/CLINIC LEVEL 2, AREA D, ZONE 5
HOSPITAL/CLINIC LEVEL 2, AREA D, ZONE 6
HOSPITAL/CLINIC LEVEL 2, AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 2, AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 2, AREA E, ZONE 3
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA A, ZONE 1
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA D, ZONE 1
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA D, ZONE 3
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA D, ZONE 4
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA D, ZONE 5
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA D, ZONE 6
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 2 INTERSITIAL, AREA E, ZONE 3
HOSPITAL/CLINIC LEVEL 3, AREA A, ZONE 1
HOSPITAL/CLINIC LEVEL 3, AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 3, AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 3, AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 3, AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 3, AREA C, ZONE 1
HOSPITAL/CLINIC LEVEL 3, AREA C, ZONE 2
HOSPITAL/CLINIC LEVEL 3, AREA D, ZONE 1
HOSPITAL/CLINIC LEVEL 3, AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 3, AREA D, ZONE 3
HOSPITAL/CLINIC LEVEL 3, AREA D, ZONE 4
HOSPITAL/CLINIC LEVEL 3, AREA D, ZONE 5
HOSPITAL/CLINIC LEVEL 3, AREA D, ZONE 6
HOSPITAL/CLINIC LEVEL 3, AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 3, AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 3, AREA E, ZONE 3
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA A, ZONE 1
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA D, ZONE 1
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA D, ZONE 3
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA D, ZONE 4
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA D, ZONE 5
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA D, ZONE 6
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 3 INTERSITIAL, AREA E, ZONE 3
STRUCTURE
H-SF0.001
H-SF0.002
H-SF0.003
H-SF0.004
H-SF0.005
H-SF0.006
H-SF0.007
H-SF0.008
H-SF0.009
H-SF1.1FA1
H-SF1.1FA2
H-SF1.1FA3
H-SF1.1FB1
H-SF1.1FB2
H-SF1.1FC1
H-SF1.1FC2
H-SF1.1FD1
H-SF1.1FD2
H-SF1.1FD3
H-SF1.1FD4
H-SF1.1FD5
H-SF1.1FD6
H-SF1.1FE1
H-SF1.1FE2
H-SF1.1FE3
H-SF1.1NA1
H-SF1.1NA2
H-SF1.1NA3
H-SF1.1NB1
H-SF1.1NB2
H-SF1.1ND1
H-SF1.1ND2
H-SF1.1ND3
H-SF1.1ND4
H-SF1.1ND5
H-SF1.1ND6
H-SF1.1NE1
H-SF1.1NE2
H-SF1.1NE3
H-SF1.2FA1
H-SF1.2FA2
H-SF1.2FA3
H-SF1.2FB1
H-SF1.2FB2
H-SF1.2FC1
H-SF1.2FC2
H-SF1.2FD1
H-SF1.2FD2
H-SF1.2FD3
H-SF1.2FD4
H-SF1.2FD5
H-SF1.2FD6
H-SF1.2FE1
H-SF1.2FE2
H-SF1.2FE3
H-SF1.2NA1
H-SF1.2NA2
H-SF1.2NA3
H-SF1.2NB1
H-SF1.2NB2
H-SF1.2ND1
H-SF1.2ND2
H-SF1.2ND3
H-SF1.2ND4
H-SF1.2ND5
H-SF1.2ND6
H-SF1.2NE1
H-SF1.2NE2
H-SF1.2NE3
H-SF1.3FA1
H-SF1.3FA2
H-SF1.3FA3
H-SF1.3FB1
H-SF1.3FB2
H-SF1.3FC1
H-SF1.3FC2
H-SF1.3FD1
H-SF1.3FD2
H-SF1.3FD3
H-SF1.3FD4
H-SF1.3FD5
H-SF1.3FD6
H-SF1.3FE1
H-SF1.3FE2
H-SF1.3FE3
H-SF1.3NA1
H-SF1.3NA2
H-SF1.3NA3
H-SF1.3NB1
H-SF1.3NB2
H-SF1.3ND1
H-SF1.3ND2
H-SF1.3ND3
H-SF1.3ND4
H-SF1.3ND5
H-SF1.3ND6
H-SF1.3NE1
H-SF1.3NE2
H-SF1.3NE3
Sheet Title
HOSPITAL/CLINIC LEVEL 4, AREA A. ZONE 1
HOSPITAL/CLINIC LEVEL 4, AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 4, AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 4, AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 4, AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 4, AREA C, ZONE 1
HOSPITAL/CLINIC LEVEL 4, AREA C, ZONE 2
HOSPITAL/CLINIC LEVEL 4, AREA D, ZONE 1
HOSPITAL/CLINIC LEVEL 4, AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 4, AREA D, ZONE 3
HOSPITAL/CLINIC LEVEL 4, AREA D, ZONE 4
HOSPITAL/CLINIC LEVEL 4, AREA D, ZONE 5
HOSPITAL/CLINIC LEVEL 4, AREA D, ZONE 6
HOSPITAL/CLINIC LEVEL 4, AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 4, AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 4, AREA E, ZONE 3
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA A, ZONE 1
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA D, ZONE 1
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA D, ZONE 4
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA D, ZONE 5
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 4 INTERSITIAL, AREA E, ZONE 3
HOSPITAL/CLINIC LEVEL 5, AREA A, ZONE 1
HOSPITAL/CLINIC LEVEL 5, AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 5, AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 5, AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 5, AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 5, AREA C, ZONE 1
HOSPITAL/CLINIC LEVEL 5, AREA C, ZONE 2
HOSPITAL/CLINIC LEVEL 5, AREA D, ZONE 1
HOSPITAL/CLINIC LEVEL 5, AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 5, AREA D, ZONE 4
HOSPITAL/CLINIC LEVEL 5, AREA D, ZONE 5 AND 6
HOSPITAL/CLINIC LEVEL 5, AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 5, AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 5, AREA E, ZONE 3
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA A, ZONE 1
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA A, ZONE 2
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA A, ZONE 3
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA B, ZONE 1
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA B, ZONE 2
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA D, ZONE 2
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA D, ZONE 5
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA E, ZONE 1
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA E, ZONE 2
HOSPITAL/CLINIC LEVEL 6 (ROOF), AREA E, ZONE 3
HOSPITAL/CLINIC TYPICAL FOUNDATION SCHEDULE AND DETAILS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FOUNDATION SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC FRAMING SECTIONS
HOSPITAL/CLINIC TYPICAL BEAM DETAILS
HOSPITAL/CLINIC BEAM SCHEDULE
HOSPITAL/CLINIC TYPICAL CONCRETE COLUMN DETAILS
HOSPITAL/CLINIC COLUMN SCHEDULE
HOSPITAL/CLINIC TYPICAL ONE-WAY SLAB SCHEDULE AND DETAILS
Sht#
STRUCTURE - CONT.
H-SF1.4FA1
H-SF1.4FA2
H-SF1.4FA3
H-SF1.4FB1
H-SF1.4FB2
H-SF1.4FC1
H-SF1.4FC2
H-SF1.4FD1
H-SF1.4FD2
H-SF1.4FD3
H-SF1.4FD4
H-SF1.4FD5
H-SF1.4FD6
H-SF1.4FE1
H-SF1.4FE2
H-SF1.4FE3
H-SF1.4NA1
H-SF1.4NA2
H-SF1.4NA3
H-SF1.4NB1
H-SF1.4NB2
H-SF1.4ND1
H-SF1.4ND2
H-SF1.4ND4
H-SF1.4ND5
H-SF1.4NE1
H-SF1.4NE2
H-SF1.4NE3
H-SF1.5FA1
H-SF1.5FA2
H-SF1.5FA3
H-SF1.5FB1
H-SF1.5FB2
H-SF1.5FC1
H-SF1.5FC2
H-SF1.5FD1
H-SF1.5FD2
H-SF1.5FD4
H-SF1.5FD5
H-SF1.5FE1
H-SF1.5FE2
H-SF1.5FE3
H-SF1.6FA1
H-SF1.6FA2
H-SF1.6FA3
H-SF1.6FB1
H-SF1.6FB2
H-SF1.6FD2
H-SF1.6FD5
H-SF1.6FE1
H-SF1.6FE2
H-SF1.6FE3
H-SF4.100
H-SF4.101
H-SF4.102
H-SF4.103
H-SF4.104
H-SF4.151
H-SF4.152
H-SF4.153
H-SF4.154
H-SF4.155
H-SF4.156
H-SF4.157
H-SF5.100
H-SF5.101
H-SF5.102
H-SF5.103
H-SF5.104
H-SF5.150
H-SF5.151
H-SF5.152
H-SF5.153
H-SF5.154
H-SF5.155
H-SF5.156
H-SF5.157
H-SF5.158
H-SF5.159
H-SF5.160
H-SF6.100
H-SF6.101
H-SF6.200
H-SF6.201
H-SF6.400
Sheet Title
HOSPITAL / CLINIC LEVEL 2, INTERSTITIAL, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 2, INTERSTITIAL, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 2, INTERSTITIAL, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 2, INTERSTITIAL, AREA E LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 3, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 3, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 3, AREA C LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 3, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 3, AREA E LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 3, INTERSTITIAL, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 3, INTERSTITIAL, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 3, INTERSTITIAL, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 3, INTERSTITIAL, AREA E LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 4, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 4, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 4, AREA C LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 4, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 4, AREA E LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 4, INTERSTITIAL, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 4, INTERSTITIAL, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 4, INTERSTITIAL, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 4, INTERSTITIAL, AREA E LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 5, AREA A LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 5, AREA B LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 5, AREA C LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 5, AREA D LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 5, AREA E LIFE SAFETY PLAN
HOSPITAL / CLINIC LEVEL 0 OVERALL PLAN
HOSPITAL / CLINIC LEVEL 1 OVERALL PLAN
HOSPITAL / CLINIC LEVEL 2 OVERALL PLAN
HOSPITAL / CLINIC LEVEL 3 OVERALL PLAN
HOSPITAL / CLINIC LEVEL 4 OVERALL PLAN
HOSPITAL / CLINIC LEVEL 5 OVERALL PLAN
HOSPITAL / CLINIC ROOF LEVEL OVERALL PLAN
HOSPITAL / CLINIC LEVEL 0, AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 0, AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 0, AREA C AREA PLAN
HOSPITAL / CLINIC LEVEL 0, AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 1, AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 1, AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 1, AREA C AREA PLAN
HOSPITAL / CLINIC LEVEL 1, AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 1, AREA E AREA PLAN
HOSPITAL / CLINIC LEVEL 1 INTERSTITIAL AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 1 INTERSTITIAL AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 1 INTERSTITIAL AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 1 INTERSTITIAL AREA E AREA PLAN
HOSPITAL / CLINIC LEVEL 2, AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 2, AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 2, AREA C AREA PLAN
HOSPITAL / CLINIC LEVEL 2, AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 2, AREA E AREA PLAN
HOSPITAL / CLINIC LEVEL 2 INTERSTITIAL AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 2 INTERSTITIAL AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 2 INTERSTITIAL AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 2 INTERSTITIAL AREA E AREA PLAN
HOSPITAL / CLINIC LEVEL 3, AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 3, AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 3, AREA C AREA PLAN
HOSPITAL / CLINIC LEVEL 3, AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 3, AREA E AREA PLAN
HOSPITAL / CLINIC LEVEL 3 INTERSTITIAL AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 3 INTERSTITIAL AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 3 INTERSTITIAL AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 3 INTERSTITIAL AREA E AREA PLAN
HOSPITAL / CLINIC LEVEL 4, AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 4, AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 4, AREA C AREA PLAN
HOSPITAL / CLINIC LEVEL 4, AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 4, AREA E AREA PLAN
HOSPITAL / CLINIC LEVEL 4 INTERSTITIAL AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 4 INTERSTITIAL AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 4 INTERSTITIAL AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 4 INTERSTITIAL AREA E AREA PLAN
HOSPITAL / CLINIC LEVEL 5, AREA A AREA PLAN
HOSPITAL / CLINIC LEVEL 5, AREA B AREA PLAN
HOSPITAL / CLINIC LEVEL 5, AREA C AREA PLAN
HOSPITAL / CLINIC LEVEL 5, AREA D AREA PLAN
HOSPITAL / CLINIC LEVEL 5, AREA E AREA PLAN
HOSPITAL / CLINIC ROOF LEVEL, AREA A AREA PLAN
HO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .