Attachment A - VA Illiana Fire Extinguishers Inventory and Estimated Maintenance Per Year_Final.xlsx

XLSX spreadsheet 75 KB Posted

Attached to
H212--Fire Extinguisher/Hood Maintenance Illiana VA Healthcare System in Danville, IL
Solicitation number
36C25225Q0673
Issued by

About this file

This document is a detailed Fire Extinguisher Inventory Log for the Illiana VA Healthcare System in Danville, IL, tracking 350 portable fire extinguishers across multiple buildings. The inventory lists specific locations, types (primarily 10 lb ABC and 5 lb CO2), and scheduled maintenance dates for fire extinguishers in buildings including Administration, Warehouse, Medical/Surgery, Resident Quarters, and various support facilities. The log provides a comprehensive four-year maintenance schedule from October 2025 to October 2029, with precise tracking of 6-year and 12-year hydrostatic testing requirements.

The associated federal contract opportunity (Solicitation Number 36C25225Q0673) is a commercial items solicitation for fire extinguisher and hood maintenance services, to be awarded on a Lowest Price Technically Acceptable basis. The contract is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12, with provisions for potential option extensions up to six months. The inventory log appears to be a supporting document for this maintenance contract, providing a detailed baseline of existing fire safety equipment across the healthcare system's campus.

View the file

Other files

File Type Posted
36C25225Q0673 0002.docx DOCX document
36C25225Q0673 0001.docx DOCX document
P07 - Vermillion County WD 2015-5021 Rev 26 dated 07082025.pdf PDF
Attachment B - Fixed Systems.docx DOCX document
36C25225Q0673.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2025 Inventory

FIRE EXTINGUISHER LOG 2025- UPDATED 8-18-25
QTYWTTYPELOCATION6 yr12 yr. Hydr
Building 14-
Administration
Attic (1) (12 Total)
110ABCATTICOct-26Oct-32
2nd Floor (3)
210ABCEAST (cabinet)Oct-25Oct-31
310ABCCENTER (cabinet)Oct-25Oct-31
410ABCWEST (cabinet)Oct-25Oct-31
1st Floor (3)
510ABCEAST (cabinet)Oct-25Oct-31
610ABCCENTER (cabinet)Oct-25Oct-31
710ABCWEST (cabinet)Oct-25Oct-31
Basement (5)
810ABCRM B100Oct-26Oct-26
910ABCRM B102Oct-25Oct-31
1010ABCRM B104Oct-25Oct-31
1110ABCRM B105 (East) (Flat Bracket)Oct-28Oct-34
1210ABCRM B101 (West)Oct-28Oct-28
Building 19
Warehouse
(16 Total)
1310ABCDOCK (Amerex)Oct-30Oct-24
1st Floor (6)
1410ABCELEVATOR (outside office)Oct-24Oct-30
1510ABCNORTH END (EAST)Oct-24Oct-30
1610ABCNORTH END (WEST)Oct-26Oct-32
1710ABCSOUTH END (Bay 3)Oct-26Oct-32
1810ABCO2 ROOMOct-28Oct-28
Attic (4)
1910ABCOUTSIDE ELEVOct-24Oct-30
2010ABCSOUTH END-MIDDLEOct-24Oct-30
2110ABCNORTH END-MIDDLEOct-24Oct-30
2210ABCNORTH ENDOct-28Oct-28
QTYWTTYPELOCATION6 yr12 yr. Hydr
Basement (6)
2310ABCOUTSIDE ELEVOct-24Oct-30
2410ABCNORTH END-BAY 35Oct-24Oct-30
2510ABCNORTH END-BAY 27Oct-24Oct-30
2610ABCSOUTH END-BAY 44Oct-24Oct-30
2710ABCSOUTH END-BAY 36Oct-24Oct-30
2810ABCSOUTH END-BAY 38Oct-24Oct-30
Building 22-
Laundry
(4 Total)
2910ABCW. LOADING DOCK-STAIRSOct-26Oct-32
3010ABCNEXT TO BAILEROct-28Oct-34
3110ABCTOP OF RAMP-NORTH ENDOct-28Oct-34
3210ABCNW DOCK - (next to exit)Oct-26Oct-32
Building 25-
Greenhouse
(2 Total)
3310ABCWEST ENDOct-24Oct-30
3410ABCEAST ENDOct-28Oct-34
Building 35-
Residents Quarters
(4 Total)
3510ABCBASEMENT *Oct-25Oct-31
3610ABC1ST FLOOR - HALL *Oct-26Oct-32
3710ABC2ND FLOOR - HALL*Oct-26Oct-32
3810ABC3RD FLOOR - HALL*Oct-26Oct-32
QTYWTTYPELOCATION6 yr12 yr. Hydr
Building 39B- (5)
TR House
(5 Total)
395ABCBASEMENTOct-25Oct-31
405ABCKITCHENOct-25Oct-31
415ABCFIRST FLOOR-FOYEROct-26Oct-32
425ABC2ND FLOOR - Top of stairsOct-25Oct-31
435ABCATTICOct-25Oct-31
Building 49-
Chapel
(4 Total)
4410ABCENTRANCE - CatholicOct-28Oct-34
4510ABCSACRISTY - Catholic-NorthOct-28Oct-34
4610ABCENTRANCE - ProtestantOct-28Oct-34
4710ABCSACRISTY - ProtestantOct-28Oct-34
Building 58-
Medical/Surgery
Basement (5)( Total)
4820ABCELEVATOR LOBBYOct-26Oct-32
4910ABCINSIDE SIMS DOOR (Am- Flat)Oct-25Oct-31
5010ABCINSIDE NEXT DOOR (Am- Pin)Oct-29Oct-35
5110ABCELEVATOR ROOMOct-25Oct-31
5210ABCSERVICE ROOM (OUTSIDE-Fork)Oct-29Oct-35
Service Rooms (Outside (2))
5310ABCA/C SERVICE ROOM (South)Oct-28Oct-34
5410ABCGENERATOR ROOM (North)Oct-28Oct-34
5510ABCPHAR - RM 103 - ENTROct-26Oct-32
5620ABCPHAR-CORR-RM 102LOct-26Oct-32
5720ABCPHAR-CORR-DOCK (102J) backOct-26Oct-32
5810ABCMAIN HALLWAYMar-26Mar-32
5910ABCLOBBY - WAITING RMMar-24Mar-30
605CO2ROOM 131Oct-25Oct-30
615CO2REAR - ROOM 134-EASTOct-24Oct-29
625CO2REAR - ROOM 134-WESTOct-25Oct-30
635CO2DOOR - ROOM 136Oct-24Oct-29
1st Floor (17)
645CO2ROOM 136BOct-25Oct-30
6510ABCROOM 142Oct-24Oct-30
6610ABCENTR- WEST CORR (Rm 128)Oct-26Oct-32
6710ABCENTR - EAST CORR (Rm 106)Oct-24Oct-30
6810ABCCORR - XRAY RM 117C (cabinet)Oct-25Jan-31
6910ABCCORR - ROOM 121C (CABINET)Oct-25Oct-31
7010ABC58 BACK DOCKOct-26Oct-32
7110ABCMORGUEOct-26Oct-32
2nd Floor (11)
7210ABCSPD-CLEAN-ACROSS RM 203COct-25Oct-31
7310ABCSPD - ROOM 205BOct-24Oct-30
7410ABCSPD - ROOM 205d (CABINET)Oct-26Oct-32
7510ABCSPD-BACK EXIT TO STAIRSOct-26Oct-32
7610ABCSPD-OUTSIDE EXITOct-26Oct-32
7710ABCSRVC RM-ABOVE SPDOct-25Oct-31
7810ABCSPD-DIRTY-ROOM 202AOct-25Oct-31
7910ABCENTR - WEST CORRMar-24Mar-30
8010ABCCORR - ROOM 227Mar-24Mar-30
8110ABCENTR - EAST CORRMar-28Mar-34
8220ABCCORR - ROOM 237Oct-24Oct-30
3rd Floor (5)
8310ABCENTR - WEST CORROct-24Oct-30
8420ABCCORR - ROOM 344Oct-28Oct-34
8510ABCENTR - EAST CORRMar-24Mar-30
8610ABCCORR - ROOM 332Mar-25Mar-31
8710ABCSERVICE ROOM**Oct-25Oct-30
4th Floor (4)
8810ABCENTR - WEST CORRMar-24Mar-30
8910ABCCORR - ROOM 446Mar-24Mar-30
9010ABCENTR - EAST CORRMar-24Mar-30
9110ABCCORR - ROOM 428Mar-24Mar-30
5th Floor (13)
9210ABCELEVATOR LOBBYMar-24Mar-30
9310ABCSURGERY ENTRANCEMar-24Mar-30
9410ABCCORR-ACROSS ROOM 528Mar-24Mar-24
9510ABCREAR - O.R. 527Mar-24Mar-24
965CO2OPERATING ROOM 527 (5 yr. Hydro Test)Oct-26Oct-31
975CO2OPERATING ROOM 524 (5 yr. Hydro Test)Oct-26Oct-31
985CO2OPERATING ROOM 529 (5 yr. Hydro Test)Oct-26Oct-26
995CO2OPERATING ROOM 521 (5 yr. Hydro Test)Oct-26Oct-31
10010ABCOUTSIDE LOCKER RM-519Oct-241010/2024
1015CO2RECOVERY ROOM-EASTOct-26Oct-26
1025CO2RECOVERY ROOM-WESTOct-26Oct-26
10310ABCWest end by Rm 508AOct-24Oct-30
10410ABCCenter West Hall by Rm 512Oct-24Oct-30
Attic (5)
10510ABCINSIDE ATTIC DOOR €Oct-25Oct-31
10610ABCELEVATOR ROOMOct-28Oct-34
10710ABCWEST ATTICOct-24Oct-30
10810ABCEAST ATTICOct-29Oct-35
Building 60-HBPC
(4Total)
10910ABC2ND FLOOR - CORR -Oct-24Oct-30
11010ABCBASEMENT - SOUTHOct-24Oct-30
11510ABCBASEMENT - EASTOct-24Oct-30
11110ABCBASEMENT - NORTHOct-24Oct-30
112
Building 64-
Engineering
(6 Total)
11310ABCMACHINE SHOPOct-26Oct-32
11410ABCCORR - ENG OFFICEOct-26Oct-32
11510ABCCONFERENCE ROOMOct-26Oct-32
11610ABCMACH-WELD BOOTHOct-26Oct-28
11710ABCSOUTH WALL TIN SHOPOct-24Oct-28
11810ABCPAINT SHOPOct-24Oct-30
Building 69-
Eng Storage
1st Floor (2) (5 Total)
11920ABCSOUTH ENTRANCEOct-26Oct-32
12010ABCS.W. ENTRANCEOct-26Oct-32
12110ABCN. W. ENTRANCEOct-28Oct-34
12210ABCN. E. ENTRANCEOct-28Oct-34
Basement (3)
12310ABCWESTOct-28Oct-34
12410ABCEASTOct-28Oct-34
Building 72-
Eng Shop
(4 Total)
12510ABCBoiler RoomOct-25Oct-31
12610ABCELECTRIC SHOPOct-26Oct-32
12710ABCEAST ENTRANCE BY R-RoomOct-28Oct-28
12810ABCCARPENTER SHOPOct-25Oct-31
Building 85-
HazMat Storage
12910ABCHazmat StorageOct-30Oct-36
Building 93-
Pump House
13010ABCPUMP HOUSEOct-28Oct-34
Building 98-May-23
Administration
Basement (5)(37 Total)
13110ABCCORR - ELEVATOROct-28Oct-34
13210ABCVERA OFFICE - ROOM BC3Oct-26Oct-32
13310ABCEAST WALL - SRVC RMOct-25Oct-31
13410ABCSRVC RM-FIRE PANELOct-25Oct-31
1st Floor- (15)
13510ABCMAIN CORR-North End (cabinet)Oct-26Oct-32
13610ABCNEW PHARMACY ENTRANCE ©Oct-28Oct-34
13710ABCNEW PHARMACY BY STAIRS ©Oct-28Oct-34
13810ABCEMER GEN. ROOM (Outside)Oct-28Oct-28
13915CO2TELEPHONE ROOM (Outside)Oct-25Oct-25
14010ABCLAB - 1179Oct-25Oct-31
14110ABCCORR - ELEVATOROct-26Oct-32
14210ABCACROSS-1174Oct-27Oct-33
14310ABCCORR - 1170 (cabinet)Oct-26Oct-32
14410ABCCORR - 1157 (cabinet)Oct-26Oct-32
14510ABCCORR - 1127 (cabinet)Oct-27Oct-33
14610ABCUC by 1144Oct-25Oct-31
14710ABCCORR - 1080 (cabinet) By PharOct-25Oct-31
1485ABCCORR - Back Hall 1111Oct-26Oct-32
1495ABCCORR - Back Hall 1101Oct-24Oct-30
2nd Floor (13)
15010ABCCORR - ELEVATOROct-28Oct-34
15110ABCSW CORNER STAIR CLOSETOct-26Oct-32
15210ABCSE CORNER STAIR CLOSETOct-26Oct-32
15310ABCNE CORNER STAIR CLOSETOct-26Oct-32
15410ABCNW CORNER CLOSETOct-28Oct-34
1555ABCCORR - StarbucksOct-25Oct-31
1565ABCCORR - South middleOct-25Oct-31
15710ABCDental east sideOct-27Oct-33
15810ABCDental west sideOct-26Oct-32
15910ABCDental north sideOct-27Oct-33
16010ABCDental Lab 2029Oct-27Oct-33
1615ABCBACK HALL SOUTHOct-24Oct-30
1625ABCBACK HALL NORTHOct-25Oct-28
3nd Floor (5)
16310ABCCORR - ELEVATOROct-24Oct-30
16410ABCCORRIDOR (3027)Oct-24Oct-30
16510ABCCORRIDOR (3036)Oct-24Oct-30
16610ABCCORRIDOR (3103)Oct-24Oct-30
16710ABCCORRIDOR (3088)Oct-24Oct-30
Attic Entrance (1)
16810ABCATTIC ENTRANCE (Flat Brkt)Oct-25Oct-31
Penthouse (1)
16910ABCPenthouseOct-28Oct-28
Building 101-
Extended Care
(16 Total)
17010ABCWARD 5 - CLOSOct-24Oct-30
17110ABCWARD 6 - CLOSOct-24Oct-30
17210ABCCORR - RM 132E CLOSOct-24Oct-30
17310ABCWARD 3 - CLOS(115C)Oct-24Oct-30
17410ABCWARD 4 - CLOSOct-24Oct-30
17510ABCMAIN SERVICE RM-EASTOct-25Oct-31
17610ABCMAIN SERVICE RM-WESTOct-25Oct-31
17710ABCPATIENT DINING-RM 124EOct-28Oct-34
17810ABCFRONT SERVICE RM (119E)Oct-25Oct-31
17910ABCWARD 7 - CLOSOct-24Oct-30
18010ABCWARD 8 - CLOSOct-24Oct-30
18110ABCCORR - RM 116E CLOSOct-24Oct-30
18210ABCWARD 1 - CLOSOct-24Oct-30
18310ABCWARD 2 - CLOSOct-24Oct-30
18410ABCELECTRIC CLOSET (RM 139)Oct-25Oct-31
18510ABCKITCHEN - ROOM 144EOct-25Oct-31
Building 102-
Administration
(15 Total)
1865Co2BIO-MED - ROOM 109FOct-24Oct-24
18710ABCCLOSET (WARD 5)Oct-28Oct-28
18810ABCCORR - CLOS (WARD 6)Oct-28Oct-28
18910ABCCORR - RM 136J CLOSOct-27Oct-28
19010ABCSERVICE RM - RM 126J (FRONT)Oct-28Oct-22
19110ABCSRVC RM - RM 126J (REAR)Oct-24Oct-30
19210ABCWARD 3 - CLOSETOct-25Oct-31
19310ABCWARD 4 - CLOSETOct-27Oct-27
19410ABCSRVC RM - RM 120JOct-25Oct-31
19510ABCCORR - RM 116J CLOSOct-26Oct-32
19610ABCWARD 7 - CLOSETOct-28Oct-28
19710ABCWARD 8 - CLOSETOct-28Oct-28
19810ABCWARD 1 - CLOSETOct-28Oct-28
19910ABCWARD 2 - CLOSETOct-25Oct-29
20010ABCPolice OfficeOct-26Oct-32
Building 103-
Behavior Health 7-15-20
(15 Total)
20110ABCWARD 5 - CLOSETOct-26Oct-32
20210ABCWARD 6 - CLOSETOct-26Oct-32
20310ABCCORR - RM 133E CLOSOct-26Oct-32
20410ABCMAIN SRVC ROOM (127E) FrontOct-25Oct-31
20510ABCMAIN SRVC ROOM (127E) BackOct-25Oct-31
20610ABCWARD 3 - CLOSETOct-26Oct-32
20710ABCWARD 4 - CLOSETOct-26Oct-32
20810ABCKITCHEN - RM 124EOct-26Oct-32
20910ABCWHEEL CHAIR REPAIR-RM 138EOct-26Oct-26
21010ABCWARD 7 - CLOSETOct-26Oct-32
21110ABCMHC-CLOS (WARD 8)Oct-26Oct-32
21210ABCCORR - RM 117E CLOSOct-26Oct-32
21310ABCWARD 1 - CLOSETOct-26Oct-32
21410ABCWARD 2 - CLOSETOct-26Oct-32
21510ABCSRVC RM - RM 119EOct-26Oct-32
Building 104-
NFS/Canteen
(39 Total)
21610ABCMain Hall - RM 107 CLOS*Oct-26Oct-32
21710ABCSOC ACTIV RM 107 (North)*Oct-26Oct-32
21810ABCMAIN RM 107Oct-26Oct-32
21910ABCSOC ACTIV RM 107 (South)*Oct-26Oct-32
22010ABCRMS ROOM 119-CLOS*Oct-27Oct-33
22110ABCRM 117B-ADL KITCHENOct-24Oct-30
22210ABCVOL SERVICE By 117AOct-26Oct-32
22310ABCACROSS FROM OLD GYM 107DOct-26Oct-32
2245CO2IRM - COMPU RM 128b (back)Oct-26Oct-25
22510ABCIRM-COMPU. RM 128b (front)Oct-27Oct-33
22610ABCRMS - Across 120Oct-25Oct-31
22710ABCREC-P CORN RM 109Oct-25Oct-31
22810ABCCORR - CLOS (next to 100)*Oct-26Oct-32
22910ABCAHU #3 (126A)Oct-24Oct-30
23010ABCNEXT TO AHU # 5Oct-25Oct-31
23110ABCFREEZ COOL TOWEROct-25Oct-31
23210ABCGENER COOL TOWEROct-25Oct-31
23310ABCCORR - BY BWLG MACH RoomOct-26Oct-32
23410ABCSRVC RM 100 -FRONTOct-25Oct-31
23510ABCSRVC RM 101-TRANSOct-25Oct-31
23610ABCSRVC RM 102 - REAROct-25Oct-31
23710ABCRECYCLING ROOM 146Oct-25Oct-31
23810ABCSRVC RM - ROOM 141Oct-24Oct-30
23910ABCKIT MAIN AREA-Clos. (134D)*Oct-26Oct-32
24010ABCRM 145- Dock by ScaleOct-26Oct-32
24110ABCKIT.-144G CORR.Oct-24Jan-30
24210ABCKIT-ROOM 144C-STOR (locked)*Oct-26Oct-32
24310ABCRETAIL STORE-CORR CLOS*Oct-26Oct-32
24410ABCCANTEEN - DINING RM 105*Oct-26Oct-32
24510KFOOD PREP 104 (FRONT)Oct-27Oct-27
24610KDISHWASHING 104FOct-24Oct-24
24710ABCCANTEEN-BACK HALL CLOS*Oct-26Oct-32
24810ABCFOOD PREP (BACK)Oct-24Oct-30
24910ABCRETAIL STORE-STORAGE*Oct-26Oct-32
25010ABCRETAIL STORE-STOR.(REAR)*Oct-26Oct-32
2515ABCCOOKIE CARTOct-24Oct-30
2525ABCCOOKIE CART- PRRTP!Oct-24Oct-30
25310ABCBOWLING ALLEY-EQUIP 132AOct-24Oct-32
Building 110
Biomed Hut
25410ABCTV AMP ROOM (Key AD4-Bio-Med)Oct-28Oct-34
Building 111
Grounds Hut
25510ABCIn BreakroomOct-28Oct-34
Building 112
Eng Storage
25610ABCElectric- SouthOct-28Oct-34
25710ABCHaz Waste- SouthOct-28Oct-34
Building 113
Eng Storage
25820ABCPaint Storage (FLAT BRACKET)Oct-28Oct-28
Fuel Islands
2595ABCNORTH SIDEOct-28Oct-34
26010ABCSTORAGE HUT-LOT 1Oct-24Oct-30
(7 Total Above)
Building 125
Library
(5 Total)
26110ABCCORR - ROOM 107 (cabinet)Oct-26Oct-32
26210ABCCORR-ACROSS RM. 101 (cab)Oct-24Oct-30
26310ABCROOM 110 (cabinet)Oct-26Jan-34
2645CO2MECHANICAL ROOMOct-26Oct-31
26510ABCWEST-LIBRARY RM 109Oct-28Oct-34
Building 138
Haz. Material storage
26650ABCHAZMAT-ANSL SYSTEMOct-25Oct-31
Building 128
Freedom Home(4 Total)
26710ABCBy front entraceOct-29Oct-29
26810ABCBy back entranceOct-29Oct-29
26910ABCIn laundryOct-29Oct-29
27010KKitchen ClosetOct-29Oct-29
Building 129
Liberty Home(4 Total)
27110ABCBy front entraceOct-29Oct-29
27210ABCBy back entranceOct-29Oct-29
27310ABCLaundryOct-29Oct-29
10KKitchen Closet (EMPTY)Oct-25Oct-30
Building 130
Honor Home(5 Total)
27410ABCBasementOct-28Oct-34
27510ABCBy back doorOct-28Oct-34
27610ABCKitchen cabinetOct-28Oct-34
27710ABCBack hallwayOct-28Oct-34
27810KKitchenOct-26Oct-31
Building 131
Valor Home(5 Total)
27910ABCBasementOct-28Oct-34
28010ABCBy back doorOct-28Oct-34
28110ABCKitchen cabinetOct-28Oct-34
28210ABCBack hallwayOct-28Oct-34
28310KKitchenOct-26Oct-31
Building 132
Independence Home(6 Total)
28410ABCMechanical RoomOct-27Oct-33
28510ABCBy 115Oct-27Oct-33
28610ABCBy 110Oct-27Oct-33
28710ABCBy 106Oct-27Oct-33
28810ABCBy 103BOct-27Oct-33
28910ABCBy 120Oct-27Oct-33
Building 133
Courage Home(6 Total)
29010ABCMechanical RoomOct-27Oct-33
29110ABCBy 115Oct-27Oct-33
29210ABCBy 110Oct-27Oct-33
29310ABCBy 106Oct-27Oct-33
29410ABCBy 103BOct-27Oct-33
29510ABCBy 120Oct-27Oct-33
Boiler Plants (10-26-20)
B211, 212, 214, 216(8 Total)
29610ABCB211 E (Sentry Pin)Oct-24Oct-30
29710ABCB211 W (Sentry Flat)Oct-24Oct-30
29810ABCB212 E (Amerex Fork)Oct-25Oct-31
29910ABCB212 W (Sentry Flat)Oct-25Oct-31
30010ABCB214 E (Sentry Pin)Oct-24Oct-30
30110ABCB214 W (Sentry Flat)Oct-28Oct-34
30210ABCB216 E (Sentry Pin)Oct-25Oct-31
30310ABCB216 W (Amerex Fork)Oct-32Oct-26
B140 Mental Health Building
(9 Total)
29610ABCNorth Entrace HallOct-28Oct-34
29710ABCHall by EntranceOct-28Oct-34
29810ABCMechinical Space HallwayOct-28Oct-34
29910ABCOffice areaOct-28Oct-34
30010ABCNorth Hall EastOct-28Oct-34
30110ABCNorth Hall WestOct-28Oct-34
30210ABCCenter Hall EastOct-28Oct-34
30310ABCCenter Hall WestOct-28Oct-34
30410ABCSouth Hall EastOct-28Oct-34
30510ABCSouth Hall WestOct-28Oct-34
SPARES
(37 Total)
10ABC11 Outside BuildingOct-30Oct-36
5ABC10 Outside BuildingOct-30Oct-36
5CO29 Storeroom/B85Oct-29Oct-29
10K1 StoreroomOct-27Oct-32
5ABC1 Storeroom- BadgerOct-29Oct-35
2.5ABC5 B85Oct-30Oct-36

350 PORTABLE EXTINGUISHERS IN ILLIANA INVENTORY

FY26 Base Year Work

October 2025 Estimated Work
QTYWTTYPELOCATION5/6 yr12 yr. Hydr
Building 14
Administration
Attic
110ABCEAST (cabinet)Oct-25Oct-31
210ABCCENTER (cabinet)Oct-25Oct-31
310ABCWEST (cabinet)Oct-25Oct-31
1st Floor
410ABCEAST (cabinet)Oct-25Oct-31
510ABCCENTER (cabinet)Oct-25Oct-31
610ABCWEST (cabinet)Oct-25Oct-31
Basement
710ABCRM B102Oct-25Oct-31
810ABCRM B104Oct-25Oct-31
Building 35
Residents Quarters

9 10 ABC BASEMENT * Oct-25 Oct-31

Building 39B
TR House
105ABCBASEMENTOct-25Oct-31
115ABCKITCHENOct-25Oct-31
125ABC2ND FLOOR - Top of stairsOct-25Oct-31
135ABCATTICOct-25Oct-31
Building 58
Medical/Surgery
Basement
1410ABCINSIDE SIMS DOOR (Am- Flat)Oct-25Oct-31
1510ABCELEVATOR ROOMOct-25Oct-31
165CO2ROOM 131Oct-25Oct-25
175CO2REAR - ROOM 134-WESTOct-25Oct-25
1st Floor
185CO2ROOM 136BOct-25Oct-25
1910ABCCORR - XRAY RM 117C (cabinet)Oct-25Jan-31
2010ABCCORR - ROOM 121C (CABINET)Oct-25Oct-31
2nd Floor
2110ABCSPD-CLEAN-ACROSS RM 203COct-25Oct-31
2210ABCSRVC RM-ABOVE SPDOct-25Oct-31
2310ABCSPD-DIRTY-ROOM 202AOct-25Oct-31
2410ABCCORR - ROOM 332Oct-25Mar-31
2510ABCSERVICE ROOM**Oct-25Oct-31
Attic
2610ABCINSIDE ATTIC DOOR €Oct-25Oct-31
Building 98
Administration
Basement
2710ABCEAST WALL - SRVC RMOct-25Oct-31
2810ABCSRVC RM-FIRE PANELOct-25Oct-31
1st Floor
2915CO2TELEPHONE ROOM (Outside)Oct-25Oct-25
3010ABCLAB - 1179Oct-25Oct-31
3110ABCUC by 1144Oct-25Oct-31
3210ABCCORR - 1080 (cabinet) By PharOct-25Oct-31
2nd Floor
335ABCCORR - StarbucksOct-25Oct-31
345ABCCORR - South middleOct-25Oct-31
355ABCBACK HALL NORTHOct-25Oct-31
Attic Entrance
3610ABCATTIC ENTRANCE (Flat Brkt)Oct-25Oct-31
Building 101
Extended Care
3710ABCMAIN SERVICE RM-EASTOct-25Oct-31
3810ABCMAIN SERVICE RM-WESTOct-25Oct-31
3910ABCFRONT SERVICE RM (119E)Oct-25Oct-31
4010ABCELECTRIC CLOSET (RM 139)Oct-25Oct-31
4110ABCKITCHEN - ROOM 144EOct-25Oct-31
Building 102
Administration
4210ABCWARD 3 - CLOSETOct-25Oct-31
4310ABCSRVC RM - RM 120JOct-25Oct-31
4410ABCWARD 2 - CLOSETOct-25Oct-31
Building 103
Behavior Health
4510ABCMAIN SRVC ROOM (127E) FrontOct-25Oct-31
4610ABCMAIN SRVC ROOM (127E) BackOct-25Oct-31
Building 104
NFS/Canteen
4710ABCRMS - Across 120Oct-25Oct-31
4810ABCREC-P CORN RM 109Oct-25Oct-31
4910ABCNEXT TO AHU # 5Oct-25Oct-31
5010ABCFREEZ COOL TOWEROct-25Oct-31
5110ABCGENER COOL TOWEROct-25Oct-31
5210ABCSRVC RM 100 -FRONTOct-25Oct-31
5310ABCSRVC RM 101-TRANSOct-25Oct-31
5410ABCSRVC RM 102 - REAROct-25Oct-31
5510ABCRECYCLING ROOM 146Oct-25Oct-31
Boiler Plants
B211, 212, 214, 216
5610ABCB212 E (Amerex Fork)Oct-25Oct-31
5710ABCB212 W (Sentry Flat)Oct-25Oct-31
5810ABCB216 E (Sentry Pin)Oct-25Oct-31
2025 Totals
Fire Extinguisher Totals
ESTIMATED WORK DUE OCT 2025
6 YEAR DUE
7 5 LB ABC's
47 10 LB ABC's
5 YEAR DUE
3 5LB CO2's
1 15 LB CO2
HYDRO'S DUE
3 5LB CO2's
1 15lb CO2'
TAGS/SEALS BASED ON 350 IN INVENTORY

289 TAGS/SEALS ONLY

FY27 +1 Year Work

October 2026 Estimated Work
QTYWTTYPELOCATION5/6 yr12 yr. Hydr
Building 14
Administration
Attic
110ABCATTICOct-26Oct-32
Basement
210ABCRM B100Oct-26Oct-26
Building 19
Warehouse
1st Floor
310ABCNORTH END (WEST)Oct-26Oct-32
410ABCSOUTH END (Bay 3)Oct-26Oct-32
Building 22
Laundry
510ABCW. LOADING DOCK-STAIRSOct-26Oct-32
610ABCNW DOCK - (next to exit)Oct-26Oct-32
Building 35
Residents Quarters
710ABC1ST FLOOR - HALL *Oct-26Oct-32
810ABC2ND FLOOR - HALL*Oct-26Oct-32
910ABC3RD FLOOR - HALL*Oct-26Oct-26
Building 39B
TR House

10 5 ABC FIRST FLOOR-FOYER Oct-26 Oct-32

Building 58
Medical/Surgery
Basement
1110ABCPHAR - RM 103 - ENTROct-26Oct-32
1210ABCMAIN HALLWAYMar-26Mar-32
1310ABCENTR- WEST CORR (Rm 128)Oct-26Oct-32
1410ABC58 BACK DOCKOct-26Oct-32
1510ABCMORGUEOct-26Oct-32
2nd Floor
1610ABCSPD - ROOM 205d (CABINET)Oct-26Oct-32
1710ABCSPD-BACK EXIT TO STAIRSOct-26Oct-32
1810ABCSPD-OUTSIDE EXITOct-26Oct-32
5th Floor
195CO2OPERATING ROOM 527 (5 yr. Hydro Test)Oct-26Oct-26
205CO2OPERATING ROOM 524 (5 yr. Hydro Test)Oct-26Oct-26
215CO2OPERATING ROOM 529 (5 yr. Hydro Test)Oct-26Oct-26
225CO2OPERATING ROOM 521 (5 yr. Hydro Test)Oct-26Oct-26
235CO2RECOVERY ROOM-EASTOct-26Oct-26
245CO2RECOVERY ROOM-WESTOct-26Oct-26
Building 64
Engineering
2510ABCMACHINE SHOPOct-26Oct-32
2610ABCCORR - ENG OFFICEOct-26Oct-32
2710ABCCONFERENCE ROOMOct-26Oct-32
2810ABCMACH-WELD BOOTHOct-26Oct-32
Building 69
Eng Storage
1st Floor
2920ABCSOUTH ENTRANCEOct-26Oct-32
3010ABCS.W. ENTRANCEOct-26Oct-32
Building 72
Eng Shop

31 10 ABC ELECTRIC SHOP Oct-26 Oct-32

Building 98
Administration
Basement
3210ABCCORR - ELEVATOROct-26Oct-33
3310ABCVERA OFFICE - ROOM BC3Oct-26Oct-32
1st Floor
3410ABCMAIN CORR-North End (cabinet)Oct-26Oct-32
3510ABCCORR - ELEVATOROct-26Oct-32
3610ABCCORR - 1170 (cabinet)Oct-26Oct-32
3710ABCCORR - 1157 (cabinet)Oct-26Oct-32
385ABCCORR - Back Hall 1111Oct-26Oct-26
2nd Floor
3910ABCSW CORNER STAIR CLOSETOct-26Oct-32
4010ABCSE CORNER STAIR CLOSETOct-26Oct-32
4110ABCNE CORNER STAIR CLOSETOct-26Oct-32
4210ABCDental west sideOct-26Oct-32
Building 102
Administration

43 10 ABC Police Office Oct-26 Oct-32

Building 103
Behavior Health
4410ABCWARD 5 - CLOSETOct-26Oct-32
4510ABCWARD 6 - CLOSETOct-26Oct-32
4610ABCCORR - RM 133E CLOSOct-26Oct-32
4710ABCWARD 3 - CLOSETOct-26Oct-32
4810ABCWARD 4 - CLOSETOct-26Oct-32
4910ABCKITCHEN - RM 124EOct-26Oct-32
5010ABCWHEEL CHAIR REPAIR-RM 138EOct-26Oct-26
5110ABCWARD 7 - CLOSETOct-26Oct-32
5210ABCMHC-CLOS (WARD 8)Oct-26Oct-32
5310ABCCORR - RM 117E CLOSOct-26Oct-32
5410ABCWARD 1 - CLOSETOct-26Oct-32
5510ABCWARD 2 - CLOSETOct-26Oct-32
5610ABCSRVC RM - RM 119EOct-26Oct-32
Building 104
NFS/Canteen
5710ABCMain Hall - RM 107 CLOS*Oct-26Oct-32
5810ABCSOC ACTIV RM 107 (North)*Oct-26Oct-32
5910ABCMAIN RM 107Oct-26Oct-32
6010ABCSOC ACTIV RM 107 (South)*Oct-26Oct-32
6110ABCVOL SERVICE By 117AOct-26Oct-32
6210ABCACROSS FROM OLD GYM 107DOct-26Oct-32
635CO2IRM - COMPU RM 128b (back)Oct-26Oct-26
6410ABCCORR - CLOS (next to 100)*Oct-26Oct-32
6510ABCCORR - BY BWLG MACH RoomOct-26Oct-32
6610ABCKIT MAIN AREA-Clos. (134D)*Oct-26Oct-32
6710ABCRM 145- Dock by ScaleOct-26Oct-32
6810ABCKIT-ROOM 144C-STOR (locked)*Oct-26Oct-32
6910ABCRETAIL STORE-CORR CLOS*Oct-26Oct-32
7010ABCCANTEEN - DINING RM 105*Oct-26Oct-32
7110ABCCANTEEN-BACK HALL CLOS*Oct-26Oct-32
7210ABCRETAIL STORE-STORAGE*Oct-26Oct-32
7310ABCRETAIL STORE-STOR.(REAR)*Oct-26Oct-32
Building 125
Library
7410ABCCORR - ROOM 107 (cabinet)Oct-26Oct-32
7510ABCROOM 110 (cabinet)Oct-26Oct-32
765CO2MECHANICAL ROOMOct-26Oct-26
Building 130
Honor Home
7710KKitchenOct-26Oct-32
Building 131
Valor Home
7810KKitchenOct-26Oct-32
2026 Totals
Fire Extinguisher Totals
ESTIMATED WORK DUE OCT 2026
6 YEAR DUE
7 5 LB ABC's
62 10 LB ABC's
5 YEAR DUE
3 5LB CO2's
1 15 LB CO2
HYDRO'S DUE
1 5LB ABC
3 10LB ABC's
8 5 LB CO2

TAGS/SEALS BASED ON 350 IN INVENTORY

265 TAGS/SEALS ONLY

FY28 +2 Year Work

October 2027 Estimated Work
QTYWTTYPELOCATION5/6 yr12 yr. Hydr
Building 98
Administration
1st Floor-
110ABCACROSS-1174Oct-27Oct-33
210ABCCORR - 1127 (cabinet)Oct-27Oct-33
310ABCDental east sideOct-27Oct-33
410ABCDental north sideOct-27Oct-33
510ABCDental Lab 2029Oct-27Oct-33
Building 102
Administration
610ABCCORR - RM 136J CLOSOct-27Oct-28
710ABCWARD 4 - CLOSETOct-27Oct-27
Building 104
NFS/Canteen
810ABCRMS ROOM 119-CLOS*Oct-27Oct-33
910ABCIRM-COMPU. RM 128b (front)Oct-27Oct-33
1010KFOOD PREP 104 (FRONT)Oct-27Oct-27
Building 128
Freedom Home
1110KKitchen ClosetOct-27Oct-27
Building 132
Independence Home
1210ABCMechanical RoomOct-27Oct-33
1310ABCBy 115Oct-27Oct-33
1410ABCBy 110Oct-27Oct-33
1510ABCBy 106Oct-27Oct-33
1610ABCBy 103BOct-27Oct-33
1710ABCBy 120Oct-27Oct-33
Building 133
Courage Home
1810ABCMechanical RoomOct-27Oct-33
1910ABCBy 115Oct-27Oct-33
2010ABCBy 110Oct-27Oct-33
2110ABCBy 106Oct-27Oct-33
2210ABCBy 103BOct-27Oct-33
2310ABCBy 120Oct-27Oct-33
2027 Totals
Fire Extinguisher Totals
ESTIMATED WORK DUE OCT 2027
6 YEAR DUE
21 10 LB ABC's
5 YEAR DUE
2 10LB K's
HYDRO'S DUE
1 10LB ABC's

TAGS/SEALS BASED ON 350 IN INVENTORY

326 TAGS/SEALS ONLY

FY29 +3 Year Work

October 2028 Estimated Work
QTYWTTYPELOCATION5/6 yr12 yr. Hydr
Building 14
Administration
Basement
110ABCRM B105 (East) (Flat Bracket)Oct-28Oct-34
210ABCRM B101 (West)Oct-28Oct-28
Building 19
Warehouse
1st Floor
310ABCO2 ROOMOct-28Oct-28
Attic
410ABCNORTH ENDOct-28Oct-28
Building 22
Laundry
510ABCNEXT TO BAILEROct-28Oct-34
610ABCTOP OF RAMP-NORTH ENDOct-28Oct-34
Building 25
Greenhouse
710ABCEAST ENDOct-28Oct-34
Building 49
Chapel
810ABCENTRANCE - CatholicOct-28Oct-34
910ABCSACRISTY - Catholic-NorthOct-28Oct-34
1010ABCENTRANCE - ProtestantOct-28Oct-34
1110ABCSACRISTY - ProtestantOct-28Oct-34
Building 58
Medical/Surgery
Service Rooms (Outside (2))
1210ABCA/C SERVICE ROOM (South)Oct-28Oct-34
1310ABCGENERATOR ROOM (North)Oct-28Oct-34
2nd Floor
1410ABCENTR - EAST CORRMar-28Oct-34
3rd Floor
Attic
1510ABCELEVATOR ROOMOct-28Oct-34
Building 69
Eng Storage
1st Floor
1610ABCN. W. ENTRANCEOct-28Oct-34
1710ABCN. E. ENTRANCEOct-28Oct-34
Basement
1810ABCWESTOct-28Oct-34
1910ABCEASTOct-28Oct-34
Building 72
Eng Shop
2010ABCEAST ENTRANCE BY R-RoomOct-28Oct-28
Building 93
Pump House
2110ABCPUMP HOUSEOct-28Oct-34
Building 98
Administration
Basement
2210ABCCORR - ELEVATOROct-28Oct-34
1st Floor
2310ABCNEW PHARMACY ENTRANCE ©Oct-28Oct-34
2410ABCNEW PHARMACY BY STAIRS ©Oct-28Oct-34
2510ABCEMER GEN. ROOM (Outside)Oct-28Oct-28
2nd Floor
2610ABCCORR - ELEVATOROct-28Oct-34
2710ABCNW CORNER CLOSETOct-28Oct-34
Penthouse
2810ABCPenthouseOct-28Oct-28
Building 101
Extended Care

29 10 ABC PATIENT DINING-RM 124E Oct-28 Oct-34

Building 102
Administration
3010ABCCLOSET (WARD 5)Oct-28Oct-28
3110ABCCORR - CLOS (WARD 6)Oct-28Oct-28
3210ABCSERVICE RM - RM 126J (FRONT)Oct-28Oct-28
3310ABCWARD 7 - CLOSETOct-28Oct-28
3410ABCWARD 8 - CLOSETOct-28Oct-28
3510ABCWARD 1 - CLOSETOct-28Oct-28
Building 110
Biomed Hut
3610ABCTV AMP ROOM (Key AD4-Bio-Med)Oct-28Oct-34
Building 111
Grounds Hut
3710ABCIn BreakroomOct-28Oct-34
Building 112
Eng Storage
3810ABCElectric- SouthOct-28Oct-34
3910ABCHaz Waste- SouthOct-28Oct-34
Building 125
Library
4010ABCWEST-LIBRARY RM 109Oct-28Oct-34
Building 130
Honor Home
4110ABCBasementOct-28Oct-34
4210ABCBy back doorOct-28Oct-34
4310ABCKitchen cabinetOct-28Oct-34
4410ABCBack hallwayOct-28Oct-34
Building 131
Valor Home
4510ABCBasementOct-28Oct-34
4610ABCBy back doorOct-28Oct-34
4710ABCKitchen cabinetOct-28Oct-34
4810ABCBack hallwayOct-28Oct-34
Boiler Plants
B211, 212, 214, 216
4910ABCB214 W (Sentry Flat)Oct-28Oct-34
B140 Mental Health Building
5010ABCNorth Entrace HallOct-28Oct-34
5110ABCHall by EntranceOct-28Oct-34
5210ABCMechinical Space HallwayOct-28Oct-34
5310ABCOffice areaOct-28Oct-34
5410ABCNorth Hall EastOct-28Oct-34
5510ABCNorth Hall WestOct-28Oct-34
5610ABCCenter Hall EastOct-28Oct-34
5710ABCCenter Hall WestOct-28Oct-34
5810ABCSouth Hall EastOct-28Oct-34
5910ABCSouth Hall WestOct-28Oct-34
SPARES

10 ABC 6 Outside Building Oct-28 Oct-34

2028 Totals
Fire Extinguisher Totals
ESTIMATED WORK DUE OCT 2028
6 YEAR DUE
62 10 LB ABC's
HYDRO'S DUE
9 10LB ABC's

TAGS/SEALS BASED ON 350 IN INVENTORY

279 TAGS/SEALS ONLY

FY30 +4 Year Work

October 2029 Estimated Work
QTYWTTYPELOCATION5/6 yr12 yr. Hydr
Building 58-
Medical/Surgery
Basement
110ABCINSIDE NEXT DOOR (Am- Pin)Oct-29Oct-35
210ABCSERVICE ROOM (OUTSIDE-Fork)Oct-29Oct-35
Attic
310ABCEAST ATTICOct-29Oct-35
Building 128
Freedom Home
410ABCBy front entraceOct-29Oct-29
510ABCBy back entranceOct-29Oct-29
610ABCIn laundryOct-29Oct-29
710KKitchen ClosetOct-29Oct-29
Building 129
Liberty Home
810ABCBy front entraceOct-29Oct-29
910ABCBy back entranceOct-29Oct-29
1010ABCLaundryOct-29Oct-29
1110KKitchen ClosetOct-29Oct-29
SPARES
125CO29 Storeroom/B85Oct-29Oct-29
ESTIMATED WORK DUE OCT 2026
6 YEAR DUE
3 10 LB ABC's
HYDRO'S DUE
2 10LB K's
6 10LB ABC's
1 5 LB CO2

TAGS/SEALS BASED ON 350 IN INVENTORY

338 TAGS/SEALS ONLY

File details come from the government source that posted it. Updated .