This document outlines the requirements for an indefinite delivery/indefinite quantity contract for pavement repair and replacement services in the Beaufort, South Carolina area. The contract will cover various types of rigid concrete pavement, bituminous pavement, concrete work, pavement markings, storm drainage repairs, and incidental work related to airfield standards at government installations. Work will include repair and replacement of joint sealants, damaged pavement and concrete areas, markings and signage, runway friction testing and reporting, and associated drainage and safety features. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for the Tri-Command area including Marine Corps Recruit Depot Parris Island, Marine Corps Air Station Beaufort, and Naval Support Facility Beaufort. The IDIQ contract has a one-year base period and four one-year options and will be awarded to a single contractor to fulfill task orders from the three locations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRI-COMMAND PAVEMENT PAVEMENTCONTRACT

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRICTIONS

01 20 00 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 16.00 20 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 19.01 20 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL CONTROLS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

DIVISION 26 - ELECTRICAL

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARING AND GRUBBING

31 23 00.00 20 EXCAVATION AND FILL

31 32 19.16 GEOTEXTILE SOIL STABILIZATION

31 35 19.13 GEOGRID SLOPE PROTECTION

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS

32 01 13.64 BITUMINOUS PAVEMENT LIQUID REJUVENATING

32 01 16.71 COLD MILLING ASPHALT PAVING

32 01 17.61 SEALING CRACKS IN ASPHALT PAVING

32 01 17.62 PAVING FABRIC INTERLAYER

32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT

32 01 29.61 PARTIAL DEPTH PATCHING OF RIGID PAVING

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK COAT

32 12 15.13 ASPHALT PAVING FOR AIRFIELDS

32 12 16.16 ROAD-MIX ASPHALT PAVING

32 12 36.13 ASPHALTIC SEAL AND FOG COATS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

PROJECT TABLE OF CONTENTS Page 1

32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY

PAVEMENTS

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 17 23 PAVEMENT MARKINGS

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

DIVISION 34 - TRANSPORTATION

34 73 13 AIRCRAFT TIEDOWNS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E2114 (2019) Standard Terminology for Sustainability Relative to the Performance of Buildings

1.2 DEFINITIONS

Definitions pertaining to sustainable development are as defined in ASTM E2114, Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS, and as specified.

a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.

b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.

c. "Operational performance" is the functional behavior of the building as a whole or of the building components.

d. "Sustainability" is the balance of environmental, economic, and societal considerations.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals Salvage Plan; G

Submit the following items to the Contracting Officer:

Utility Outage Requests Utility Connection Request Borrow Permits Excavation Permits

SECTION 01 11 00 Page 1

Welding Permits

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.4.1 Project Description

The work includes providing services under a Regional Indefinite Quantity Pavement Repair/Replacement Contract for various types of rigid Portland cement concrete pavement, bituminous pavement, concrete work, pavement markings, storm drainage repairs, and incidental work related to Airfield Standards at existing or new locations on and around various Government sites in the greater Beaufort, SC area. The Contractor must provide all labor materials, equipment, tools, transportation, supervision, safety, surveys, layout work, quality control, traffic control, and management necessary to fulfill the requirements of task orders issued by the Contracting Officer under this contract. The Government contemplates that one Contract will be awarded for this solicitation. Each base location (3 total) will administer the work that they order.

The bid schedule contains the Annual aggregate estimated total of quantities for the contract. Furnish all labor, materials, equipment, tools, transportation, supervision, safety, surveys, scoping, layout work, general traffic control measures, engineering and management necessary to fulfill the requirements of this contract and each task order in a timely manner, with safety as a priority and quality work as the final product.

1.4.2 Location

The work may be ordered and administered by any of the three sites listed below, each site has a Facilities Engineering and Acquisition Division (FEAD) Contracting Officer that will order and administer the task order and inspect the work within their areas. Parris Island FEAD will have task order authority over Naval Support Facility. Each site will process invoices for their orders. Work may also be ordered electronically by authorized agents through E-mail.

a. Marine Corp Recruit Depot, Parris Island, South Carolina, and locations within 50 miles of Marine Corp Recruit Depot.

b. Marine Corps Air Station (MCAS), Beaufort, South Carolina, and locations within 50 miles of Marine Corps Air Station.

c. Naval Support Facility, Beaufort, South Carolina, and locations within 50 miles of Navy Support Facility: Task orders will be requested by Naval Support Facilities Public Works and awarded and administered by FEAD Parris Island.

1.4.3 Term of Contract

The contracts base year shall be for a period of 12 months commencing after Notice of Award. The Government has the option to extend the term of the contract for up to four additional years in accordance with FAR 52.217-9 "Option To Extend The Term of the Contract" (March 1998) referenced in Section I, with a total contract period not to exceed 5 years.

1.5 PROJECT ENVIRONMENTAL GOALS

Contractor shall distribute copies of the Environmental Goals to each subcontractor and the Contracting Officer. The overall goal for design, SECTION 01 11 00 Page 2 construction, and operation is to produce a building that meets the functional program needs and incorporates the principles of sustainability. Specifically:

a. Preserve and restore the site ecosystem and biodiversity; avoid site degradation and erosion. Minimize offsite environmental impact.

b. Use the minimum amount of energy, water, and materials feasible to meet the design intent. Select energy and water efficient equipment and strategies.

c. Use environmentally preferable products and decrease toxicity level of materials used.

d. Use renewable energy and material resources.

e. Optimize operational performance (through commissioning efforts) in order to ensure energy efficient equipment operates as intended.

Consider the durability, maintainability, and flexibility of building systems.

f. Manage construction site and storage of materials to ensure no negative impact on the indoor environmental quality of the building.

g. Reduce construction waste through reuse, recycling, and supplier take-back.

1.6 OCCUPANCY OF PREMISES

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.7 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.8 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Contact local utility locating service a minimum of 15 days prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work.

Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of

SECTION 01 11 00 Page 3 the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.

1.8.1 Notification Prior to Excavation

Notify the Contracting Officer at least 15 days prior to starting excavation work.

1.9 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 30 miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 4

SECTION 01 14 00

WORK RESTRICTIONS

11/11, CHG 11: 11/20

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel

1.2 SPECIAL SCHEDULING REQUIREMENTS

a. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work.

b. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of 15 calendar days prior to the desired date of interruption.

c. The work under this contract requires special attention to the scheduling and conduct of the work in connection with existing operations. Identify on the construction schedule each factor which constitutes a potential interruption to operations.

d. Special work requirements for Marine Corps Recruit Depot, Parris Island.

Parris Island hosts a recruit graduation every week on Thursday and Friday. Due to increased visitor traffic, work on these days may be restricted in certain parts of the Depot, or alternate schedules planned.

1.3 CONTRACTOR ACCESS AND USE OF PREMISES

1.3.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear appropriate personal protective equipment (PPE) in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.3.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

SECTION 01 14 00 Page 1

1.3.1.2 Installation Access

Obtain access to Navy installations through participation in the Defense Biometrics Identification System (DBIDS). Requirements for Contractor employee registration, and transition for employees currently under Navy Commercial Access Control System (NCACS), are available at https://www.cnic.navy.mil/om/dbids.html. No fees are associated with obtaining a DBIDS credential.

Participation in the DBIDS is not mandatory, and Contractor personnel may apply for One-Day Passes at the Base Visitor Control Office to access an installation.

1.3.1.2.1 Registration for DBIDS

Registration for DBIDS is available at https://www.cnic.navy.mil/om/dbids.html. Procedure includes:

a. Present a letter or official award document (i.e. DD Form 1155 or SF 1442) from the Contracting Officer, that provides the purpose for access, to the base Visitor Control Center representative.

b. Present valid identification, such as a passport or Real ID Act-compliant state driver's license.

c. Provide completed SECNAV FORM 5512/1 to the base Visitor Control Center representative to obtain a background check. This form is available for download at https://www.cnic.navy.mil/om/dbids.html.

d. Upon successful completion of the background check, the Government will complete the DBIDS enrollment process, which includes Contractor employee photo, fingerprints, base restriction and several other assessments.

e. Upon successful completion of the enrollment process, the Contractor employee will be issued a DBIDS credential, and will be allowed to proceed to worksite.

1.3.1.2.2 DBIDS Eligibility Requirements

Throughout the length of the contract, the Contractor employee must continue to meet background screen standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.

An adjudication process may be initiated when a background screen failure results in disqualification from participation in the DBIDS, and Contractor employee does not agree with the reason for disqualification. The Government is the final authority.

1.3.1.2.3 DBIDS Notification Requirements

a. Immediately report instances of lost or stolen badges to the Contracting Officer.

b. Immediately collect DBIDS credentials and notify the Contracting Officer in writing under the following circumstances:

SECTION 01 14 00 Page 2

(1) An employee has departed the company without having properly returned or surrendered their DBIDS credentials.

(2) There is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the Installation or anyone therein.

1.3.1.2.4 One-Day Passes

Personnel applying for One-Day passes at the Base Visitor Control Office are subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government is not responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

1.3.1.3 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.3.2 Working Hours

Regular working hours will consist of an 8 1/2 hour period established by the Contracting Officer, between 7 a.m. and 3:30 p.m., Monday through Friday, excluding Government holidays.

1.3.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer approval.

Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

1.3.4 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and are considered utility cutovers pursuant to the paragraph

WORK OUTSIDE REGULAR HOURS.

SECTION 01 14 00 Page 3

1.4 SECURITY REQUIREMENTS

Contract Clause FAR 52.204-2 Security Requirements and Alternate II, FAC 5252.236-9301, Special Working Conditions, and Entry to Work Area, and the following apply:

The Contractor shall ensure that all security/entrance clearances are obtained. All Contractor employees shall obtain the required employee and vehicle passes. Employee badges may be obtained either by visiting the Pass and ID Office daily to obtain a pass or utilizing Defense Biometric Identification System (DBIDS) systems. More information on these two access systems can be received in writing from the Contracting Office. The Contractor is responsible for filling out all forms and providing all information necessary to request passes and/or badges. Heightened security requirements may cause unexpected delays. The contractor is responsible for requesting badges in a timely manner. Each employee shall wear the Government issued badge over the front of the outer clothing. When working on site, if wearing the badge would be a safety hazard, the individual may remove the badge but shall retain it in his/her possession to show if challenged.

When an employee leaves the Contractor's or subcontractor's service, the employee's pass and/or badge shall be returned to the Government. Upon completion of the work, the Contractor shall return all identification items issued to him during the course of the contract.

1.4.1 Marine Corps Recruit Depot, Parris Island, SC

Contractor personnel requesting access to MCRD Parris Island SHALL comply with MARINE CORPS RECRUIT DEPOT ORDER: DepO 5510.12C

a. The contractor shall request access to MCAS Beaufort, SC, from the MCAS Beaufort Security Manager, via the Contracting Officer (KO) or the Contracting Officer's Representative (COR).

1.4.2 Marine Corps Air Station Beaufort, Beaufort, SC

Contractor personnel requesting access to MCAS Beaufort SHALL comply with

MARINE CORPS AIR STATION BEAUFORT ORDER: ASO 5510.12C

a. The contractor shall request access to MCAS Beaufort, SC, from the MCAS Beaufort Security Manager, via the Contracting Officer (KO) or the Contracting Officer's Representative (COR). The requestor shall utilize a MCAS cover sheet and Contractor Information Sheet Request Form MCASBFT/CMCC/4 (Revised 10/14). An example of the cover sheet is included below. Modify all items in bold print and fill in the additional required information. The Contractor shall request copies of the forms from the KO or the COR, during the pre-construction meeting.

1.4.3 Naval Support Facility Beaufort, Beaufort, NAVSUPPFACBFTINST 5530

a. Pass and Registration Office.

The Pass and Registration Office is responsible for issuing vehicle and visitor passes to individuals that have been granted access to the Naval Support Facility Beaufort (NSFB). The Security Department Security Clerk has the primary responsibility for vetting visitors via background checks conducted on OpenFox.

SECTION 01 14 00 Page 4

b. Public Affairs Office.

The Public Affairs Office is the point of contact for any entities requesting access to NSFB for tours or other types of visits. The Public Affairs Office will coordinate with the Security Department a minimum of five days prior to any tour or visit. Vendors or other personnel requesting access without a sponsor, such as contractors wanting to establish a relationship with NSFB, will be referred to the Public Affairs Office.

c. NSFB Security Department. The NSFB Security Department is responsible for enforcing the provisions of this instruction to include:

1. Ensure only personnel designated by the Security Director perform access control duties.

2. Validate the claimed identity of individuals and also determining eligibility for access by using biographical information to include, but is not limited to, the visitors' name, date of birth, and Social Security number.

3. Ensure visitors have been issued appropriate vehicle passes from the Vehicle Registration Office prior to authorizing access.

4. Conduct random inspections of persons requiring access to NSFB, as determined by the Commanding Officer.

5. Any deviation from the access standards established in this instruction will be approved by the Commanding Officer via the Security Director.

6. The Security Department will incorporate the following trusted traveler procedure for use during Force Protection Conditions (FPCON) NORMAL, ALPHA, and BRAVO.

i. The trusted traveler procedure allows a uniformed service member, Department of Defense (DoD) Government employee with a valid Common Access Card (CAC), a military retiree with a valid DoD identification credential, or an adult dependent with a valid DoD identification credential to present their identification card for verification while simultaneously vouching for all vehicle occupants.

ii. Trusted travelers are responsible for the actions of sponsored individuals and for meeting security requirements for escorts as established by the NSFB Commanding Officer.

iii. Personnel vetted and issued a SECNAV 5512/1 are not authorized to vouch for passengers in their vehicle, with the exception of VA patients. VA patients may vouch for a mother, father, daughter, son, or spouse. If the VA patient is accompanied by someone other than those listed above, they must be vetted by the Security Clerk at the Pass and Registration Office prior to being granted access.

d. Visitors and Vetting.

Personnel entering Naval Support Facility Beaufort (NSFB) are screened to ensure access is granted to only authorized persons. Civilians shall be subject to military control while aboard this installation and

SECTION 01 14 00 Page 5 may be prosecuted in a federal court for offenses committed while on federal property. Civilian visitors, while aboard NSFB, will be required to observe proper standards of personal conduct at all times.

Improper conduct may result in the visitor's removal from the installation and may result in extended or permanent debarment.

Military personnel and their family members are responsible for any guest they sponsor while aboard the installation, and must assure that they are escorted, visit only unrestricted areas and buildings, and conduct themselves in an orderly and lawful manner.

e. Visitor Screening.

Active duty, retired Department of Defense (DoD) personnel, and their adult dependents with a valid DoD identification credential may bring guest(s) to building 19 to obtain a 14 day visitor pass, after the guest has filled out a 5512/1 and passed the background check. If the Security Clerk is unavailable, the guest will complete the 5512/1, the Watch Commander will verify the information submitted matches the identification presented and then issue a visitor pass that is valid until the next business day. Visitor pass requests over 14 days must be approved by the NSFB Commanding Officer prior to a pass being issued.

Visitors that decline to submit to a background check will be denied access to NSFB. The following credentials are required for issuance of a temporary pass:

1. A valid federal or state government identification containing a photograph.

2. Current and existing state identification and other government issued identifications are acceptable forms of identification.

3. Current passport with photograph.

4. If operating a motor vehicle, the driver must furnish a valid driver's license, vehicle registration, and proof of insurance.

5. Sponsors are required to identify names of visitors, dates of visit, and purpose when requesting to sponsor individuals aboard

NSFB.

6. OpenFox queries will be conducted for unaffiliated guests that enter NSFB with the exception of Department of Veterans Affairs (VA) patients. OpenFox queries will include at a minimum: a driver's license, wants and warrants, and a criminal history check, and a review of sexual offender database and any other inquiry that is warranted.

f. Sponsorship.

1. Active duty, retired DoD personnel, and their adult dependents with a valid DoD identification credential may sponsor guests (not to exceed 20 guests) aboard NSFB. For groups larger than twenty personnel, the sponsor must coordinate with the Public Affairs Office a minimum of 14 days prior to the event or requested entry.

2. DoD civilians may sponsor ten guests aboard NSFB.

3. Contractors and venders requiring installation access must be vetted in OpenFox prior to granting access to NSFB. Requests for access should be submitted to the Security Department, with

SECTION 01 14 00 Page 6 completed 5512/l's, a minimum of five business days prior to requested initial entry date. Contractors and venders may not sponsor personnel aboard the installation.

g. Vetting Process.

The NSFB Commanding Officer reserves the right to deny access to any person or conveyance when it is in the best interest of the government to do so.

Denial for access may be based upon, but not limited to, criminal history, poor driving record, or a combination of both, which demonstrates a clear pattern of disregard for the law. Applicants may also be denied if they demonstrate an increased risk to the safety and security of the Installation.

1. A query will be conducted to vet the claimed identity, determine fitness to enter, and deny access if ineligible to enter NSFB.

The below listed government database sources shall be used:

(a) The National Crime Information Center (NCIC) Database.

(b) Terrorist Screening Database.

(c) Other sources that can include but are not limited to:

(1) Department of Homeland Security (E-verify).

(2) Department of Homeland Security (U.S. Visit).

(3) Department of State Consular Check (non-U.S. Citizen).

(4) The Foreign Visitor System Confirmation Module (FVS-CM).

h. Disqualifying Factors for Installation Access.

The below list of criminal activities within an applicant's record are considered not in the best interest of the DoD and will normally be grounds for referral to the Commanding Officer with a recommendation of denial of access.

1. Conviction of any felony offense within ten years.

2. Conviction of a misdemeanor offense within five years with the exception of driving under the influence and reckless driving.

3. Conviction of any offense involving a weapon.

4. Conviction of any assault charge within five years.

5. Conviction of any offense related to the abuse or neglect of a child.

6. Conviction of any sexual offense or registration as a sex offender.

7. Commission of any grievous criminal offense and/or misconduct while aboard any Federal installation, to include blatant disregard for rules and regulations of the installation, but excluding minor traffic offenses.

8. Other than Honorable, Bad Conduct, and Dishonorable discharges

SECTION 01 14 00 Page 7 from the U.S. Military.

9. Those identified as undocumented non-U.S. citizens.

10. Those on the National Terrorist Watch List.

11. Individual who attempts to hide or purposely fails to disclose past criminal history during the vetting process.

12. Individual that the Security Director determines to present a risk to the security and safety of the installation and whose access is deemed not in the best interest of the DoD.

13. Individual who has been debarred from NSFB by the Commanding Officer or are currently listed as debarred from any other federal installation.

14. Individual with an outstanding warrant for their arrest, apprehension or criminal summons.

15. Membership within the previous ten years in any organization that advocated or advocates the overthrow of the United States Government.

16. Membership within the previous ten years or affiliated with any active gang.

17. Prisoner on a work release or currently on felony probation or parole.

18. Individual with a pending criminal court case that, if convicted, would result in denial of installation access in accordance with the criteria listed above.

19. Individual that is the subject of a restraining order and the individual protected may be on the installation.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 14 00 Page 8

SECTION 01 20 00

PRICE AND PAYMENT PROCEDURES

11/20, CHG 1: 02/21

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EP 1110-1-8 (2016) Construction Equipment Ownership and Operating Expense Schedule

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Schedule of Prices; G

1.3 SCHEDULE OF PRICES

1.3.1 Data Required

Provide a detailed breakdown of the Contract price, giving quantities for each of the various kinds of work, unit prices and extended prices.

Contractor overhead and profit including salaries for field office personnel, if applicable, must be proportionately spread over all pay items and not included as individual pay items.

1.3.2 Payment Schedule Instructions

Payments will not be made until the Schedule of Prices has been submitted to and accepted by the Contracting Officer. For design phase progress payment(s), the Schedule of Prices or Earned Value Report from the Cost Loaded CPM must include detailed design activities and general (summarized) approach for the construction phase(s) of the project. The Schedule of Prices or Earned Value Report must be fully developed with detailed construction line items as design progresses. The complete design and construction Schedule of Prices or Earned Value Report must be submitted and accepted prior to starting construction work.

For Fast-Tracked or Critical Path Submittals of construction projects, the Schedule of Prices must include detailed design and construction line items for each fast-tracked/ critical path phase(s), submitted to and accepted by the Contracting Officer during the Post Award Kickoff Meetings and confirmed prior to starting construction work in that phase. Additionally, SECTION 01 20 00 Page 1 the Schedule of Prices must be separated as follows:

a. Primary Facilities Cost Breakdown:

Defined as work on the primary facilities out to the 5 foot line. Work out to the 5 foot line includes construction encompassed within a theoretical line 5 foot from the face of exterior walls and includes attendant construction, such as pad mounted HVAC cooling equipment, cooling towers, and transformers placed beyond the 5 foot line.

b. Supporting Facilities Cost Breakdown:

Defined as site work, including incidental work, outside the 5 foot line.

1.4 CONTRACT MODIFICATIONS

In conjunction with the Contract Clause DFARS 252.236-7000 Modification Proposals-Price Breakdown, and where actual ownership and operating costs of construction equipment cannot be determined from Contractor accounting records, base equipment use rates upon the applicable provisions of the

EP 1110-1-8.

1.5 CONTRACTOR'S INVOICE AND CONTRACT PERFORMANCE STATEMENT

1.5.1 Content of Invoice

Requests for payment will be processed in accordance with the Contract Clause FAR 52.232-27 Prompt Payment for Construction Contracts and FAR 52.232-5 Payments Under Fixed-Price Construction Contracts. Invoices not completed in accordance with contract requirements will be returned to the Contractor for correction of the deficiencies. The requests for payment shall include the documents listed below.

a. The Contractor's invoice, on NAVFAC Form 7300/30 furnished by the Government, showing in summary form, the basis for arriving at the amount of the invoice. Form 7300/30 must include certification by Quality Control (QC) Manager as required by the Contract.

b. The Estimate for Voucher/ Contract Performance Statement on NAVFAC Form 4330/54 furnished by the Government. Use NAVFAC Form 4330, unless otherwise directed by the Contracting Officer, on NAVFAC Contracts when a Monthly Estimate for Voucher is required.

c. Contractor's Monthly Estimate for Voucher and Contractors Certification (NAVFAC Form 4330) with Subcontractor and supplier payment certification. Other documents, including but not limited to, that need to be received prior to processing payment include the following submittals as required. These items are still required monthly even when a pay voucher is not submitted.

d. Monthly Work-hour report.

e. Updated Construction Progress Schedule and tabular reports required by the contract.

f. Contractor Safety Self Evaluation Checklist.

g. Updated submittal register.

SECTION 01 20 00 Page 2

h. Solid Waste Disposal Report.

i. Certified payrolls.

j. Updated testing logs.

k. Other supporting documents as requested.

1.5.2 Submission of Invoices

If DFARS Clause 252.232-7006 Wide Area WorkFlow Payment Instructions is included in the Contract, provide the documents listed in above paragraph CONTENT OF INVOICE in their entirety as attachments in Wide Area Work Flow (WAWF) for each invoice submitted. The maximum size of each WAWF attachment is two megabytes, but there are no limits on the number of attachments. If a document cannot be attached in WAWF due to system or size restriction, provide it as instructed by the Contracting Officer.

Monthly invoices and supporting forms for work performed through the anniversary award date of the Contract must be submitted to the Contracting Officer within 5 calendar days of the date of invoice. For example, if Contract award date is the 7th of the month, the date of each monthly invoice must be the 7th and the invoice must be submitted by the 12th of the month.

1.5.3 Final Invoice

a. A final invoice must be accompanied by the certification required by DFARS 252.247.7023 Transportation of Supplies by Sea, and the Contractor's Final Release. If the Contractor is incorporated, the Final Release must contain the corporate seal. An officer of the corporation must sign and the corporate secretary must certify the Final Release.

b. For final invoices being submitted via WAWF, the original Contractor's Final Release Form and required certification of Transportation of Supplies by Sea must be provided directly to the respective Contracting Officer prior to submission of the final invoice. Once receipt of the original Final Release Form and required certification of Transportation of Supplies by Sea has been confirmed by the Contracting Officer, the Contractor must then submit final invoice and attach a copy of the Final Release Form and required certification of Transportation of Supplies by Sea in WAWF.

c. Final invoices not accompanied by the Contractor's Final Release and required certification of Transportation of Supplies by Sea will be considered incomplete and will be returned to the Contractor.

1.6 PAYMENTS TO THE CONTRACTOR

Payments will be made on submission of itemized requests by the Contractor which comply with the requirements of this section, and will be subject to reduction for overpayments or increase for underpayments made on previous payments to the Contractor.

1.6.1 Obligation of Government Payments

The obligation of the Government to make payments required under the

SECTION 01 20 00 Page 3 provisions of this Contract will, at the discretion of the Contracting Officer, be subject to reductions and suspensions permitted under the FAR and agency regulations including the following in accordance with FAR FAR

32.103 Progress Payments Under Construction Contracts:

a. Reasonable deductions due to defects in material or workmanship;

b. Claims which the Government may have against the Contractor under or in connection with this Contract;

c. Unless otherwise adjusted, repayment to the Government upon demand for overpayments made to the Contractor; and

d. Failure to maintain accurate "as-built" or record drawings in accordance with FAR 52.236.21.

1.6.2 Payment for Onsite and Offsite Materials

Progress payments may be made to the Contractor for materials delivered on the site, for materials stored off construction sites, or materials that are in transit to the construction sites under the following conditions:

a. FAR 52.232-5(b) Payments Under Fixed Price Construction Contracts.

b. Materials delivered on the site but not installed, including completed preparatory work, and off-site materials to be considered for progress payment must be major high cost, long lead, special order, or specialty items, not susceptible to deterioration or physical damage in storage or in transit to the construction site. Examples of materials acceptable for payment consideration include, but are not limited to, structural steel, non-magnetic steel, non-magnetic aggregate, equipment, machinery, large pipe and fittings, precast/prestressed concrete products, plastic lumber (e.g., fender piles/curbs), and high-voltage electrical cable. Materials not acceptable for payment include consumable materials such as nails, fasteners, conduits, gypsum board, glass, insulation, and wall coverings.

c. Materials to be considered for progress payment prior to installation must be specifically and separately identified in the Contractor's estimates of work submitted for the Contracting Officer's approval in accordance with Schedule of Prices requirement of this Contract.

Requests for progress payment consideration for such items must be supported by documents establishing their value and that the title requirements of the clause at FAR 52.232-5 Payments Under Fixed-Price Construction Contracts have been met.

d. Materials are adequately insured and protected from theft and exposure.

e. Provide a written consent from the surety company with each payment request for offsite materials.

f. Materials to be considered for progress payments prior to installation must be stored either in Hawaii, Guam, Puerto Rico, or the Continental United States. Other locations are subject to written approval by the Contracting Officer.

g. Materials in transit to the job site or storage site are not acceptable for payment.

SECTION 01 20 00 Page 4

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

SECTION 01 20 00 Page 5

SECTION 01 30 00

ADMINISTRATIVE REQUIREMENTS

11/20

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

1.2 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

View Location Map; G

Progress and Completion Pictures; G

Performance Assessment Plan (PAP)

1.3 VIEW LOCATION MAP

Submit, prior to or with the first digital photograph submittals, a sketch or drawing indicating the required photographic locations. Update as required if the locations are moved.

1.4 PROGRESS AND COMPLETION PICTURES

Photographically document site conditions prior to start of construction operations. Provide monthly, and within one month of the completion of work, digital photographs, 1600x1200x24 bit true color minimum resolution in JPEG file format showing the sequence and progress of work. Take a minimum of 20 digital photographs each week throughout the entire project from a minimum of ten different viewpoints selected by the Contractor unless otherwise directed by the Contracting Officer. Submit with the monthly invoice two sets of digital photographs, each set on a separate compact disc (CD) or data versatile disc (DVD), cumulative of all photos to date. Indicate photographs demonstrating environmental procedures.

Provide photographs for each month in a separate monthly directory and name each file to indicate its location on the view location sketch. Also provide the view location sketch on the CD or DVD as a digital file.

Include a date designator in file names. Photographs provided are for unrestricted use by the Government.

SECTION 01 30 00 Page 1

1.5 MINIMUM INSURANCE REQUIREMENTS

Provide the minimum insurance coverage required by FAR 28.307-2 Liability, during the entire period of performance under this contract. Provide other insurance coverage as required by South Carolina law.

1.6 SUPERVISION

1.6.1 Superintendent Qualifications

Provide project superintendent with a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.

1.6.2 Minimum Communication Requirements

Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of Contract work.In addition, if a Quality Control (QC) representative is required on the Contract, then that individual must also have fluent English communication skills.

1.6.3 Duties

The project superintendent is primarily responsible for managing subcontractors and coordinating day-to-day production and schedule adherence on the project. The superintendent is required to attend Red Zone meetings, partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.

1.6.4 Non-Compliance Actions

The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to ensure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.

1.7 PRECONSTRUCTION MEETING

After award of the contract but prior to commencing any work at the site, coordinate with the Contracting Officer a time and place to meet for the Preconstruction Meeting. The meeting must take place within 35 calendar days after award of the contract, but prior to commencement of any work at the site. The purpose of this meeting is to discuss and develop a mutual understanding of the administrative requirements of the Contract including

SECTION 01 30 00 Page 2 but not limited to: daily reporting, invoicing, value engineering, safety, base-access, outage requests, hot work permits, schedule requirements, quality control, schedule of prices or earned value report, shop drawings, submittals, cybersecurity, prosecution of the work, government acceptance, final inspections and contract close-out. Contractor must present and discuss their basic approach to scheduling the construction work and any required phasing.

1.7.1 Attendees

Contractor attendees must include the Project Manager, Superintendent, Site Safety and Health Officer (SSHO), Quality Control Manager and major subcontractors.

1.8 FACILITY TURNOVER PLANNING MEETINGS (Red Zone Meetings)

Meet with the Government to identify strategies to ensure the project is carried to expeditious closure and turnover to the Client. Start planning the turnover process at the Pre-Construction Conference meeting with a discussion of the Red Zone process and convene at regularly scheduled NRZ Meetings beginning at approximately 75 percent of project completion.

Include the following in the facility Turnover effort:

1.8.1 Red Zone Checklist

a. Contracting Officer's Technical Representative (COTR) will provide the Contractor a copy of the Red Zone Checklist template.

b. Prior to 75 percent completion, modify the Red Zone Checklist template by adding or deleting critical activities applicable to the project and assign planned completion dates for each activity. Submit the modified Red Zone Checklist to the Contracting Officer. The Contracting Officer may request additional activities be added to the Red Zone Checklist at any time as necessary.

1.8.2 Meetings

a. Conduct regular Red Zone Meetings beginning at approximately 75 percent project completion, or three to six months prior to Beneficial Occupancy Date (BOD), whichever comes first.

b. The Contracting Officer will establish the frequency of the meetings, which is expected to increase as the project completion draws nearer.

At the beginning, Red Zone meetings may be every two weeks then increase to weekly towards the final month of the project.

c. Using the Red Zone Checklist as a Plan of Action and Milestones (POAM) and basis for discussion, review upcoming critical activities and strategies to ensure work is completed on time.

d. During the Red Zone Meetings discuss with the COTR any upcoming activities that require Government involvement.

e. Maintain the Red Zone Checklist by documenting the actual completion dates as work is completed and update the Red Zone Checklist with revised planned completion dates as necessary to match progress.

Distribute copies of the current Red Zone Checklist to attendees at each Red Zone Meeting.

SECTION 01 30 00 Page 3

1.9 PARTNERING

To most effectively accomplish this Contract, the Contractor and Government must form a cohesive partnership with the common goal of drawing on the strength of each organization in an effort to achieve a successful project without safety mishaps, conforming to the Contract, within budget and on schedule. The partnering team must consist of personnel from both the Government and Contractor including project level and corporate level leadership positions. Key Personnel from the supported command, end user, NAVFAC, PWD, FEAD/ROICC, Contractor, key subcontractors and the Designer of Record are required to participate in the Partnering process.

1.9.1 Team-Led (Informal) Partnering

a. The Contracting Officer will coordinate the initial Team-Led (Informal) Partnering Session with key personnel of the project team, including Contractor and Government personnel. The Partnering Session will be co-led by the Government Construction Manager and Contractor's Project Manager.

b. The Initial Team-led Partnering session may be held concurrently with the Post-Award Kickoff meeting. Partnering sessions will be held at a location mutually agreed to by the Contracting Officer and the Contractor, typically at a conference room on-base or at the Contractor's temporary trailer.

c. The Initial Team-Led Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer.

d. The Partners will determine the frequency of the follow-on sessions.

e. Participants will bear their own costs for meals, lodging and transportation associated with Partnering.

1.10 PERFORMANCE ASSESSMENT PLAN (PAP)

The Performance Assessment Plan (PAP) will be used to document design innovation and budget management, provide performance feedback to the Contractor, and as a basis for interim and final evaluations in the Contractor Performance Appraisal Reporting System (CPARS) on-line database.

It is the intent of the Government to establish the PAP based on tangible, measurable indicators of outstanding contractor performance, and on commitments made in the Contractor's proposal. The initial PAP may be found on the NAVFAC Design-Build Request for Proposal Website in RFP PART 6 Attachments.