Attachment A Technical Capability Statement.pdf
PDF 137 KB Posted
- Attached to
- Hose Assembly
- Solicitation number
- N4215825QE016
About this file
This is a Technical Capabilities Statement attachment that requires vendor certification for hose assembly specifications. The document details requirements for two line items: CLIN 0001 requires a 1-1/2" ID x 20 ft long hose assembly (Aeroquip P/N: 2661-24) with specific steel female JIC/SAE 37 degree swivel fittings and CRES male flare plugs, while CLIN 0002 requires the same specifications but in a 30 ft length.
Both items must undergo proof testing at 250 + 25/-0 PSI for 1-5 minutes according to S6430-AE-TED-010 standards, with no allowance for leaks, weakness, twisting, deterioration, deformation, damage, burst, or fitting separation. Each hose assembly requires permanent tags identifying hydrostatic proof test pressure, test date, and testing activity. The procurement requires a Certificate of Compliance and invokes a Mercury Free Clause. Vendors must certify compliance with all specifications by initialing and dating the form, with no exceptions permitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 Certificate of Compliance.pdf | ||
| N4215825QE016.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N4215825QE016 - Attachment (A)
Page 1 of 1 (Rev 1)
Vendor shall certify that item quoted meets the capabilities, features and specifications listed below and that vendor can assume all contractor responsibilities stated below by initialing at the bottom. In order to be considered for award, this must be completed and submitted with the vendor quote.
TECHNICAL CAPABILITES STATEMENT
General Specification for HOSE ASSEMBLY
Shall be provided with the following capabilities, features and specifications: Yes No
All specifications listed under CLIN 0001 and 0002 – Extended Description
ITEM 0001 EXTENDED DESCRIPTION
HOSE ASSEMBLY,
1-1/2" ID X 20 FT LONG (AEROQUIP P/N: 2661-24), WITH
TWO (2) EACH 1-1/2" STEEL FEMALE JIC/SAE 37 DEG SWIVEL FITTINGS (AEROQUIP P/N
1GA24FJ24-24) (NO SUBSTITUTIONS), AND TWO (2) EACH 1-1/2” CRES 37 DEG MALE
FLARE PLUGS (SSP P/N J24P OR EQUAL) INSTALLED ON EACH END.
-ENSURE EACH HOSE ASSEMBLY IS PROOF TESTED TO 250 + 25/-0 PSI FOR 1 TO 5
MINUTES IAW S6430-AE-TED-010.
-THE HOSE ASSEMBLY SHOULD NOT SHOW ANY LEAKS, SIGNS OF WEAKNESS,
TWISTING, DETERIORATION, DEFORMATION, DAMAGE, BURST OR SHOW SIGNS OF
FITTING SEAPRATION.
-VENDOR SHALL LABEL EACH END OF EACH HOSE ASSEMBLY WITH A PERMANENT
TAG IDENTIFYING HYDROSTATIC PROOF TEST PRESSURE, DATE OF TEST, AND TESTING
ACTIVITY.
**CERTIFICATE OF COMPLIANCE REQUIRED**
**MERCURY FREE CLAUSE INVOKED**
ITEM 0002 EXTENDED DESCRIPTION
HOSE ASSEMBLY,
1-1/2" ID X 30 FT LONG (AEROQUIP P/N: 2661-24), WITH
TWO (2) EACH 1-1/2" STEEL FEMALE JIC/SAE 37 DEG SWIVEL FITTINGS (AEROQUIP P/N
1GA24FJ24-24) (NO SUBSTITUTIONS), AND TWO (2) EACH 1-1/2” CRES 37 DEG MALE
FLARE PLUGS (SSP P/N J24P OR EQUAL) INSTALLED ON EACH END.
-ENSURE EACH HOSE ASSEMBLY IS PROOF TESTED TO 250 + 25/-0 PSI FOR 1 TO 5
MINUTES IAW S6430-AE-TED-010.
-THE HOSE ASSEMBLY SHOULD NOT SHOW ANY LEAKS, SIGNS OF WEAKNESS,
TWISTING, DETERIORATION, DEFORMATION, DAMAGE, BURST OR SHOW SIGNS OF
FITTING SEAPRATION.
-VENDOR SHALL LABEL EACH END OF EACH HOSE ASSEMBLY WITH A PERMANENT
TAG IDENTIFYING HYDROSTATIC PROOF TEST PRESSURE, DATE OF TEST, AND TESTING
ACTIVITY.
**CERTIFICATE OF COMPLIANCE REQUIRED**
**MERCURY FREE CLAUSE INVOKED**
TECHNICAL CAPABILITY/CONTRACTOR RESPONSIBILITY CERTIFICATION
Vendor hereby certifies that vendor’s item meets or exceeds all specifications and contractor responsibilities stated in this solicitation, in their entirety, with no exceptions. __________ (initials)
DATE: _________________________________________
File details come from the government source that posted it. Updated .