Attachment A Technical Capability Statement.pdf

PDF 137 KB Posted

Attached to
Hose Assembly
Solicitation number
N4215825QE016
Issued by

About this file

This is a Technical Capabilities Statement attachment that requires vendor certification for hose assembly specifications. The document details requirements for two line items: CLIN 0001 requires a 1-1/2" ID x 20 ft long hose assembly (Aeroquip P/N: 2661-24) with specific steel female JIC/SAE 37 degree swivel fittings and CRES male flare plugs, while CLIN 0002 requires the same specifications but in a 30 ft length.

Both items must undergo proof testing at 250 + 25/-0 PSI for 1-5 minutes according to S6430-AE-TED-010 standards, with no allowance for leaks, weakness, twisting, deterioration, deformation, damage, burst, or fitting separation. Each hose assembly requires permanent tags identifying hydrostatic proof test pressure, test date, and testing activity. The procurement requires a Certificate of Compliance and invokes a Mercury Free Clause. Vendors must certify compliance with all specifications by initialing and dating the form, with no exceptions permitted.

View the file

Other files

File Type Posted
Attachment 1 Certificate of Compliance.pdf PDF
N4215825QE016.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N4215825QE016 - Attachment (A)

Page 1 of 1 (Rev 1)

Vendor shall certify that item quoted meets the capabilities, features and specifications listed below and that vendor can assume all contractor responsibilities stated below by initialing at the bottom. In order to be considered for award, this must be completed and submitted with the vendor quote.

TECHNICAL CAPABILITES STATEMENT

General Specification for HOSE ASSEMBLY

Shall be provided with the following capabilities, features and specifications: Yes No

All specifications listed under CLIN 0001 and 0002 – Extended Description

ITEM 0001 EXTENDED DESCRIPTION

HOSE ASSEMBLY,

1-1/2" ID X 20 FT LONG (AEROQUIP P/N: 2661-24), WITH

TWO (2) EACH 1-1/2" STEEL FEMALE JIC/SAE 37 DEG SWIVEL FITTINGS (AEROQUIP P/N

1GA24FJ24-24) (NO SUBSTITUTIONS), AND TWO (2) EACH 1-1/2” CRES 37 DEG MALE

FLARE PLUGS (SSP P/N J24P OR EQUAL) INSTALLED ON EACH END.

-ENSURE EACH HOSE ASSEMBLY IS PROOF TESTED TO 250 + 25/-0 PSI FOR 1 TO 5

MINUTES IAW S6430-AE-TED-010.

-THE HOSE ASSEMBLY SHOULD NOT SHOW ANY LEAKS, SIGNS OF WEAKNESS,

TWISTING, DETERIORATION, DEFORMATION, DAMAGE, BURST OR SHOW SIGNS OF

FITTING SEAPRATION.

-VENDOR SHALL LABEL EACH END OF EACH HOSE ASSEMBLY WITH A PERMANENT

TAG IDENTIFYING HYDROSTATIC PROOF TEST PRESSURE, DATE OF TEST, AND TESTING

ACTIVITY.

**CERTIFICATE OF COMPLIANCE REQUIRED**

**MERCURY FREE CLAUSE INVOKED**

ITEM 0002 EXTENDED DESCRIPTION

HOSE ASSEMBLY,

1-1/2" ID X 30 FT LONG (AEROQUIP P/N: 2661-24), WITH

TWO (2) EACH 1-1/2" STEEL FEMALE JIC/SAE 37 DEG SWIVEL FITTINGS (AEROQUIP P/N

1GA24FJ24-24) (NO SUBSTITUTIONS), AND TWO (2) EACH 1-1/2” CRES 37 DEG MALE

FLARE PLUGS (SSP P/N J24P OR EQUAL) INSTALLED ON EACH END.

-ENSURE EACH HOSE ASSEMBLY IS PROOF TESTED TO 250 + 25/-0 PSI FOR 1 TO 5

MINUTES IAW S6430-AE-TED-010.

-THE HOSE ASSEMBLY SHOULD NOT SHOW ANY LEAKS, SIGNS OF WEAKNESS,

TWISTING, DETERIORATION, DEFORMATION, DAMAGE, BURST OR SHOW SIGNS OF

FITTING SEAPRATION.

-VENDOR SHALL LABEL EACH END OF EACH HOSE ASSEMBLY WITH A PERMANENT

TAG IDENTIFYING HYDROSTATIC PROOF TEST PRESSURE, DATE OF TEST, AND TESTING

ACTIVITY.

**CERTIFICATE OF COMPLIANCE REQUIRED**

**MERCURY FREE CLAUSE INVOKED**

TECHNICAL CAPABILITY/CONTRACTOR RESPONSIBILITY CERTIFICATION

Vendor hereby certifies that vendor’s item meets or exceeds all specifications and contractor responsibilities stated in this solicitation, in their entirety, with no exceptions. __________ (initials)

DATE: _________________________________________

File details come from the government source that posted it. Updated .