Attachment A supplement Elevation Bid Worksheet 4568-0007.xlsx
XLSX spreadsheet 636 KB Posted
- Solicitation number
- Doc1985787376
- Issued by
- Beaufort County, North Carolina
About this file
This is a bid worksheet supplement for residential elevation projects issued by the North Carolina Department of Public Safety, Division of Emergency Management (NCEM), in response to Storm #4568 affecting Beaufort County. The worksheet is designed for prequalified vendors to submit itemized bids for the elevation of eight residential properties located in Washington and Belhaven, North Carolina. The project encompasses three primary work phases: Pre-Elevation (including feasibility analysis, home inspections, surveys, title research, engineering, permitting, and environmental inspections), Elevation Construction (site preparation, utility work, structural lifting, foundation work, access construction, and temporary lodging), and Post-Elevation (final surveys, site restoration, deed recording, and demobilization). Vendors are required to complete individual property worksheets for each of the seven mandatory properties and one optional property, providing unit prices and quantities for all line items. The worksheet includes provisions for profit, overhead, and construction management costs, and vendors must provide an overall project timeline in days from Notice to Proceed through final closeout for all contracted work.
The bid worksheet specifies that vendors must not modify the worksheet structure, formulas, or line items under penalty of proposal rejection. Each vendor is responsible for accurately calculating all work phase totals and the grand total, with auto-calculation features built into the Bid Summary Sheet. Vendors may add up to three miscellaneous line items per phase per property if additional eligible costs are identified, provided they include appropriate descriptions, units of measure, unit prices, and quantities. The worksheet accommodates flexible units of measure (linear feet, square feet, hourly rates, flat rates, or other reasonable measures) to allow vendors to tailor their pricing approaches to specific project conditions. Vendors are instructed to bring any calculation errors or concerns to NCEM's attention using contact methods specified in Section 2.3 of the RFB. The timeframe submitted by each vendor will be a key evaluation criterion for meeting HMGP (Hazard Mitigation Grant Program) goals and deadlines, requiring vendors to develop realistic project schedules that account for phasing and potential work overlap across multiple properties.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 4568-0007 Beaufort County Elevation RQ197223.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
| North Carolina Department of Public Safety |
| Emergency Management |
| ELEVATION REQUEST FOR BID WORKSHEET |
| RFB NUMBER: |
| VENDOR: |
| BID DATE: |
| BID SUMMARY | |
| WORK PHASE | TOTAL |
| PRE-ELEVATION | $0.00 |
| ELEVATION CONSTRUCTION | $0.00 |
| POST-ELEVATION | $0.00 |
| PROFIT & OVERHEAD | $0.00 |
| CONSTRUCTION MANAGEMENT COSTS | $0.00 |
| GRAND TOTAL: | $0.00 |
TOTAL PROJECT TIME (DAYS):
| NOTES: | **Please read the following information carefully** |
| 1) The Vendor shall fill out this Bid Worksheet in its entirety. | |
| 2) Modifications to this worksheet (i.e., adding/removing line items, modifying formulas, etc.) are not permitted. Noncompliance shall constitute grounds to reject Vendor's proposal. | |
| 3) Vendor is responsible for providing information in light blue cells. | |
| 4) This Bid Summary Sheet auto-calculates the Work Phase Totals (Pre-Elevation, Construction, Post-Elevation, and Profit & Overhead / Management Costs) from subsequent Property Worksheets. Vendor shall verify that all amounts for each individual phase and the Grand Total have been calculated correctly. Any errors or concerns with this worksheet shall be brought to the immediate attention of the State; Vendor shall follow the contact method as specified in Section 2.3 of the RFB. | |
| 5) Vendor must provide profit & overhead and management costs for each property, as applicable. | |
| 6) An individual Property Worksheet must be filled out in its entirety for EACH property. Property Worksheets are included within this Bid Worksheet. | |
| 7) Vendor shall note the unit of measure for each line item listed on the Property Worksheet (i.e., linear feet, square feet, hour, flat rate, or any reasonable unit of measure). Vendor shall input a Unit Price and Quantity for every line item (a '1' must be entered in the Quantity column for flat or individual costs). | |
| 8) Additional rows for miscellaneous costs have been provided for each property. Three additional rows per phase have been provided if the Vendor determines other eligible costs should be provided in their bid. If Vendor elects to use this category, a description of the cost must be provided along with the unit of measure, unit price, and quantity. | |
| 9) Vendor shall provide the anticipated overall project timeframe (i.e., total time to complete work for all properties listed). This estimate, in days, shall begin with the Notice to Proceed and end at closeout for all contracted work. Vendor shall strive to meet this timeframe, as well as any timeframes put forth by NCEM, barring any unexpected acts of nature requiring a change in the Scope of Work and/or Change Order(s). It is the responsibility of the Vendor to create a time schedule, including any phasing or work overlap, in order to complete all projects in the specified timeframe. The timeframe submitted by each Vendor shall be used by the State when evaluating bids as to meet HMGP goals and deadlines. |
REF-SHEET2-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
PROPERTY (1)
| ELEVATION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4568 | STREET ADDRESS: | 75 E River Acres |
| PROJECT #: | 7 | CITY: | Washington |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Pre-Elevation | Feasibility Analysis | $0.00 | ||||
| Home Inspection Report | $0.00 | |||||
| Pre-Survey & Elevation Certificate | $0.00 | |||||
| Title Research (Coversheet, Deed & Tax Report) | $0.00 | |||||
| Engineering & Design | $0.00 | |||||
| Permitting | $0.00 | |||||
| Asbestos & Lead Inspection | $0.00 | |||||
| Termite Inspection & Treatment | $0.00 | |||||
| Mobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Pre-Elevation Total: | $0.00 | |||||
| Elevation Construction | Preparatory Site Work | $0.00 | ||||
| Utility Disconnect & Reconnect | $0.00 | |||||
| Elevation - Lift & Lower | $0.00 | |||||
| Foundation Demolition | $0.00 | |||||
| Foundation Construction | $0.00 | |||||
| Access (e.g., Porches, Stairs, Ramps, etc.) | $0.00 | |||||
| Inspections | $0.00 | |||||
| Temporary Lodging | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Construction Total: | $0.00 | |||||
| Post-Elevation | Post-Survey & Elevation Certificate | $0.00 | ||||
| Final Site Work (e.g., Grade, Seed, etc.) | $0.00 | |||||
| Deed Record Fee | $0.00 | |||||
| Demobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Post-Elevation Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Property (2)
| ELEVATION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4568 | STREET ADDRESS: | 108 Harbour Way |
| PROJECT #: | 7 | CITY: | Washington |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Pre-Elevation | Feasibility Analysis | $0.00 | ||||
| Home Inspection Report | $0.00 | |||||
| Pre-Survey & Elevation Certificate | $0.00 | |||||
| Title Research (Coversheet, Deed & Tax Report) | $0.00 | |||||
| Engineering & Design | $0.00 | |||||
| Permitting | $0.00 | |||||
| Asbestos & Lead Inspection | $0.00 | |||||
| Termite Inspection & Treatment | $0.00 | |||||
| Mobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Pre-Elevation Total: | $0.00 | |||||
| Elevation Construction | Preparatory Site Work | $0.00 | ||||
| Utility Disconnect & Reconnect | $0.00 | |||||
| Elevation - Lift & Lower | $0.00 | |||||
| Foundation Demolition | $0.00 | |||||
| Foundation Construction | $0.00 | |||||
| Access (e.g., Porches, Stairs, Ramps, etc.) | $0.00 | |||||
| Inspections | $0.00 | |||||
| Temporary Lodging | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Construction Total: | $0.00 | |||||
| Post-Elevation | Post-Survey & Elevation Certificate | $0.00 | ||||
| Final Site Work (e.g., Grade, Seed, etc.) | $0.00 | |||||
| Deed Record Fee | $0.00 | |||||
| Demobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Post-Elevation Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Property (3)
| ELEVATION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4568 | STREET ADDRESS: | 269 Old Topping Drive |
| PROJECT #: | 7 | CITY: | Belhaven |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Pre-Elevation | Feasibility Analysis | $0.00 | ||||
| Home Inspection Report | $0.00 | |||||
| Pre-Survey & Elevation Certificate | $0.00 | |||||
| Title Research (Coversheet, Deed & Tax Report) | $0.00 | |||||
| Engineering & Design | $0.00 | |||||
| Permitting | $0.00 | |||||
| Asbestos & Lead Inspection | $0.00 | |||||
| Termite Inspection & Treatment | $0.00 | |||||
| Mobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Pre-Elevation Total: | $0.00 | |||||
| Elevation Construction | Preparatory Site Work | $0.00 | ||||
| Utility Disconnect & Reconnect | $0.00 | |||||
| Elevation - Lift & Lower | $0.00 | |||||
| Foundation Demolition | $0.00 | |||||
| Foundation Construction | $0.00 | |||||
| Access (e.g., Porches, Stairs, Ramps, etc.) | $0.00 | |||||
| Inspections | $0.00 | |||||
| Temporary Lodging | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Construction Total: | $0.00 | |||||
| Post-Elevation | Post-Survey & Elevation Certificate | $0.00 | ||||
| Final Site Work (e.g., Grade, Seed, etc.) | $0.00 | |||||
| Deed Record Fee | $0.00 | |||||
| Demobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Post-Elevation Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Property (4)
| ELEVATION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4568 | STREET ADDRESS: | 693 E Water Street |
| PROJECT #: | 7 | CITY: | Belhaven |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Pre-Elevation | Feasibility Analysis | $0.00 | ||||
| Home Inspection Report | $0.00 | |||||
| Pre-Survey & Elevation Certificate | $0.00 | |||||
| Title Research (Coversheet, Deed & Tax Report) | $0.00 | |||||
| Engineering & Design | $0.00 | |||||
| Permitting | $0.00 | |||||
| Asbestos & Lead Inspection | $0.00 | |||||
| Termite Inspection & Treatment | $0.00 | |||||
| Mobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Pre-Elevation Total: | $0.00 | |||||
| Elevation Construction | Preparatory Site Work | $0.00 | ||||
| Utility Disconnect & Reconnect | $0.00 | |||||
| Elevation - Lift & Lower | $0.00 | |||||
| Foundation Demolition | $0.00 | |||||
| Foundation Construction | $0.00 | |||||
| Access (e.g., Porches, Stairs, Ramps, etc.) | $0.00 | |||||
| Inspections | $0.00 | |||||
| Temporary Lodging | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Construction Total: | $0.00 | |||||
| Post-Elevation | Post-Survey & Elevation Certificate | $0.00 | ||||
| Final Site Work (e.g., Grade, Seed, etc.) | $0.00 | |||||
| Deed Record Fee | $0.00 | |||||
| Demobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Post-Elevation Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Property (5)
| ELEVATION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4568 | STREET ADDRESS: | 795 Foreman Lane |
| PROJECT #: | 7 | CITY: | Belhaven |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Pre-Elevation | Feasibility Analysis | $0.00 | ||||
| Home Inspection Report | $0.00 | |||||
| Pre-Survey & Elevation Certificate | $0.00 | |||||
| Title Research (Coversheet, Deed & Tax Report) | $0.00 | |||||
| Engineering & Design | $0.00 | |||||
| Permitting | $0.00 | |||||
| Asbestos & Lead Inspection | $0.00 | |||||
| Termite Inspection & Treatment | $0.00 | |||||
| Mobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Pre-Elevation Total: | $0.00 | |||||
| Elevation Construction | Preparatory Site Work | $0.00 | ||||
| Utility Disconnect & Reconnect | $0.00 | |||||
| Elevation - Lift & Lower | $0.00 | |||||
| Foundation Demolition | $0.00 | |||||
| Foundation Construction | $0.00 | |||||
| Access (e.g., Porches, Stairs, Ramps, etc.) | $0.00 | |||||
| Inspections | $0.00 | |||||
| Temporary Lodging | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Construction Total: | $0.00 | |||||
| Post-Elevation | Post-Survey & Elevation Certificate | $0.00 | ||||
| Final Site Work (e.g., Grade, Seed, etc.) | $0.00 | |||||
| Deed Record Fee | $0.00 | |||||
| Demobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Post-Elevation Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Property (6)
| ELEVATION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4568 | STREET ADDRESS: | 952 E Main Street |
| PROJECT #: | 7 | CITY: | Belhaven |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Pre-Elevation | Feasibility Analysis | $0.00 | ||||
| Home Inspection Report | $0.00 | |||||
| Pre-Survey & Elevation Certificate | $0.00 | |||||
| Title Research (Coversheet, Deed & Tax Report) | $0.00 | |||||
| Engineering & Design | $0.00 | |||||
| Permitting | $0.00 | |||||
| Asbestos & Lead Inspection | $0.00 | |||||
| Termite Inspection & Treatment | $0.00 | |||||
| Mobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Pre-Elevation Total: | $0.00 | |||||
| Elevation Construction | Preparatory Site Work | $0.00 | ||||
| Utility Disconnect & Reconnect | $0.00 | |||||
| Elevation - Lift & Lower | $0.00 | |||||
| Foundation Demolition | $0.00 | |||||
| Foundation Construction | $0.00 | |||||
| Access (e.g., Porches, Stairs, Ramps, etc.) | $0.00 | |||||
| Inspections | $0.00 | |||||
| Temporary Lodging | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Construction Total: | $0.00 | |||||
| Post-Elevation | Post-Survey & Elevation Certificate | $0.00 | ||||
| Final Site Work (e.g., Grade, Seed, etc.) | $0.00 | |||||
| Deed Record Fee | $0.00 | |||||
| Demobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Post-Elevation Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Property (7)
| ELEVATION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4568 | STREET ADDRESS: | 1275 Little Creek Rd Ext |
| PROJECT #: | 7 | CITY: | Belhaven |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Pre-Elevation | Feasibility Analysis | $0.00 | ||||
| Home Inspection Report | $0.00 | |||||
| Pre-Survey & Elevation Certificate | $0.00 | |||||
| Title Research (Coversheet, Deed & Tax Report) | $0.00 | |||||
| Engineering & Design | $0.00 | |||||
| Permitting | $0.00 | |||||
| Asbestos & Lead Inspection | $0.00 | |||||
| Termite Inspection & Treatment | $0.00 | |||||
| Mobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Pre-Elevation Total: | $0.00 | |||||
| Elevation Construction | Preparatory Site Work | $0.00 | ||||
| Utility Disconnect & Reconnect | $0.00 | |||||
| Elevation - Lift & Lower | $0.00 | |||||
| Foundation Demolition | $0.00 | |||||
| Foundation Construction | $0.00 | |||||
| Access (e.g., Porches, Stairs, Ramps, etc.) | $0.00 | |||||
| Inspections | $0.00 | |||||
| Temporary Lodging | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Construction Total: | $0.00 | |||||
| Post-Elevation | Post-Survey & Elevation Certificate | $0.00 | ||||
| Final Site Work (e.g., Grade, Seed, etc.) | $0.00 | |||||
| Deed Record Fee | $0.00 | |||||
| Demobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Post-Elevation Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
Property (8)
| ELEVATION REQUEST FOR BID PROPERTY WORKSHEET | |||
| STORM #: | 4568 | STREET ADDRESS: | 617 E Second St-OPTIONED |
| PROJECT #: | 7 | CITY: | Belhaven |
| WORK PHASE | ITEMIZED WORK | UNIT OF MEASURE | UNIT PRICE | QUANTITY | ITEMIZED COST | |
| Pre-Elevation | Feasibility Analysis | $0.00 | ||||
| Home Inspection Report | $0.00 | |||||
| Pre-Survey & Elevation Certificate | $0.00 | |||||
| Title Research (Coversheet, Deed & Tax Report) | $0.00 | |||||
| Engineering & Design | $0.00 | |||||
| Permitting | $0.00 | |||||
| Asbestos & Lead Inspection | $0.00 | |||||
| Termite Inspection & Treatment | $0.00 | |||||
| Mobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Pre-Elevation Total: | $0.00 | |||||
| Elevation Construction | Preparatory Site Work | $0.00 | ||||
| Utility Disconnect & Reconnect | $0.00 | |||||
| Elevation - Lift & Lower | $0.00 | |||||
| Foundation Demolition | $0.00 | |||||
| Foundation Construction | $0.00 | |||||
| Access (e.g., Porches, Stairs, Ramps, etc.) | $0.00 | |||||
| Inspections | $0.00 | |||||
| Temporary Lodging | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Construction Total: | $0.00 | |||||
| Post-Elevation | Post-Survey & Elevation Certificate | $0.00 | ||||
| Final Site Work (e.g., Grade, Seed, etc.) | $0.00 | |||||
| Deed Record Fee | $0.00 | |||||
| Demobilization | $0.00 | |||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Misc. | N/A or Provide Details | $0.00 | ||||
| Post-Elevation Total: | $0.00 | |||||
| Other | Profit & Overhead | |||||
| Construction Management Costs | ||||||
| Other Total: | $0.00 |
Property Total: $0.00
REF-LASTSHEET-DONOTMOVE
*THIS SHEET HAS INTENTIONALLY BEEN LEFT BLANK. DO NOT DELETE.
image1.wmf
File details come from the government source that posted it. Updated .