Attachment A Statement of work S-24800-00017248.pdf

PDF 207 KB Posted

Attached to
Repair Asphalt Pavements - Kingsley Field
Solicitation number
S-24800-00017248
Issued by
Jackson County, Oregon

About this file

This Statement of Work is for the Oregon Air National Guard at Kingsley Field in Klamath Falls, Oregon, detailing repair and maintenance services for asphalt pavements on the military installation. The contract requires comprehensive asphalt work including tar seal application, crack sealing, grind and inlay operations, full-depth pavement replacement, and pavement markings across multiple areas. The base bid scope includes installation of approximately 800 square yards of new asphalt on a loading dock and approach, crack seal and heavy sealcoat application to approximately 34,200 square yards of roads, and repainting of traffic and pedestrian markings. Option 1 encompasses crack seal and heavy sealcoat application to approximately 17,200 square yards of parking lots with repainting of parking stalls, while Option 2 involves demolition, regrading, and installation of new asphalt totaling approximately 11,026 square yards. A mandatory pre-bid site walk is required for all bidders to verify dimensions and quantities. The contractor must coordinate with Base Civil Engineering fourteen days prior to work start to secure base-entry access and request a dig permit from Oregon's utility notification center.

The contractor must comply with all federal, state, county, and local regulations, including OSHA, DEQ, and EPA requirements, and is responsible for all labor, tools, equipment, and materials necessary for project completion. Security requirements include completion of DD Form 369 background checks and Antiterrorism Awareness Level I training by all contractor and subcontractor employees within 30 calendar days of contract start, along with Operations Security training within the same timeframe. Work shall be conducted during base duty hours of Monday through Friday, 0700 to 1630, with coordination required for any work outside these hours, and no work is permitted on federal holidays or scheduled days off without prior approval. The contractor must submit a one-year warranty on all materials and workmanship upon completion and is responsible for all site cleanup, debris removal, and disposal of materials off base and airport property daily. Nuclear density testing must achieve 92% compaction on all asphalt placed per Oregon Department of Transportation standards, with testing occurring at least once per paving lane per day, and water flow testing must be conducted prior to project completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OREGON AIR NATIONAL GUARD

KINGSLEY FIELD

221 Wagner Street

Klamath Falls, OR 97603

STATEMENT OF WORK

FOR

Repair Asphalt Pavements S-24800-00017248

DATE

January 28 2026

CONTENTS

1. General Requirements

1.1 Submittals

1.2 Quality Control

1.3 Preparation

1.4 Security

1.5 Work Hours

1.6 Warranty

2. Asphalt

2.1 Tar Seal

2.2 Crack Seal

2.3 Grind and Inlay

2.4 Full Depth Replacement

2.5 Pavement Markings

1. GENERAL REQUIREMENTS

The Contractor will provide all labor, tools, equipment, and materials to complete this project in accordance with all federal, state, county and local regulations and codes.

Protect all facilities, grounds, plants, and utilities not scheduled to receive work. Observe all safety, OSHA, DEQ, and EPA rules and regulations. Contractors are required to report all labor hours, regardless of contract type via the contract manpower reporting application and federal acquisition regulation (FAR) requirements. Contractor will repair, repaint, or replace all damaged finishes. Coordination with the Base Civil Engineering (BCE) office and Security operations fourteen (14) days prior to start of work is required to secure base-entry access. Contractor will request & secure a dig permit and call Oregon’s utility notification center 1-800-332-2344 prior to work as well as coordinate work site access. The Contractor shall submit a construction schedule and material submittal for approval prior to construction. This Statement of Work and the drawings are an outline of performance to ensure the contractor understands the basis for design and construction. The contractor will clean-up and dispose of all debris off base and Airport property at the end of each workday.

Contractor shall verify all dimensions and quantities listed and attend a mandatory pre-bid site walk.

1.1 Submittals

Submit a preliminary list, developed with the project inspector, of major products proposed for use, which includes the name of its manufacturer, trade name, and model number. Contractors must also submit MSDS data on all products used on site to the project inspector.

1.2 Quality Control

The Contractor shall ensure that all work is completed in strict compliance with this specification and the contract drawings.

1.3 Preparation

Work shall be conducted in a professional manner. Contractor shall keep site clean and free of blowing scrap materials. Vehicles and job site clean-up must comply with Kingsley Field and Airport Regulations. Protect adjacent surfaces to remain.

1.4 Security

Contractors and associated subcontractors are required to fill out a Security Background Check on DD Form 369 and submit to the BCE office 14 days prior to performing work on base. The same persons must complete the anti-terrorism training level 1 then submit their completion certificate with their background check. POC is Ms.

Jennifer Hall (541-885-6368). Any deliveries of equipment shall be scheduled 1 day in advance with BCE.

The contractor will follow all security procedures for the Base and Airport, including:

Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I Training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on the Advanced Distributed Learning System (ADLS), or Joint Knowledge Online at http://jko.jten.mil. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.

OPSEC Training. In accordance with AFI 10-701, Operations Security, OPSEC

PMs/SMO/SMNCOs/Coordinators will provide OPSEC training or training materials to contract employees within 30 days of employees’ initial assignment to the contract and prior to having access to any critical information (CI) and annually thereafter. General organizational orientations may need to be supplemented by duty-related orientations in the work center targeted toward specific critical information and vulnerabilities associated with the work. Initial training (OPSE 1301 - OPSEC Fundamentals) located on the ADLS website and refresher OPSEC training (Conducted annually at Commander's Call.)

1.5 Work Hours

Contractors shall perform work during Base duty hours (M-F 0700-1630) and or hours specified by the Airport. Contractors must coordinate with the BCE if they wish to work outside of these hours. The contractor will not be allowed to work on Federal holidays or Scheduled Days off (SDO), without prior approval.

1.6 Warranty

For ANG purposes a written one year warranty from the contractor is required for all materials and workmanship at the time of completion.

SUMMARY OF WORK

2. ASPHALT SPECIFICATIONS

Task orders will dictate type of repair desired and surface area estimates to be verified by the contractor during a mandatory pre-bid site walk.

The Contractor is responsible for recording components unearthed during excavation and submitting to the BCE Office prior to the completion of work. Survey Monuments to be preserved. The project work shall not interfere with the operation of the surrounding shops or facilities unless prior approval is given.

2.1 Tar Seal

Roadway and Parking lot asphalt coating shall be one coat, heavy duty pavement sealer, water dispersed, polymer modified, slate and mineral filled, black, emulsified asphalt coating. Product data will be submitted to the Base Civil Engineering office for approval prior to award of contract. The product shall be applied by squeegee or sprayed with proper heavy duty commercial equipment at a minimum of 35 SF per gallon of product and provide a cured film thickness of 8.0 to 10.0 mils. A designated test area will be applied with the coating first to determine the specific thickness with a manufacture representative on-site for approval. The contractor will submit a schedule of work for approval before proceeding with the work.

2.2 Crack Seal

Use crack sealant conforming to ASTM D6690, (AASHTO M324), Crafco RoadSaver 221 or equal. Check the temperature of the sealant to ensure it is at the manufacturer’s recommended application temperature. Insert the nozzle of the application equipment into the crack and seal the crack from the bottom to the top (Figure

9-11). Sealing in this manner minimizes bubbling of the sealant due to entrapped air.

Recess the sealant approximately 0.125 to 0.25 inch (3 to 6 millimeters) below the pavement surface to prevent tracking. Remove excess sealant with a squeegee or similar equipment.

Provide and use backer rods with melting point higher than the pouring temperature of the sealant. Provide and use backer rod that is approximately 25 percent wider in diameter than the nominal width of the crack. The larger size will enable the sealant to be inserted without dislodging the backer rod. Place the backer rod to a depth that will provide a shape factor (depth-to-width ratio) of approximately 1 for petroleum-based sealants. However, do not place the top of the backer rod deeper than 0.75 inch (19 millimeters). This will provide a reservoir for the sealant that will minimize the internal stresses in the sealant. High internal stresses can create cohesion failure, split the material, or dislodge loose aggregate from the pavement, damaging the effectiveness of the seal. However, if the shape factor is too small, adhesion failure can occur; therefore, it is important to maintain the proper shape factor.

Apply a thin tack coat to the edges and bottom of the patch. Ensure the patch area edges clean, dry, and free of any dust so the tack coat will bond to the edges. Use tack coat materials that are cutback grades RC-70 or RC-250, or emulsion grades RS-1, MS-1, SS-1, SS-1h, CSS-1, or CSS-1h. The same grade of asphalt binder used in the asphalt mix can also be used as a tack coat, but this is difficult in small areas. If used, apply it hot and apply the patch material hot enough to soften the asphalt cement to obtain the required bond.

2.2.1 Small and Medium Cracks (0.25 to 2 Inches): Widen small cracks to a nominal width of 0.25 inch greater than the existing nominal or average width. Widening the cracks 0.25 inch will help eliminate the potential for raveling of the pavement along the edges of the crack. After the crack has been cleaned and inspected, it is ready for sealing.

The depth of the cracks to be sealed is determined and, if the depth is greater than 0.75 inch a backer rod material is inserted. If the depth of the crack is not deep enough to accommodate the backer rod and maintain a sealant depth of 0.5 to 0.75 inch then the crack can be routed or the backer rod material omitted

2.2.2 For Large Cracks (Greater Than 2 Inches): Fill cracks that are 2 inches and larger with a sand asphalt or fine-graded asphalt mix and compacted. Cut or route the edges vertical and clean the cracks to obtain a patch that meets the specified requirement. The asphalt material could prematurely fail if the proper cleaning and patching procedures are not followed. Square by sawing, fill with asphalt mix, and compact the cracks and apply sealant at joints.

2.3 Full Depth Replacement

2.3.1 Preparation: Remove existing asphalt pavement by COLD PLANE method, It is expected that the cold plane shall produce a clean concrete lip to pave to and not damage the lip of the gutter. Infrastructure damaged by the contractor will be repaired by the contractor to existing condition or better. Prepare sub-base as necessary to achieve grade and compaction per ODOT standards. Rollover test to be conducted in the presence of the base project manager to check for soft spots before applying tack coat.

2.3.2 Paving: 3-6 inches of compacted asphalt as needed (ODOT ½”, Level 3 asphalt w/ PG 64-28 binder compacted to ODOT standards). Provide steel-wheeled rollers with a minimum gross static weight as follows: Breakdown and Intermediate 10 ton, Finish 8 ton. A roller with drum width of 36” or less shall be used to compact the joint at the gutter lip.

2.3.3 Tack Coat Application: Seal all adjoining asphalt concrete pavement surfaces with an edge tack coat. Place sufficient tack coat to seal the adjoining surfaces. After the tack coat has been placed, place clean sand over the tack coat. Reapply additional tack coat and sand cover to any edges that are not completely sealed in first application.

2.3.4 Testing: Nuclear Density test shall achieve 92% compaction rate on all asphalt placed per ODOT standards. Testing shall occur one test per paving lane, per day. The Contractor will be required to establish finished elevations that provide positive drainage to storm drains where applicable. Contractor is responsible for testing. Water flow testing will be conducted prior to project completion and witnessed by the base project inspector. If new work contains birdbaths or improper drainage, the Contractor will repair the problem at no additional cost to the Government..

2.4 Pavement Markings

The Contractor shall conduct all marking operations in strict compliance with all local, state, and Federal environmental statutes and regulations, including, but not limited to, regulations promulgated under 29 C.F.R. 1910, et seq., 42 U.S.C. 6901, et seq.; and 42 U.S.C. 9601, et seq. The Contractor shall provide all cones, barriers, lights, signs, placards, flags, and flagging personnel necessary to establish an adequate and safe work zone and control traffic in and around the work area until newly applied markings are dry. The Contractor shall establish and maintain work zones as necessary throughout the period of the contract, prominently identifying potential hazards and dangers to personnel and traffic in or near the work area. Coordinate all vehicle marking, escorts, and taxiway closures when required. The Contractor shall remove all debris, waste, spillage, and by-products generated by the marking operations from the base and shall strictly comply with all applicable state, local, and Federal environmental statutes and regulations regarding disposal, including, but not limited to, regulations promulgated under 42 U.S.C. 6901, et seq.; 42 U.S.C. 9601, et seq.; and 49 U.S.C. 1801, et seq.

3. SCOPE

3.1 Base Bid

Install approximately 800SY of asphalt on new loading dock and approach. Apply crack seal and heavy sealcoat to approximately 34,200SY of road, repaint traffic and pedestrian markings to match existing. See attached map for approximate locations.

3.2 Option 1

Apply crack seal and heavy sealcoat to approximately 17,200SY of parking lots, repaint parking stalls to match existing.

3.3 Option 2

Demolish existing, regrade as necessary and install new asphalt totaling approximately 11,026SY.

January 28 2026
CONTENTS
1. GENERAL REQUIREMENTS
SUMMARY OF WORK
2. ASPHALT SPECIFICATIONS
3. SCOPE