Attachment_A_Statement_of_Work.pdf
PDF 168 KB Posted
- Attached to
- Road Closures Gates, Lake Roosevelt NRA
- Solicitation number
- 140P8322Q0074
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_C_DOL_Wage_Determination.pdf | ||
| Attachment_D_Forms_to_Return_with_Quote.docx | DOCX document | |
| Attachment_B__Drawings.pdf | ||
| Sol_140P8322Q0074.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ # 140P8322Q0074
Attachment A Statement of Work Lake Roosevelt NRA
P a g e 1 | 3
Scope of Work
Lake Roosevelt National Recreation Area
Install Steel Road Gates
The National Park Service has a need for the fabrication and installation of metal swinging pipe gates. There will be six primary and three optional locations within the Lake Roosevelt National Recreation Area.
Primary Locations:
Marcus Island Boat Launch: 5.4 miles North on WA. State Hwy 25 from the intersection of WA. State Hwy 25 & WA. State Hwy 395
Evans Boat Launch: 9.2 miles North on WA. State Hwy 25 from the intersection of WA. State Hwy 25 & WA. State Hwy 395
North Gorge Boat Launch: 16.4 miles North on WA. State Hwy 25 from the intersection of WA. State Hwy 25 & WA. State Hwy 395
Kamloops Boat Launch: .2 miles North on Northport Flat Creek Road from the intersection of WA. State Hwy 395 & Northport Flat Creek Road on Northport Flat Creek Road
Snag Cove Boat Launch: 6.8 miles North on Northport Flat Creek Road from the intersection of WA. State Hwy 395 & Northport Flat Creek Road on Northport Flat Creek Road
Bradbury Beach Boat Launch: 7.6 miles South on WA. State Hwy 25 from the intersection of WA. State Hwy 25 & WA. State Hwy 395
Optional Locations:
Option A - French Rock Boat Launch: 7.8 miles South on Inchelium Kettle Falls Rd from the intersection of WA. State Hwy 20 & Inchelium Kettle Falls Rd.
Option B - China Bend Boat Launch: 20.5 miles North on WA. State Hwy 25 from the intersection of WA.
State Hwy 25 & WA. State Hwy 395
Option C - Napoleon Bridge Access Road and Boat Launch: .8 miles East on Napoleon Rd from the intersection of WA. State Hwy 395 & Napoleon Rd.
Description of Work
Contractor shall provide all labor, materials, tools and other equipment, services and supervision required to fabricate and install dual arm swing metal closure gates in accordance with Attachment B Project Drawings.
Contractor’s work sequence shall include, but is not limited to:
P a g e 2 | 3
Fabrication of Gates and Posts:
Consists of all work required to fabricate the gates and the required mounting and locking posts. Gates will lock in both the open and closed position, open in the downstream direction only, fully reflective when facing traffic, and secured at closing with a vandal proof bell/square housing.
Installation:
Consists of all work required to install and anchor the gates and posts in concrete.
Fabrication and welding of metal will be performed by a American Welding Society certified welder and all welds conform to the AWS D1.1/D1.1M Structural Welding Code – Steel.
All metal work will need to be painted with Rust-Oleum Low Voc Brown paint (#660000 rgb(102, 0, 0)) or equivalent.
Period of Performance:
Fabrication will commence upon award with gates to be installed no later than April 30, 2023.
Requirements:
A. Contractor shall at all times conduct their operations to ensure the least inconvenience to the public.
Confine storage of materials to the work limits of the project. Keep project area neat, orderly and in a safe condition at all times.
B. All excess materials and project debris, including all trash from any Contractor generated source, shall be completely removed from the park for reuse, recycling, or environmentally responsible disposal. No disposal of any items shall be allowed within the park.
C. Work Restrictions: Work may occur only between 8:00 am and 5:00 pm, Monday through Friday, except those days designated as federal holidays, unless prior permission is granted by the COR. The Contractor shall propose a schedule for installation to be approved by the COR prior to the commencement of the actual work.
D. Staging, Storage, and Stockpile Areas E. The Park does not have onsite storage space available for materials
Access:
Boat launch will be closed to public access during the installation of the swing gates.
Field Verification:
Field verify all conditions affecting the work of this contract before mobilizing. All provided measurements are estimates only.
Lodging:
There is no lodging available at the site.
P a g e 3 | 3
Utilities:
There are no utilities provided at the sites. The contractor may use the existing vault toilets if he/she maintains it in a sanitary condition acceptable to the Facility Manager. There is no fuel available at the project site.
SUBMITTALS:
Materials:
A. Contractor shall submit manufacturer’s data on the proposed materials.
Certifications:
A. Fabrication and welding of metal will be performed by a American Welding Society certified welder and all welds conform to the AWS D1.1/D1.1M Structural Welding Code – Steel.