Attachment_A_Statement_of_Work.pdf
PDF 196 KB Posted
- Attached to
- Replace 3. 5 Ton Heat Pump HVAC Federal contract opportunity
- Solicitation number
- 140P8323Q0053
About this file
This statement of work outlines the requirements for replacing a 3.5-ton heating, ventilation, and air conditioning (HVAC) unit at a National Park Service housing unit located in Davenport, Washington. The contractor will be responsible for removing the existing HVAC unit and installing a new, more energy efficient unit that meets or exceeds the specifications of the old unit. Duties include inspecting and modifying ductwork and electrical components for compatibility, performing load calculations, measuring airflow and refrigerant charge, and testing and documenting the new unit's performance. The contractor must dispose of waste properly, obtain all necessary permits, and provide training and maintenance manuals to park staff. The solicitation was issued by the National Park Service's Pacific West Region for this HVAC replacement project located at Lake Roosevelt National Recreation Area.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8323Q0053_Amd_0001.pdf | ||
| Attachment_D_Key_Personnel.pdf | ||
| Sol_140P8323Q0053.pdf | ||
| Attachment_C_Wage_Determination_WA20220033.pdf | ||
| Attachment_B_Photos_and_Details.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ 140P8323Q0053 Lake Roosevelt NRA
Replace 3.5 Ton Heat Pump HVAC
LAKE ROOSEVELT NATIONAL RECREATION AREA
REPLACE 3.5 TON HEATING AND AIR CONDITIONING UNIT
PROJECT SPECIFICATIONS
GENERAL REQUIREMENTS
SUMMARY OF WORK
WORK COVERED BY CONTRACT DOCUMENTS
A. General: All work outlined below will be performed under a single contract.
B. Project Location: This project is located at 44150 District Office LN, Davenport, WA 99122
Housing unit 1004.
C. Project Background: Housing unit 1004 is a required occupancy unit that houses LE rangers year-round. The current HVAC system consists of an electric RHEEM air handler model
#RHQA 1620 T manufactured in 1979, and a TRANE XR11 heat pump manufactured in
2003. This unit has a REHAB project, and the HVAC system needs replaced. Replacement of this unit will make the facility more energy efficient, and the reliability of this unit will negate future repair bills in the coming years due to the age of current unit.
D. Project Scope of Work: The Work consists of the following:
1. This project will replace the existing HVAC unit with equal to or better than the existing HVAC unit. Manufacture make and model of new unit to be equal to or better than existing unit. All existing ducting, and all associated components must be inspected by contractor for compatibility with the replacement HVAC unit’s manufacturer specifications.
2. Provide the National Park Service with cost and energy efficient HVAC system that is compatible with existing ducting and electrical components. All needed alterations to ducting and electrical shall completed by contractor. Contractor must install HVAC unit, ducting and all other components with as few disruptions or down time of current system to minimize impacts to park operations.
3. The Contractor is to provide all labor, equipment and materials unless otherwise stated in this scope of work. The contractor is responsible for all costs associated with this project, including all travel, per-diem, and the disposal if any waste generated by this project. A staging area will be determined during the preconstruction meeting at the work site. Electrical power, water and restrooms are available.
4. Work shall include but is not limited to:
5. Mobilization and Cleanup; a. All refrigerant will be disposed of following the state of
Washington environmental regulations and receipts or proof of proper disposal is required.
6. Remove and disposal of existing unit and its product specific parts.
7. Prior inspection by contractor of all ducting, electrical and all other components to determine compatibility with the replacement unit and must verify installation and operations in accordance with manufacturer specifications through testing and documentation. Must provide test results and operation and maintenance manuals to
Lake Roosevelt National Recreation Area for park records.
8. Contractor will provide submittals and perform alterations to ducting, electrical and all other components if required to meet manufacturer specifications to insure complete functionality.
9. Determine heating and cooling requirements for the size and uniqueness of the building
(considering ventilation needs, size of building, windows, insulation) Provide proof that the system will deliver specified efficiency and conduct load calculation for proper equipment selection.
Install replacement HVAC and air handling unit at current exterior location to manufacturer specifications.
10. Measure and document airflow
11. Test existing line sets for reuse or replace if leaks or defects are present.
12. Measure and document refrigerant charge
13. Modify or install new electrical service to fan, coils or air handler units if none exists including installation of new breakers labeled at associated breaker panel box. All electric work will follow manufacturer’s specifications and Washington State Electrical
Codes e.g. wire gauge, breaker amperage, power supply, etc.
14. Install new thermostats that meet manufacturer specifications, test, and submit results.
15. Assure PVC or approved drain lines will be installed to manufacture specifications and drain away from existing structure.
16. Provide as-builts and operations and maintenance manuals
Contractor will provide lump sum pricing.
STAFF USE OF THE SITE
A. General: The project site will be open to the staff during construction but closed to the public. The Contractor shall at all times conduct his operations to ensure the least inconvenience to the staff. Temporary closures may be permitted upon specific written approval of the Contracting Officer.
B. Other Contracts and Work: During the contract performance period, there may be other contracts, work occurring in the park or within the project area limits that may affect the
Contractor’s operations. The Contractor shall conduct his operations in consideration of these other activities. If the other activities are affecting the critical path of the construction schedule, the Contractor shall document the issue in the daily reports and report the issue to the Contracting Officer.
CONTRACTOR USE OF SITE
A. General: Limit construction operations to the project area.
B. Park Regulations: Ensure all personnel (contractors, subcontractors) entering or working in the park are familiar with and obey all park regulations. Law enforcement rangers will intervene if they perceive any unsafe or unlawful activity.
C. Site Access: The contractor shall access the project site along pavement, do not drive vehicles off road or access non-project areas without permission from the Contracting Officer or their representative.
D. Working Hours: Regular work hours shall be limited to daylight hours from 7:00 a.m. until
5:00 p.m. Monday through Friday, excluding government holidays. Work outside regular hours requires advance approval from the Contracting Officer.
E. Staging and Storage: Confine the staging and storage of equipment and materials to the attached garage of the housing unit.
F. Property Damage: The Contractor is required to report missing, lost, stolen, or damaged property occurring within the park. This report must be made to the LE rangers upon discovery.
G. No Smoking Policy: Smoking is prohibited inside or outside within 25 feet of any buildings in the park. This applies to existing buildings and buildings under construction or renovation.
Discarding of tobacco products or debris anywhere other than into designated tobacco receptacles is considered littering and subject to fines.
WORK RESTRICTIONS
A. General: The Contractor must comply with the following work restrictions:
B. Resource Protection:
1. General: The Park is committed to protecting natural and cultural resources found within the park and adjacent lands. The Contractor must comply with the following rules and conditions:
2. Preservation of Natural Features: Prevent damage to natural surroundings.
a. Do not attach ropes, wires, guy lines, cables, or chains to trees or vegetation. Restore damaged areas and replace damaged trees, vegetation, and grass at no additional expense to the government.
3. Archaeological Resources: Archaeological resources are physical evidence of past human activity, including evidence of the effects of that activity on the environment.
Archaeological resources are found above and below the ground and underwater. The
Contractor, or designee, will observe all ground-disturbing activities in archaeological sensitive areas. If the Contractor discovers resources, the Contractor shall stop work or relocate to a non-sensitive area and notify the Contracting Officer immediately. The Park may also have an Archaeological Monitor at the jobsite who is authorized to stop work upon discovery of archaeological resources. Archaeological resources typically found in the park or at the project site will be discussed further at the preconstruction meeting.
PROJECT MANAGEMENT
SUBMITTALS
A. Submittal Documents: The following documents shall be submitted no later than 14 calendar days after contract award and a minimum of seven (7) calendar days prior to the
Preconstruction Meeting. If all these documents have not been received prior to the scheduled Preconstruction Meeting date, the meeting will be cancelled and the Notice to
Proceed (NTP) will not be issued. Work shall not commence until written Notice to Proceed
(NTP) has been issued.
1. Construction Schedule - Submit a baseline schedule with start date, end date, major work activities and durations, estimated pre-final (substantially complete) and final (entirely complete) inspection dates, and other major milestones. Provide updates to baseline schedule as needed or as requested (when there is a change to the critical path).
2. Accident Prevention Plan (APP) – Submit a “site specific” accident prevention plan with the following information (at a minimum). Refer also to PART 5 Safety Requirements.
a. Name of the supervisor responsible for executing the plan.
b. Emergency contact phone numbers.
c. Map of local area emergency medical facilities relative to the jobsite.
3. Quality Control Plan (QCP) – Submit a “site specific” quality control plan with the following information (at a minimum). Refer also to PART 6 Quality Requirements.
a. Name of the supervisor responsible for executing the plan.
b. Organizational flow chart showing key staff / subcontractors.
c. Testing and inspection procedures at all phases of the project (i.e. preparatory, initial, follow-up) to ensure quality, with steps for correction of work / re-work.
5. Construction Waste Management Plan – Submit a construction waste management plan that addresses storage, handling, and disposal of all trash, recyclables, non-hazardous construction waste, and hazardous waste generated from the execution of the work. Refer also to PART 8 Execution.
6. A list of Subcontractors for this project.
7. Written statements from subcontractors certifying compliance with applicable labor standard clauses.
8. Satisfactory evidence of liability insurance coverage and worker’s compensation for the
Contactor and all subcontractors.
9. Hot Work Plan – Complete and submit a hot work management plan that addresses fire prevention for any work involving open flame or grinding metal. See Attachment D
B. Submittal Documents: The following documents shall be submitted to the Contracting
Officer prior to construction mobilization. If these documents have not been received and approved by the NPS prior to construction start, the construction start date may be delayed.
1. Product Data – Submit product cut sheets / material data on all products to be used for approval. Indicate the size, model, or type of each recommended product.
PRECONSTRUCTION
A. Preconstruction Meeting: Before the start of construction, the Contracting Officer will arrange for a preconstruction meeting either on site or via teleconference. The meeting agenda will include the following topics:
1. NPS Roles & Responsibilities
2. Key Contractor Personnel
3. Coordination with Subcontractors
4. Correspondence & Submittal Procedures
5. Submittals
6. Park Rules & Regulations
7. Work Hours and Weekend, Holiday, and Night Work
8. Project Information
a. Jobsite Access & Parking
b. Staging, Storage, and Laydown Area(s)
c. Temporary Facilities & Controls
d. Jobsite Restrictions
e. Resource Protection
f. Reference Documents
h. Other Contracts / Ongoing Work
9. Labor Standards Provisions
10. Labor Interviews
11. Payroll Reports
12. Payments to the Contractor
13. Change Orders / Modifications
14. Progress Meetings
15. QC Daily Reports
16. Inspections
17. Acceptance and Rejection of Work
18. Closeout Procedures & Submittals
19. Contract Period of Performance
20. Notice to Proceed
3.3 REQUESTS FOR INFORMATION (RFIs)
A. General: On discovery of the need for additional information or interpretation of the Contract
Documents, the Contractor shall prepare and submit an RFI utilizing the NPS form.
1. Contracting Officer will only respond to RFIs submitted by the Contractor.
2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.
B. RFI Form: Include a detailed, legible description of the subject or item needing information or interpretation on the RFI Form with:
1. RFI number, numbered sequentially.
2. Date.
3. RFI subject.
4. Specification Section number and title and related paragraphs, if applicable.
5. Drawing number and detail references, if applicable.
6. Photographs or sketches, if applicable.
7. Contractor's suggested resolution. If the Contractor's suggested resolution impacts the contract time or the contract sum, Contractor shall state the impact in the RFI.
C. Response to the RFI: The Contracting Officer will review each RFI, determine the action required, and respond accordingly.
SUBMITTAL PROCEDURES
A. CM-16 Transmittal Form: All submittals shall be transmitted using NPS CM-16 form sent via email. No action will be taken on a submittal item unless accompanied by the CM-16 transmittal form. Complete all applicable fields, sign the form, and attach all supporting documentation.
B. General Submittal Procedures:
1. Processing Time: Allow 7 days for NPS review of a submittal. When review is complete, an e-mail notification will be sent to the Contractor. No extension of contract time will be authorized because of failure to transmit submittals in a timely manner.
2. Approved Equals: For each item proposed as an “approved equal” submit supporting data including:
a. Comparison of the salient characteristics of the proposed item with that specified.
b. Name, address, and telephone number of vendor.
c. Manufacturer’s literature.
d. Compliance with the Buy American Act.
3. Electronic Submittals: Transmit all submittals except physical samples in PDF format.
4. Physical samples: Deliver physical samples to COR (or onsite POC).
SAFETY REQUIREMENTS
A. General: The Contractor must comply with the following safety requirements:
1. First Aid Equipment: Provide adequate first aid equipment for all contract employees for the hazards associated with the types of ongoing construction work at the site.
2. First Aid Training: Provide adequate training to all Contractor personnel to ensure prompt and efficient application of first aid.
3. Covid-19 Precautions: The Contractor is expected to read and abide by Washington State
Proclamations and all proclamations added or modified pertaining to the COVID-19 pandemic. Also, the contractor shall be knowledgeable of the guidance from the Centers for Disease Control and Prevention (CDC) and all federal, state and local authorities and regulations to protect the park visitors, contractors and employees.
4. Personal Protective Equipment (PPE): Provide personal protective equipment (PPE) that meets applicable OSHA and ANSI standards for all contract employees.
5. Hazardous Materials: Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury. Store hazardous materials in accordance with manufacturer’s and OSHA recommendations. Maintain MSDS onsite for each chemical used on the jobsite.
Immediately report all spills of hazardous materials to the contracting officer.
6. Safety Meetings: At a minimum, conduct weekly "toolbox" safety meetings. These meetings shall be conducted by a job superintendent or crew leader and attended by all construction personnel at the worksite. Topics need to coincide with work scheduled for the week.
7. Emergency Contacts: Post telephone numbers and reporting instructions for ambulance, hospital, fire department, police, and park dispatch in conspicuous locations at the site.
8. Emergency Medical & Accident Reporting: In the event of an emergency / medical incident, the Contractor shall Dial 911 as needed.
QUALITY REQUIREMENTS
A. General: The Contractor is responsible for all quality control to guard against defects and deficiencies in the work. Inspect and test work as needed to ensure that the quality of materials, workmanship, construction, finishes, and functional performance are in compliance with applicable specifications, drawings, codes and standards.
EXECUTION
A. Examination: Examine the project area and site facilities and verify compatibility between existing conditions and the scope of work.
B. Preparation: Take field measurements or conduct surveys to verify quantities and dimensions before procurement and fabrication or installation.
C. Digging: Any ground disturbance requires an NPS Archaeologist to be present. Contractor must notify NPS at least 48 hours in advance of any digging. Archaeologist will be provided by the NPS. Tone and mark for utilities in advance of digging. If a buried utility or feature is discovered, exercise extreme caution or hand dig to prevent damage to the utility or feature.
If the utility or feature is damaged, repair at no additional cost to the government.
D. Cutting & Patching: Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed. Before patching, verify compatibility with and suitability of substrates, including compatibility with in-place finishes or primers. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.
E. Installation: Install all systems or components according to the specifications, manufacturer’s recommendations, permit conditions (where applicable), and local, State, and Federal codes, standards, and regulations. All systems or components shall be complete and operable.
F. Correction of the Work: Upon discovery of defects or damage of new work or to existing facilities damaged by new work, repair or replace damaged systems or components and restore substrates and finishes.
G. Progress Cleaning: Clean the project site and work area on a daily basis. Keep site free of waste and debris in proper containment. Properly dispose of all waste and debris offsite.
H. Final Cleaning & Waste Disposal: At the completion of the work, clean all surfaces and remove all waste materials, trash, tools, equipment, machinery, and surplus items from the project site and legally dispose of all waste items.
SUBSTANTIAL COMPLETION AND FINAL INSPECTION
A. When the project, or a designated portion of the project, is substantially complete, the
Contractor shall request a pre-final inspection.
B. If the work is determined to be substantially complete at the pre-final inspection, the
Contracting Officer will prepare a Letter of Substantial Completion with a Punch List of deficiencies to be corrected before final inspection / acceptance. The Contractor shall complete the work described in the Punch List within thirty (30) calendar days, as weather permits. Once all Punch List work is complete, the Contractor shall request a final inspection in writing to arrange for the confirmation of punchlist completion.
C. If the Contractor fails to complete the Punch List work within this timeframe, the Contracting
Officer may either replace or correct the work with an appropriate reduction in the contract price or charge for re-inspection costs in accordance with the Inspection of Construction clause of the contract.
D. If the work is determined to be not substantially complete at the time of the pre-final inspection, the Contracting Officer will notify the Contractor in writing. The Contractor may request a new pre-final inspection; however, all re-inspection costs may be charged against the Contractor in accordance with the Inspection of Construction clause of the contract.
E. After all deficiencies have been corrected and the project is complete, a Letter of Final
Acceptance will be issued by the Contracting Officer.
CLOSEOUT SUBMITTALS
A. Operation & Maintenance (O&M) Manual: Submit hard copy to the onsite Point of Contact
(POC).
1. Preventative maintenance schedule for all major components (1st page).
2. Operating instructions, if applicable.
3. Product / material cut sheets (all approved products used on the project).
4. Updated system diagrams or shop drawings, as applicable.
5. Progress photos showing all phases of the work numbered sequentially.
6. Product warranties for individual products and systems.
7. At least one (1) year Contractor-issued warranty on all workmanship starting from the date of final acceptance.
DEMONSTRATION & TRAINING
A. Demonstration & Training: Provide onsite demonstration and training to NPS operators and staff on the proper, safe operation of all new systems and components.
CONTENT
A. Manufacturers' Published Data: Provide all available data, including installation and operating instructions, parts lists, electrical and mechanical schematics, control circuit documentation, performance data, safety instructions, cleaning and care instructions, and illustrations and instructions for maintenance, including lubrication, disassembly and repair, cleaning, and service. Indicate catalog numbers, sizes, colors, options, and other information pertaining to the products furnished which would be required when ordering replacements.
For equipment assemblies, provide data for each separate item of equipment furnished as part of the assembly.
B. Custom Written Data: For data not in manufacturer's standard literature, provide text, drawings, and schematics specifically applicable to installed systems. Include step-by-step descriptions of operating procedures; identification of individual components and their functions; descriptions of how system components relate to one another and operate together to accomplish a common process or function; and sequence of operation for system control circuits. For seasonally operated systems, provide start-up and shutdown instructions.
C. Equipment Data Sheets: For each item of equipment included in the operation and maintenance data, provide an Equipment Data Sheet using the form at the end of this section.
D. Vendor Furnished As-Built Drawings: Provide for each electrical and each mechanical control system.
1. For each control system, provide control circuit schematic drawings. Identify each wire and terminal block number. Show terminal numbers on all control devices.
Show control wires and devices remote from the control panel.
2. For each control panel, provide a general arrangement drawing showing location of each control component and terminal block on the panel front and interior. Include a materials list of all panel-mounted control components as well as field-installed control components remote from the panel, identifying components, manufacturer, model number, and initial set points or sensing ranges of devices where applicable.
3. In addition to the control wiring schematic, provide a power wiring schematic drawing showing the power flow to each motor. Identify each power conductor.
Show all overcurrent protection and motor starting devices.
E. Schedules: Provide one copy of material and equipment schedules in the appropriate sections of the manual.
F. Warranties: Place a copy of each manufacturer, supplier, and installer warranty extending for a period greater than one year in a single separately identified tabbed section of the manual.
G. Test Results: Include in the operation and maintenance data copies of test results for mechanical and electrical equipment and systems as listed in the individual specification sections.
H. Subcontractor and Supplier List: List all subcontractors and major suppliers who worked on the project. Include each subcontractor's or supplier's address and telephone number and identify work performed.
END OF SECTION
EQUIPMENT DATA SHEET
Equipment Item: Designation:
Function:
Location:
Project:
Model No.: Serial No.:
Manufacturer Address and Phone: Supplier Address and Phone:
Preventive Maintenance Tasks:
Nameplate Data:
Spare Parts Furnished and Other Information:
TRAINING
A. Furnish the services of instructors to train designated personnel in adjustment, operation, including seasonal and emergency operations, if applicable, maintenance, and safety requirements of equipment and systems. Instructors shall be thoroughly trained in operating theory as well as practical operation and maintenance work for each type of equipment or system.
B. Use Operating and Maintenance Data as a training guide.
File details come from the government source that posted it. Updated .