Attachment A - Statement of Work Burn Cell.pdf

PDF 198 KB Posted

Attached to
FLETC Burn Cell Service Federal contract opportunity
Solicitation number
15A00025R00000099
Issued by
Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives

About this file

This Statement of Work (SOW) details a contract for renovation and construction work at the ATF National Academy's Arson and Explosives Training Program located at the Federal Law Enforcement Training Center (FLETC) in Glynco, Georgia. The project requires a contractor to perform "Tear Out" and "Build In" interior renovation of multiple specialized training cells, including two Flashover Cells, ten Burn Cells, and four Post Blast Cells used for fire and explosives investigation training.

The contract is a firm-fixed price Indefinite Delivery Indefinite Quantity (IDIQ) with a 12-month base period and four potential 12-month option periods. Specific renovation requirements include installing 1/2" sheetrock, electrical receptacles, windows, doors, plywood flooring, carpet pads, and carpet in each cell type. The contractor must maintain strict safety standards, comply with OSHA and EPA regulations, pass security background checks, and be prepared to respond to repairs within 24 hours. The primary performance location is the ATF National Academy at 1131 Chapel Crossing Road, Building 681 in Glynco, Georgia.

View the file

Other files for this federal contract opportunity

Other files attached to FLETC Burn Cell Service, newest first.
File Type Posted
15A00025R00000099.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THE BUREAU OF ALCOHOL, TOBACCO, FIREARMS, and EXPLOSIVES ATF NATIONAL ACADEMY'S ARSON and EXPLOSIVES TRAINING

PROGRAM

STATEMENT OF WORK

1.1 Introduction.

This Statement of Work (SOW) is for Tear Out, Labor and Materials required to Build In Framing of the interior of the Practical Exercise Compound “Burn Cells, Flashover Cells and Post Blast Cells” at the ATF National Academy's Arson / Explosives Range at the Federal Law Enforcement Training Center (FLETC), Glynco, Georgia.

1.2 Background

1.2.1 Training Background

ATF is the primary federal law enforcement agency with fire and explosive related jurisdiction that conducts critical incidents, Post Fired and Post Blast, Origin and Cause Investigative Training. ATF National Academy trains its agents, other federal agencies, State and local Public Safety personnel as well as international students in the Origin of Cause phase of the Fire and Explosives Investigation. This training conducted at FLETC consists of Special Agents Basic Training (SABT) classes, state and local classes (various advanced technical and investigative programs) and (advanced) International classes. To facilitate the delivery of these classes, and reinforce classrooms concepts and retention of investigative principles, practical exercises are conducted wherein the students observe live fire demonstrations and conduct investigation of the fire and/or explosive events.

1.2.2 Fire and Explosives Range Configuration

The fire and explosives training area are located within the National Academy’s Compound at the north end of the Federal Law Enforcement Training Center in Southeast Georgia and encompasses approximately 100 acres. The Fire/Arson Practical Exercise Compound includes two (2) side by side - Flashover Cells, ten

(10) Bum Cells and four (4) Post Blast Cells. Concrete pads support the after mentioned and are designed to retain potentially hazardous water runoff from suppression activities.

1.2.3 Objectives

The requirements of the contract as stated in terms of objectives and standards desired for providing labor and materials are required to Tear Out Existing Interior and Build In New Interior. The SOW defines the labor to be performed to meet the stated contract objectives. The contractor shall communicate with the contracting office

Representative (COR) regarding the Tear Out and Build In schedule to ensure adherence to the training schedules and the delivery of the training classes at the ATF National Academy. We expect the contractor will need to make visits to the work site in order to complete the Tear Out and Build In of the cells.

1.2.4 The contractor shall provide the labor materials, tools and equipment necessary to TEAR OUT the existing interior of the cells and build in the interior. This Tear Out must meet the needs of the Arson and Explosives Program managers to insure a state-of-the-art delivery of the Arson and Explosives Training Program.

1.3 Scope

The focus of this contract is the labor AND materials required to "Tear Out" and "BUILD IN" of the practical exercise burn/flashover/post blast cells as described in Paragraph 1.2.2 in such a fashion that it is acceptable for usage in the ATF National Academy's presentation of the fire and Explosives Investigative Training programs. The Academy staff will provide the contractor with a Standard Operating Procedure (S.O.P), Range safety briefing.

Part 2 Definitions

2.1 Specific Contract Definitions

The Fire investigation complex is the area directly inside the main FLETC Arson/Explosives Range Gate that includes two (2) side by side flashover cells, ten (l0) Burn Cells, and (4) Post Blast cells. Concrete pads support the aforementioned structures and are designed to retain potentially hazardous water runoff from fire suppression activities. The runoff from these pads is channeled into two (2) large retention vessels at the east end of the complex. This complex also includes a spectator area with bleachers searing metal storage sheds that contain furniture, training equipment and supplies.

2.1.1 The Post Blast/Explosives Investigations Complex area is located adjacent to the asphalt tarmac at the north end of the Explosives Range/Demonstration Area. It consists of four (4) cells that are covered by a stand-alone roof that covers the cell and provides protection from weather elements. This complex also includes metal storage sheds that contain furniture and training equipment and supplies.

Part 3. Requirements

3.1.1

The “Build in" phase that includes hanging, mudding and taping sheetrock, installing windows, doors and duplex electrical receptacles. In addition, the contractor must provide all materials related to the installation of plywood flooring that is covered with pad and carpet. Metal flashing will be installed on the exterior concrete wall surfaces around the windows and doors of each bum cell to protect finish from spalling as a result fire venting through the windows and doors during live fire. While in the "Build In" phase, the contractor will ensure that the work area is kept clean and free of nails and screws and that the pad area is swept at the end of the workday.

3.1.2 The ''Tear Out” phase, includes removing all debris within the cell from previous practical exercises to include furniture and accoutrements. In addition to strip cells of sheetrock, the contractor must remove windows and doors, plywood floors and duplex electrical receptacles, switches and ensure that the work area is clean and free of nails and screws by sweeping the pad area at the end of the workday, subsequent to students having performed their investigations, will be performed as soon as reasonably possible and also requires attention to detail. While there may be some flexibility in program delivery forecast dates, once the program delivery date is identified, there is no flexibility. The work projects must be performed and completed and performed on time.

3.1.3 The contractor is expected to perform work on the below listed projects:

a) FLASHOVER CELLS

The FLASHOVER CELLS (2 ea.) sit side by side and are constructed of concrete with 2" X 4" Studding that is 24" on center. The FLASHOVER CELLS measure approx. 10' X 13'X 8' (inside dimensions) and are unique in that one of the four walls is missing to enable students can view the fire’s growth and development during training classes at the ATF National Academy explosives range. There is a 2” concrete drop wall from the ceiling where the fourth wall would normally be. This 2” drop will be covered with sheetrock on the inside, at the bottom of and outside, up to the roof level. This 2' drop keeps the superheated gases from escaping during the live fire demonstration to illustrate the phenomena of the flashover transition stage of fire development. The inside of the FLASHOVER CELLS (walls and ceiling) must be covered with Y2" sheetrock, allowing one to open for a duplex electrical receptacle. All seams and joints must be covered with paper tape and two separate mud applications making sure to allow sufficient drying time before the second application of mud. The sub floors will be covered with ¼" plywood and the contractor shall install carpet pads and carpet. Attention to detail is critical as temperatures within the cells normally reach and at times exceed 1400 degrees F. An electrical duplex receptacle with an attached 3' “electrical conductor ...pigtail” must be installed in each cell upon one wall at the direction of ATF staff. These receptacles will be energized during the live fire demonstration by ATF staff. It is of the utmost importance that the work area be kept clean and free of debris (nails and sheetrock screws) as emergency vehicles transit the area of the SIDE BY SIDE - FLASHOVER CELLS.

b) BURN CELLS

The BURN CELLS (10 ea.) sit adjacent to the Flashover Cells and are constructed of concrete with 2" X 4" studding 24" on center. The Bum Cells measure approx. 13' X 9' X 8' (interior dimensions) with one door measuring 36" X 80" and one window measuring 36"X 36". All walls and the ceiling will be covered with Y2" sheetrock with allowances made for one (1) sprinkler head in the ceiling. Electrical duplex receptacles with an attached 3' electrical conductor "pigtails" will be installed in each cell within each wall, except for the front wall with the doorway. These duplex outlets will be energized during the live fire demonstration by ATF staff. All seams and joints will be covered with paper tape and two separate applications of mud allowing for the first application to completely dry before the application of the second layer of mud. Quarter inch (¼") plywood will cover the sub floors and the contractor will install carpet pad and carpet. Tin flashing will also be installed above both window and door openings to aid in minimizing the structure’s exposure to flame impingement. Attention to detail is critical as temperatures can reach and at times exceed 1400 degrees F. It is of the utmost importance that the work area be kept clean and free of debris (nails and sheetrock screws) as emergency vehicles transit the area of the BURN CELLS. The contractor is expected to install and remove the aforementioned materials.

c) POST BLAST CELLS

The POST BLAST CELLS (4 Ea.) sit adjacent to the asphalt tarmac at the north end of the Explosives Range/Demonstration area and are covered by a stand alone roof that covers the cells and provides protection from weather elements. The post blast cells measure approx... 11.5’ X 9.5’X 8’ (interior dimensions) with one door measuring 36" X 80" and one window measuring 36" X 36". All walls and the ceiling will be covered with 1/2’ sheetrock. At the discretion of ATF staff, an electrical receptacle will be inserted into each wall. These outlets will not be energized and as such do not need electrical conductor “pigtails” attached to them. All seams and joints will be covered with paper tape and two separate applications of mud allowing for the first application to completely dry before the application of the second layer of mud. Quarter inch (¼") plywood will cover the sub floors and the contractor will install carpet pad and carpet. It is of the utmost importance that the work area be kept clean and free of debris (nails and sheetrock screws) as emergency vehicles transit the area of the POST BLAST CELLS.

The contractor is expected to install and remove the aforementioned materials.

3.2 General Requirements

3.2.1 Maintain a hazard free area surrounding the practical exercise compound area.

3.2.1 Place all debris in dumpsters provided at the academy worksite.

3.2.2 Turn off all utilities after completion of work. Ensure all contractor equipment and building supplies are removed from the ATF site. (There will be no storing of any building supplies or equipment at the ATF facility for longer than 5 days.).

3.2.3 Ensure that Arson / Explosive Range Compound is secured at the end of the workday

3.3 Special Requirements

3.3.1 All contract personnel shall complete FLETC security background checks, i.e. no felony convictions or egregious misdemeanor convictions.

3.3.2 All contract personnel shall display FLETC individual security badges and vehicles pass at all times when on ATF and FLETC property.

3.3.3 The contractor shall be present when the COR conducts the required inspections of the work completed in order to approve the task as complete and satisfactory or make corrections on the spot.

3.3.4 The contractor shall be on call at all times and have the ability to respond within a 24-hour period to correct defects in work or necessary repairs brought about by weather from the time of the project completion to the time of bum and flashover cell scheduled use.

3.4 Other Requirements

3.4.1 The contractor shall provide staff trained in EPA and OSHA safety regulations.

The contractor shall supply its personnel with respiratory equipment so as to limit their exposure to dust hazards. Employees without the proper equipment will not be allowed on the Arson/ Explosives Range. Applicable state and local codes will also apply.

3.4.2 The contractor shall maintain training and safety records of compliance with OSHA and submit documentation to the appropriate authority of compliance, when requested, for any staff used at the ATF National Academy burn range complex. The contractor site supervisor shall be OSHA 30 certified.

3.4.3 The contractor shall comply with any and all security protocols and rules set forth By the ATF National Academy.

3.4.4 The performance of this agreement is subject to any circumstance, making it illegal or impossible to perform, including acts of nature and civil disaster (only those events that directly affect the location of performance, not to include fluctuations in price based on events in other locations), war, government regulations, and strikes.

3.5 Repairs

a) Under the scope of this contract. Repairs are defined as scheduled work required to:

(1) to repair structural damages to the interior and exterior of the Burn Cells.

The contractor shall report any need for any repairs to Burn Cells and shall not initiate such work until requested to do so by the Contracting Officer (CO). A formal request shall be issued to the contractor requesting the specific repairs required and the contractor will be required to submit a proposal (with specific breakdown of cost to include labor and materials) to complete the job. A Task Order will be issued, as a firm-fixed price, based on the detailed cost breakdown. An agreement must be reached between the contractor and the COR prior to initiation of repair work. The CO will then request the contractor via Task Order to begin the repairs.

4.0 PERIOD OF PERFORMANCE

The period of performance will be 12 months from the date of the award and four 12-month option periods, if exercised.

5.0 PLACE OF PERFORMANCE

The primary place of performance shall be at the ATF National Academy, 1131 Chapel Crossing Road Bldg. 681 Glynco, Ga 31524.

6.0 CONTRACT TYPE

This requirement shall be a firm-fixed price Indefinite Delivery Indefinite Quantity (IDIQ).

7.0 GOVERNMENT-CONTRACTOR RELATIONSHIPS

7.1 Non-personal services. The parties agree that the services to be provided under this contract are non-personal and that no employer/employee relationship exists, or will exist, between the Government and the contractor’s employees.

7.2 Employee Relationship. Local rules, regulations, directives and requirements issued by military and civilian authorities pursuant to their responsibility for the administration and security of Government and military installations are applicable to contractor personnel entering the offices or installations or traveling via Government-owned transportation. The contractor agrees that compliance will not be construed to establish any degree of Government control consistent with a personal services contract.

8.0 ORGANIZATIONAL CONFLICT OF INTEREST

Any contractor (or member of its team and subcontractor) having a conflict of interest as defined under FAR Part 9.5 shall identify the conflict as soon as it is known and provide a recommended mitigation plan. Mitigation plans are required whenever a competing contractor has had unequal access to non-public information regarding this requirement and competition or has assisted the Government in defining the requirements or evaluation criteria. The contractor selected for this requirement will be precluded from bidding on the future requirement.

THE BUREAU OF ALCOHOL, TOBACCO, FIREARMS, and EXPLOSIVES ATF NATIONAL ACADEMY'S ARSON and EXPLOSIVES TRAINING PROGRAM
1.1 Introduction.
1.3 Scope
Part 2 Definitions
Part 3. Requirements
a) FLASHOVER CELLS
3.2 General Requirements
3.3 Special Requirements
3.4 Other Requirements