Date: 4 Dec 20

PPN: 9.1d

SCOPE: Defense Logistics Agency Energy (DLA Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Government-owned tank at Beale AFB, CA

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 2 calendar days after receipt of an order from the Delivery Scheduler.

Deliveries shall be made from 0700-1600 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

9th Physiological Support Squadron 19301 McGregor Street, Bldg 1029 Beale AFB, CA 95903

DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Location # of Tanks Capacity - Gallons MAWP* Bldg 1029 1 – ABO 1,500 GL 250 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the Supplier’s expense they may equip conveyance or servicing hose with a tank over pressurization control device or shall use a conveyance without pump assisted off load.

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting Officer, Service Control Point (AFPET), Air Force Life Cycle Management Center (AFLCMC/WNZ), and the activity that physically possesses the tank(s).

TANK HOT FILL: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

SECURITY REQUIREMENTS: Contractor personnel making deliveries of product are required to enter the base through the Commercial Inspection Area located at the Wheatland Gate accessible through South Beale Road off of Hwy 65. Contractor delivery personnel must have a valid driver’s license, vehicle registration, and proof of insurance.

TSW ID: CDSBEA9LRS

DODAAC: FP8115

related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Government-owned tank at Beale AFB, CA

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 2 calendar days after receipt of an order from the Delivery Scheduler.

Deliveries shall be made from 0700-1500 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

9 LRS/LGRFIR

Bldg 1231, Arnold Ave Beale AFB, CA 95903

DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Bldg 1231 2 – ABO 6,000 GL 55 psig ea

*Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the Supplier’s expense they may equip conveyance or servicing hose with a tank over pressurization control device or shall use a conveyance without pump assisted off load.

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting Officer, Service Control Point (AFPET), Air Force Life Cycle Management Center (AFLCMC/WNZ), and the activity that physically possesses the tank(s).

TANK HOT FILL: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

SECURITY REQUIREMENTS: Contractor personnel making deliveries of product are required to enter the base through the Commercial Inspection Area located at the Wheatland Gate accessible through South Beale Road off of Hwy 65. Contractor delivery personnel must have a valid driver’s license, vehicle registration, and proof of insurance.

TSW ID: CDSCHANNEL

DODAAC: FP8082

related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Government-owned tank at Channel Islands ANG, CA

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

Deliveries shall be made from 0600-1600 hours, Tuesday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

Channel Islands ANG 1204 POL Rd Port Hueneme, CA 93041

DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Location # of Tanks Capacity - Gallons MAWP* Bldg 1072 1 – ABO 2,000 GL 50 psig required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting Officer, Service Control Point (AFPET), Air Force Life Cycle Management Center (AFLCMC/WNZ), and the activity that physically possesses the tank(s).

SECURITY REQUIREMENTS: Security guards will direct Contractor delivery personnel to the POL yard.

TSW ID: CDSCHINLAK

DODAAC: R55646

related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Government-owned tank at China Lake, CA.

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 1 calendar day after receipt of an order from the Delivery Scheduler.

Deliveries shall be made from 0730-1400 hours, Monday-Friday, with every other Friday being closed and excluding federal holidays.

Product deliveries shall be made to the following address:

NAVSUP FLC China Lake Fuel Division NAWS LOX Farm Bldg 20174 China Lake, CA 93555

DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into be trailer accessible.

Location # of Tanks Capacity - Gallons MAWP* Bldg 20174 1 – ABO 2,000 GL 20 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting Officer, Service Control Point (AFPET), Air Force Life Cycle Management Center (AFLCMC/WNZ), and the activity that physically possesses the tank(s).

SECURITY REQUIREMENTS: Contractors will be required to provide their vehicle registration, current insurance, and valid state driver’s license.

TSW ID: CDSNAWCCHI

DODAAC: N60530

related services, requires delivery of Liquid Nitrogen (LN2) and Liquid Oxygen (LOX).

The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b.

destination into Government-owned tank at China Lake, CA.

PRODUCT: LN2 (NSN 9135-01-665-3253), Type II, Grade B, shall meet the requirements of the most current version of MIL-PRF-27401.

LOX (NSN 9135-01-665-3235), Type II, Grade B, shall meet the requirements of the most current version of MIL-PRF-25508.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 1 calendar day after receipt of an order from the Delivery Scheduler.

DESCRIPTION OF GOVERNMENT-OWNED LN2 TANKS: LN2 shall be delivered into be trailer accessible.

Deliveries shall be made from 0630-1600 hours, Wednesday, excluding federal holidays.

Product deliveries shall be made to the following addresses:

Naval Air Weapons Station

1900 N. Knox Rd Bldg 00005 and 01400 China Lake, CA 93555

Location - Michelson Lab # of Tanks Capacity-Gallons(GL) MAWP* Bldg 00005 (IBAR tank NB94899) 1 – LN2 500 GL 350 psig Bldg 00005 (Solid St Wg tank #1) 1 – LN2 1,500 GL 75 psig Bldg 00005 (Chemistry tank #2) 1 – LN2 1,500 GL 250 psig Bldg 00005 (Chemistry tank #4) 1 – LN2 3,000 GL 250 psig *Maximum Allowable Working Pressure

Location - Lauritsen Lab # of Tanks Capacity-Gallons(GL) MAWP* Bldg 01400 (Tank #5) 1 – LN2 900 GL 200 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the be trailer accessible.

Deliveries shall be made from 0730-1500 hours, Monday-Friday, with every other Friday being closed and excluding federal holidays.

Product deliveries shall be made to the following addresses:

Naval Air Weapons Station Fuels Assessment Lab Bldg 10173 and 10175 China Lake, CA 93555

Location # of Tanks Capacity-Gallons(GL) MAWP* Bldg 10173 (tank NB94908) 1 – LN2 265 GL 350 psig Bldg 10175 (tank NB94609) 1 – LN2 9,000 GL 250 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the be trailer accessible.

Deliveries shall be made from 0730-1500 hours, Monday-Friday, with every other Friday being closed and excluding federal holidays.

Product deliveries shall be made to the following addresses:

Naval Air Weapons Station Energetic Materials Branch Bldg 14506 China Lake, CA 93555

Location – Salt Wells # of Tanks Capacity-Gallons (GL) MAWP* Bldg 14506 (tank NB72434) 1 – LN2 3,000 GL 250 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the be trailer accessible.

Deliveries shall be made from 0730-1400 hours, Monday-Friday, with every other Friday being closed and excluding federal holidays.

Product deliveries shall be made to the following addresses:

NAVSUP FLC China Lake Fuel Divison NAWS LOX Farm Bldg 20174 China Lake, CA 93555

Location # of Tanks Capacity-Gallons (GL) MAWP* Bldg 20174 1 – LN2 2,000 GL 20 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the

DESCRIPTION OF GOVERNMENT-OWNED LOX TANK: LOX shall be delivered into be trailer accessible.

Deliveries shall be made from 0800-1600 hours, Monday-Thursday, excluding federal holidays.

Product deliveries shall be made to the following address:

Naval Air Weapons Station Thermal Dynamic Test Facility (TDTF), T-Range Tare Access Road, Building 16059 China Lake, CA 93555

DESCRIPTION OF GOVERNMENT-OWNED LOX TANK: LOX shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Location # of Tanks Capacity - Tons MAWP* TDTF, Bldg 16059 1 – LOX 1,000 GL 50 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting

SECURITY REQUIREMENTS: Contractors will be required to provide their vehicle registration, current insurance, and valid state driver’s license.

TSW ID: CDSCREECHA

DODAAC: FP8172

Date: 4 Sep 19 related services, requires delivery of Aviator’s Breathing Oxygen (ABO) and Liquid Nitrogen (LN2). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Contractor-provided tanks at Cheech AFB, NV.

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

LN2 (NSN 6830-01-644-2557), Type II, Grade B, shall meet the requirements of the most current version of Commercial Item Description A-A 59503.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. Expedited or emergency delivery request shall be delivered within 3 calendar days of receipt of an order.

Deliveries shall be made from 0700-1400 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

Creech AFB NTTR/MSXF, Bldg 121 Indian Springs, NV 89018

DESCRIPTION OF CONTRACTOR-PROVIDED ABO AND LN2 TANKS: ABO AND

LN2 shall be delivered into the following Contractor-provided storage vessel listed below. The storage vessels will be trailer accessible.

Location # of Tanks Capacity Range-Gallons Bldg 121 1 – ABO 500-1,000 GL Bldg 121 1 – LN2 500-1,000 GL

CONTRACTOR-PROVIDED TANK INSTALLATION:

Contractor shall install their Contractor provided tanks and equipment on existing cement pads, within the existing system footprints, no later than 30 calendar days from start of contract performance. The Contractor shall also perform all inspections and maintenance of Contractor provided tanks/equipment to assure systems provide safe and uninterrupted support. Contractor provided tanks may be chilled through initial deliveries, but initial deliveries into Contractor provided tanks shall not qualify as a “Hot Fill” service. The Contractor will coordinate with the current supplier to effect removal of current equipment and installation of new equipment, or to retain the current equipment.

The Contractor may be required to provide a temporary system during change out of existing system or tanks to eliminate any delay in supply of product.

CONTRACTOR-PROVIDED EQUIPMENT REMOVAL:

Contractor provided tanks/equipment shall be removed by the Contractor within 30 calendar days after contract termination. The Contractor will coordinate with the follow-on supplier to effect removal of current equipment and installation of new equipment.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

TANK HOT FILL: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

SECURITY REQUIREMENTS: Contractor must have a CAC card for unescorted entry.

For contractor’s requiring entry without a CAC card, the base main gate will accomplish a ten (10) year wants and warrants background check on the individual. Individual will be required to show driver’s license and social security number to main gate security personnel. An escort from the fuels shop will also be in attendance and the fuels shop will escort the driver to the correct location. Response time from the background check on average takes about 30 minutes.

TSW ID: CDSDAVISMO

DODAAC: FP8043

STATEMENT OF OBJECTIVES

Date: 4 Dec 20

PPN: 9.1d

SCOPE: Defense Logistics Agency Energy (DLA Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Government-owned tank at Davis Monthan AFB, AZ

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 1 calendar day after receipt of an order from the Delivery Scheduler.

Deliveries shall be made from 0800-1400 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

355th LRS/LGRF 4665 Phoenix Street, Bldg 4863 Davis Monthan AFB, AZ 85707

DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the

Bldg 4863 2 – ABO 6,000 GL 68 psig *Maximum Allowable Working Pressure

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting Officer, Service Control Point (AFPET), Air Force Life Cycle Management Center (AFLCMC/WNZ), and the activity that physically possesses the tank(s).

TANK HOT FILL: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

SECURITY REQUIREMENTS: Contractor delivery personnel shall provide a valid state driver’s license, current insurance, vehicle registration, and bill of lading. Must use the Swan Gate to be searched prior to being granted base access. Call 520-228- 9117/9118 to request an escort to Cryogenics facility.

TSW ID: CDSEDWARDS

DODAAC: FP8084

related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into government-owned tank at Edwards AFB, CA

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

Deliveries shall be made from 0700-1200 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

412 LGR/LGRF

300 Yeager Blvd Facility 1718 Edwards AFB, CA 93524

DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Facility 1718 2 – ABO 6,000 GL 30 psig ea required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting Officer, Service Control Point (AFPET), Air Force Life Cycle Management Center (AFLCMC/WNZ), and the activity that physically possesses the tank(s).

SECURITY REQUIREMENTS: Contractor delivery personnel shall contact the FSC when arriving on base to deliver product. An escort is required to get to the CRYO Storage (Bldg 1718) area which is on the flight-line. Truck operator must not have any Felonies or Warrants to be able to enter a Federal Installation.

TSW ID: CDSEDWRDS2

DODAAC: FP8012

related services, requires delivery of Liquid Oxygen (LOX). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Government-owned tank at Edwards AFB, CA

PRODUCT: LOX (NSN 9135-01-665-3259), Type II, Grade A, shall meet the requirements of the most current version of MIL-PRF-25508.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 3 calendar day after receipt of an order from the Delivery Scheduler.

Deliveries shall be made from 0730-1600 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

Air Force Research Laboratory 746 E. Mars Blvd Bldg 9625 Edwards AFB, CA 93524

DESCRIPTION OF GOVERNMENT-OWNED LOX TANK: LOX shall be delivered into

Location Tank ID # of Tanks Capacity - Tons MAWP* 1-120 V-153 1 – LOX 123.9 TN 35 psig 1-120 V-371 1 – LOX 9.5 TN 6,000 psig 1-120 V-422 1 – LOX 2.4 TN 3,700 psig 1-125 V-356, V-159 2 – LOX 428.7 TN 165 psig ea 1-14 V-148 1 – LOX 81.6 TN 35 psig 1-14 V-217 1 – LOX 1.3 TN 50 psig 1-14 V-311 1 – LOX 2.4 TN 1,500 psig 1-14 V-759,V-760,V-761,V-762 4 – LOX .14 TN 10 psig ea 1-14 V-776 1 – LOX .26 TN 5,000 psig 1-42 V-177 1 – LOX 5.4 TN 1,100 psig 1-42 V-184, V-185 2 – LOX 68.6 TN 90 psig ea 1-52 V-307 1 – LOX 4.8 TN 5,000 psig 1-56 V-332 1 – LOX 133.4 TN 150 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the

METHOD OF MEASUREMENT: Method of measurement to be performed by use of certified scales on site.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is r307equired to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting

SECURITY REQUIREMENTS: For access to the premises, the driver shall provide a valid driver’s license, insurance, vehicle paperwork and contact Fuels office at (661) 275-6444.

TSW ID: CDSEIELSON

DODAAC: FP8132

related services, requires delivery of Aviator’s Breathing Oxygen (ABO) and Liquid Nitrogen (LN2). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Government-owned tank at Eielson AFB, AK.

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

LN2 (NSN 6830-01-644-2557), Type II, Grade B, shall meet the requirements of the most current version of Commercial Item Description A-A 59503.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 2 calendar day after receipt of an order from the Delivery Scheduler

Deliveries shall be made from 0800-1500 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

354 LRS/LGRF

3245 Flightline Ave Eielson, AK 99702

DESCRIPTION OF GOVERNMENT-OWNED ABO and LN2 TANKS: ABO and LN2 shall be delivered into the following Government-owned storage vessel listed below.

The storage vessels will be trailer accessible.

3245 Flightline Ave 1 – ABO 5,000 GL 50 psig 3245 Flightline Ave 1 – ABO 6,000 GL 50 psig 3245 Flightline Ave 1 – LN2 5,000 GL 50 psig 3245 Flightline Ave 1 – LN2 3,000 GL 50 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting

SECURITY REQUIREMENTS: The delivery location is unmanned and located away from our normal operating location. Request that carrier phone the Fuels Service

Center at (907) 377-4190 at least one hour prior to arrival. Contractor personnel shall provide a valid driver’s license, insurance, vehicle paperwork to base Security Forces personnel, and will need to call the Fuels Service Center for sponsorship onto the base.

TSW ID: CDSELMENDO

DODAAC: FP8139

related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Government-owned tank at Elmendorf AFB, AK.

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. No emergency deliveries are anticipated.

Deliveries shall be made from 0700-1500 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

673 LRS/LGRF

23rd Street, Bldg 9268 Joint Base Elmendorf-Richardson, AK 99506

DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessels will be trailer accessible.

Location # of Tanks Capacity - Gallons MAWP* Bldg 9268 2 – ABO 5,000 GL 50 psig ea required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

FILL LINE RESTRICTION ORIFICE: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting

SECURITY REQUIREMENTS: Contact the Fuels Service Center at 907-552-5180 upon arrival at the gate.

TSW ID: CDSFTIRWIN

DODAAC: 2AC024

STATEMENT OF OBJECTIVES

Date: 4 Sep 19

PPN: 9.1d

SCOPE: Defense Logistics Agency Energy (DLA Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and related services, requires delivery of Liquid Nitrogen (LN2). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Customer-owned tanks at Exelis, Fort Irwin, CA.

PRODUCT: LN2 (NSN 9135-01-665-3253), Type II, Grade B, shall meet the requirements of the most current version of MIL-PRF-27401.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 1 calendar day after receipt of an order from the Delivery Scheduler.

Deliveries shall be made from 0700-1630 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

Exelis 93 Goldstone Rd.

Fort Irwin, CA 92310

DESCRIPTION OF CUSTOMER-OWNED LN2 TANK: LN2 shall be delivered into the following Customer-owned storage vessel listed below. The storage vessels will be trailer accessible.

Location # of Tanks Capacity - Tons MAWP* Bldg: Mars Site 1 – LN2 3.4 TN 55 psig required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up. In addition, Government-owned tanks are designed under Military Specifications and are not governed by commercial standards. At the Supplier’s expense they may equip conveyance or servicing hose with a tank over pressurization control device or shall use a conveyance without pump assisted off load.

METHOD OF MEASUREMENT: Method of measurement shall be by truck mounted calibrated flow meter.

INSPECTION AND ACCEPTANCE: Inspection for quality shall be performed at origin.

Quantity determination and acceptance shall be at destination. Contractor shall obtain customer signature for delivery at each location for acceptance of quantity. A copy of the signed quantity acceptance document must be attached to the WAWF invoice submittal for payment.

TANK OVER-PRESSURE PROTECTION: If it is determined during supplier site visits or upon review of Customer tank technical information, that additional tank over-pressure protection is required to comply with CGA P-59, Prevention of Over-Pressure during Filling of Cryogenic Vessels, the Contractor shall identify the deficiency to the designated Customer representative(s) for implementation of corrective action. The Contractor may be requested to provide and install the additional tank protection, which may encompass any of the methods identified in the P-59. The inspection by the Contractor and any required corrective actions shall be completed within 30 days after contract award. NOTE: Over-pressure protection devices shall not be installed on Customer-owned storage tanks without prior approval from DLA Energy Contracting Officer, Service Control Point (AFPET), Air Force Life Cycle Management Center (AFLCMC/WNZ), and the activity that physically possesses the tank(s).

TANK HOT FILL: Occasionally, the Contractor may be required to perform a “Hot Fill” in order to cool-down and refill any tank that has gone empty and is warm.

SECURITY REQUIREMENTS: Contractor must be a US citizen, have a current ID, and a criminal background check for access through the Fort Irwin gate. A pass will be issued so driver can access without having to stop at gate for each delivery.

TSW ID: CDSFRESNOA

DODAAC: FP8087

related services, requires delivery of Aviator’s Breathing Oxygen (ABO). The Contractor shall provide all materials, supplies, product, management, tools, equipment, transportation and labor necessary for the delivery of products f.o.b. destination into Government-owned tank at Fresno ANG, CA.

PRODUCT: ABO (NSN 6830-01-644-2463), Type II, shall meet the requirements of the most current version of MIL-PRF-27210.

One copy of the Certificate of Analysis (COA) for each sample required by the specification shall be submitted by the Contractor as an attachment to Wide Area Workflow (WAWF) invoice. In addition, the Contractor shall include a copy of COA to accompany each delivery to be provided to acceptor at delivery destination.

PRODUCT DELIVERY: Product shall be delivered within 7 calendar days after receipt of an order from the appointed Delivery Scheduler. For emergency deliveries, product shall be delivered within 1 calendar day after receipt of an order from the Delivery Scheduler.

Deliveries shall be made from 0700-1400 hours, Monday-Friday, excluding federal holidays.

Product deliveries shall be made to the following address:

144 WF/LGRF

5323 E. McKinley Ave.

Bldg 117 Fresno, CA 93727

DESCRIPTION OF GOVERNMENT-OWNED ABO TANK: ABO shall be delivered into the following Government-owned storage vessel listed below. The storage vessel will be trailer accessible.

Bldg 117 1 – ABO 3,000 GL 50 psig *Maximum Allowable Working Pressure

Government-owned tanks, required “non-pump assisted off-loads”, tank vent valves are required to be fully open during receipt operations, and are equipped with a 10micron filter installed in-line with receiving connection which acts as a restriction orifice and mitigates tank pressure build up.