Attachment_A_Specifications.pdf

PDF 137 KB Posted

Attached to
Radio Shelter, North Cascades NP
Solicitation number
140P8323Q0058
Issued by

About this file

This document outlines specifications for a communications shelter and integrated articulating monopole tower solicitation for the North Cascades National Park. The solicitation seeks a self-contained walk-in shelter no larger than 8x8 feet to house radio equipment and batteries. The integrated 40-foot monopole tower must lower and raise by hand crank for antenna maintenance. Requirements include withstanding 90 mph winds with 1/2 inch radial ice, Faraday grounding, and FCC/FAA identification labeling. The contractor must deliver and install the shelter and tower, and provide documentation to facilitate installation. The power system requires a 48VDC AGM battery system with solar charging and a minimum 48 hours run time at 105 watts continuous load. The Park will provide eight 12-volt batteries.

View the file

Other files

File Type Posted
Sol_140P8323Q0058.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ # 140P8323Q0058

Attachment A : Specifications North Cascades NP

GENERAL DESCRIPTION:

The North Cascades National Park has a requirement for the purchase of one communications shelter with an integrated articulating monopole tower.

The shelter will be a self-contained no larger than an 8’x8’walkin shelter that can contain the required radio equipment and power system safely. The communication structures will have an articulating integrated 40’ monopole tower. The structure will not have a supporting foundation and must be designed to be mobile. Faraday grounding is required and in accordance with EIA standards. The tower is to be integrated into the structures and designed to support wind loads of 90 mph with radial ice load of ¼”.

SHELTER AND TOWER REQUIREMENTS:

• Structure:

o The maximum footprint of the structure with integrated tower will be no more than 15’x15’. The shelter must be able to protect sensitive digital radio equipment and batteries from external threats such as snow, ice, wind, lightning, radio frequency interference and electro-magnetic radiation. At minimum, the structure will include one standard 19” equipment racks capable of holding 3 Codan repeater subracks, (each approximately 6” in height), and one standard rack for the battery system.

o The structure shall be designed to withstand a minimum of 90 MPH sustained winds at twenty feet above ground level with a coating of ¼ inch solid radial ice or the requirements in the current ANSI/EIA STANDARD 222, whichever is greater.

o Structure and tower shall be properly grounded, at a minimum, in accordance with all industry standards. To further protection sensitive communications equipment, a Faraday grounding system will be used in the structure.

o Structure and tower shall be constructed in a fashion for ease of installation, and if necessary easy for redeployment.

o Structure must be constructed of aluminum alloy plating for electrical conduction (RFI and lightning shielding) and high strength.

o The structure will be built to allow for a four or more-port cable entry gland. The entry gland will be provided by the contractor.

o Internal grounding will be facilitated through the structure Faraday cage. The contractor will provide any necessary grounding straps to ground the transmissions cable entering the structure.

o The shelter and tower should be new, unused, and shall meet the latest design and fabrications standards.

o Structure and tower will be painted Tan.

o A permanent metal marker plate shall be affixed to the shelter, inscribed with the following information:

RFQ # 140P8323Q0058

Attachment A : Specifications North Cascades NP

Site name Manufacturer and contact information Model number Serial number

• Tower:

o The tower shall be 40’ in height, integrated to the structures via direct contact or through a base sub-structure. Tower shall be a monopole in design and must articulate so that can be mechanically lowered for maintenance of antennas.

o The contractor will provide three standoffs for three Telewave ANT150F2 omni antenna. Antennas listed will be purchased and installed by the Park.

o Tower shall, once constructed, be designed to lower and raise by hand crank.

Cable management into the structure will be through a four or more-port cable entry gland.

o The tower is to be integrated into the structure and designed to support wind loads of 90 mph with radial ice load of ¼” and will be in accordance with ANSI/TIA- 222 latest version.

o Will comply with Federal Aviation Administration (FAA), Advisory Circular; AC 70/7460-1K or latest revision.

o Will Comply with all Federal, State and local codes and regulations, as needed.

o FAA and FCC identification numbers, if applicable, shall be clearly labeled near the base of the tower.

• Power:

o Design of the power system will be in a fashion to allow easy installation, maintenance and replacement of the batteries.

o Solar and battery system will be provided by the contractor. The Park will provide the eight 12-volt 100Ah batteries.

o 48VDC AGM battery system with supported solar system. Battery system must be able to provide a minimum of 48 hours at 105w load continuous.

o Solar system must be large enough to support the 48VDC battery system and have the appropriate charge controller and breaker for the system.

INSTALLATION:

Structure installation will be complete by the NPS. The contractor will provide necessary documentation to facilitate a successful installation of the structure and tower.

DELIVERY:

Coordination of transportation of all materials to the Park is the responsibility of the contractor.

File details come from the government source that posted it. Updated .