Attachment A - Special Provisions~2.pdf
PDF 6 MB Posted
- Attached to
- Delta Park KOA Access Restriction
- Solicitation number
- S-73000-00000613
- Issued by
- Multnomah County, Oregon
About this file
This document is a set of Special Provisions for the Barrier and Boulders Delta Park KOA Access Restriction Project, a state project managed by the Oregon Department of Transportation (ODOT) in Multnomah County and the City of Portland. The scope of work requires the contractor to haul and place ODOT-furnished boulders, install ODOT-furnished concrete barrier and gates, and provide any additional boulders needed to complete the project. The work must be completed by November 15, 2021, with substantial completion by October 10, 2021. The project is located on Pacific Highway West (Hwy 99W) and Victory Blvd, with specific site details and clear zone requirements provided. The intent is to install a fence around the property to restrict access.
The Special Provisions outline technical specifications, project details, and contractor requirements. Key items include excavation and grading, boulder and barrier placement, gate installation, and protection of existing features. The contractor will be responsible for providing a work plan, scheduling, safety practices, and coordination with ODOT. ODOT will furnish the concrete barrier, metal gates, and some of the boulders, with the contractor responsible for providing any additional boulders needed. There are no specific pricing terms, set asides, or funding details provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00000613 ITB.docx | DOCX document | |
| 00000613_Pre Bid Sign up Sheet.pdf | ||
| 00000613 ITB_ADDENDUM.docx | DOCX document | |
| SOLE SOURCE Dispatch Now Mobile Licenses.pdf | ||
| 00000613 QA.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROVISIONS
FOR MAINTENANCE HIGHWAY CONSTRUCTION
OREGON DEPARTMENT OF TRANSPORTATION
SALEM, OREGON
BARRIER AND BOULDERS
DELTA PARK KOA ACCESS RESTRICTION PROJECT
PACIFIC HIGHWAY WEST
MULTNOMAH COUNTY
AUGUST 2021
SPECIAL PROVISIONS 2
DESCRIPTION OF WORK
BARRIER AND BOULDER
PACIFIC HIGHWAY WEST
MULTNOMAH COUNTY
Scope- Contract requires Contractor haul and place ODOT furnished boulders, place ODOT furnished standard barrier, place ODOT furnished gates, and furnish and place boulders any required additional boulders beyond what ODOT furnishes. Comply with the 2021 Oregon Standard Specifications for Construction. The intent of the barrier being installed is to form a fence around the property to restrict access.
Location of Work—this work will be on Pacific Highway West (Hwy 99W) and Victory Blvd.
in the location as described below.
Site Hwy Direction 3 99W and Victory Blvd NB and EB
9a Victory Blvd WB 9b 99W NB
COMPLETION TIME LIMIT
Complete all Work to be done under the Contract not later than November 15, 2021. Work can begin as agreed between ODOT Project Manager and Contractor after issuance of notice to proceed. Substantially complete all Work to be done under the Contract not later than October 10, 2021. Substantial completion is considered to be boulder and barrier work.
APPLICABLE SPECFICATIONS
The 2021 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications in Sections 00200 and beyond that apply to this ITB and any resulting Contract. Some sections of the technical specifications may be identified and modified in the Plans and Special Provisions. Sections of the technical specifications not identified in the Plans and Special Provisions remain applicable to the Contract according to their original terms.
Sections in Part 00100 of the Standard Specifications (General Conditions) are not applicable to the Contract unless they are specifically identified in the Plans and Special Provisions as being applicable. However, if a Part 00100 section that has been identified as being applicable references another section in Part 00100, or a technical specification (Parts 00200 and beyond) references a section from Part 00100, that section from Part 00100 applies to
SPECIAL PROVISIONS 3
the Contract for purposes of supporting and giving full effect to the specification that referenced it. Bidders can access the Standard Specifications online at:
http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx
All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety.
CLASS OF PROJECT
This is a State Project.
SPECIAL PROVISIONS 4
TABLE OF CONTENTS FOR SPECIAL PROVISIONS
SECTION 00210 - MOBILIZATION
SECTION 00280 – EROSION AND SEDIMENT CONTROL
SECTION 00290 - ENVIRONMENTAL PROTECTION
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
SECTION 00320 - CLEARING AND GRUBBING
SECTION 00390 - RIPRAP PROTECTION
SECTION 00440 - COMMERCIAL GRADE CONCRETE
SECTION 00640 - AGGREGATE BASE AND SHOULDERS
SECTION 00820 - CONCRETE BARRIER
SECTION 01050 - FENCES
SECTION 02080 - GROUT
SUPPLEMENTAL SPECIAL PROVISIONS
REGION 1 MAINTENANCE: GUIDELINE FOR PAVEMENT RESTORATION OR
DEFECTIVE WORK
BOULDER STOCKPILE VICINITY MAP
PLANS
STANDARD DRAWINGS
BOULDER STOCKPILE PHOTOS
SPECIAL PROVISIONS 5
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00280 – EROSION AND SEDIMENT CONTROL
Comply with Section 00280 of the Standard Specifications modified as follows:
00280.06 Erosion and Sediment Control Manager - Delete this subsection.
00280.62 Inspection and Monitoring - Replace this subsection, except for the subsection number and title, with the following:
Inspect the Project Site and all ESC devices for potential erosion or sediment movement on a weekly basis and when 1/2 inch or more of rainfall occurs within a 24-hour period, including weekends and holidays.
If a significant noncompliance or serious water quality issue occurs that could endanger health or the environment, verbally report it to the Engineer within 24 hours.
00280.80 Measurement - Replace this subsection, except for the subsection number and title, with the following:
No extra measurement will be made for this work.
00280.90 Payment – Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for erosion and sediment control.
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications modified as follows:
00290.90 Payment – Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for environmental protection.
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Comply with Section 00310 of the Standard Specifications modified as follows:
SPECIAL PROVISIONS 6
00310.92 Separate Item Basis – Add the following to the end of the Pay Item list:
(i) Removal of Bollards Each
(j) Removal of Cable Fences Lump Sum
Add the following to the end of this subsection:
Item (i) includes the bollards with gate attachments.
SECTION 00320 - CLEARING AND GRUBBING
Comply with Section 00320 of the Standard Specifications.
SECTION 00390 - RIPRAP PROTECTION
Comply with Section 00390 of the Standard Specifications modified as follows:
Add the following paragraph to the end of this subsection:
Upon completion of this project the work site shall remain in the same or better condition as when project work began.
00390.11(a) General– Delete this section.
00390.11(b) Test Requirements– Delete this section.
00390.11(c) Gradation Requirements– Delete this section.
00390.80(c) Measurement - Replace this subsection, except for the subsection number and title, with the following:
Riprap will be measured on the area basis in place or on the weight basis. The area measured will be the outside perimeter of the boulder field.
00390.90 Payment – Add the following to the end of the unit of measurement list for items c and d:
“or Area”
Add the following to the end of the Pay Item list:
(g) Extra For Contractor Furnished Riprap, Class 700 Cubic Yard or Ton
Add the following to the end of this subsection:
SPECIAL PROVISIONS 7
Item (c) and (d) include hauling for ODOT or Contractor furnished Riprap.
Item (g) is only for the material cost of additional Riprap furnished by Contractor.
SECTION 00440 - COMMERCIAL GRADE CONCRETE
Comply with Section 00440 of the Standard Specifications.
SECTION 00640 - AGGREGATE BASE AND SHOULDERS
Comply with Section 00640 of the Standard Specifications.
SECTION 00820 - CONCRETE BARRIER
Comply with Section 00820 of the Standard Specifications modified as follows:
00820.41 Line and Gradae - Replace the paragraph beginning with “ Place precast barrier sections…” with the following:
Place precast barrier sections on the existing ground or a 3 foot wide aggregate leveling pad where required. The existing ground or aggregate leveling pad shall meet the appropriate smoothness requirement prior to placing the barrier.
00820.90 Payment – Add the following to the end of the No separate or additional payment list:
Preparing and leveling the existing ground.
Preparing, compacting and leveling the 3 foot aggregate leveling pad.
SECTION 01050 - FENCES
Comply with Section 01050 of the Standard Specifications.
SECTION 02080 - GROUT
Comply with Section 02080 of the Standard Specifications.
SPECIAL PROVISIONS 8
SUPPLEMENTAL SPECIAL PROVISIONS
1. The quantities in the bid item list are intended to serve only as a guide to bidders, and are not to be construed as a guarantee. All quantities are estimated, and are for bid purposes only. The quantity for each bid item includes all labor, equipment and materials for all activities associated with this project. The Oregon Department of Transportation (ODOT) reserves the right to adjust quantities and add or delete, as needed.
2. Contractor shall provide a work plan detailing their sequencing and duration of each sequence of the work with their bid. Changes work plan shall be submitted via email during the course of the contract.
3. Work needs to be continuous, seven (7) days a week, once it has started.
4. Contractor shall schedule a pre-construction meeting with the ODOT Project Manager within five (5) business days of notice to proceed.
5. Allowed work hours: Daily, 7 am to 7 pm
6. All work to be from on site, no lanes may be closed.
7. ODOT will furnish and deliver the concrete barrier (12.5 ft long by 32 in tall) to the site.
8. ODOT will furnish and deliver the metal gates to the site. Two work days’ notice required to allow for scheduling.
9. Contractor to load, deliver and place ODOT furnished boulders (Class 700 Riprap) for the project. Boulder stockpile location:
a. ODOT Wilsonville Yard: Located at the east end of 5th Street by I5 SB in Wilsonville, see attached map.
b. Contractor to provide their own lock to be “daisy chained” with the ODOT lock.
c. The gate is to remain closed and locked when no one is present at the site.
d. Contractor to provide their own loading equipment.
10. Contractor to enclose site perimeters with orange construction fencing on the first day of work.
11. Camp clean-up required prior to the start of work is currently in progress of being coordinated by ODOT. ODOT will provide Contractor with a 48 hour notification prior to completion of camp clean-up. Contractor shall occupy the site and begin work immediately following the expi9ration of the camp clean-up 48 hour notice. If there is evidence that additional cleanups will be required based on camper presence or personal property found at the site, notify the Project Manager so it can be scheduled. Clean ups can occur daily once the site has been posted. Contractor may not move or remove any personal property from the site. No monetary compensation will be considered for any camp clean-up delay.
SPECIAL PROVISIONS 9
12. Any camp clean-up required after the start of work will be coordinated by ODOT. The Contractor shall notify the Project Manager to allow for the clean-up to be posted and completed. In areas not affected by the illegal camping work shall continue. Contractor shall occupy the area of the site affected by the illegal camping and continue work immediately following the camp clean-up. If there is evidence that additional cleanups will be required based on camper presence or personal property found at the site, notify the Project Manager so it can be scheduled. Clean ups can occur daily once the site has been posted. Contractor may not move or remove any personal property from the site. Any time delay caused by campers occupying the site after the start of work, when they had not been present prior to the start of work, will be added to the end of the contract. No monetary compensation will be considered for any camp clean-up delay.
13. Contractor to furnish additional boulders as necessary to complete the project after all the ODOT furnished boulders have been installed. Contractor furnished boulders to be of similar size as ODOT supplied boulders. See attached photos of boulder stockpile for sizing.
Contractor to clear and grub the site as necessary for barrier, boulder and gate installation.
Excavated material may be spread on site. Contractor to remove existing bollards, gate and cable fencing in conflict with barrier alignment or boulders. All bollards, cable from the fences and gates are to be retained by ODOT. Contractor to notify the ODOT Project manager in advance of the removal date and stockpile them on site for ODOT to retrieve the same day.
14. Existing signs in conflict with barrier alignment to be relocated by ODOT.
15. Concrete Barrier Placement:
a. Pin barrier together.
b. Bury the ends of the barrier into the existing bank in locations shown on plan for Site 9a and 9b.
c. Create a 3 foot wide level aggregate base, compacted, for concrete barrier placement, typical all locations.
d. Longitudinal slope to follow existing ground, grade as necessary to allow for pinning of concrete barrier together.
e. Barrier to be placed around existing trees and utilities.
f. Increase the clear zone distance to avoid conflicts.
g. Alignment to parallel skip line or curb to the best extent possible.
h. Barrier to be between 6 inches and 1 foot of gate posts.
16. Boulder Placement:
a. Two rows of boulders are to be installed behind the new concrete barrier. In the first row one boulder is to be placed at each concrete barrier pinned joint.
b. Offset the boulders in the second row to fill the gap between boulders in the first row.
c. Boulders are to be 4-5 foot apart from each other in all directions.
d. Boulders in the first row are to be 1-2 feet from the back of the barrier.
e. Boulders are to be keyed in.
f. Boulders placed on slopes of 2:1 will be also be grouted, grout to have a smooth appearance after placement. Grout to extend up 1/3 the height of the boulders
SPECIAL PROVISIONS 10
g. Depending on arc of barrier placement on Site 3 boulders may be placed in front of barrier outside the clear zone with similar spacing requirements as behind the barrier.
17. Gate Placement:
a. Exact location to be determined in the field.
b. If gates are not available for installation at time barrier and boulder work is complete Contractor to temporarily block driveway access by continuing the with barrier and boulders. Placement of barrier joints needs to be coordinated with gate placement. Contractor to remove temporary barrier and boulders for gate installation. Boulders to be permanently placed elsewhere on site. Barrier to be placed on site for ODOT to retrieve.
18. All utility locates are the responsibility of the Contractor.
19. All brushing and plant removal is the responsibility of Contractor.
20. Boulders to be placed to create as angular of an exposed surface as possible.
21. No filter blanket or riprap geotextile is required.
22. Protect all existing features and structures including but not limited to concrete barrier, concrete curbs, asphalt, utilities, trees, and fences. Any damage to the existing features or structures will be repaired or replaced by Contractor as determined by the Owner’s Authorized Representative at no expense to the Agency.
23. Defective pavement will be repaired, at no additional cost to the State, according to the Region 1 Maintenance: Guideline for Pavement Restoration or Defective Work. This will be required if the asphalt is damaged during riprap delivery or installation.
24. Contractor’s employees and their subcontractors may not wear clothing, hats, vests, etc. that have the ODOT name or “flying T” symbol.
25. There is public interest in the work. Contractor is advised to use courtesy and respect in any work site interaction with the public and to refer all public relations matters to the ODOT Project Manager.
26. Contractor shall implement safety policies, procedures and practices in conformance with all applicable local, state and federal laws, rules and regulations including but not limited to:
a. Applicable OSHA safety regulations
b. ANSI Z 133.1 Safety standards agreed upon by ODOT and local jurisdiction The
Manual of Uniform Traffic Control Devices (MUTCD)
c. Any other applicable safety laws, regulations and codes.
27. All equipment utilized during this contract shall be in good and serviceable condition.
28. Correspondence for the project is required to have either the project name or the contract number in the subject line.
SPECIAL PROVISIONS 11
29. The invoices, certified payrolls and project submittals are to be submitted via email to the Agency Authorized Representative.
Stacy Stubblefield: Stacy.stubblefield@odot.state.or.us
30. Invoices must have the flowing certified statement on them along with a signature by the Contractor’s Authorized Representative.
“I the undersigned, hereby certify that the above bill is true and correct and that payment has not been received. Signature: _______________________”
31. Invoices are to have the contract number listed on them and the following billing address:
ODOT District 2B 9200 SE Lawnfield Rd Clackamas, OR 97015
Updated 11/9/2020
Region 1 Maintenance Guidelines for Pavement Restoration or Defective Work
This guideline applies anytime the asphalt saw cut does not fall at a lane line, striping is removed and not replaced in the same location or when defective paving has to be replaced.
Base Objective: Motorist cannot feel the repaired pavement. Prolong the working life of the asphalt pavement and reduce future maintenance costs.
Repair Guidelines:
1. Pavement condition new or like new (1‐3 years old): Complete a 2” grind and inlay with the same Level of ACP required in the contract (Level 3 minimum) for an area that covers the entire lane width of every lane affected by 100 foot long. The length to be centered on the defective/saw cut area if the defective area is small. If the area is larger than 100 feet then complete a 2” grind and inlay with the same Level of ACP required in the contract for an area that covers the entire lane width of every lane affected by the entire length of the defective/saw cut area.
2. Pavement condition anything less than new (3 years or older): Complete a 2” grind and inlay with the same Level of ACP required in the contract (Level 3 minimum) for an area that covers the entire lane width of every lane affected by 50 foot long. The length to be centered on the defective/saw cut area if the defective area is small. If the area is larger than 50 feet then complete a 2” grind and inlay with the same Level of ACP required in the contract for an area that covers the entire lane width of every lane affected by the entire length of the defective area.
3. When there are several smaller areas that are within a short distance of each other complete one continuous repair.
4. The District Manager or their designated representative will determine the limits of the repair based on these guidelines.
hwym17i Text Box Boulder Stockpile Vicinity Map Wilsonville Yard hwym17i Text Box ODOT Wilsonville Yard hwym17i Text Box 5Th St hwym17i Line hwym17i Line hwym17i Text Box Wilsonville Rd
Line
Polygonal Line hwym17i Text Box Site 3: 14 FT Clear Zone measured from Fog Line if present. If no Fog Line measured from face of Curb.
hwym17i Text Box Victory Blvd hwym17i Text Box I5 hwym17i Line hwym17i Text Box 99W Exit Ramp hwym17i Line hwym17i Text Box Delta Park KOA Access Restriction Site 3 Clear Zone Requirements hwym17i Text Box See Barrier and Boulder Plan, Typical Placement Detail and Special Provisions for additional Detail.
hwym17i Line hwym17i Text Box North N.T.S.
Polygonal Line hwym17i Polygonal Line hwym17i Text Box Delta Park KOA Access Restriction Site 9 Clear Zone Requirements hwym17i Line hwym17i Text Box North N.T.S.
hwym17i Line hwym17i Text Box Site 9b: 24 FT Clear Zone measured from Fog Line if present. If no Fog Line measured from face of Curb.
hwym17i Text Box Site 9a: 14 FT Clear Zone measured from Fog Line if present. If no Fog Line measured from face of Curb.
hwym17i Line hwym17i Text Box Victory Blvd hwym17i Text Box I5 hwym17i Text Box 99W Entrance Ramp hwym17i Line hwym17i
See Barrier and Boulder Plan, Typical Placement Detail and Special Provisions for additional Detail.
Delta Park KOA Access Restriction Site 3 Barrier and Boulder Plan hwym17i Text Box Type A: Concrete Barrier with Grouted Riprap Type B: Concrete Barrier with Keyed Riprap See Typical Placement Detail and Special Provisions for additional details.
Delta Park KOA Access Restriction Site 9 Barrier and Boulder Plan hwym17i Text Box Type A: Concrete Barrier with Grouted Riprap Type B: Concrete Barrier with Keyed Riprap See Typical Placement Detail and Special Provisions for additional details.
P R
O E
C T
S H
E E
T T
IT
LE
U S
D A
F O
R E
S T
S E
R V
IC
E
T
N r
M
. H O
O D
N A
T
IO
N A
L F
O R
E S
C
W d
O
Contract Name: Goat STEW Attachment D2 hwym17i Text Box Gate Plan and Elevation hwym17i Text Box hwym17i Text Box hwym17i Text Box yellow
O E
C T
S H
E E
T T
IT
LE
U S
D A
F O
R E
S T
S E
R V
IC
. H O
O D
N A
T
IO
N A
L F
O R
E
Contract Name: Goat STEW Attachment D2 hwym17i Text Box Gate Assembly Details hwym17i Text Box hwym17i Text Box hwym17i Text Box hwym17i
SHEET 5)
O E
C T
S H
E E
T T
IT
LE
U S
D A
F O
R E
S T
S E
R V
IC
. H O
O D
N A
T
IO
N A
L F
O R
E
F d r d d r d r d . W d r r (D , S ).
Contract Name: Goat STEW Attachment D2 hwym17i Text Box hwym17i Text Box hwym17i Text Box Gate Latch (Detail A) hwym17i Text Box
O E
C T
S H
E E
T T
IT
LE
U S
D A
F O
R E
S T
S E
R V
IC
. H O
O D
N A
T
IO
N A
L F
O R
E
(SEE DETAIL , SHEET , FOR LOCK BOX OPEN CROSS
SECTION).
TANG (SEE DETAIL A, SHEET )
I O M r r
OM V
I O M r r
OM V
I O M r r
OM V
GN N TA AT ON NOTE
" " T B rr d M r r BM BM R r d r d r d r " " r d r r " " T O M r r OM r d r " " r d r OM r r r d r d r r r
I B rr d M r r
FBM L FBM R
Contract Name: Goat STEW Attachment D2 hwym17i Text Box hwym17i Text Box hwym17i Text Box Open Gate Support Detail hwym17i Text Box hwym17i Text Box hwym17i Text Box
(SEE DETAIL 4 SHEET 3 FOR LOCK BOX OPEN CROSS SECTION)
hwym17i Text Box hwym17i Text Box hwym17i Text Box hwym17i Text Box hwym17i
TANG (SEE DETAIL A, SHEET 3)
Section length = 12' - 6" (150") loop bar (Typ.)
3/4" Dia.
1" Clear min.
See Detail "B"
See Detail "A"
C
C
(Typ.)2"
"16
3/4" Dia. Loop bar
Longitudinal bar
#4 (Typ.)
#4 Stirrup pair (Typ.)
(When required)
" x 4" Pin slot (Typ.)
#4 Pin slot bar
#4 Stirrup pairs - 5 spaces @18"
311 "
14" 14" "
311 "
" dia. loop bar (Typ.)4
#4 Pin slot bar (Typ.)
(Typ.)
3"x12" Scupper
(Typ.)
12"
(Typ.)
(When required)
" x 4" Pin slot (Typ.)
(Typ.)
" Clear
11 (Typ.)
#4 Stirrup pair
(Typ.)
#4 Longitudinal bar
#4 Pin slot bar (Typ.)
(Typ.)
" x 4" Pin slot
"4 loop bar (Typ.)
" Dia.
(Typ.)
Clr.
" rad.4
" rad.8
(No pin slots required)
SHOULDER BARRIER
NARROW BASE
STANDARD
r d .d g n
A P
R
R D
RD500
MEDIAN BARRIER
PLAN
ELEVATION
SECTION C-C
TYP. BARRIER PIN LOOP
BARRIER END
DETAIL "A"
DETAIL "B"
smooth, solid surfacing for the clear area behind temporary barrier.
barrier. Place temporary barrier on smooth, solid surfacing. Maintain behind the barrier if secured or 5.5' of clear space behind unsecured
11. For temporary installations, provide a minimum of 18" of clear space hot-dip galvanized after fabrication.
10. All pins, bolts, dowels, loop bars, and connectors shall be
See Std. Dwg. RD502 for securing concrete barrier to roadway.
9. See Std. Dwg. RD501 for details not shown.
See Std. Dwgs. RD515 & RD516 for details.
shall be secured to roadway.
8. Precast concrete barrier used in medians less than 8' in width of thick consistency, as directed.
scuppers shall be portland cement grout, weak in strength and
7. Conc. grout for grouting over pins, pinning holes or grouting of of grout, as directed.
6. When scuppers are not required, plug them with a minimum 2" pin and loop assembly (See Std. Drg. RD502).
5. Temp. conc. barrier to be precast conc. median barrier with backfill behind barrier as shown on plans.
4. Narrow base shldr. barrier to be used only at locations with with radii greater than 770'.
3. Normal use of precast barrier units is restricted to curvatures
1425' shall be 25'.
be 12.5'. Max. chord length for curves with radii exceeding
2. Max. chord length for curves with a 1425' radius or less shall
2" clear of nearest face of conc., unless otherwise shown.
1. All reinforcement shall be full length as shown and shall be
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
" rad.4
" rad.8 side
Trafficside
Traffic where reqd.
"x4" paving ledge2
"2
"8
"8
10" R.
12"
"4
"2
12"
24"
" 1
"2
"8 7** 4
"8 3** 2
Construct the 10" radius to provide a smooth transition between the slopes.
** Dimensions marked thus are to the intersection point of the barrier slopes.
dimensions cannot be obtained shall be secured to roadway.
* Barrier used as shoulder barrier and placed in areas where these
Finish grade
(When reqd.)
and 2" dia. hole
"U" loop bar
Finish grade
01-2021 TITLE CHANGED, REVISED DETAILS & NOTES
" 1 " 2
"x2" Slots2
" cl.2
"x2" Slot2
24"
"2
" 2 " 2
"x2" Slots2
" Cl.2
" x 2" Slot2
24"
(top, bottom, and ends)
" Chamfer (Typ.)4
"8
"8
"2
" R.8
" R.4
" R.8
" R.4
(top, bottom, and ends)
" Chamfer (Typ.)4
10" R.10 " R
"8
"8
(Secured)
12" min.
(Unsecured)
* 24" min.
TYPE "F" PRECAST
32" CONCRETE BARRIER
#4 Longitudinal bar (Typ.) 3"
"2 1 "2
1/2"
END "A"
"A"
END
"B"
END
END "B"
(Secured)
12" min.
(Unsecured)
42" min.
REVISED DETAILS & NOTES04-2021
The selection and use of this
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
SDR DATE
Effective Date: June 1, 2021 - November 30, 2021
15-APR-2021N/A
.d
JA
N
R D
6"
(Typ.)
" R.
" Dia.
(Typ.)
" R.
333 1" R.
45°
144"
36 (Typ.)
" R.
RD501
5"
6"
#4
10"
11"
5"
(Typ.)
" R.
# 4 (Pairs) placement beveled to facilitate
" may be2 1Bottom
1" Dia.
2" Dia.
" Dia.
REINFORCING STEEL BENDING DIAGRAM
(#4 Rebar)
MEDIAN BARRIER STIRRUP "M"
#4 PIN SLOT BAR
NARROW BASE
#4 LONGITUDINAL BAR
STANDARD
STANDARDALTERNATE
(Fabricated as a single piece)
#4
#4 LOOP BAR DETAIL
the stirrup bars (see Stirrup Bar Narrow Base Detail).
the same as those shown for the 24" (in) wide barrier except for
7. The reinforcing steel details for the NARROW BASE barrier are hot-dip galvanized after fabrication.
6. All pins, bolts, dowels, loop bars, and connectors shall be
5. See Std. Dwg. RD516 for securing concrete barrier to roadway.
of thick consistency, as directed.
scuppers shall be portland cement grout, weak in strength and
4. Conc. grout for grouting over pins, pinning holes or grouting of pin and loop assembly (See Std. Drg. RD502).
3. Temp. conc. barrier to be precast conc. median barrier with backfill behind barrier as shown on plans.
2. Narrow base shldr. barrier to be used only at locations with
2" clear of nearest face of conc., unless otherwise shown.
1. All reinforcement shall be full length as shown and shall be
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
R D
PIN AND LOOP CONNECTION
PLAN
1"x8 UNC
"16
3°
ALTERNATE
1" Dia.
1" Dia.
Connecting Pin
(See general note 7) as directed.
Grout over connecting pin, A
(Typ.)
" Dia. loop bar 4
" Chamfer4
CONNECTING PIN ASSEMBLY DETAIL
(When required)
PLATE WASHER DETAIL
shall be welded as shown.
PIN NOTE: Washer shall be forged as integral part of pin or
See detail "A"
DETAIL "A"
SECTION A-A
A
TYPE "F" PRECAST
32" CONCRETE BARRIER
" thkn.)4 1( circular washer
" dia.4 12" or 2
"8
(#4 Rebar)
SHOULDER BARRIER STIRRUP "S"
1" clearance
NEW DRAWING CREATED01-2021
The selection and use of this
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
SDR DATE
15-JAN-2021N/A
.d
JU
L
R D
RD526
BURIED IN BACKSLOPE
STANDARD CONCRETE BARRIER
Y cover
6" min.
Edge of widened paved shldr.
Standard conc. barrier P.I.
Precast tall conc. barrier
Toe of slope (where reqd.)
Culv. pipe
To p o f c ut
Var. as shown on plans
Edge of travel lane
Bottom of ditch
Adjacent traffic flow
1V:1H p refe rred
Slop e 1V:4H o r ste epe r
See Table A 75' Transition Parab ola
6X
W E
See Table A a b
10:1 taper paved shldr.
Normal edge of
Extg. ground line
ELEVATION
SECTION A-A
D
Precast Tall Conc. Barrier - Pay limit
D
C
C
B
B
A A
(See Std. Dwg. RD510)
Mound terminal section
12'-6"
PLAN
1 2 3 4 5 6
7562.55037.512.5 25
0.10 0.20 0.50 0.80 1.30 1.90
X (ft)
Y (ft)20:1 a:b
Rate
Flare
FLARE RATES AND TRANSITION PARABOLA
TABLE A
Finish grade
1'-0" min. if unsecured
1'-0" min. if secured
2'-0" min. if unsecured*
1'
Edge of widened paved shldr.
1V:2H m ax.
Sl. var.
24" 2'* p a v e d s h ld r
N o r m e d g e o f
E
(See gen. note 5 & 6)
Extg. ground line
Sl. var.
SECTION D-D
Offset distance - Var.
Extg. ground line
Finish grade
(See general note 3) shown hatched.
excavated area
Backfill of original (See general note 3) shown hatched.
excavated area
Backfill of original cover
6" min.
3' 3'WE
1V:
1H pr efe rre d
Sl.
1V:
4H or st ee pe r
6" min.
Sl. var.
1V:
1H p re fe rr ed
Sl . 1
V:
4H o r st ee pe r
Offset distance - Var.
WE
r o a d w a y m in a b o v e p a v e d s h ld r
N o r m e d g e o f
Finish grade
Extg. ground line p a v e d s h ld r
N o r m e d g e o f
SECTION C-C
SECTION B-B
calculations stamped by an engineer.
6. Barrier sections, connections and appurtenances that retain backslope require stability design
5. Surfacing details same as adjacent shldr.
4. See Std. Dwgs. RD500, RD510 and RD516 for details not shown.
3. Provide drainage as required.
with no funneling effect to the back of the obstruction.
2. If the slope is flatter than 1V:1H ensure that there is a clear recovery area behind the barrier, of new slope steeper than a slope of 1V:2H.
1. Normal use assumes an existing established slope. This detail is not intended for construction
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
paved shldr.
Edge of widened
(See Std. Dwg. RD510)
Mound terminal section
12'-6"
Concrete Barrier Segment
The selection and use of this
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
SDR DATE
21-JUN-2019N/A
Boulder Stockpile Photos Wilsonville Yard
Boulder Stockpile Photos Wilsonville Yard
File details come from the government source that posted it. Updated .