Attachment A - Special Provisions~10.pdf
PDF 14 MB Posted
- Attached to
- US30 MP 1. 97 Pavement Repair
- Solicitation number
- S-73000-00003126
- Issued by
- Multnomah County, Oregon
About this file
Attachment A - Special Provisions is a document related to the US30 MP 1.97 Pavement Repair contract opportunity involving Multnomah County and the City of Portland, Oregon. The document provides an overview of the requested services, including pavement repair along a section of US Route 30 within the specified jurisdictions. The contract requires a responsive and comprehensive approach to completing the necessary work. Key details include response deadlines, required site visits, and the term of the awarded contract.
The pricing terms, funding sources, and any set-aside requirements are not explicitly stated in the provided information. However, the document indicates that this is a state and local government contract opportunity, which may involve specific procurement guidelines and preferences relevant to the agencies and jurisdictions involved.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3126_Invitation to Bid~2.docx | DOCX document | |
| 3127 preliminary BID_TAB.xlsx | XLSX spreadsheet | |
| 00003126 preliminary BID_TAB.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2" & 5" GRIND AND INLAY, DEEP BASE REPAIR
US30 MP 1.97 PAVEMENT REPAIR
SPECIAL PROVISIONS 2
DESCRIPTION OF WORK
LOWER COLUMBIA RIVER HIGHWAY
MULTNOMAH COUNTY
Scope- Contract requires Contractor furnish, place and compact 11-inches of Level 4, ½” Dense ACP Mixture, cold plane pavement removal at 2-inches and 5-inches, 18-inches of aggregate base, 24-inch subgrade stabilization, provide and apply tack coat, and traffic control. Comply with the 2021 Oregon Standard Specifications for Construction.
Location of Work—this work will be on Lower Columbia River Highway (US30) in the location as described below.
MP Length Width
1.79 50 feet 105 feet
Above identified areas will be marked with white lines by the Pre-Construction Meeting.
COMPLETION TIME LIMIT
Complete all Work to be done under the Contract not later than September 30, 2022. Work can begin upon notice to proceed. Substantially complete all Work to be done under the Contract not later than October 15, 2022. Substantial completion is considered to be top lift of asphalt pavement and temporary pavement markings in place.
APPLICABLE SPECFICATIONS
The 2021 Oregon Standard Specifications for Construction (“Standard Specifications”) include detailed technical specifications in Sections 00200 and beyond that apply to this ITB and any resulting Contract. Some sections of the technical specifications may be identified and modified in the Plans and Special Provisions. Sections of the technical specifications not identified in the Plans and Special Provisions remain applicable to the Contract according to their original terms.
Sections in Part 00100 of the Standard Specifications (General Conditions) are not applicable to the Contract unless they are specifically identified in the Plans and Special Provisions as being applicable. However, if a Part 00100 section that has been identified as being applicable references another section in Part 00100, or a technical specification (Parts 00200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Bidders can access the Standard Specifications online at:
SPECIAL PROVISIONS 3
http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx
All number references in these Special Provisions shall be understood to refer to the Sections and subsections of the Standard Specifications bearing like numbers and to Sections and subsections contained in these Special Provisions in their entirety.
CLASS OF PROJECT
This is a State Project.
SPECIAL PROVISIONS 4
TABLE OF CONTENTS FOR SPECIAL PROVISIONS
SECTION 00210 - MOBILIZATION
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC
CONTROL
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES
SECTION 00225 - TEMPORARY PAVEMENT MARKINGS
SECTION 00228 - TEMPORARY PEDESTRIAN AND BICYCLIST ROUTING
SECTION 00280 – EROSION AND SEDIMENT CONTROL
SECTION 00290 - ENVIRONMENTAL PROTECTION
SECTION 00294 - CONTAMINATED MEDIA ........................ Error! Bookmark not defined.
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
SECTION 00331 - SUBGRADE STABILIZATION
SECTION 00490 - WORK ON EXISTING SEWERS AND STRUCTURES
SECTION 00620 - COLD PLANE PAVEMENT REMOVAL
SECTION 00640 - AGGREGATE BASE AND SHOULDERS
SECTION 00730 - EMULSIFIED ASPHALT TACK COAT
SECTION 00744 - ASPHALT CONCRETE PAVEMENT
SUPPLEMENTAL SPECIAL PROVISIONS
REGION 1 MAINTENANCE: GUIDELINE FOR PAVEMENT RESTORATION OR
DEFECTIVE WORK
VICINITY MAP – NORTH PORTLAND SAVIER YARD
PLAN
STANDARD DRAWINGS
CMPP_FINAL JUNE112009
SPECIAL PROVISIONS 5
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00220 - ACCOMMODATIONS FOR PUBLIC TRAFFIC
Comply with Section 00220 of the Standard Specifications modified as follows:
00220.02(a) General Requirements - Add the following bullet to the end of the bullet list:
• When performing trench excavation or other excavation across or adjacent to a Traffic Lane on a roadway having a pre-construction posted speed greater than 35 mph, backfill the excavation, install surfacing, and open the roadway to traffic by the end of each work shift. Install a "BUMP" (W8-1-48) sign approximately 100 feet before the backfilled area and a "ROUGH ROAD" (W8-8-48) sign approximately 500 feet ahead of the "BUMP" sign. If this requirement is not met, maintain all necessary lane or shoulder closures and provide additional TCM, including flagging, at no additional cost to the Agency. Do not use temporary steel plating to reopen the roadway.
• When paving operations create an abrupt edge, protect traffic by installing a "DO NOT PASS" (R4-1) sign before the Work Area at sign spacing "A" from the TCD Spacing Table" shown on the Standard Drawings. Alternate "ABRUPT EDGE" (CW21-7) signs with appropriate (CW21-8) rider and "DO NOT PASS" (R4-1) signs at 1/2 mile spacings. Install a "BUMP" (W8-1) sign 100 feet prior to the transverse paving edge.
00220.40(e-1) Closed Lanes - Replace this subsection, except for the subsection number and title, with the following:
One or more Traffic Lanes may be closed on the Lower Columbia River Highway (US30) when allowed, shown, or directed during the following periods of time except as indicated in 00220.40(e-2):
Single Lane Closures – One Traffic Lane in each direction on Lower Columbia River Highway (US30) may be closed during the following times:
• Nightly, between 9:00 p.m. and 5:00 a.m.
Two-lane Closures – Two Traffic Lanes on Lower Columbia River Highway (US30) may be closed during the following times:
• Nightly, between 9:00 p.m. and 5:00 a.m.
00220.60(A)(1) Contractor Responsibility – Add the following to the end of the first bullet list:
SPECIAL PROVISIONS 6
• Keep the surfaces being used by bicycles free of all dirt, mud, gravel and other harmful material. The surface includes bike paths, bike lanes, roadway shoulders or the outside 6 feet of the roadway. Roadways shall be free of barricades or other objects and all lanes opened to traffic during all the non-restrictive timeframes.
SECTION 00221 - COMMON PROVISIONS FOR WORK ZONE TRAFFIC CONTROL
Comply with Section 00221 of the Standard Specifications modified as follows:
00221.03 Traffic Safety and Operations - Replace the bullet that begins “When paving operations create…” with the following bullet:
• When paving operations create an abrupt or sloped edge drop off greater than 1 inch, protect traffic by installing signing according to the "2 Lane, 2 Way Roadway Overlay Area" detail shown on the Standard Drawings. Protect longitudinal and transverse Pavement joints by placing and maintaining an asphalt concrete wedge according to 00221.07(c)(1).
00221.07(c)(1) Paving - Replace this subsection, except subsection number and title, with the following:
When the longitudinal joint is greater than 1 inch in height, install additional TCD according to 00221.03. Complete the placing of ACP and construction of paving joints according to 00735.48, 00735.49, 00743.45, 00744.44, 00744.45, 00745.47, and 00745.48, as applicable.
00221.90(b) Temporary Protection and Direction of Traffic - Delete the bullet that begins “Moving temporary barrier to and from Contractor’s stockpile areas”.
Replace the bullet that begins "When the Schedule of Items does not include …" with the following bullet:
• Preparing and signing the daily “Traffic Control Inspection Report”, when a TCS is not included in the Schedule of Items or when a TCS is not onsite for a work shift.
00221.06 Traffic Control Plan – Replace this subsection, except for the subsection number and title, with the following:
The Contractor will use a TCP developed by the Contractor and submit Unstamped Working Drawings that include the proposed TCP showing all TCM and quantities of TCD, and the following:
A temporary pedestrian accessible route plan that includes:
o Details and features used to provide pedestrian accessibility.
o Pedestrian staging Plans at a scale no smaller than 1 inch = 50 feet.
o Temporary alternate facilities or detour routes for pedestrian traffic.
Staging sequences and details for Work affecting vehicular, pedestrian, and bicycle traffic.
Proposed order and duration of the TCM.
A detailed temporary striping plan if the existing striping is affected.
SPECIAL PROVISIONS 7
00221.88 Measurement, Method “B” – Under this method, no measurement of quantities will be made.
00221.98 Payment, Method “B” – Lump Sum Basis – Work zone traffic control will be paid for at the Contract Lump Sum amount for the item “Temporary Work Zone Traffic Control, Complete”.
Payment will be payment in full for furnishing, installing, moving, operating, maintaining, inspecting and removing Materials and TCD, and for furnishing all Equipment, labor and Incidentals necessary to complete the Work as specified.
SECTION 00222 – TEMPORARY TRAFFIC CONTROL SIGNS
Comply with Section 00222 of the Standard Specifications modified as follows:
00222.40(e) Temporary Sign Placement - Add the following to the end of the bullet list:
• Place a “WAIT FOR FLAGGER” (CR4-23) sign approximately 50 feet in advance of each flagger station, facing incoming pedestrian traffic. Install the sign on a conical marker or other temporary sign support, as shown or as directed. Do not allow the sign installation height or location to block the visibility of the flagger for incoming public traffic.
• For paving operations on non-freeways, place “ABRUPT EDGE” (CW21-9) and “ROAD WORK XX MPH” (CW20-1a) signs as shown. Use an “XX” value equal to 10 mph below the current posted regulatory speed. If a speed is posted for a temporary regulatory speed reduction, that speed is the current posted regulatory speed.
• For all other moving operations that do not create an abrupt edge adjacent to traffic, omit the “ABRUPT EDGE” signs.
• When construction requires bicycles to use the Traffic Lanes, install a "Bicycle ON
ROADWAY" (CW11 1) symbol sign on 1/2 mile spacing through the affected area. Keep the signs in place until completion of the Shoulder or bikeway final surface.
• Install a 72 by 24-inch "CONSTRUCTION VEHICLE DO NOT FOLLOW" (CW23-14) sign on rigid substrate on the back of all material or Equipment delivery vehicles.
• At least seven Calendar Days before the Cornelius Pass Highway closure, place one or more PCMS displaying the following message as shown, or as directed:
Panel 1 Panel 2
(Name/# of highway) LANE CLOSURE (Location) (Time Frame) LANE CLOSURE (Time Frame)
SPECIAL PROVISIONS 8
00222.80 Measurement - Replace this subsection, except for the subsection number and title, with the following:
No extra measurement will be made for this work.
SECTION 00223 - WORK ZONE TRAFFIC CONTROL LABOR AND VEHICLES
Comply with Section 00223 of the Standard Specifications modified as follows:
00223.31(b) Traffic Control Inspection Without TCS - Replace the paragraph that begins “When the Schedule of Items does not include an item…” with the following paragraph:
When the Schedule of Items does not include an item for a TCS, or when TCS is not onsite for a work shift, designate a trained person who shall be on the Project Site during work hours and on call at all other times, and who:
Replace the bullet that begins “Prepares and signs a daily “Traffic Control Inspection Report”…” with the following bullet:
• Prepares and signs a “Traffic Control Inspection Report” (Form No. 734-2474) upon the initial installation of TCM and each working day when any modification, removal, or reinstallation of TCM are made, or as directed by the Engineer. Submit completed reports to the Engineer no later than the end of the next working day.
SECTION 00224 - TEMPORARY TRAFFIC CHANNELIZING DEVICES
Comply with Section 00224 of the Standard Specifications modified as follows:
00224.46 Pavement Edge Delineation - Replace the paragraph that begins “Place tubular or conical markers…” with the following paragraph:
Place tubular or conical markers to delineate the edge of Pavement immediately after construction Work or paving operations create an abrupt or sloped edge drop-off greater than 1 inch in height along the right hand or left hand Shoulder.
SECTION 00225 - TEMPORARY PAVEMENT MARKINGS
Comply with Section 00225 of the Standard Specifications.
SPECIAL PROVISIONS 9
SECTION 00228 - TEMPORARY PEDESTRIAN AND BICYCLIST ROUTING
Comply with Section 00228 of the Standard Specifications modified as follows:
00228.00 Scope - Replace this subsection, except subsection number and title, with the following:
In addition to the requirements of Section 00221, this Work consists of furnishing, installing, operating, maintaining, inspecting, and removing temporary devices for accommodating pedestrians and bicyclists through a work zone.
00228.80(a) Length Basis - Replace this subsection, except for the subsection number and
SECTION 00280 – EROSION AND SEDIMENT CONTROL
Comply with Section 00280 of the Standard Specifications modified as follows:
00280.06 Erosion and Sediment Control Manager - Delete this subsection.
00280.62 Inspection and Monitoring - Replace this subsection, except for the subsection number and title, with the following:
Inspect the Project Site and all ESC devices for potential erosion or sediment movement on a weekly basis and when 1/2 inch or more of rainfall occurs within a 24-hour period, including weekends and holidays.
If a significant noncompliance or serious water quality issue occurs that could endanger health or the environment, verbally report it to the Engineer within 24 hours.
00280.80 Measurement - Replace this subsection, except for the subsection number and title, with the following:
No extra measurement will be made for this work.
00280.90 Payment – Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for erosion and sediment control.
SECTION 00290 - ENVIRONMENTAL PROTECTION
Comply with Section 00290 of the Standard Specifications modified as follows:
SPECIAL PROVISIONS 10
00290.90 Payment – Replace this subsection, except for the subsection number and title, No separate or additional payment will be made for environmental protection.
SECTION 00294 - CONTAMINATED MEDIA
Section 00294, which is not a Standard Specification, is included in this Project by Special Provision.
Description
00294.00 Scope - In addition to the requirements of Section 00290 and the Specifications, this Work consists of the following:
• Excavate, segregate, stockpile, transport, and dispose of Contaminated Soils, as defined by 00294.01, from the following locations:
Contaminated Soil Location Table 00294-1 From
Location/Station to Location/Station
Depth below grade
(feet)
Approximate Quantity (cy)
Known Contaminants
Subgrade soil 1-5 136 Arsenic, oil, PCBs
Approximate Total Quantity 136 cy
Quantity to be reused on Project 0 cy
Quantity to be disposed at landfill 204 tons
• In areas where excavation is not required, leave contaminated Material and clearing and grubbing Material in place.
• Prepare a Health and Safety Plan (HASP) for work within the contaminated areas of the Project.
The June 2009 City of Portland report, titled Contaminated Media Management Plan for the Balch Consolidation Conduit Shafts and Pipeline Project documenting the contaminated media identified near the Project, is available from the Engineer.
SPECIAL PROVISIONS 11
00294.01 Definitions:
Contaminated Soil - Soil that does not meet the DEQ definition of "Clean Fill", as defined by OAR 340-093-0030(18). This Contaminated Soil is a regulated waste, subject to OAR 340-093-0005 through OAR 340-093-0290. If the grubbing Material has been determined to be contaminated, it will be considered and treated as Contaminated Soil for the purposes of this Section.
Shoulder Soil - Soil outside of the existing Highway Pavement and within Highway Right-of- Way generated during Highway maintenance or construction activities. This definition applies to excess Soil generated to a maximum depth of 1.5 feet below ground surface. This definition does not apply to Soil that is covered by existing impervious surfaces, including but not limited to curbs, sidewalks and parking lots constructed of asphalt or concrete.
ODOT Beneficial Use Determination (ODOT BUD) - The statewide ODOT Beneficial Use Determination (ODOT BUD), approved by DEQ (No. BUD-20181204), outlines a series of pre-approved non-residential reuse options for excess Soil Materials that do not meet DEQ’s Clean Fill Standards in some circumstances. These options may vary based on project scope and location, and documentation may vary, as directed by the Engineer.
00294.02 Testing of Contaminated Soil - When additional testing of Contaminated Soil or groundwater is required to characterize the Material for reuse, recycle, or disposal, conduct the tests according to 00290.20(c).
Use analytical methods meeting DEQ's Clean Fill Guidance Screening Levels for each analyte. Contaminated Soil sampling must be conducted by an Oregon Registered Geologist or Professional Engineer who has experience characterizing contaminated media.
Collect 1 composite Soil sample and submit for the following required testing within 5 business days from the completion of excavation:
• TPH-Gx and TPH-Dx by Northwest methods.
• Total arsenic, cadmium, chromium and lead by EPA 6000 and 7000 series.
• One TCLP lead by using EPA Method 1311.
• PCBs by EPA Method 8082.
00294.03 Submittals - Submit the following documents:
• A site specific HASP at least 10 Calendar Days before the pre-construction conference.
Submit all modifications to the HASP that are requested by the Engineer or the qualified health and safety professional within 7 Calendar Days of the request.
Submit the following documents within 48 hours of removal of contaminated media:
SPECIAL PROVISIONS 12
• Permits, permit applications, and documentation of compliance.
• All reuse, recycled, and disposal receipts.
• Final quantities of Soil reused, recycled, and disposed and their final location.
• All analytical test results.
Labor
00294.30 Personnel Qualifications - Provide employees meeting the following requirements:
• An Oregon Registered Geologist or Professional Engineer who has experience sampling and characterizing contaminated media.
Construction
00294.40 Contaminated Soil Excavation - Excavate and handle Contaminated Soil from Project excavations according to the following:
• Notify the Engineer 3 Calendar Days before beginning excavation activities within contaminated areas.
• Allow the Agency to collect Soil samples during excavation activities.
• Load Contaminated Soil directly into trucks and transport directly to the recycling or disposal facility, or on-site reuse areas or, when approved by the Engineer, temporarily store Contaminated Soil at the North Portland Savier Yard as shown on the Vicinity Map available from the Engineer..
• Store Contaminated Soil from subgrade excavation in covered water tight containers or place Contaminated Soil on minimum 6 mil thick polyethylene sheeting that has an impermeable berm around the edge. Cover the Contaminated Soil with minimum 6 mil thick polyethylene sheeting. Do not allow precipitation run-off to enter the excavated Contaminated Soil. Label all stored Material with the type of Material, the contaminants, and the dates of accumulation.
• Remove contaminated media from the exterior of all vehicles before they leave the Project Site
• Cover trucks transporting contaminated Materials to prevent spillage during transit to the disposal facility according to OAR 340-093-0220.
• Where over excavation is required, backfill the excavation according to 00330.42.
00294.41 Contaminated Soil Management - Reuse, recycle, or dispose of Contaminated Soil according to any of the following:
(a) Landfill Disposal:
SPECIAL PROVISIONS 13
• Obtain the Engineer's approval of the disposal facility before disposing of the Contaminated Soil.
• Transport the Contaminated Soil to a DEQ permitted municipal solid waste landfill or a permitted construction and demolition landfill for disposal. Dispose of temporarily stored Contaminated Soils within 7 Days of receipt of laboratory results.
• Complete and sign all manifests and bill-of-lading forms for handling, loading, transporting, and disposing of the Contaminated Soil.
• Pay all filing and permit fees.
Measurement
00294.80 Measurement - Work performed under this Section will be measured according to the following:
No measurement of quantities will be made for the following:
• HASP.
• Segregate and stockpile Contaminated Soil.
Soil sample and analytical testing will be measured on the unit basis for each sample submitted and tested according to 00294.02 when test results are submitted according to 00294.03.
The quantities of Contaminated Soil disposed will be measured on the weight basis, based on weigh tickets from the recycling or disposal facility.
Clearing and grubbing will be measured according to 00320.80.
Payment
00294.90 Payment - The accepted quantities of Work performed under this Section will be paid for at the Contract unit price, per unit of measurement, for the following items:
Pay Item Unit of Measurement
(a) Health and Safety Plan ............................................. Lump Sum
(c) Segregate and Stockpile Contaminated Soil ............ Lump Sum
(d) Soil Sample Collection and Analytical Testing ............... Each
(e) Contaminated Soil Disposal ............................................ Ton
Item (c) includes segregating, handling, and stockpiling Contaminated Soil within the Project Site or at the North Portland Savier Yard for the purpose of analytical testing, on-site reuse, or disposal.
SPECIAL PROVISIONS 14
Item (d) includes mobilization, Soil sampling, testing, analyses, and preparation of reports for tests required in 00294.02. Additional testing beyond that listed in 00294.02 will only be paid if authorized by the Engineer.
Item (e) includes all costs involved with the disposal of Contaminated Soil at a recycling or disposal facility.
No separate or additional payment will be made for the excavation or reuse of Contaminated Soil or contaminated Shoulder Soil. Payment will be included in payment made for the appropriate items under which the excavation or reuse of Contaminated Soils or contaminated Shoulder Soil is required.
Clearing and grubbing will be paid for according to 00320.90.
Payment will be payment in full for removing and disposing of all Materials, and for furnishing all Equipment, labor, Plans, test results, and Incidentals necessary to complete the Work as specified.
SECTION 00310 - REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Comply with Section 00310 of the Standard Specifications modified as follows:
00310.90 Payment - Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for removal or disposal Work included in Section 00330 according to 00310.02.
SECTION 00331 - SUBGRADE STABILIZATION
Comply with Section 00331 of the Standard Specifications.
SECTION 00490 - WORK ON EXISTING SEWERS AND STRUCTURES
Comply with Section 00490 of the Standard Specifications modified as follows:
00490.46 Adjusting Manholes: Add the following to the end of the subsection:
Follow Method ‘C”, “Circular Cut” for manhole adjustments per Standard Drawing RD 360.
00490.80 Measurement - Replace this subsection, except for the subsection number and
SPECIAL PROVISIONS 15
00490.90 Payment - Replace this subsection, except for the subsection number and title, No separate or additional payment will be made for work on existing sewers and structures.
SECTION 00620 - COLD PLANE PAVEMENT REMOVAL
Comply with Section 00620 of the Standard Specifications modified as follows:
00620.40(e) Warning Signs - Replace this subsection, except for the subsection number and title, with the following:
Provide warning signs as required where abrupt or sloped drop-offs occur at the edge of the existing or new surface according to Sections 00221 and 00222.
00620.43 Maintenance Under Traffic - Replace this subsection, except for the subsection number and title, with the following:
Traffic is not allowed on the cold planed surface. Before opening the area to traffic, pave the surface according to 00744.51.
SECTION 00640 - AGGREGATE BASE AND SHOULDERS
Comply with Section 00640 of the Standard Specifications.
SECTION 00730 - EMULSIFIED ASPHALT TACK COAT
Comply with Section 00730 of the Standard Specifications modified as follows:
00730.11 Emulsified Asphalt - In the paragraph that begins "Obtain samples according to AASHTO T 40…" replace the words “AASHTO T 40” with the words “AASHTO R 66”.
00730.90 Payment - Replace this subsection, except for the subsection number and title, with the following:
No separate or additional payment will be made for Emulsified Asphalt tack coat.
Approximately 0.40 Tons of Emulsified Asphalt in tack coat will be required on this Project.
SPECIAL PROVISIONS 16
SECTION 00744 - ASPHALT CONCRETE PAVEMENT
Comply with Section 00744 of the Standard Specifications modified as follows:
00744.11(a) Asphalt Cement - Add the following to the end of this subsection:
Provide Level 4, PG 70-22ER grade asphalt cement for this Project.
Add the following subsection:
00744.51 Opening Sections to Traffic - Schedule work so that, during the same shift, the surfaces being paved are paved full width and length through the wearing Course before opening to traffic.
SPECIAL PROVISIONS 17
SUPPLEMENTAL SPECIAL PROVISIONS
1. The quantities in the bid item list are intended to serve only as a guide to bidders, and are not to be construed as a guarantee. All quantities are estimated, and are for bid purposes only. The quantity for each bid item includes all labor, equipment and materials for all activities associated with this project. The Oregon Department of Transportation (ODOT) reserves the right to adjust quantities and add or delete, as needed.
2. Contractor will be responsible for traffic control measures for all closures, based on approved traffic control plan (TCP). Submit TCP twenty-eight (28) days prior to pre-construction meeting to allow for review and approval.
3. The total number of PCMS required for the project will be determined by the Contractor’s TCP. Contractor must include the messages to be displayed on their TCP.
4. Contractor shall provide a schedule to the Project Manager twenty-eight (28) days prior to the pre-construction meeting to allow for review.
5. Contractor shall schedule a pre-construction meeting with the Project Manager seven (7) days prior to the proposed start of construction.
6. Any illegal camp cleanup required prior to the start of work will be coordinated by ODOT.
The Contractor shall notify the Project Manager 10 working days before the scheduled start date to allow for the cleanup to be posted and completed. Contractor to account for this time in their schedule. Contractor shall occupy the site and begin work immediately following the camp cleanup. If there is evidence that additional cleanups will be required based on camper presence or personal property found at the site, notify the Project Manager so it can be scheduled. Contractor may not move or remove any personal property from the site. No monetary compensation will be considered for any camp cleanup delay.
7. Any illegal camp cleanup required after the start of work will be coordinated by ODOT.
The Contractor shall notify the Project Manager to allow for the cleanup to be posted and completed. Contractor shall occupy the site and continue work immediately following the camp cleanup. If there is evidence that additional cleanups will be required based on camper presence or personal property found at the site, notify the Project Manager so it can be scheduled. Contractor may not move or remove any personal property from the site. Any time delay caused by campers occupying the site after the start of work, when they had not been present prior to the start of work, will be added to the end of the contract. No monetary compensation will be considered for any camp cleanup delay.
8. The contractor will be responsible to submit a highway restriction notice for mobility in order to perform the work. Because this is a system to system ramp closure the mobility notice is required to be submitted 28 days prior to the start of work. Work will be allowed to begin no sooner than 28 days after the approval of the submitted restriction notice. The notice can be found at:
https://www.oregontruckingonline.com/cf/MCAD/pubmetaentry/restriction/index.cfm.
a. Agency (ODOT) Project Manager:
SPECIAL PROVISIONS 18
Stacy Stubblefield 971-673-1343 Stacy.Stubblefield@odot.oregon.gov
b. Alternate (ODOT) Project Manager:
Shawn Sterken 971-673-6105 Shawn.STERKEN@odot.oregon.gov
c. Region Mobility Coordinator:
Region 1
9. Contractor shall provide a recently approved ODOT asphalt mix design for Level 4, Grade PG70-22ER, ½-inch dense, ACP seven (7) days prior to the pre-construction meeting for review.
10. Contractor shall provide weigh slips for each load of ACP material placed in performance of Work under the Contract. Contractor to collect all weigh slips during the shift and give the group of them to the inspector at the end of the shift.
11. Changes to the scope and/or limits of work are to be requested in writing to the Owners Authorized Representative. The Owners Authorized Representative will respond in writing with approval or denial of the change(s). ADA ramp upgrades that are triggered due to unauthorized changes to the scope and/or limits of work are the Contractors responsibility to remedy. Contractor, or their designated representative, will design and construct the ADA ramp upgrades per ODOT standards at no expense to the Agency. ADA ramp upgrades must follow the triggering activity in a timely manner.
12. Furnish a 12 foot straight edge. Test with a 12 foot straight edge parallel to and perpendicular to the centerline and at joints, as directed. The pavement surface shall not vary by more than ¼ inch. District 2B Manager will determine which corrective action from Section 00744.75 of the 2021 Oregon Standard Specifications for Construction for pavement roughness is acceptable for the project.
13. All new transverse joint pavement edges shall be sand sealed. This work will be considered incidental to the bid item “Level 4, ½-inch dense, ACP”.
14. Contractor shall be responsible to provide quality control and quality assurance for the project. The Contractor shall meet the compaction requirement listed in Section 00744.49 of a minimum of 91% of MAMD. The Project Manager reserves the right to take and re-test material samples, and based upon such test results, to reject any material not meeting the referenced Specifications. It is agreed and understood that the Contractor shall replace all rejected material with material meeting the Specifications at no additional cost to the State.
15. North Portland Savier Yard temporary contaminated material stockpile location requirements in conjunction with Spec 294:
a. Initial walkthrough of the Savier Yard will be completed at the Pre-Construction Meeting. The walkthrough will document the current condition of the site through photos. The area available for use by the Contractor will be determined.
SPECIAL PROVISIONS 19
b. Contractor will remove any debris generated at the temporary stockpile location.
c. Contractor will properly cone and barricade any material stockpiled at this location.
d. Contracotr is responsible for the security of their items within the site. ODOT is not responsible or liable for any damage to the material and equipment stored.
e. Damage to the Site caused by Contractor will be repaired at no expense to Agency and to the satisfaction of the Owner’s Authorized Representative. This includes but is not limited to ruts created in the ground. Repairs to be completed within seven (7) days from the date of damage. Contractor to notify Owner’s Authorized Representative of any damage caused, the proposed repair method and materials, and a schedule for repair. Owner’s Authorized Representative to provide acceptance of repair method and materials or an alternative.
f. Contractor to comply with OSHA, State and Federal Rules and Regulations applicable to any hazardous materials stored on Site.
g. Contractor will remove all items and restore the Site to the existing conditions within fifteen (15) days of completing the contract work. If WSP fails to remove or restore within the time requested, ODOT may perform the work at Contractor’s expense.
16. Defective pavement will be repaired, at no additional cost to the State, according to the Region 1 Maintenance: Guideline for Pavement Restoration or Defective Work.
17. Contractor’s employees and their subcontractors may not wear clothing, hats, vests, etc. that have the ODOT name or “flying T” symbol.
18. There is public interest in the work. Contractor is advised to use courtesy and respect in any work site interaction with the public and to refer all public relations matters to the ODOT Project Manager.
19. Contractor shall implement safety policies, procedures and practices in conformance with all applicable local, state and federal laws, rules and regulations including but not limited to:
a. Applicable OSHA safety regulations
b. ANSI Z 133.1 Safety standards agreed upon by ODOT and local jurisdiction
c. The Manual of Uniform Traffic Control Devices (MUTCD)
d. Any other applicable safety laws, regulations and codes.
20. All equipment utilized during this contract shall be in good and serviceable condition.
21. In addition to the notifications required under the standard specifications and special provisions, contractor will also:
A. At least 72 hours prior to executing lane and/or complete roadway closures on US30 notify:
SPECIAL PROVISIONS 20
i. The ODOT Project Manager: 971-673-1343
ii. Portland Bureau of Transportation Dispatch Center: 503-823-3333
B. At the time of lane and/or complete roadway closures and again when the lane and/or complete roadway is opened on US30 notify:
i. ODOT Traffic Management Operations Center (TMOC): 503-283-
22. Correspondence for the project is required to have the project name in the subject line.
23. The invoices, certified payrolls (if applicable) and project submittals are to be submitted via email to the Agency Authorized Representative.
Stacy Stubblefield: Stacy.stubblefield@odot.state.or.us
24. Invoices must have the following certified statement on them along with a signature by the Contractor’s Authorized Representative.
“I the undersigned, hereby certify that the above bill is true and correct and that payment has not been received. Signature: _______________________”
25. Invoices are to have the contract number and service period listed on them and the following billing address:
ODOT District 2B 9200 SE Lawnfield Rd Clackamas OR 97015
Updated 11/9/2020
Region 1 Maintenance Guidelines for Pavement Restoration or Defective Work
This guideline applies anytime the asphalt saw cut does not fall at a lane line, striping is removed and not replaced in the same location or when defective paving has to be replaced.
Base Objective: Motorist cannot feel the repaired pavement. Prolong the working life of the asphalt pavement and reduce future maintenance costs.
Repair Guidelines:
1. Pavement condition new or like new (1‐3 years old): Complete a 2” grind and inlay with the same Level of ACP required in the contract (Level 3 minimum) for an area that covers the entire lane width of every lane affected by 100 foot long. The length to be centered on the defective/saw cut area if the defective area is small. If the area is larger than 100 feet then complete a 2” grind and inlay with the same Level of ACP required in the contract for an area that covers the entire lane width of every lane affected by the entire length of the defective/saw cut area.
2. Pavement condition anything less than new (3 years or older): Complete a 2” grind and inlay with the same Level of ACP required in the contract (Level 3 minimum) for an area that covers the entire lane width of every lane affected by 50 foot long. The length to be centered on the defective/saw cut area if the defective area is small. If the area is larger than 50 feet then complete a 2” grind and inlay with the same Level of ACP required in the contract for an area that covers the entire lane width of every lane affected by the entire length of the defective area.
3. When there are several smaller areas that are within a short distance of each other complete one continuous repair.
4. The District Manager or their designated representative will determine the limits of the repair based on these guidelines.
hwym17i Text Box US 30 MP 1.97 Pavement Repair hwym17i Polygonal Line hwym17i Text Box 50' hwym17i Text Box 105' hwym17i Line hwym17i Line hwym17i Line hwym17i Text Box
NORTH
NTS
hwym17i Text Box A hwym17i
A
US 30 MP 1.97 Pavement Repair North Portland Savier Yard Vicinity Map hwym17i Line hwym17i
North Porltand Savier Yard
10' hwym17i Typewritten Text = 50 ' hwym17i Text Box 2" of Level 4, 1/2" Dense ACP Wearing Course hwym17i Text Box 6 " of Level 4, 1/2" Dense ACP Base Course in two equal lifts hwym17i Text Box 3" of Level 4, 1/2" Dense ACP Base Course hwym17i Text Box US 30 MP 1.97 Pavement Repair hwym17i Typewritten Text Repair Section A-A
Effective Date: December 1, 2021 - May 31, 2022
The selection and use of this
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
SDR DATE
r d .d g n
J U
L
R D
RD360
MANHOLE FRAME ADJUSTMENT
wearing course
Asph. conc.
base course
Asph. conc.
(Or others listed in ODOT's QPL) as reqd.
Conc. manhole adjustment rings
(See general note 10)
Mortar 2" max.
See Alternate "A"
Raise as dir.
& frame
Manhole cover
C u t li n e
C u t li n e
Finish grade or hoop
#4 bar
" min. (Typ.)2
(Typ.)
3" min.
Thkn. - 2" min.
Asph. conc.
12" min.
Thkn. - 2" min.
Asph. conc.
12" min.
(Min. 12" thkn.)
P.C. concrete
Backfill with early strength
(Min. 12" thkn.)
P.C. concrete
Backfill with early strength
(Or others listed in ODOT's QPL) as reqd.
Conc. manhole adjustment rings
Raise as dir.
See Alternate "A"
(See general note 10)
Mortar 2" max.
or hoop
#4 bar
" min. (Typ.)2
(Typ.)
3" min.
12" min. 12" min.
Finish grade wearing course
Asph. conc.
base course
Asph. conc.
C u t li n e
C u t li n e
& frame
Manhole cover wearing course
Asph. conc.
base course
Asph. conc.
(Min. 12" thkn.)
P.C. concrete
Backfill with early strength
(Or others listed in ODOT's QPL) as reqd.
Conc. manhole adjustment rings
C u t li n e
C u t li n e
12" min. 12" min.
Finish grade & frame
Manhole cover
Raise as dir.
See Alternate "A"
(See general note 10)
Mortar 2" max.
(Typ.)
3" min.
" min. (Typ.)2 or hoop
#4 bar
- 2 each
#4 bar Cut line frame
Manhole cover & frame
Manhole cover &
Cut line
- 2 each
#4 hoop o f t r a v e l
D ir e c ti o n
12" min.
m in
(T yp
Manhole frame adjusment ring
Conc. manhole
Manhole note 10)
(See general
Mortar 2" max.
12. See Std. Dwg. RD356 for manhole covers and frames.
11. See Std. Dwg. RD336 for tracer wire details.
10. Use epoxy for synthetic grade rings.
9. See appropriate manhole standard drawings for details not shown.
8. See Std. Dwg. RD336 for manhole steps details.
7. Finish joint with asphalt seal and sand.
6. Apply tack coat to edges of existing pavement before installing patch.
5. Protect from traffic loading until conc. has cured to 3000 psi.
concrete.
4. Backfill with early strength Portland Cement Concrete. All concrete shall be commercial grade and leveling mortar, as shown.
3. Raise manhole cover and frame to finish grade by installing conc. manhole adjustment rings
2. Saw cut square or circular excavation around manhole 12" min. from manhole frame.
1. Cover manhole with building paper and const. asph. conc. base course and wearing courses.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
SQUARE CUT
PLAN
CIRCULAR CUT
PLAN
METHOD "A"
METHOD "B"
METHOD "C"
ALTERNATE "A"
21-JUL-2015N/A
Effective Date: December 1, 2021 - May 31, 2022
The selection and use of this
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-gineer.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
SDR DATE
1" in 5'
Feather base course Taper 1" in 5' r d .d
J U
L
R D
RD610
DETAILS
PAVEMENT (ACP)
ASPHALT CONCRETE
AT GRAVEL APPROACHES
METHOD OF FEATHERING ACP PAVEMENT
OR BRIDGE ENDS WHEN NOT OVERLAYING THE BRIDGE
ACP PAVEMENT MATCH AT PROJECT ENDS
METHOD OF MATCHING EXTG. ACP INLAY SURFACING
TABLE 1
METHOD A *
METHOD B *
TAPER LENGTHS
ACP wearing course
(When present)
Feather ACP base course
Extg. pvmt.
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered
See project plans for method.
Taper (See Table 1)
Cold plane pvmt. removal
Taper (See Table 1)
Cold plane pvmt. removal
Posted Speed Taper Length
1" per 50' 45 mph
1" per 100'> 45 mph
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered top ACP base course
Construct non-feathered
(See "EDGE DETAIL")
Top of ACP base, Extg. pvmt.
ACP wearing course
(When present)
Feather ACP base course
Extg. gravel surfacewearing course thkn.
ACP unfeathered
Thkn. - Var. (2" to 0)
Aggr. base
Thkn. - Var. (2" to 0)
(When present)
Asph. conc. base course
(Thkn. as shown on plans)
ACP wearing course
Extg. pvmt.
Thkn. - 2"
(When present)
ACP base course e x tg p v m t.
E d g e o f
See "EDGE DETAIL"
ACP wearing courseExtg. pvmt.
See "EDGE DETAIL"
Extg. A.C. pvmt.
Cold plane pvmt. removal
(Inlay to extg. asphalt conc. pvmt.)
not acceptable
Mill edge as shown
Nom. depth
Sawcut & seal
EDGE DETAIL
25-JUL-2017N/A
panelStyle:construction_warning.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:0panelHeightLock:0marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18 panelStyle:construction_warning.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:0panelHeightLock:0marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18 panelStyle:regulatory.ssipanelName:namepanelQuantity:1panelStation:nonepanelMaterial:0legendMaterial:0panelMounting:0panelWidthLock:1panelHeightLock:1marginAlign:9panelRoundCorners:0panelSizes:constructPanelMode:0constructPanels:36|24|18
Freeway
Use aggregate wedge when abrupt edge is 2 inches or greater.
four feet wide protect longitudinal abrupt edge as shown.
When paved shoulders adjacent to excavations are less than
NOTES:
shoulder, as far as practical.
Place cart / generator / power supply off of the on 10' spacing.
Use six tubular markers in shoulder taper outside shoulder, where practical.
Install Flagger Station Lighting beyond the
2" or GreaterExtg. pavement aggregate base rock
Shoulder or message sign (PCMS)
Portable changeable
20'
100'
4' B(III)R
Temp. Plastic Drums
Lighting
Flagger Station
50'
10'
Markers
28" Tubular
Place roll-up signs in advance of barricades.
plaques to the sign face using hook and loop fasteners.
If roll-up signs are used, attach the correct (CW21-9) throughout excavation area at spacings shown.
Continue signing and other traffic control devices
"RIGHT" (CW21-8C) riders with "LEFT" (CW21-8A) riders.
8' B(III)R barricades with 8' B(III)L barricades and replace the
If the excavation is located on left side of traffic, replace the abrupt edges of 1 inch or greater.
or other roadway work. Use abrupt edge signing for longitudinal
Abrupt edges may be created by paving, operations, excavations
GENERAL NOTES FOR ALL TCP DRAWINGS:
for max. spacing.
See TCD Spacing Table
Temp. Plastic Drums for max. spacing.
See TCD Spacing Table
28" Tubular Markers
UNDER TRAFFIC
UNDER CONSTRUCTION
TM09-01 01-JUL-2021
EXCAVATION ABRUPT EDGE SIGN (PCMS) INSTALLATION
PORTABLE CHANGEABLE MESSAGE
LIGHTING DELINEATION
FLAGGER STATION
Sl. 1:3
TAPER TYPES & FORMULAS
TEMPORARY BARRIER FLARE RATE TABLE
TAPER FORMULA
Merging (Lane Closure)
Shifting
Shoulder Closure
Flagging (See Drg. TM850)
Downstream (Termination)
"L"
"L"3 1"L"/3 or
50' - 100'
Varies (See Drawings)
"L"2 1"L"/2 or the Speed from the Tables below:
Use Pre-Construction Posted Speed to select
For Lane closures where W < 10', use "L" value for W = 10'.
Limit spacing adjustments to 30% of the "A" dimension for all speeds.
When necessary, sign spacing may be adjusted to fit site conditions.
Place traffic control devices on 10 ft. spacing for intersection and access radii.
NOTES:
SPEED (mph) MINIMUM FLARE RATE
M I N I M U M L E N G T H S T A B L E
"L" VALUE FOR TAPERS (ft) BUFFER "B" (ft)W = Lane or Shoulder Width being closed or shifted
20:1
19:1
18:1
16:1
14:1
12:1
10:1
9:1
8:1
FREEWAYS
SPEED (mph) W = 12 W = 14 W = 16
TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE
20 - 30
35 - 40
45 - 55
60 - 70 700
100 100
15001000 2640
100 20
Device Spacing (ft)
Max. Channelizing Sign Spacing (ft) SPEED (mph)
A B C
CW21-8A
(As noted)
36x18
C W
(Mount on TSS)
(As needed)
42x18
CW21-8C
OR
C
W
Plaques
CW21-9
Abrupt edge
8' B(III)R 8' B(III)R
mi.4 1 mi.4
1 mi.4
EDGE
ABRUPT
RIGHT
LEFT
(Roll-up sign)
(As needed)
EDGE
ABRUPT 32x11
32x11
32x11
CENTER
RIGHT
LEFT
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
PCMS DETAILS
TABLES, ABRUPT EDGE AND
TM800
T M tm .d
JU
L
10≤ W
30≤
W/60, S = Speed, W=WidthS 45: L = WS, Speeds < 45: L = ≥ formula, for Speeds For Shoulder closures where W < 10', use "L" value for W = 10' or calculate "L" using
2 To be accompanied by Dwg. Nos. TM820 & TM821.
Combine drawing details to complete temporary traffic control for each work activity.
Do not locate sign supports in locations designated for bicycle or pedestrian traffic.
High speed highways have a pre-construction posted speed of 45 mph or higher.
Low speed highways have a pre-construction posted speed of 40 mph or less.
All other signs mounted on barrier sign supports shall not exceed 12 sq. ft. in total sign area.
All diamond shaped warning signs mounted on barrier sign supports shall be 36" by 36".
background of all temporary warning signs.
Use flourescent orange sheeting for the
All signs are 48" x 48" unless otherwise shown.
to indicate traffic movements.
Arrows shown in roadway are directional arrows sequential arrow boards.
Place a barricade approx. 20' ahead of all shown are the minimum required.
Signs and other Traffic Control Devices (TCD)
SDR DATE
TYPICAL ABRUPT EDGE DELINEATION
Smart Work Zone Systems
Portable Traffic Signals
Detail as shown is used for trailered and non-crashworthy components of:
barricade may be omitted when PCMS is placed behind a roadside barrier.
Use six drums in shoulder taper on 20' spacing. The drums and
Left shoulder, use Type B(III)L
Right shoulder, use Type B(III)R
Use the appropriate type of barricade panels for PCMS location.
Install PCMS beyond the outside shoulder, when possible.
gineer.
The selection and use of this
Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a
Registered Professional En-
Effective Date: December 1, 2021 – May 31, 2022
4"x 4"x 12'
2 - 2"x 4" @ 45° angle
2"x 6"x 37"
36"
Sandbags per side (typ.)
lag screw
"x 3"8 31 -per side (typ.)
" dia. bolts8 32 -screw per side (typ.)
"x 3" lag 8 31 -per support (typ.)
"x 3" lag screws8 32 -
"x 37"2 1"x 54 sign (typ.)
48"x 48" sign area of 20 sq. ft. or less.
Use Double Post TSS for a total
NOTES:
per support (typ.)
2 - 3/8" dia. bolts per support (typ.)
2 - 3/8" dia. bolts
4 - 2"x 6"
40"
"2 12 - 4"x 4"x 5
NOTES:
2' - 8" Sandbags
2' - 6"
A
"4
" - 12 ga. PSST2
" - 12 ga. x 4" PSST Stub2
PSST Stub
" - 12 ga. x 4" 2 12 A
See DETAIL A
" - 12 ga. PSST4
" - 12 ga. PSST4 sign (typ.)
48"x 48" per support (typ.)
" dia. bolts8 3Two, support (typ.)
joining brace and
" dia. bolt 8
NOTES:
1 - 2"x 4"
1 - 4"x 4"x 4"
2 - 2"x 4"
1 - 4"x 4"x 4"
1- 2"x 4" 40"
Sandbags lag screws
"x 4"8 34 -
4"x 4"x 10'
"x 3" lag screws8 32 -
2"x 4"x35" @ 45° angle
2"x 4"x 6"
"x 3" lag screws8 32 -
"x 4" lag screws8 34 -
" dia. bolts8 31 -
" dia. bolts8 31 -
" dia. bolts8 32 -
" dia. bolts8 31 -sign (typ.)
36"x 36"
" dia. bolts8 32 -
TEMPORARY SIGN SUPPORT GENERAL NOTES:
Sheeting
Retroreflective
Sheeting
Retroreflective
" Sheeting
Retroreflective
(m in and Right sides)
Sheeting (Left
Retroreflective
NOTES:
SIGN POST REFLECTIVE SHEETING PLACEMENT
Sheeting
Retroreflective Sheeting
Retroreflective
N/A 01-JUL-2020
TM821
T M signs. Do not mount signs on Type II or III Barricades.
Use Single Post TSS for mounting "Business Access" (CG20-11)
Use Single Post TSS for a total sign area of 12 sq. ft. or less.
CALC. BOOK NO.
the current Oregon Standard Specifications
All material and workmanship shall be in accordance withNOTE:
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
tm .d
JU
L
TEMPORARY SIGN SUPPORTS
Sheeting may be applied directly to post material; or applied to a rigid, lightweight substrate, then securely attached to the posts.
for wood post TSS's. Use 2" wide sheeting for PSST TSS's.
Apply sign post retroreflectivity to each TSS post facing front; and to the left and right sides of the TSS, as shown. Use 3" wide sheeting and "DO NOT ENTER". For "STOP" and "DO NOT ENTER" signs, used red ANSI Type III or IV retroreflective sheeting on the TSS posts.
Apply fluorescent orange, ANSI Type VIII or IX retroreflective sheeting to TSS posts, as shown, for all temporary signs, except "STOP"
Use A325 Bolts or equivalent.
welding. Repair Galvanizing according to ASTM A780.
designation G90. Remove Galvanizing from steel before
Galvanize steel according to ASTM A653 with coating
All members shall have a minimum yield stress of 50 ksi.
Use PSST TSS's for a total sign area of 16 sq. ft. or less.
Society (AWS) D.1.1.
Weld steel…