Attachment_A_-_SOW_Declaration_House_Scaffolding.pdf
PDF 329 KB Posted
- Attached to
- Rehabilitate The Declaration House - Scaffolding
- Solicitation number
- 140D0425Q0621
About this file
This Statement of Work (SOW) details scaffolding services for the Declaration House (Graff House) at Independence National Historic Park in Philadelphia, Pennsylvania. The National Park Service requires a comprehensive scaffolding installation for masonry restoration work, with specific requirements including: a fully engineered, OSHA-compliant free-standing scaffolding system rated for heavy-duty loading (minimum 75 pounds per square foot), capable of supporting up to twelve workers across multiple levels, and providing full access to the north, east, and south exterior brick masonry walls.
The scaffolding project has a total performance period of 136 calendar days, broken into specific phases: a 19-day pre-installation phase for submittals and permitting, a 5-day installation period, a 90-day base use period, a 5-day dismantling period, and a 14-day closeout period. The contractor must obtain all necessary permits from the City of Philadelphia, provide a covered pedestrian passageway, ensure pedestrian safety, and comply with strict safety and historical preservation requirements. The scaffolding must include fall protection, secure access controls, and be designed by a Pennsylvania-licensed Professional Engineer, with all work conducted in a national park setting that prioritizes preservation of historical and natural features.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
I N D EPEN DENCE NA TI ON AL H IS TORI C S IT E
R EH AB I L I T AT E T H E DE C L A R AT I O N HO U S E-
( G R A F F H O U SE ) S CA F FO L DI N G
P M I S N O . 3 4 9 9 8 9
S TAT EM EN T OF WORK
N ATI ONA L PAR K S ER VI CE
H IS TORI C PRES ER VAT ION T RAI NIN G CEN T ER –
PR OJ ECT MAN AGEM ENT
J U L Y 2 0 2 5
1. BACKGROUND
The Declaration House, also known as the Graff House, is the site where Thomas Jefferson drafted the Declaration of Independence in June 1776. Located at 7th and Market Streets in Philadelphia, the house was owned by Jacob Graff, who rented a second-floor room to Jefferson during the Second Continental Congress. Jefferson composed the document over 17 days before presenting it to the drafting committee. The original Graff House was demolished in 1883. In the 1950s, the National Park Service acquired the site, and a reconstructed version of the Declaration (Graff) House with modern Annex was completed in 1975 as part of the U.S. Bicentennial commemoration. The reconstruction was based on historic descriptions, drawings, and archaeological evidence. The building is part of Independence National Historical Park and is receiving preservation treatment in preparation for the 250th anniversary of American independence.
2. SCOPE OF WORK
A. OVERVIEW
Independently, and not as an agent of the Government, the Contractor shall provide all labor, materials, equipment, and travel necessary to design, erect, assemble, and install compliant scaffolding at the Declaration (Graff) House at Independence National Historical Park in Philadelphia, PA. The scaffold shall be erected to provide full access to the north, east, and south exterior (brick) masonry walls of the reconstructed Graff House and shall remain in place for a period of ninety (90) calendar days. The system shall be designed to support multiple workers, tools, and materials across several working levels, with integrated stair access located within the confines of the perimeter safety rail. The Contractor shall verify all site dimensions prior to erection to ensure the scaffold reaches all required work areas, and all scaffold bases shall be properly footed to distribute loads.
The scaffold must be configured to prevent unauthorized access using secured access points and ground-level barriers. A Pennsylvania licensed Professional Engineer shall seal the scaffold design and structural calculations, and the Contractor shall obtain all required permits and, if applicable, submit the design to the City of Philadelphia Department of Licenses and Inspections for engineering review and approval, in accordance with Section C, Permitting and Coordination.
Scaffolding shall be provided on three elevations of the four and one-half story brick masonry Declaration (Graff) House, which has an approximate building footprint of 16’- 6” by 51’-2” at ground level. Exact building dimensions to be verified by the Contractor in the field.
The Declaration House (Graff House) is located at 7th and Market Streets within a heavily trafficked pedestrian zone of Independence National Historical Park. Where scaffolding encroaches on public sidewalks, the Contractor shall design, permit, and install a covered pedestrian passageway with lighting consistent with City of Philadelphia Department of Licenses and Inspections requirements. No anchoring to the historic structure or adjacent site features shall occur without prior written approval from the National Park Service and the Philadelphia Historical Commission. The Contractor shall coordinate all deliveries, staging, and sidewalk closures with NPS and applicable municipal agencies, while ensuring protection of trees, hardscape, and historic features, and minimizing disruption to visitor access and circulation. The Contractor shall maintain the scaffolding in a safe and serviceable condition for the duration of its use, including securing the system during severe weather and promptly correcting any damage or instability at no additional cost to the Government. Upon written notification by the Government, the Contractor shall safely dismantle the scaffold and fully restore all impacted areas to preconstruction conditions.
B. SCAFFOLD LOADING REQUIREMENTS
1. The Contractor shall furnish and install a fully engineered, OSHA-compliant free-standing scaffolding system rated for heavy-duty loading (minimum 75 pounds per square foot (psf) across all working platforms. The scaffolding shall be designed to safely accommodate the concurrent use of up to twelve (12) workers performing masonry restoration work, inclusive of all required tools, equipment, and construction materials, distributed across multiple working levels. Anchoring to the historic brick structure at the mortar joints will require prior written approval from the National Park Service and the Philadelphia Historical Commission.
2. Each scaffold platform shall:
a. Be rated to support a minimum of 2,100 pounds per typical 7 ft x 4 ft bay.
b. Be configured to allow simultaneous operation by two (2) masons with materials per bay, or equivalent distributed loading.
c. Be fully decked and equipped with all required fall protection, including toe boards, guardrails, and mid-rails, per OSHA 29 CFR 1926 Subpart L.
3. Rooftop bearing of scaffolding on the adjoining annex structure at west side of
Reconstructed House is not authorized.
4. The scaffold system shall be designed to account for the cumulative vertical loading from multiple occupied levels and shall include proper bracing, anchorage, and tie-ins at masonry joints (if approved by CO in writing) per engineering best practices and local building code.
5. The Contractor shall submit scaffold design drawings and structural loading calculations sealed by a Pennsylvania-licensed Professional Engineer. If required by the City of Philadelphia Department of Licenses and Inspections (L&I), the scaffold design shall also be submitted to the city for engineering review and approval. All permitting obligations—including scaffolding, sidewalk encroachment, and any applicable historic preservation clearances—shall be fulfilled in accordance with Section C, Permitting and Coordination, and no onsite work shall begin without valid, approved permits.
C. PERMITTING AND COORDINATION
1. The Contractor shall obtain and maintain all required permits, licenses, approvals, and certificates necessary to lawfully perform the work described herein. All associated permit fees for the duration that the scaffolding is in place are the sole responsibility of the Contractor and are included in the firm-fixed price of this contract. This includes, but is not limited to:
a. Scaffolding permits from the City of Philadelphia
b. Sidewalk closure and right-of-way encroachment permits
c. Engineering approval or design filings if required by city code for scaffolding exceeding specific heights or complexity
d. historic preservation clearances required by the City of Philadelphia or
Philadelphia Historical Commission clearances coordinated through the NPS liaison.
2. The Contractor shall submit copies of all permits and approvals to the National Park Service prior to commencing onsite work. No work may begin without proof of valid and active permitting. Any delays associated with failure to obtain required permits shall be the responsibility of the Contractor and shall not result in a cost or time extension to the government.
3. Delays resulting from the Contractor’s failure to prepare, complete, or submit permit applications and required documentation in a timely and complete manner shall be the sole responsibility of the Contractor and shall not entitle the Contractor to a cost or time extension. However, delays attributable solely to third-party review or approval agencies—despite timely and complete submittals by the Contractor—may be considered for a non-compensable time extension at the discretion of the Contracting Officer.
4. Contractor shall submit scaffolding design for review and approval by a Pennsylvania-licensed Professional Engineer. If required by the City of Philadelphia Department of Licenses & Inspections (L&I), the design shall also be submitted for review and approval by city engineering staff.
5. Even in the absence of excavation, the Contractor shall contact Pennsylvania One Call to request a utility locate for all areas where scaffolding will be placed. The Contractor shall submit utility locate confirmation to the Contracting Officer’s Representative (COR) prior to scaffold erection. If underground vaults, utility covers, or other subsurface structures are identified within the scaffold footprint, the Contractor shall notify the COR and submit a site plan identifying affected areas.
Scaffold placement over such features shall not proceed without review and written concurrence from a Pennsylvania-licensed Professional Engineer. The Engineer shall evaluate potential loading risks and design any required bridging, shoring, or load distribution systems to ensure the structural integrity of subsurface features. The Contractor shall implement the Engineer’s recommendations in full and submit all calculations, stamped drawings, and protection details to the COR prior to erection, at no additional cost to the Government. All protective measures shall be installed in accordance with the Engineer’s design and documented with photographic evidence prior to use.
D. SITE MOBILIZATION AND PREPARATION
1. Conduct a pre-installation site visit with NPS staff to verify dimensions, access constraints, and historical sensitivities.
2. Coordinate work schedule and equipment staging to minimize impact on park operations and visitor access.
3. Implement protection for adjacent surfaces, vegetation, and public walkways.
4. Obtain all necessary permits from the City of Philadelphia for scaffolding installation, sidewalk encroachment, and any right-of-way occupation prior to mobilization. The contractor shall be solely responsible for the application process, associated fees, and adherence to city permit conditions.
E. SCAFFOLDING DELIVERY, INSTALLATION, AND COORDINATION
1. The Contractor shall coordinate all scaffold-related activities—including delivery, unloading, erection, maintenance, and dismantling—with the National Park Service (NPS) and the City of Philadelphia. All materials and equipment shall be street-loaded and unloaded efficiently to avoid blockage of adjacent city streets, sidewalks, or park visitor routes. No laydown or staging area is available.
2. All sidewalk and road closures shall be coordinated in advance with the following agencies:
a. National Park Service: Submit requests for short-term sidewalk closures in writing no fewer than twenty-one (21) calendar days prior to the requested closure date. Direct requests to the Contracting Officer (CO) and Contracting Officer’s Representative (COR).
b. City of Philadelphia: submit road or sidewalk closure applications in accordance with Philadelphia Department of Licenses and Inspections (L&I) permitting requirements.
c. Law Enforcement / Philadelphia Police: Coordinate any required flagging, traffic control, or temporary barriers necessary for deliveries or scaffold operations.
d. SEPTA: Maintain uninterrupted pedestrian access to adjacent Southeastern Pennsylvania Transportation Authority (SEPTA) bus stops.
3. No direct attachment to the Declaration House structure is permitted unless expressly authorized in writing by both NPS and the Philadelphia Historical Commission.
4. The Contractor shall schedule all deliveries to:
a. Minimize the use of sidewalk and street space
b. Avoid interference with public entrances, emergency egress, and park visitor pathways
c. Limit on-site time and storage duration for materials and equipment
The Contractor shall protect all sidewalks and adjacent public surfaces from damage. Any damaged areas shall be restored to their pre-construction condition.
F. PEDESTRIAN PASSAGEWAY AND SIDEWALK PROTECTION
Where scaffolding is installed above or adjacent to public sidewalks or designated pedestrian circulation routes, the Contractor shall provide a secure and code-compliant protection system to maintain continuous and safe public access. The Contractor shall:
1. Design, permit, and install a covered pedestrian passageway (e.g., sidewalk shed or canopy) in accordance with:
a. OSHA 29 CFR 1926.502(c) – Falling Object Protection
b. City of Philadelphia Department of Licenses and Inspections (L&I) regulations on overhead protection and right-of-way use
c. ANSI A10.18 – Safety Requirements for Temporary Walkways
2. Ensure that the passageway:
a. Provides a minimum vertical clearance of 8 feet
b. Is structurally rated to withstand falling object loads from active overhead work
c. Includes decking, framing, and barricades sufficient to protect pedestrians from tools, debris, or materials
d. Is illuminated as required by City code and shall provide a minimum average of 0.3 foot-candle horizontal illumination beneath the canopy during hours of use.
Illumination levels shall be measured at five feet above grade on a 5-foot grid using a calibrated foot-candle meter.
e. Includes temporary fencing or barricades to direct pedestrian flow and restrict access to work zones
3. Coordinate with NPS and City authorities to avoid blocking public access routes, visitor entry points, or emergency egress. Continuous access shall be maintained to the adjacent Southeastern Pennsylvania Transportation Authority (SEPTA) bus stop at all times. Any temporary rerouting of pedestrian flow near the stop must be clearly marked and accessible.
4. Submit stamped engineering drawings and load calculations, as required by L&I, for the pedestrian passageway system. Obtain all necessary right-of-way and closure permits.
5. Remove the passageway and all sidewalk protection measures upon scaffold takedown and restore affected areas to their pre-construction condition.
Where scaffolding is installed above or adjacent to public sidewalks or pedestrian routes, the Contractor shall provide a secure and code-compliant pedestrian protection system to maintain continuous public access beneath or around the scaffolding.
The Contractor shall:
1. Design, permit, and install a covered pedestrian passageway (sidewalk shed or canopy) that complies with:
a. OSHA 29 CFR 1926.502(c) – Falling object protection
b. City of Philadelphia Department of Licenses and Inspections (L&I) regulations for overhead protection and right-of-way use
c. ANSI A10.18 – Safety Requirements for Temporary Walkways
2. Ensure the passageway:
a. Provides a minimum vertical clearance of 8 feet
b. Is structurally rated to support falling object loads from active work above
c. Includes decking, framing, and barriers sufficient to protect the public from tools, debris, or materials
d. Is illuminated if used during low-light conditions, per city code
e. Includes temporary fencing or barricades to channel pedestrian flow
3. Coordinate with NPS and the City of Philadelphia to ensure the passageway does not obstruct park visitor routes, emergency egress, or block access to SEPTA bus stop or SEPTA Public Transit operations.
4. Submit stamped engineering drawings and calculations including live load and dead load (if required by L&I) and obtain all necessary right-of-way and sidewalk closure permits.
5. Remove the passageway upon scaffold takedown and restore sidewalk and surrounding areas to pre-construction condition.
Contractor shall coordinate sidewalk closure for scaffolding installation on Market and Seventh Street with the National Park Service, City of Philadelphia, and law enforcement before interruptions as identified in sections E and G.
1. Schedule deliveries to minimize use of sidewalk and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
3. Protect existing sidewalks.
G. ROAD / SIDEWALK CLOSURES
Contractor shall complete all National Park Service, City of Philadelphia and law enforcement permitting/notifications and coordinate temporary or longer-term road/sidewalk closures for scaffolding installation and maintenance with the prior to interruptions.
1. Schedule deliveries to minimize use of sidewalk where possible.
2. No sidewalk material storage available
Protect existing sidewalks and roads. Maintain public access to adjacent Southeastern Pennsylvania Transportation Authority (SEPTA) Bus Stop. The Contractor is responsible for coordination of Road or Sidewalk closures with National Park Service and the City of Philadelphia.
a. Request for sidewalk closures sent to National Park Service shall be submitted in writing no later than twenty-one (21) calendar days prior to requested closure and directed to the CO and COR.
b. Request for City of Philadelphia Sidewalk or Road closure shall be submitted in accordance with the Philadelphia Department of Licenses and Inspections (L&I) permitting guidelines/requirements.
H. SCAFFOLDING SECURITY AND ACCESS CONTROL
The Contractor shall be responsible for providing a secure scaffolding system that prevents unauthorized access by the public during and after scaffold erection. The scaffolding will be used by Government personnel and/or Government contractors for masonry and wood restoration activities following installation. Therefore, scaffolding must be designed and installed to meet all applicable safety standards and incorporate access control features that allow secure use during the Government’s work period.
The Contractor shall:
1. Provide a scaffolding system with integrated safety features to deter public access, including lockable ladder access, fencing, or other means of restricting entry at the ground level.
2. Install all necessary toe boards, guardrails, fall protection features, and deck planking as part of the initial build to allow safe use by Government personnel.
3. Ensure that no access ladders, stairs, or platforms are left unsecured at the time of turnover to the Government. Access components shall be installed and secured in a manner consistent with OSHA 29 CFR 1926 Subpart L.
4. Install visible signage at ground-level access points stating “Authorized Personnel Only” and “No Public Access.”
5. Coordinate final inspection and acceptance of the scaffolding system with the NPS Contracting Officer’s Representative (COR) (and City of Philadelphia if required) prior to releasing the structure for Government use.
6. The Contractor shall not be responsible for monitoring or securing the scaffolding after formal turnover to the Government, except for any corrective actions or repairs needed due to defects in erection.
Scaffolding shall remain in place for the duration specified by the Government and shall be removed upon written notification. At the time of removal, the Contractor shall safely dismantle the entire scaffold system and restore all surrounding areas to their pre-installation condition.
I. SCAFFOLD WARRANTY AND REPAIR
Following installation, the Contractor shall remain responsible for the structural integrity, safety, and regulatory compliance of the scaffolding system for the entire duration it remains erected. The Contractor shall:
1. Respond within twenty-four (24) hours of notification by the Government to assess and correct any damage, vandalism, graffiti, instability, or safety concern related to the scaffolding system.
2. Repair, stabilize, or replace any defective components at no additional cost to the Government if caused by faulty installation, material failure, improper configuration, or vandalism.
3. Provide a qualified scaffold technician to inspect and re-certify the scaffolding if any structural modification or suspected compromise occurs during the period of use.
4. Maintain availability (within reason) for emergency response should a safety issue arise. “Reasonable availability” shall mean:
a. A qualified representative reachable by phone or email outside of normal business hours;
b. b. Ability to mobilize to the site within four (4) hours for serious safety issues or within twenty-four (24) hours for non-urgent matters, unless otherwise approved in writing by the Government;
c. c. No on-site standby is required, but the Contractor shall maintain a designated emergency point-of-contact (POC) for the full duration of scaffold installation, maintenance, and removal.
5. Be responsible for scaffolding safety during severe weather, including implementing all necessary measures to secure the system or temporarily remove components as conditions warrant. Following high-wind events exceeding 35 mph or other significant storms, the Contractor shall re-inspect and re-certify scaffold stability before further use, at no additional cost to the Government.
6. Maintain all scaffolding systems, perimeter fencing, screening, and associated temporary access and protection systems in safe, secure, and serviceable condition throughout the duration of the project. Any damage, displacement, or tampering resulting from vandalism or unauthorized interference—including but not limited to scaffold platforms, guardrails, netting, ladders, ties, anchors, fencing panels, posts, privacy screening, or access control devices—shall be repaired or replaced by the Contractor at no additional cost to the Government. All graffiti shall be fully removed from affected surfaces using appropriate removal methods; painting over or covering graffiti shall not be considered acceptable unless expressly authorized in writing by the Government. All repairs shall be completed promptly as outlined above and in accordance with applicable OSHA, ANSI, and manufacturer requirements to ensure continued safety and compliance. Responsibility for any schedule delays resulting from such incidents shall rest solely with the Contractor.
The Government reserves the right to require removal or modification of the scaffold system if the Contractor fails to maintain the system in a safe and serviceable condition.
J. PRESERVATION OF NATURAL FEATURES
The scaffolding project is located within the boundaries of a designated national park, where preservation of natural and cultural resources is a core management objective. All construction activities, including scaffold installation and staging, must avoid impacts to surrounding vegetation, soils, and other natural features. The Contractor shall:
1. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and other plants, at no additional expense to the Government.
2. Provide temporary barriers to protect existing trees and other plants and root zones.
3. Do not remove, injure, or destroy trees or other plants without prior approval.
Consult with Contracting Officer (CO) and remove agreed-on roots and branches that interfere with construction.
4. Do not fasten ropes, cables, or guys to existing trees.
5. Carefully supervise scaffold installation/removal operations near trees to prevent damage.
K. PRESERVATION OF SITE FEATURES
National Park Service The structure is located within the boundaries of a national park, where preservation of historic and cultural site features is a primary management priority. All work, including scaffold placement, material staging, and access routes, must be carefully planned to avoid damage to contributing landscape elements, walkways, and adjacent structures. The Contractor is responsible for ensuring that all site features are protected and fully restored to their pre-construction condition upon project completion.
City of Philadelphia The sidewalks, curbs, streetlights, public transit infrastructure and all utilities outsite of the building’s property lines are the property of the City of Philadelphia, Philadelphia Electric Company (PECO), Philadelphia Water Department (PWD), and Southeastern Pennsylvania Transportation Authority (SEPTA) and not under National Park Service jurisdiction. The Contractor shall coordinate directly with the City, Utility Providers, and SEPTA for any required protection, temporary removal, or modification of these features during scaffold installation, use, and removal. All affected non-Government owned features must be restored to their original condition in accordance with their respective owners requirements and permitting.
The Contractor shall:
1. Protect all existing site features, including but not limited to pavers, curbs, pedestal, gates, fences, exterior ramps and steps, public transit infrastructure and site lighting, from damage during scaffold installation, use, and removal.
2. Provide appropriate temporary protection (e.g., padding, barriers, mats) at all surfaces that will be in direct contact with scaffolding components or contractor equipment.
3. Obtain written approval from the Contracting Officer prior to the removal, disassembly, or alteration of any existing site feature.
4. Closely supervise all contractor operations to ensure work is conducted with care and in a manner that avoids damage to park- and city-owned features.
5. Promptly repair or restore any damage to site features or utilities caused by contractor activities, at no additional cost to the Government, the City of Philadelphia, Philadelphia Electric Company (PECO), Philadelphia Water
Department (PWD), and Southeastern Pennsylvania Transportation Authority
(SEPTA).
L. PUBLIC USE OF SITE
Both the Declaration House building and adjacent courtyard site / landscape areas will be closed to the public during construction.
Project site is located within an area of significant pedestrian traffic. Conduct operations to ensure the least inconvenience to public. Building, sidewalk, and road closures may be permitted, when required, upon specific approval by Contracting Officer and The City of Philadelphia for a maximum of one (1) week or such other time as may be approved by the CO and City of Philadelphia.
M. GOVERNMENT RESPONSIBILITIES
The National Park Service will provide:
1. Access to the Annex roof. (personnel access only, not for moving materials)
2. Declaration House and Annex will be closed to the general public.
3. Will provide plans for Annex building upon Notice to Proceed, contractor to verify plans against existing site conditions in field.
N. WORK RESTRICTIONS
1. On-Site Work Hours: Work shall be generally performed during normal business working hours of 7:00 a.m. to 5:00 p.m., Monday through Friday, excluding federal holidays. Work may be performed outside these days/hours with the advance written permission of the Contracting Officer.
a. Early Morning Hours: Non-noisy activities may begin on site at 7:00 a.m.
b. Hours for Noisy Activity: Comply with Chapter 10-4000 of The Philadelphia Code.
The Philadelphia Code is the compilation of all general ordinances adopted by the Philadelphia City Council. It is divided into 22 titles: Title 1: General Provisions.
Title 2: City-County Consolidation.
2. Freedom Week: No construction shall occur from June 30th through July 8th. Verify Dates with Independence National Historic Park.
3. Contractor shall comply with noise levels not exceeding 85 dB(A) at 50 feet during working hours, per Chapter 10-4000 of The Philadelphia Code, or lower thresholds if posted by INDE.
O. UTILITY AND SANITARY FACILITY AVAILABLITY
1. Restroom Access - The Contractor shall provide and maintain temporary portable restroom facilities for all personnel throughout the duration of onsite work. Use of National Park Service facilities by contractor personnel is not permitted. Portable units shall be located in a discreet area approved by the Contracting Officer’s Representative (COR), regularly serviced, and maintained in a sanitary condition in accordance with OSHA 29 CFR 1926.51. Restroom units shall be secured at all times to prevent unauthorized public access, vandalism, or tipping, through physical locking mechanisms and appropriate stabilization methods. In the urban environment of the project site, this may include bracing, ballasting, enclosure within temporary fencing, or other approved means to prevent movement or overturning due to wind, pedestrian contact, or other external forces.
2. Electricity - No electrical power will be provided by the National Park Service for contractor use. The Contractor shall be responsible for supplying all necessary power sources, including generators, to support scaffold installation, lighting, or other operational needs. Generator placement shall be coordinated with the COR to avoid disruption to park operations or visitors and to ensure protection of site features.
3. Water - Potable or non-potable water will not be made available by the National Park Service. The Contractor shall furnish any required water supply for dust control, cleaning, or other construction-related activities. Water transport and storage shall be managed in a manner that prevents spillage or damage to park resources.
P. WASTE MANAGEMENT AND HOUSEKEEPING
The Contractor shall maintain clean and orderly conditions throughout the scaffold erection and disassembly process. All waste materials, packaging, discarded hardware, and personal trash generated during installation or removal activities shall be promptly collected and properly disposed of off-site in accordance with applicable regulations. At no time shall debris, trash, or construction-related refuse be left unsecured on scaffold platforms, stair towers, or in the vicinity of pedestrian passageways. The Contractor shall implement daily housekeeping measures to prevent accumulation of materials that could pose safety hazards or visual impacts. Scaffolding shall be inspected at the end of each workday to ensure all trash and other debris/refuse is cleared, and no materials are left behind in or on the structure.
The Contractor is solely responsible for preventing tools, debris, or trash from becoming dislodged or falling from height during active or inactive scaffold use.
Q. CONTRACTOR DELIVERABLES
The Contractor shall furnish the following to the COR for review and approval:
Pre-Installation Phase
1. Site Visit Report - Summary of field verification, site access conditions, documentation of Pre-Construction Conditions and any existing constraints or conflicts (e.g., overhead utilities, pedestrian traffic, historic fabric protection).
2. Scaffolding Design Package
a. Draft scaffolding design drawings/schematic plan (14 calendar day government review)
i. Provide tie down requirements on the site plan with proposed methods and specific locations.
ii. A detailed description of the method and materials to be used in protecting the building and site.
iii. Dimensions of Scaffolding
iv. Description of other related equipment and security
v. Weather Contingency Plan - Outlines strategies for responding to inclement weather, protecting materials and personnel, and ensuring safety compliance during adverse conditions.
Acceptance of the plan shall not relieve the Contractor of responsibility for damages, delays, or safety incidents resulting from weather events
b. Final Scaffold Design Package
i. Signed and sealed scaffolding design drawings (PE licensed in
Pennsylvania)
ii. Structural load calculations and system configuration details
iii. Description of anchoring methods (if applicable)
iv. Manufacturer technical data sheets (planks, guardrails, access components)
3. City of Philadelphia Permit Submittals
a. Copy of all permit applications submitted to the Department of Licenses & Inspections (L&I)
b. Final approved permit documents (e.g., Scaffolding Permit, Right-of-Way Permit)
4. Pre-Mobilization Submittals (Submit together for concurrent 14 calendar day government review)
a. Mobilization and Installation Schedule - The Contractor shall prepare and submit a detailed Mobilization and Installation Schedule outlining all major service activities, including submittal delivery, coordination meetings, scaffold system delivery and installation, Government access period, system dismantling, and site restoration. The schedule shall identify all milestones from Notice to Proceed (NTP) through final closeout and shall specify the anticipated scaffold turnover date. The schedule shall be submitted to the COR for review and comment prior to mobilization and updated as necessary to reflect actual progress.
b. Coordination Plan - The Contractor shall provide a Coordination Plan describing how all service activities will be coordinated with the National Park Service, the City of Philadelphia, and any applicable third-party entities (e.g., utility providers, SEPTA, Department of Licenses and Inspections). The plan shall include communication protocols, responsible personnel, and procedures for requesting access, right-of-way use, pedestrian management, and permitting. The plan shall also identify any anticipated service windows or time-sensitive coordination points that may affect onsite operations.
c. Accident Prevention Plan - The Contractor shall develop and submit an Accident Prevention Plan (APP) describing the overall safety and health procedures that will be followed throughout the performance of this service contract. The APP shall identify the designated Site Safety and Health Officer (SSHO), outline fall protection measures related to scaffolding systems, address hazard communication, emergency response, equipment use, and safety responsibilities. The APP shall comply with OSHA 29 CFR 1926 and other applicable safety regulations. The Government will review and accept the APP prior to mobilization. A copy shall be maintained onsite and updated as necessary during the period of performance. (See Section S – SAFETY
REQUIREMENTS)
d. Joh Hazard Analysis (JHA) - The Contractor shall prepare Job Hazard Analyses (JHAs) for all service-related activities that pose potential safety risks. Each JHA shall identify the task, associated hazards, risk mitigation measures, and responsible personnel. Required JHAs include, but are not limited to: scaffold delivery, handling, installation, rooftop access, overhead protection setup, and dismantling. JHAs shall be submitted to the COR and made available onsite. The Contractor shall ensure all personnel are briefed on relevant JHAs prior to execution of each activity. (See Section S – SAFETY REQUIREMENTS)
e. Site Protection Plan - The Contractor shall submit a Site Protection Plan detailing procedures to avoid damage to adjacent features during scaffold installation, maintenance, and removal. The plan shall describe methods for protecting sidewalks, curbs, landscaping, signage, utilities, and nearby structures from incidental impact. It shall specify use of temporary fencing, cribbing, padding, or other non-invasive protective materials. If site features must be temporarily relocated or covered, the Contractor shall obtain prior written approval from the COR. No onsite work may begin without implementation of the accepted site protection plan.
Installation Phase
5. Daily Safety Inspection Logs (Installation Period)
a. Documentation of daily inspections performed during erection
b. Notes of corrective actions or incidents (if any)
6. Photographic Documentation
a. Photos showing completed scaffold system at key stages (foundation, mid-installation, final)
7. Scaffolding Certification for Use
a. Written confirmation by the installing contractor that scaffolding meets all specifications and was built per the approved PE design and manufacturer recommendations
b. Signed turnover form releasing scaffold for Government use
Maintenance/Support Period
8. Warranty and Repair Contact Information
a. Point of contact for scaffold warranty service
b. Summary of warranty terms (as defined in SOW)
9. Response Log for Any Government-Reported Issues (if applicable)
a. Documentation of inspections, repairs, or modifications performed in response to NPS concerns.
Post-Use and Dismantling Phase
10. Notice of Removal Readiness
a. Advance notice (minimum 5 business days) of planned scaffold removal
11. Demobilization and Site Restoration Report
a. Confirmation that all scaffolding and materials have been removed
b. Documentation of site restoration (e.g., sidewalk cleaning, reinstallation of barriers if removed)
12. Permit Closure Documentation
a. Proof that all City of Philadelphia permits have been properly closed out or canceled
R. PERIOD OF PERFORMANCE
The total period of performance for this scaffolding service contract shall not exceed 136 calendar days. This period includes a nineteen (19) day pre-installation phase for submittals, permitting, and coordination; a 5-calendar-day scaffold installation period; a ninety (90) calendar-day base use period following acceptance of the installed scaffold; a five (5) calendar-day dismantling period; and a final fourteen (14) calendar-day closeout period.
1. Pre-Installation Phase (19 Calendar Days)
a. Upon issuance of the Notice to Proceed (NTP), the Contractor shall begin performance immediately and shall submit all required pre-installation submittals no later than fourteen (14) calendar days from the date of NTP.
b. Required submittals include:
i. Draft scaffolding design package
ii. Mobilization and installation schedule
iii. Coordination Plan
iv. Accident Prevention Plan (APP)
v. Job Hazard Analyses (JHAs)
vi. Site Protection Plan
vii. Weather Contingency Plan
c. The Government shall review all pre-installation submittals within five
(5) business days of receipt. If revisions are required, the Contractor shall revise and resubmit the corrected documents. A second Government review period of five (5) business days shall begin upon resubmission, if necessary.
d. During this phase, the Contractor shall also:
i. Conduct site verification and staging coordination
ii. Obtain all required permits and approvals from applicable city agencies
iii. Finalize stamped engineering drawings and calculations
iv. Coordinate access, delivery logistics, and sidewalk or right-of-way use with the National Park Service and the City of Philadelphia
v. No onsite work may commence until all required submittals have been accepted by the Government and all applicable permits have been obtained.
2. Installation Period (8 Calendar Days)
a. Upon completion of the pre-installation phase and receipt of Government authorization, the Contractor shall mobilize to the site within 3 calendar days, and complete full scaffold installation no longer than 5 calendar days following mobilization.
b. The installed system shall conform to the approved PE-stamped design and include:
i. Required fall protection and access systems
ii. Pedestrian shielding and sidewalk protection
iii. Security features to restrict unauthorized access
c. The Contractor shall notify the Contracting Officer’s Representative (COR) when installation is complete. The scaffold shall not be released for Government use until inspected and formally accepted by the COR.
3. Base Use Period (90 Calendar Days Following Acceptance)
a. Following COR acceptance, the scaffolding system shall remain in place and fully serviceable for a base period of ninety (90) calendar days.
b. During this period, the Contractor shall:
i. Maintain the system in a safe and compliant condition
ii. Respond to any required repairs, stability concerns, or safety issues as identified in Section I: Scaffold Warranty and Repair.
iii. Maintain supplemental general liability insurance
iv. Cooperate with the Government to coordinate access as needed
4. Dismantling Period (5 Calendar Days)
a. Upon written notification by the COR, the Contractor shall dismantle and remove the scaffold system within five (5) calendar days.
b. Scaffold removal includes:
i. All scaffolding elements, overhead protection, fencing, and signage
ii. All components placed on rooftops, sidewalks, or protected surfaces
iii. Transportation and off-site disposal or storage of all materials
c. All removal activities shall avoid obstruction to public walkways and prevent damage to park resources or city infrastructure.
5. Final Closeout Period (14 Calendar Days)
a. The Contractor shall complete all final site restoration and contract closeout deliverables within fourteen (14) calendar days following completion of scaffold removal.
b. Final closeout shall include:
i. Restoration of any disturbed site features to pre-construction condition
ii. Submission of final photographic documentation showing restored conditions
iii. A Demobilization and Site Restoration Report
iv. Written confirmation that all permits have been formally closed out or canceled with the City of Philadelphia
v. Resolution of any remaining punch list items issued by the
COR
c. Final payment shall not be processed until all closeout deliverables have been received and accepted by the Government.
S. SCHEDULE COMPLIANCE AND TIMELY MOBILIZATION
Time is of the essence in the performance of this contract. The Contractor is expected to diligently pursue all contract obligations beginning on the date of Notice to Proceed (NTP), including timely preparation of submittals, permit acquisition, mobilization, and scaffold installation.
The Government reserves the right to issue a Cure Notice or take other appropriate contractual action if the Contractor:
1. Fails to submit required pre-installation deliverables within the specified 21-day period;
2. Causes avoidable delays in coordinating with regulatory agencies, utility providers, or permitting authorities;
3. Does not actively prepare for installation during the 45-day pre-installation window;
4. Fails to begin installation by Day 46 without prior written authorization from the
Contracting Officer.
The Contractor shall not suspend, defer, or otherwise delay performance of any work under this contract without advance written approval from the Contracting Officer. Any such delay may be deemed a failure to perform and may result in:
1. Formal contractual remedies including issuance of a Cure Notice or Show Cause Notice, and/or
2. Negative past performance evaluation affecting future awards.
Nothing in this section shall prevent the Government from exercising other rights or remedies available under the contract or applicable law.
Delays arising from weather events or other unforeseeable causes beyond the Contractor’s control may be considered excusable under FAR 52.212-4(f), Excusable Delays. Such events must be documented in writing and reported to the COR promptly. No cost adjustment shall be granted unless explicitly authorized by the Contracting Officer. Time extensions for weather delays are non-compensable unless otherwise stated.
T. SCAFFOLDING ACCEPTANCE CRITERIA
The Government will not accept the scaffolding system until all of the following conditions have been met. Acceptance shall be documented in writing by the Contracting Officer’s Representative (COR) and, if applicable, reviewed by the City of Philadelphia.
System Acceptance Requirements
1. Completion of Installation
a. The scaffold must be fully erected in accordance with the approved PE-stamped design, manufacturer specifications, and all applicable OSHA and ANSI standards.
2. Scaffolding Certification for Use
a. The Contractor shall provide a signed Scaffolding Certification for Use, confirming the scaffold has been installed in accordance with the stamped engineering drawings and is structurally sound and safe for use by Government personnel.
4. Submittal Approval
a. All required submittals listed under “Contractor Deliverables,” including daily safety logs during erection and photographic documentation, shall be submitted and accepted by the COR.
5. Final Inspection
a. The COR shall conduct a final inspection of the installed scaffold. Any deficiencies identified must be corrected by the Contractor prior to acceptance.
6. Permit Confirmation
a. The Contractor must provide copies of all active permits and approvals issued by the City of Philadelphia, including scaffolding and sidewalk permits.
7. Site Protection Verification
a. Protective measures for adjacent sidewalks, vegetation, structures, and utilities must be visibly in place and conform to the Site Protection Plan as accepted.
8. Access Control Measures
a. All safety and security features (e.g., locking access, guardrails, signage) must be properly installed and functional.
Only upon fulfillment of these requirements will the scaffold be formally accepted by the Government for use. Government use prior to formal acceptance does not constitute constructive acceptance of the system.
U. SITE AND WORKER PROTECTION
1. Contractor shall be responsible for any damage to exterior finishes as a result of setting up or removing scaffold.
2. Contractor shall cordon off areas that are considered hazardous of tools and materials that could potentially fall while scaffolding is being erected or dismantled.
The Contractor shall comply with all applicable OSHA standards while erecting, maintaining, or dismantling scaffolding, including but not limited to 29 CFR §1926.451 (Scaffolds) and §1926.502 (Fall Protection Systems Criteria and Practices). Personnel shall utilize appropriate personal protective equipment (PPE) and shall be tied off at all times when exposed to fall hazards, in accordance with §1926.501(b) for elevated work.
V. CONTRACTOR IDENTIFICATION
All Contractor personnel performing work onsite shall carry valid company identification and shall comply with access protocols established by the National Park Service. The Contractor shall maintain a current roster of authorized personnel and submit updates to the COR as requested.
W. SUPPLEMENTAL LIABILITY INSURANCE
In addition to the insurance requirements under FAR 52.228-5, the Contractor shall maintain supplemental general liability insurance covering injury or property damage arising from scaffold collapse, failure, or falling materials during scaffold erection, maintenance, or removal. This coverage shall apply to any such incidents occurring prior to Government acceptance of the scaffold, while the scaffold remains under Contractor maintenance, and during final tear down. The United States Government shall be named as an additional insured.
X. SAFETY REQUIREMENTS
The Contractor shall submit a comprehensive Accident Prevention Plan (APP) and Job Hazard Analysis (JHA) as part of the pre-installation submittal package. These documents shall be submitted for Government review and acceptance by the Contracting Officer’s Representative (COR) and Park Safety Officer prior to the commencement of any onsite activities, including delivery or mobilization. The Government does not approve safety plans but will review and accept them to ensure they meet minimum contractual and regulatory requirements.
The most current accepted APP and all JHAs shall be available onsite and provided to the COR upon request.
1. Accident Prevention Plan (APP) The APP shall describe the Contractor’s overall safety and health management approach and shall, at a minimum, include:
b. Identification and qualifications of the Site Safety and Health Officer
(SSHO).
c. Emergency contact information, communication protocols, and nearest medical facility.
d. Procedures for reporting injuries, incidents, and near-misses to the COR and OSHA.
e. A fall protection plan compliant with OSHA 29 CFR 1926 Subpart M, covering all scaffold erection, access, and usage phases.
f. Weather-related hazard protocols (e.g., wind, heat, lightning shutdown procedures).
g. Fire prevention and control measures.
h. Equipment safety and lockout/tagout procedures (if applicable).
i. Internal inspection and safety briefing procedures.
2. Job Hazard Analysis (JHA)
The Contractor shall prepare task-specific JHAs that identify:
a. Description of Activity
b. Potential Hazards associated with the task
c. Risk Evaluation
d. Preventive/Control Measures
e. Responsible Person for implementation and oversight
Separate JHAs shall be submitted for all critical or high-risk activities, including scaffold erection, material loading/unloading, rooftop work, and any work in proximity to pedestrians or vehicular traffic. The Contractor shall ensure all field personnel are briefed on applicable JHAs and shall maintain signed documentation of training and briefing participation.
Y. OSHA COMPLIANCE
1. The finished scaffold shall provide safe work platforms that complies with all elements of OSHA 1926 Subpart L.
2. During the erection and dismantling of the scaffold, the Contractor shall comply with all appropriate OSHA codes, particularly OSHA 1926.501 and OSHA 1926 Subpart L.
3. The Contractor shall confirm in writing that the erected scaffold was inspected by the Contractor’s competent person prior to turning it over for use by the National Park Service.
Z. DEFINITIONS AND REFERENCE STANDARDS
1. OSHA 29 CFR 1926 Subpart L
2. ANSI A10.8 / A10.18
3. Philadelphia Code Title 4 (Building Construction and Occupancy)
4. L&I Scaffolding Regulations (external reference)
AA. DATA RIGHTS / OWNERSHIP
All submittals, drawings, and documents prepared as part of this contract become the property of the Government upon acceptance. The Contractor retains no proprietary rights to deliverables unless otherwise stated.
BB. QUALITY ASSURANCE AND GOVERNMENT INSPECTION
The Government reserves the right to inspect work at any time during contract performance.
Any deficiencies identified by the Government shall be corrected by the Contractor within the time frame specified by the COR. Failure to correct deficiencies may result in withholding of payment or issuance of a Cure Notice.
CC. PROGRESS MEETINGS AND COMMUNICATION
The Contractor shall participate in weekly progress meetings with the Government during the scaffold installation and maintenance period. Meetings may be conducted in-person or virtually at the discretion of the COR. The Contractor shall also maintain regular communication with the COR regarding schedule updates, coordination issues, and site concerns.
DD. POINTS OF CONTACT
Contracting Officer (CO):
Ericka Graham, ericka_graham@ibc.doi.gov, 571-560-2329 Interior Business Center
Contracting Officer’s Representative (COR) Provided upon award
EE. INVOICING AND PAYMENT
Reference contract clause Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (February 2021) for invoice submission requirements.
1. Invoice Frequency and Timing
Unless otherwise authorized in writing by the Contracting…
This is the start of the file's text. The full file is on GovTribe.