ATTACHMENT A - SOW - ASBESTOS SURVEY.doc
DOC document 1 MB Posted
- Attached to
- F107--ABESTOS SURVEY
- Solicitation number
- 36C26225Q0568
About this file
This document is a detailed Statement of Work (SOW) for an Asbestos, Lead Based Paint, and Other Hazardous Materials Survey at the Tibor Rubin VA Medical Center in Long Beach, California. The comprehensive survey covers approximately 1.2 million square feet across multiple buildings, requiring a thorough inspection and sampling of asbestos-containing materials, lead-based paint, mercury, polychlorinated biphenyls (PCBs), and other hazardous substances. The contractor must be an AHERA-accredited inspector with at least 10 years of experience, conduct physical and hazard assessments, collect samples, and provide detailed reporting including AutoCAD drawings, Excel spreadsheets, and an operations and maintenance plan.
The project is structured in four phases over 432 calendar days, with multiple submission and review milestones. Key deliverables include color drawings, lab reports, binders with detailed findings, and electronic copies in AutoCAD, PDF, and Excel formats. The survey requires strict compliance with federal, state, and VA safety regulations, including medical certifications, TB and COVID-19 screenings, and adherence to specific access protocols for sensitive hospital areas. Sampling will be performed using X-Ray Fluorescence (XRF) and microscopy techniques, with samples analyzed by AIHA-accredited laboratories. The VA will use the survey data to track facility hazardous materials and plan potential abatement or management strategies.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT B - SCHEDULE OF PRICING - ASBESTOS SURVEY.xlsx | XLSX spreadsheet | |
| 36C26225Q0568.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS, LEAD BASED PAINT AND OTHER HAZARDOUS MATERIALS SURVEY
STATEMENT OF WORK (SOW)
DEPARTMENT OF VETERANS AFFAIRS
Veterans Affair Long Beach Health Care System
Date: 03/10/2025 Table of Contents
3STATEMENT OF WORK
3ASBESTOS, LEAD BASED PAINT AND OTHER HAZARDOUS MATERIALS SURVEY
43.0 Definitions/Acronyms, Regulatory References, VA References
43.1 Definitions/Acronyms
53.2 Regulatory Overview
63.3 VA References
64.0 General Work Scope
105.0 Qualifications
116.0 Contractor Compliance with Facility Safety and Health Requirements
116.1 Medical Certification
126.2 Tuberculosis (TB) and Flu Requirements
126.3 COVID-19
136.4 Security and Sensitive Areas
147.0 Sampling Procedures
147.1 Asbestos
167.2 Lead Based Paint
177.3 Other Hazardous Materials
177.3.1 Mercury and polychlorinated biphenyls (PCBs)
7.3.2 Hazardous/Universal Waste 18
188.0 Deliverables
8.1 Quality Control Plan
8.2 Meetings and Daily/Weekly Reports
8.3 Schedule of Deliverables
8.3 Distribution of Deliverables
9.0 Schedule & Operational Hours
10.0 Inspecting
11.0 Furnished Property
12.0 Stop Work Order
STATEMENT OF WORK
ASBESTOS, LEAD BASED PAINT AND OTHER HAZARDOUS MATERIALS SURVEY
2.0 Background:
Tibor Rubin VA Medical Center, Long Beach, CA (VALBMC) needs an updated Asbestos, Lead based paint and other Hazardous Materials (ALBHM) survey to assess all buildings for compliance with Veterans Health Administration Directives 7710 and 7714.
The survey shall include a visual evaluation and sampling of the following; potential asbestos-containing materials (ACM), lead-based paint, and other potentially hazardous materials. This ALBHM survey will report summarizes of the work conducted; discusses findings regarding the location, quantity, and condition of hazardous materials; and includes recommendations for addressing identified or potential hazards through abatement or management practices.
The survey location shall be for all buildings and structures at the Tibor Rubin VA Medical Center located at 5901 East 7th Street, Long Beach California 90822 consisting approximately of 1.2 million square feet on a 100-acre lot. All work shall be in accordance with the VALBMC, state, and Federal codes and laws, and subject to the terms and conditions of this contract.
3.0 Definitions/Acronyms, Regulatory References, VA References
3.1 Definitions/Acronyms
I. Asbestos, Lead Based paint, and other Hazardous Materials (ALBHM). Classification of all relevant materials to be surveyed: Asbestos, Lead based paint, mercury and polychlorinated biphenyls, Soil boring test, II. Asbestos. Asbestos is a generic term for a number of asbestiform hydrated silicates that, when crushed or processed, separate into flexible fibers made up of fibrils. Asbestos means chrysotile, cummingtonite-grunerite asbestos (amosite), crocidolite, anthophyllite asbestos, tremolite asbestos, and actinolite asbestos.
III. Asbestos Containing Material (ACM). Any material containing more than 1 percent asbestos. ACM can be divided into three major categories - thermal system insulation, surfacing and miscellaneous.
IV. Asbestos Containing Building Material (ACBM). Nonfriable suspected asbestos-containing building material, thermal system insulation Asbestos Containing Material (ACM), or miscellaneous ACM that is found in or on the interior structural members or other parts of a building and that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
V. Asbestos Hazard Emergency Response Act (AHERA). Law required EPA to promulgate regulations (e.g., the Asbestos-Containing Materials in Schools Rule) requiring local educational agencies to inspect their school buildings for asbestos-containing building material, prepare asbestos management plans and perform asbestos response actions to prevent or reduce asbestos hazards.
VI. American Industrial Hygiene Association (AIHA). Association of scientists and professionals committed to preserving and ensuring occupational and environmental health and safety (OEHS) in the workplace and community.
VII. Contracting Officer Representative (COR). A representative for the contracting office ensuring that contractors meet the commitment of their contracts. They facilitate proper development of requirements and assist Contracting Officers in developing and managing their contracts.
VIII. Environmental Lead Laboratory Accreditation Program (ELLAP). A program that accredits laboratories performing analysis of lead in environmental samples including paint, soil, dust wipes, composited wipes, and air.
IX. Heating, Ventilation, Air Conditioning (HVAC). A system that controls the ambient environment (temperature, humidity, airflow and air filtering).
X. Lead-Based Paint (LBP). Paint or other surface coatings that contain lead equal to or exceeding 1.0 milligram per square centimeter or 0.5 percent by weight or 5,000 parts per million (ppm) by weight.
XI. Mercury and polychlorinated biphenyls (PCBs). PCBs belong to a broad family of man-made organic chemicals known as chlorinated hydrocarbons. PCBs were domestically manufactured from 1929 until manufacturing was banned in 1979.
XII. National Lead Laboratory Accreditation Program (NLLAP). A EPA program that defines the minimum requirements and abilities that a laboratory must meet to attain EPA recognition as an accredited lead testing laboratory.
XIII. National Voluntary Laboratory Accreditation Program (NVLAP). A Agency that provides third-party accreditation to testing and calibration laboratories in response to legislative actions or requests from government agencies or private-sector organizations.
XIV. Occupational Safety and Health Administration (OSHA). A federal agency that establishes on-the-job safety protections for workers XV. Permissible Exposure Limit (PEL). Regulatory limit on the amount or concentration of a substance in the air.
XVI. Presumed Asbestos-Containing Material (PACM). Thermal system insulation (TSI) and surfacing material found in a building constructed no later than 1980 or presumed area containing asbestos material.
XVII. X-Ray Fluorescence (XRF). A non-destructive analytical technique used to determine the elemental composition of materials.
3.2 Regulatory Overview
The contractor shall be responsible for complying with all publications, including but not limited to those identified below, in effect at the time of the proposal and all future updates:
Code of Federal Regulations (CFR): Regulations can be accessed at Law and Regulations | OSHA
1. 29 CFR 1910.134 Respiratory Protection
2. 29 CFR 1910.1001 Asbestos
3. 29 CFR 1910.1001 Asbestos, Occupational Safety and Health Standards
4. 29 CFR 1910.1025 Lead, Occupational Safety and Health Standards
5. 29 CFR 1910.134 Respiratory Protection, Occupational Safety and Health Standards
6. 29 CFR 1926.1101 Asbestos, Safety and Health Regulations for Construction
7. 29 CFR 1926.62 Lead, Safety and Health Regulations for Construction
8. 40 CFR 761.123 PCB, Standard Wipe Test
9. 40 CFR part 761.61 PCB Remediation Waste
10. 40 CFR 763.92 Training and Periodic Surveillance
EPA, HUD, OHSA, etc.:
1. EPA, Asbestos Hazard Emergency Response Act (AHERA) protocols.
2. EPA General Guidance for Using EPA’s Standard Test Procedures For Evaluating Release Detection Methods
3. EPA Residential Lead-Based Paint Hazard Reduction Act of 1992
4. Department of Housing and Urban Development (HUD), Lead-Based Paint:
5. Interim Guidelines for Hazard Identification and Abatement in Public and Indian Housing.
6. OSHA Publication 3126 Working with Lead in the Construction Industry.
7. Dept. of Housing and Urban Development, Lead-Based Paint Risk Assessment.
8. South Coast Air Quality Management District RULE 1403: Asbestos Emissions from Demolition/Renovation Activities.
9. STD 01-04-002 Classification of Polychlorinated Biphenyls (PCBs) Standards
3.3 VA References
Veterans Affairs Master Construction Specifications (PG-18-1)
01 00 00 General Requirements
01 35 26 Safety Requirements
01 57 19 Temporary Environmental Controls
02 82 11 Traditional Asbestos Abatement
02 82 13.19 Asbestos Floor Tile and Mastic Abatement
02 82 13.21 Asbestos Roofing Abatement
02 82 13.31 Asbestos Transite Abatement
02 83 33.13 Lead-Based Paint Removal and Disposal
VHA Directive 7710 Management of Lead-based Paint VHA Directive 7714 Asbestos Management Program
4.0 General Work Scope
Contractor shall conduct a comprehensive survey at Tibor Rubin VA Medical Center, Long Beach, CA (VALBMC) for the presence of Asbestos, Lead Based paint, and other Hazardous Materials (ALBHM):
1. Asbestos-containing materials (ACM),
a. i.e., mastic adhesive
b. i.e., ACM containing Vinyl Asbestos Tiles
c. i.e., ACM containing 12x12 ceiling tiles
d. i.e., ACM containing fibers (Roofing)
e. i.e., Transite Water and Sewer Pipes
2. Lead-based paint (LBP)
a. surfaces coated with suspect lead-based paint.
3. Lead containing ceramic tile glaze.
4. Hazardous/Universal Waste
a. Mercury and polychlorinated biphenyls (PCBs)
i. i.e., electrical switches and balances
ii. i.e., HVAC thermostat tilt switches
iii. i.e., hydraulic, and lubricating oils
iv. i.e., ballasts on fluorescent lights.
b. Containerized Hazardous Substance
i. i.e., HVAC Systems obtaining more than 50lbs of freon.
5. Potholing survey of soil sample
a. Survey to include soil samples for presence of hazardous materials, Ground Penetrating Radar (GPR), Excavation & Site Potholing.
Work will be required to be conducted in each of the specified buildings:
· Bldg. 1 (01-0B, 01-0P, 01-01, 01-02, 01-03, 01-04, 01-05) – 91,110 SQFT
· Bldg. 2 (02-0B, 02-01, 02-02, 02-03) – 80,742 SQFT
· Bldg. 5 (05-0B, 05-01, 05-02) – 36,403 SQFT
· Bldg. 5A (5A-0B, 5A-01) – 11,774 SQFT
· Bldg. 5B – 4,434 SQFT
· Bldg. 5C – 9,641 SQFT
· Bldg. 6 – 12,366 SQFT
· Bldg. 7 (07-0B, 07-01, 07-02, 07-03) – 35,431 SQFT
· Bldg. 8 (08-0B, 08-01, 08-02, 08-03) – 35,073 SQFT
· Bldg. 43 – 191 SQFT
· Bldg. 48 – 2,407 SQFT
· Bldg. 50 – 12,676 SQFT
· Bldg. 88 – 1,310 SQFT
· Bldg. 126 (126-0B, 126-01, 126-02, 126-03, 126-04, 126-05, 126-06, 126-07, 126-08, 126-09, 126-10, 126-11) – 338,112 SQFT
· Bldg. 126OP (126OP-0B, 126OP-01, 126OP-02, 126OP-03, 126OP-UP) – 81,000 SQFT
· Bldg. 136 – 1,049 SQFT
· Bldg. 138 (138-0B, 138-01, 138-02) – 61,658 SQFT
· Bldg. 149 – 49,505 SQFT
· Bldg. 150 (150-0B, 150-01, 150-02) – 140,434 SQFT
· Bldg. 151 – 1,659 SQFT
· Bldg. 152 – 1,182 SQFT
· Bldg. 153 – 300 SQFT
· Bldg. 155 – 630 SQFT
· Bldg. 160 – 5,791 SQFT
· Bldg. 161 – 12,267 SQFT
· Bldg. 167T – 6,485 SQFT
· Bldg. 171 – 13,847 SQFT
· Bldg. 172 – 290 SQFT (Refer to LB Site Plan for building locations).
Notes:
1. No Phase I Site Assessment has been commissioned in the past 5 years.
2. Some of the buildings or areas within the buildings have been renovated within the past 10 years. These include but not limited to: Bldg. 126OP All floors, B126 Kitchen area in the basement, Areas of Bldg. 126 1st floor such as Phlebotomy and main entrance.
3. For potholing: Scope to include 40 potholes. Contractor shall provide costs for any additional single necessary potholing.
It shall be the Contractor’s responsibility to identify the applicable federal, state, local laws and regulations, and Veterans’ Health Administration (VHA) Directives, and apply the procedures and protocols as required. The survey shall include accessible areas of all site buildings and, if present, suspect materials on the interior and exterior of buildings and in basements, penthouses, mechanical spaces, crawlspaces, to include above ceiling inspection for presence of Asbestos, Lead Based Paint and Other Hazardous Materials (ALBHM) and roofs. Survey to include soil samples for presence of hazardous materials, Ground Penetrating Radar (GPR), Excavation & Site Potholing. Inaccessible suspect materials shall be noted as presumed ACM (PACM). Specific tasks to be performed during the survey shall include but are not limited to the following:
1. The Contractor shall perform a thorough review physically at the Tibor Rubin VA Medical Center, Long Beach, CA (VALBMC) of existing building records to include previous physical surveys and hazard assessments, drawings, specifications, past abatement actions (when information is available), inspection reports, industrial hygiene data, maintenance records, and reports/findings of independent asbestos surveys.
2. The Contractor shall document the presence or absence of Asbestos, Lead Based paint and other Hazardous Materials (ALBHM) per this Scope of Work on AutoCAD drawings, reports, and provide data on an Excel spreadsheet to be used in ArcGIS which is what VALB currently has to track facility spaces data (Space Viewer).
3. The Contractor shall provide a complete new ALBHM survey plan while referring to the prior Baseline Hazardous Material Assessment Surveys, to ensure compliance with EPA, AQMD, AHERA, and OSHA. Note: past baseline surveys should only be used as a reference document and should not replace the accredited Building Inspectors responsibility to collect any additional information and/or bulk samples necessary to meet AHERA requirements. Previous surveys completed lacked overall accuracy; hence cannot be used as a confirmatory document. VALBMC will supply the existing survey for the contractor’s reference.
4. The Contractor shall identify, quantify, and assess all ALBHM and suspect during the survey and categorize each material according to the Asbestos Hazard Emergency Response Act (AHERA) physical and hazard assessment system and AHERA response categories. Inaccessible suspect material shall be noted in the database as presumed ACM and/or ALBHM. These areas of PACM shall be submitted to the VA. The VA will obtain contractor support to allow for testing of PACM as applicable.
5. All information collected as part of this SOW shall be incorporated into a system such as ArcGIS using Microsoft Excel. The contractor shall work in conjunction with the VA to provide deliverables that will be used to upload into existing site plan database after survey is completed.
6. The Contractor’s accredited Building Inspectors shall conduct a Physical Assessment and Hazard Assessment of friable and non-friable ACM in every accessible building space included in the survey; identify types, locations, quantities and conditions of ACM and locations and quantities of presumed ACM present using the AHERA protocol.
7. Due to possible presence of asbestos in vinyl asbestos tile the contractors must be capable of performing microscopy sampling.
8. The Contractor’s accredited Lead Inspector shall test potential LBP coated surfaces using an X-Ray Fluorescence (XRF) instrument. Paint chip sample method should only be used to confirm inconclusive XRF results.
9. The Contractor shall provide an asbestos operations and maintenance (O&M) plan that is in compliance with the asbestos O&M requirements specified in 40 CFR 763.91(Operations and maintenance) of the AHERA Rule.
10. The Contractor shall develop and provide awareness training (asbestos awareness training) to the Engineering services and Occupational Safety and Emergency Management Service (OSEMS) in accordance with 40 CFR 763.92(Training and periodic surveillance) and 29 CFR 1910.10001(OSHA-Standard interpretations). The contractor shall be responsible for conducting two (2) training sessions for all shifts – Regular day shift and 2nd shift for FOD employees. Contractor shall develop training in Microsoft PowerPoint and applicable handouts in Microsoft Word. After contractor provides the training sessions; the contractor shall release the rights of the training materials to the Tibor Rubin VA Medical Center Contracting Officer Representative (COR).
5.0 Qualifications
The Contractor shall perform survey work with accredited persons meeting the inspector training requirements of EPA, HUD, State, and local requirements as may be required in the state where the work is being performed.
All Samples shall be transported under full chain-of-custody to an American Industrial Hygiene Association (AIHA) and or State accredited analytical laboratory for analysis.
All bulk sample analysis shall be conducted by laboratories who are accredited under the appropriate program such as: AIHA National Voluntary Laboratory Accreditation Program (NVLAP), or the EPA Environmental Lead Laboratory Accreditation Program (ELLAP), EPA National Lead Laboratory Accreditation Program (NLLAP).
The bulk samples resulting from the survey shall be managed or disposed of by the contractor in accordance with established federal and state rules and regulations.
The Contractor shall notify the COR as soon as possible (e.g., telephonically), and the Contracting Officer in writing within 24 hours, of any area(s) where, in the opinion of the Asbestos Building Inspector or LBP Inspector, where the airborne levels of asbestos fibers and/or lead particulate could reasonably be anticipated to exceed the OSHA Permissible Exposure Limit (0.01 fibers per cubic centimeter air (f/cc) for asbestos or 50 micrograms per cubic meter (ug/m3) for lead), respectively.
6.0 Contractor Compliance with Facility Safety and Health Requirements
Prior to start of project work, Contractor shall meet with the facility Chief of OSEMS and be briefed on facility safety and security procedures (e.g., response to fire alarm, lockout/ tagout, confined space entry, electrical safety). Contractor is always responsible for ensuring that all personnel (including subcontractors working under the general contractor) comply with all applicable local, state, federal and VA safety, health, environmental, and security requirements and regulations.
Contractor will comply with the hospital's Infection Control Program; contractor will meet with Infection Control Nurse (Nurse Epidemiologist) prior to conducting any material sampling and provide infection control measures that, in the opinion of the Nurse Epidemiologist, are necessary during sampling for a safe and healthy environment for patients and staff. A Pre-Construction Risk Assessment (PCRA) will determine the need for an Infection Control Risk Assessment (ICRA) permit. See PCRA and ICRA permits for control measures needed depending on the area work is needed. Permit will be coordinated with the COR and Infection Control.
6.1 Medical Certification
Contractor shall provide written evidence, prior to commencement of this project, that all of its field employees who will be potentially exposed to asbestos during this project are:
Asbestos:
1. Enrolled in a medical surveillance program for asbestos disease which meets current OSHA requirements outlined in 29 CFR 1910.1001(M)(3)
2. Been medically cleared to wear a negative pressure, air-purifying respirator per 29 CFR 1910.134(F)
3. Fit-tested the same make and model of negative pressure, air-purifying respirator as may be utilized during this project. Complete documentation shall be provided to the COR prior the start of the project and included in the reports.
4. Contractor shall also provide written evidence of current AHERA accreditation (Building Inspector, Management Planner and/or Project Designer, as applicable) and applicable state licensure.
Lead-based paint:
1. The contract must be enrolled in a medical surveillance program for lead which meets current OSHA requirements outlined in 29 CFR 1926.62(j) or appropriate state requirements.
2. Have been medically cleared within the past 12 calendar months to wear a negative pressure, air-purifying respirator per 29 CFR 1926.62(d)(3)
3. Fit-tested the same make and model of negative pressure, air-purifying respirator as may be utilized during this project. Complete documentation shall be included in the Bid + Submittals.
4. Contractor shall also provide their qualifications/certifications of current LBP inspector certification, and applicable state licensure.
6.2 Tuberculosis (TB) and Flu Requirements
Prior to start of work within the healthcare occupancies, all contractors’ workers that will be working in patient occupied spaces shall submit for approval to the Contracting Officer TB screening and certificate of results. TB testing shall have occurred within 60 days of notice to proceed. All workers that work in the healthcare facility shall have the TB test with certification submitted to the Contracting Officer for approval by the Tibor Rubin VA Medical Center Infection Control practitioner.
Prior to start of work within the healthcare occupancies, all contractors’ workers shall comply with VHA Directive 1192.01 during flu season.
6.3 COVID-19
1. All workers shall be required to follow CDC guidance and social distancing guidelines about COVID-19 prevention. Workers are always required to wear masks (except for medical reasons and must obtain prior approval) while on campus. Workers are also required to obtain the daily wristband from one of VALBHCS screening stations on campus before start of work.
2. Contractor shall also comply with all COVID-19 screening requirements currently in effect at the Tibor Rubin VA Long Beach Medical Center during the term of the contract.
3. The Covid-19 pandemic requires flexibility of the contractor due to the evolving nature of our understanding of the virus and the require response. Protocols may change moving forward.
6.4 Security and Sensitive Areas
1. General areas of the Tibor Rubin VA Medical Center facilities may be accessed by the contractor with as little as one day notice to the COR. Sensitive and security areas require special approval for access and access may be available by special appointment only. Access into these areas shall be scheduled with Tibor Rubin VA Medical Center at least one (1) week in advance and will be rescheduled if the requested dates and times are not convenient for the functioning of the using service. COR will assist in scheduling with the using services. These areas include:
a. Bldgs. 126, 150, 133, 164 and 166 – Patient care areas (e.g. patient rooms and exam rooms) (Special appointment). Ambulatory areas shall be visited after normal working hours only.
b. Bldg. 126, 5th Floor – Operating Rooms (Special appointment and prime time only)
c. Bldg. 126, 7th Floor – SPS Rooms (Special Appointment)
d. Bldg. 126, 3rd & 4th Floor – ICU (Special Appointment)
e. Bldg. 126, 6th & 9th Floors – Special procedures and GI Procedure Rooms (Special Appointment)
f. Bldg. 2 & Bldg. 164 – Pharmacy Clean Areas (Special appointment)
g. Bldg. 7 – Agent cashier (Special appointment)
h. Bldg. 165 – Canteen Area (Special appointment)
i. Bldg. 138 – (Special Appointment and 4 hrs. training by VA for all field staff)
2. Additional areas designated as “sensitive and security areas” may be added as needed.
3. Contractors that will be working on VA premises will require VA badges after completion of background check and shall always have the issued badge visible. Background checks can take up to 30 days. Badging will be coordinated with the COR before start of project.
4. Photographing shall be limited to deficiencies noted during the survey only. Any photographing of other areas is prohibited unless permission is provided by the COR. Photographing of patients is strictly prohibited.
5. Contractor shall check-in with the COR before entering any sensitive and secure areas outlined here and any other areas that may be identified during the survey by the COR and/or VA Long Beach staff.
6. Contractor shall use parking lot I (North) only.
7.0 Sampling Procedures
7.1 Asbestos
The Contractor’s accredited Building Inspector shall conduct a Physical Assessment that groups all friable and non-friable ACM and suspected ACM in each functional space into the following three AHERA homogeneous material categories: Thermal System Insulation (TSI), Surfacing Materials (SM) and Miscellaneous Materials (MM), type (e.g., for TSI – “Magnesium silicate,” “Aircell,” “cork,” etc.), color, size, date of installation, etc. and then sampled in a representative manner in accordance with the appropriate AHERA protocol as necessary when confirmatory testing is needed.
The Contractor’s accredited Building Inspector shall also conduct a Hazard Assessment in each functional space where friable and non-friable ACM and suspected ACM is present to evaluate the risk posed by each of the following factors:
(1) Accessibility
(2) Occupancy (e.g., continuous, intermittent or occasional and patients/staff/visitors), (
3) Potential for air erosion
(4) Potential for vibration damage and,
(5) Potential for disturbance / damage (e.g., exposed and in an accessible location) and (6) Potential for water damage
The Contractor shall collect all samples of suspected ACM in accordance with EPA and OSHA regulations preventing airborne fiber exposure to the surveyor, patients, visitors and staff. Samples taken in occupied office spaces shall be taken in locations that minimize the risk of potential exposure to occupants and visual impact of the resulting sample location. No sampling of ACM or suspect ACM in occupied areas shall be conducted without first notifying the VA COR, prior to the sampling event. The Contractor is responsible for restoring visible sample locations to a condition as close to original as possible. The Contractor shall encapsulate all locations to prevent any subsequent release of asbestos fibers after sample collection (to include floor tile & mastic locations). The Contractor shall mark sample locations, an exception to this are conspicuous sample locations within occupied areas. The Contractor shall photograph sample locations at the time of sample collection to aid in future identification of sampling location. Prior to the commencement of the physical assessment, the contractor shall provide a current negative exposure assessment for the asbestos bulk sampling operations that are similar to the sampling operations that will be conducted at the Tibor Rubin VA Medical Center, Long Beach, CA (VALBMC). This is required to ensure that the asbestos bulk sampling operations are expected to be consistently below established OSHA permissible exposure limits (PELs). This information will be provided to the COR.
Where sampling is required of accessible suspect materials, Building Inspectors shall utilize inconspicuous sample locations and employ methods least destructive to finished surfaces. All destructive samples require VA COR approval prior to performing task. Building Inspectors shall use non-destructive means for collecting samples whenever possible.
Quantities of ACM shall be measured wherever practical to minimize the use of estimated material quantities in the final report.
Sample results from the Baseline Asbestos Survey may be utilized in lieu of new sampling based upon the determination of the facility COR.
Roofing materials, where required, shall be sampled to the extent that they do not compromise the integrity of the roof membrane or void the manufacturer’s warranty.
All inaccessible or accessible areas (those requiring destructed access such as above plaster ceilings or behind plaster walls or pipe chases) shall be noted in the report and on the CAD drawings. Contractors are not required to, nor allowed to, cut through solid building structures that do not have access openings, in an attempt to reach suspect ACM for visualization and/or sampling. In these cases, contractor shall provide estimated quantities of presumed ACM.
The Contractor may implement a stop at first positive strategy of analysis to conserve limited funding resources.
Except where it is documented that areas are free of ACM, such as in new construction or areas that have been totally total renovated, all accessible building interiors and exteriors shall be visually inspected to identify all friable and non-friable ACM, suspect ACM and presumed ACM.
7.2 Lead Based Paint
Lead based paint (LBP) testing shall be divided into two subcategories: residential and nonresidential buildings.
Buildings which are owned by the VA and used as a residence shall be comprehensively tested.
Non-residential buildings owned by the VA shall be tested to identify patterns of LBP.
The results will be used by the VA to prepare lead in construction exposure assessments and LBP removal estimates.
The Contractor shall develop a sampling plan (the “Plan”) consistent with the HUD LBP inspection strategies for a multifamily housing development or building sites. The plan shall take into consideration construction and maintenance history. The plan shall determine which surfaces can be grouped together for inspection purposes based on similarity of construction materials and common maintenance histories, how representative surfaces will randomly be tested, and how test results will be statistically evaluated.
Lead surveys will utilize X-Ray testing as a means of establishing homogeneous areas. If necessary, paint chip samples may be collected for laboratory atomic absorption (AA) analysis.
Suspect LBP shall be tested using an XRF Analyzer or through the collection of paint chips when XRF results are inconclusive, which shall be analyzed by an American Industrial Hygiene Association (AIHA) accredited analytical laboratory. Testing shall be performed by a Lead Inspector licensed in the state where the facility is located, and who has at least 10 years’ experience. Testing shall follow U.S. Housing and Urban Development (HUD) guidelines.
All laboratories used for analysis of bulk samples for lead shall have successfully participated in the Environmental Lead Proficiency Analytical Testing Program and shall have accreditation in the National Lead Laboratory Accreditation Program. All bulk sample analysis shall be conducted by laboratories who are accredited under the appropriate program such as: AIHA National Voluntary Laboratory Accreditation Program (NVLAP), or the EPA Environmental Lead Laboratory Accreditation Program (ELLAP), EPA National Lead Laboratory Accreditation Program (NLLAP)
7.3 Other Hazardous Materials
7.3.1 Mercury and polychlorinated biphenyls (PCBs)
The contractor shall assure a sufficient sample size should be collected to ensure the laboratory can measure the concentrations of PCBs at levels required by the PCB cleanup and disposal regulations per 40 CFR part 761.61.
The contractor shall adhere to EPA “How to test for PCB and Characterize Suspect Materials”:
Bulk solid samples - Bulk solid samples include such materials as caulk, soil, and sand. Bulk solid sampling typically includes removing a small portion of the potentially contaminated material for analytical testing. For example, a caulk sample would be the quantity of caulk needed by the laboratory for analytical testing, removed directly from the suspect area. Take care to ensure that only the caulk is included in the final sample and not other adjacent materials, such as wood or concrete that may skew the sample analysis results.
When soil or sand samples are collected, consider whether the PCBs are on the soil surface or if they could be located deeper in the soil. An example of when PCBs might be on the soil surface would be if fragments of weathered caulking were deposited on undisturbed soil surfaces. Alternatively, PCBs could be located deeper in the soil, in locations such as landscaping areas where the soil surface has been disturbed or where new soil has been added.
Porous surface samples - Because PCBs can migrate into porous surfaces (e.g., brick, masonry, concrete or wood) surface wipe sampling is not adequate to characterize the PCB concentration of porous surfaces. Instead, core samples should be collected on a bulk basis (i.e., mg/kg) to collect the top 0.5 to 2 cm of the porous surface. For these porous surface samples, an adequate sample (as determined by the analytical laboratory) should be removed for analysis. Tools such as chisels, drills, and saws can be used to collect the sample, taking care to minimize dust generation. The samples should be collected from the top 0.5 cm to 2 cm of the surface closest to the likely source of PCB contamination.
Non-porous surface samples - If the surface being sampled is smooth and impervious (e.g., unpainted metal surfaces), a hexane-saturated wipe sample can be collected to determine if the surface is contaminated with PCBs. A standard wipe test, as specified in 40 CFR 761.123, uses a 10 cm by 10 cm (or equivalent that equals 100 cm2) template to outline the sample area and a gauze pad or glass wool that has been saturated with hexane to collect the sample. The hexane-saturated wipe is used to thoroughly swab the area inside the 100 cm2 template. Care must be taken to assure proper use of the sampling template, as the sample results will be based on the 100 cm2 sample area (i.e., μg per 100 cm2).
Indoor air samples - Collect indoor air samples in accordance with EPA Methods TO-10A, TO-4A, or equivalent. Sufficient sample volumes, as referenced in the EPA Methods, should be collected to prove a minimum laboratory reporting limit of less than 0.1 μg/m3. Consult with the PCB Regional Coordinator for the number of samples to be taken and the type of sampling method to be used. Refer to epa.gov for Regional PCB Programs.
7.3.2 Hazardous/Universal Waste
The Contractor at minimum shall perform a visual inspection of the property building and surrounding areas on the property for the presence of other materials that might be considered hazardous and/or universal wastes. Visual inspection is limited to the following:
1. Refrigerants and other ozone-depleting substances, and radioactive
2. Any containerized hazardous substance observed at the Property was identified, such as 55-gallon drums, petroleum storage containers, aboveground storage tanks, etc.
8.0 Deliverables
Following completion of the field survey and analysis of samples, a survey report shall be prepared and shall include the following:
The contractor shall provide a separate section for each building, with each building as a subsection to the report.
An introduction including a brief description of the buildings, the protocols followed to conduct the survey, findings and recommendations. The Contractor’s inspectors shall use unique material location identifiers (using information such as building number, floor, number, room number, compass direction, room surface, sample ID number and material description) to describe Asbestos, Lead Based paint and other Hazardous Materials (ALBHM) and presumed ALBHM locations in the facility that is consistent throughout all reports to promote an ease of comprehension.
A schedule listing of those materials determined to contain or presumed to contain ALBHM with their locations and quantities (in linear or square feet, as appropriate for the ALBHM category). The schedule shall contain, at a minimum, Campus or site, Building Number, Floor, Room Number, material category (i.e., TSI, SM or MM), material type and quantity, a numerical priority ranking as determined by the AHERA-accredited Management Planner from 1-4 for response actions based on the AHERA-accredited Building Inspector’s Hazard Assessment findings, where one (1) represents the highest priority (e.g., removal or encapsulation) and (4) represents the lowest priority (6-month O&M surveillance), drawing number and photo ID (as applicable). All locations shall be indicated on the CAD drawings. Data tables shall be in Microsoft Excel, Access or other VA-approved format. Note: that this table shall serve as a summary table.
Additionally, the contractor shall create a separate summary of ALBHM quantities to include at minimum the following components: building number; listing of each type of ALBHM categories in separate columns; and quantities associated with each category. These dimensions shall be provided in square feet, linear feet, and/or cubic feet as appropriate for the ALBHM category. Facility totals shall be provided at the end of the table to include each group individually. This table shall be provided in Microsoft Excel. Lastly, the contractor shall provide a summary table of ALBHM liabilities to include at a minimum the following components: building number; listing of each type of ALBHM categories in separate columns; quantities associated with each category; and the corresponding liability amount in US dollars. These dimensions shall be provided in square feet, linear feet, and/or cubic feet as appropriate for the ALBHM category. Facility totals shall be provided at the end of the table to include each group individually. This table shall be provided in Microsoft Excel.
A tabular listing of those surfaces determined to contain, or potentially contain, elevated levels of lead base paint and their locations.
The Asbestos Management Plan shall include an Operation and Maintenance (O&M) plan, to include but not limited to, procedures for maintaining existing ACM.
Color drawings shall be prepared, in an AutoCAD (.dwg vector based) format or similar showing the location of ALBHM as well as sample locations and sample IDs on the drawings or similar with VA approval. Initial .dwg drawings of buildings will be provided by the VA. Contractor shall submit a layering and key plan that will be approved by the VA. At a minimum ALBHM will be on separate layers and contrast significantly to discern different sampling results:
1. Lab findings will have a hatch pattern that is color coded base on the findings
2. Visual indicators will be straight forward identifying the finding location and category The Result Section of the report shall include a description of the physical condition of the material in question that is appropriate to the survey item (e.g., AHERA categories “Good”, “Damaged” or “Significantly Damaged” in the case of friable ACM). Digital photos shall be used where they help the reader to understand an aspect of the material in questions. The Results Section of the report shall be provided in a spreadsheet format including as a minimum thumbnail digital pictures, location, type, condition, risk score (1-4), quantity, and comments.
The Conclusion Section of the report shall explain how and why the response action recommendations of the report were determined and prioritized.
CAD floor plan drawings shall be included in the report to help define material locations and to assist in planning for the abatement needs. The VA will provide to the Contractor the most current set of CAD drawings available for all applicable facility buildings.
As part of the deliverables, the Contractor must provide in the CD all data on a spreadsheet to be used in ArcGIS to capture reported data by building and room numbers which is what VA Long Beach currently uses to view our facility space information per building and room. Provide a spreadsheet with at a minimum the following fields”
1. Sample ID or Sample No
2. Building
3. Floor
4. Room
5. Surface Tested [1]
6. Material Tested [2]
7. Size
8. ALBHM Detected [3]
9. Type of ALBHM [4]
10. Quantity
11. Condition [1] Example: Floor, Ceiling, Door/Door Frame, Misc, Walls(s), Other (Specify) [2] Example: Resilient Floor Tile, Plaster, Wood and Metal, Cove Base, Wallboard w Joint Compound, Ceramic Title, Dry wall and Joint Compound, Other (Specify) [3] Example: Yes; No, Other (Specify) [4] Example: Asbestos, Lead Based Paint, Other (specify) Note: Contractor can add other fields as needed.
Building Floor and Room are crucial to allow us to use this data and join the date in ArcGIS and create a map showing the sample locations with the results of the survey. For any soil samples, contractor shall provide the coordinates so we can show the exact location on the facility map in ArcGIS.
8.1 Quality Control Plan
Contractor shall establish a quality control plan for all work, including that of his or her subcontractors, to assure compliance with the EPA, State, and AIHA requirements. Contractor shall notify appropriate State and/or Federal Environmental Agencies of Asbestos work as required. Contractor shall submit a copy of his/her quality control plan concurrently with the quote. Quality control measures shall include, but are not limited to:
1. Performing all required inspections and tests.
2. Listing all subcontractors and services they will perform.
3. Compliance with applicable Federal, state and local codes and regulations and VHA directives related to conducting the survey.
4. Participation in laboratory quality control programs (e.g., NVLAP, or other appropriate programs recognized by the EPA).
5. Correction of unsatisfactory sampling and testing.
6. Use of quality control samples and field blanks
Contractor’s Building Inspectors shall use the federal AHERA protocol for bulk sample collection. Surveyors shall each be an AHERA-accredited Building Inspector; Management Planner shall be an AHERA-accredited Management Planner; and asbestos project managers shall be AHERA-accredited Project Designer. Building Inspectors, Management Planners, Project Designers and LBP Inspectors shall have at least 10 years of similar experience with projects of substantially similar size and scope.
All laboratories used for analysis of bulk asbestos samples shall be NVLAP-Accredited. Initial analysis will be performed with polarized light microscopy.
Polarized light microscopy results ranging from less than one (1) percent to ten (10) percent may need additional analysis such as transmission electron microscopy. Therefore, the Contractor shall make arrangements with the laboratory to retain such samples in the event that additional analysis is requested. Additional analysis shall not be completed without prior authorization from the Contracting Officer of the Contracting Officer’s designee.
8.2 Meeting and Daily/Weekly Reports
Tibor Rubin VA Medical Center will provide the contractor with an orientation meeting in which the entire program will be discussed with the contractor and consultant to ensure compliance with all requirements and limit any rework.
Contractor is to provide a detailed project schedule, in both hardcopy and PDF format, at the initial meeting. It shall include milestones, review and response periods, site visits and surveys, and any anticipated meetings.
Contractor shall provide an activity report to the COR daily at a time designated in collaboration with the COR., including, but not limited to, a summary of the day’s activity, areas/rooms where access is needed, any documents needed, and any additional notes.
Contractor shall provide a status report of the work accomplished each week. This work shall be provided to the COR by COB every Monday.
8.3 Schedule of Deliverables
Contractor shall man-up this job pursuant to the table below.
| Submission # |
| BLOCK Included |
| Deliverables |
| Task Calendar Days from NTP |
| Contract Duration |
| Admin: Badging and kick-off meeting |
| N/A |
| 60 |
| 1 |
| Phase 1: |
Bldgs. 5, 5A, 5B, 5C, 6, 43, 48, 50, 88, 149, 167T, 171
| Submission #1: 35% Completion |
| 44 |
| 104 |
| Joint Review Meeting |
| 10 |
| 114 |
| Submission #2: 65% Completion |
| 20 |
| 134 |
| Joint Review Meeting |
| 10 |
| 144 |
| Submission #3: 95% Completion |
| 10 |
| 154 |
| Final Review Meeting |
| 8 |
| 162 |
| 4 |
| Phase 2: |
Bldgs. 138, 160, 161, 150
| Submission #1: 65% Completion |
| 35 |
| 197 |
| VA Review Meeting |
| 10 |
| 207 |
| Submission #3: 95% Completion |
| 12 |
| 219 |
| VA Review Meeting |
| 10 |
| 229 |
| 6 |
| Phase 3: |
Bldgs. 126, 126OP
| Submission #1: 65% Completion |
| 35 |
| 264 |
| VA Review Meeting |
| 10 |
| 274 |
| Submission #3: 95% Completion |
| 12 |
| 286 |
| VA Review Meeting |
| 10 |
| 296 |
| 8 |
| Phase 4: |
Bldgs. 1, 2, 7, 8, 151, 152, 153, 155, 172
| Submission #1: 65% Completion |
| 35 |
| 331 |
| VA Review Meeting |
| 10 |
| 341 |
| Submission #3: 95% Completion |
| 12 |
| 353 |
| VA Review Meeting |
| 10 |
| 363 |
| Submission #1 65% Completion |
| 10 |
| 373 |
VA Review Meeting
| Submission #3 95% Completion |
| 35 |
| 408 |
VA Review Meeting
| 12 |
| FINAL: All Bldgs. |
| Final Submission: Full ALBHM Assessment 100% Completion |
| 12 |
| 420 |
| Final VA Review Meeting |
| 12 |
| 432 |
Total Duration of Contract
432 calendar days
8.4 Distribution of Deliverables
1. Each progress submission shall have the following deliverable distribution
a. Five (5) – Half size color drawings
b. One (1) –8 ½” x 11” - 3 Ring Binders.
i. Schedule Lab Reports with ALBHM identifiers in color
ii. 11”x17” sheet size drawings folded to fit
c. One (1) - electronic copy (CD) of all documents in AutoCAD (drawings), PDF formats (All documents) and Excel (Data by building and room #)
2. Final submission shall include:
a. One (1) – Full size color print (30x42)
b. Two (2) – Half size laminated ALBHM drawings
c. Two (2) – Half size color ALBHM drawings
d. Two (2) – 8 ½” x 11” - 3 Ring Binders.
i. Schedule Lab Reports with ALBHM identifiers in color
ii. 11”x17” sheet size drawings folded to fit
e. Two (2) – Electronic Copies (CD) of all documents in:
i. AutoCAD (drawings)
ii. PDF formats (All documents)
iii. Excel (Data by building and room #)) – reported data on a spreadsheet to be uploaded to ArcGIS.
3. All bound items shall have the following:
a. Prominent identification on both spline and front cover.
b. Each section shall be divided by professional dividers.
c. Complete Table of Contents.
d. Date of submission, submission number, and project number on both spline and front cover of binder.
e. All information shall be divided by buildings.
f. All drawings to be 11x17 folded.
4. All submission documents shall bear the signed stamp of the Certified Industrial Hygienist and Environmental Health & Safety consultants. They shall stamp and sign with their certification.
9.0 Schedule & Operational Hours
The contractor will submit a schedule of proposed operations for approval. The schedule is subject to change so that the contractor’s work does not conflict with or otherwise disrupt normal government operations. The majority of the work to be provided under this contract shall normally be accomplished between 7:30am and 4:00pm, Monday through Friday, except Federal Holidays, unless otherwise approved by the COR. Certain areas such as the ambulatory and patient care areas will require the survey to be performed after normal working hours which include weeknights and weekends. All work shall be performed in such a manner that there will be minimum interruption, or interference with, the proper execution of the Tibor Rubin VA Medical Center operations. Contractor must adjust the schedule for areas with patient care to be completed during after-hours if needed. Contractors must obtain written permission from the Contracting Officer at least 4 working days prior to work on Saturdays, Sundays, or Federal holidays. The following federal holidays are observed:
| New Year’s Day |
| January 1st |
| Martin Luther King’s Birthday |
| Third Monday in January |
| President’s Day |
| Third Monday in February |
| Memorial Day |
| Last Monday in May |
| Juneteenth |
| June 19th |
| Independence Day |
| July 4th |
| Labor Day |
| First Monday in September |
| Columbus Day |
| Second Monday in October |
| Veteran’s Day |
| November 11th |
| Thanksgiving Day |
| Fourth Thursday in November |
| Christmas Day |
| December 25th |
10.0 Inspecting
The Contractor shall perform survey activities in a manner that will minimize the survey team; VA patients; visitors; and staff’s exposure to asbestos fibers, lead dust, and other hazardous material. The contractor shall immediately notify the VA COR and Safety Officer of any imminent asbestos or lead hazards encountered during the course of the survey (i.e., any condition that could potentially exceed the asbestos and/or lead PELs). The contractor shall likewise notify the VA COR and Safety Officer of any areas where access should be limited, and signs erected immediately to warn of asbestos or lead health risks.
11.0 Furnished Property
Contractor shall provide all the labor, materials, equipment and transportation necessary to conduct the survey, collect samples, perform lab analysis and produce required deliverables.
12.0 Stop Work Order
Contracting Officer, Chief of OSEMS, COR, and the Chief, VA Police Service or their designated representatives (e.g., occupational safety & health staff, VA Police Officers) may present a verbal stop work order to Contractor. A stop work order may be issues if Contractor is advised of any imminent or serious health or safety hazard which Contractor is creating, and which Contractor refuses to take immediate, appropriate corrective action to mitigate. Such a verbal stop work order shall be followed by a written stop work order within 24 hours by the Contracting Officer to the Project Manager. Work will not be allowed to resume until authorized by the Contracting Officer, after consultation with the Chief of OSEMS, VA Police Service and COR, to ensure that the imminent or serious health or safety hazard has been abated.
PAGE
_1789807167.pdf
VHALONSobhaS
Rectangle
Polygon
Text Box
PHASE 1
PHASE 4
PHASE 2
PHASE 3
_1802756061.pdf
File details come from the government source that posted it. Updated .