Attachment A - Schedule of Items.docx

DOCX document 18 KB Posted

Attached to
Einstein Mine Site Inspection, US Forest Service, Mark Twain National Forest
Solicitation number
12444522Q0062
Issued by

View the file

Other files

File Type Posted
Pre Bid Site Visit Sign In 8_16_2022.pdf PDF
SF30 Amend3 12444522Q0062.pdf PDF
SF30 Amend2 12444522Q0062.pdf PDF
Pre-Bid-Meeting-Sign-In-Sheet.docx DOCX document
Attachment B - Statement of Work EinsteinMine rv.docx DOCX document
QA-Pre-bid meeting at Einstein Mine.docx DOCX document
12444522Q0062 Rv.docx DOCX document
General Questions and Answers.docx DOCX document
SF30 Amend1 12444522Q0062.pdf PDF
12444522Q0062.docx DOCX document
Attachment C - Wage Determination.docx DOCX document
Attachment B - Statement of Work EinsteinMine.docx DOCX document
Appendix 1 Tables of DU priority levels.docx DOCX document
Attachment D - Experience Questionnaire.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A – Schedule of Items Mark Twain National Forest, Einstein Mine Inspection

SCHEDULE OF ITEMS

SCHEDULE OF ITEMS & Deliverables Schedule Electronic text submittals will be in both Word and Adobe Acrobat, and figures and maps will be as PDFs, and in ArcGIS format with geospatial layers included with the Final Report deliverable.

Schedule A Line Items
Time Schedule (calendar days from award or calendar date)
Deliverable Specifications
Lump Sum Price
Task 1
Work to begin
Mobilization and demobilization for field sampling
Task Subtotal $
Task 2
Field Sampling Services should commence no later than 60 days after notice to proceed is issued.
Sampling of Priority 1 DUs
Task Subtotal $
Task 3
Laboratory Analytical Services preliminary unvalidated results 60 days from completion of field sampling
Laboratory analysis of Priority 1 DUs. Electronic, recipients provided to the OSC
Task Subtotal $
Task 4
Field Sampling Services should commence no later than 60 days after notice to proceed is issued.
Sampling priority 2 DUs
Task Subtotal $
Task 5
Laboratory Analytical Services preliminary unvalidated results 60 days from completion of field sampling
Laboratory analysis of Priority 2 DUs. Electronic, recipients provided to the OSC
Task Subtotal $
Task 6
Field Sampling Services should commence no later than 60 days after notice to proceed is issued.
Sampling of Priority 3 DUs
Task Subtotal $
Task 7
Laboratory Analytical Services preliminary unvalidated results 60 days from completion of field sampling
Laboratory analysis of Priority 3 DUs. Electronic, recipients provided to the OSC
Task Subtotal $
Task 8
Laboratory Analytical Services Level III validated results delivered 90 days from completion of the field sampling
Level III validated laboratory results. Electronic, recipients provided to the OSC
Task Subtotal $
Task 9
SI Report Draft- 60 Days from receiving lab analytical data
In the SI Report Draft Final and Final, and separable from it in Excel
Task Subtotal $
Task 10
SI Report Final- 21 days from receipt of USFS acceptance of the SI Draft Report from the OSC
Electronic PDF of entire project, data in Excel also, to the OSC
Task Subtotal $
Grand Total
$

Complete the schedule above and provide backup documentation for the pricing of each item in the format contained in your quote. (ie: Program manager 5 hours x $130 per hour, CADD Operator 10 hours x $75 per hour, etc.)

It is the Government’s intent to award one firm fixed price award will result from this solicitation. The quoter shall submit pricing for all items.

_________________________________________________________
ContractorUEI# (formerly DUNS)
__________________________________________________________
SignatureDate