Attachment_A_-_Sample_Job_List.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- Electric Motor Repair
- Solicitation number
- 26-B-134LS
- Issued by
- Volusia County, Florida
About this file
This is a Sample Job List attachment for an electric motor repair contract opportunity issued by Volusia County, Florida. The document serves as the pricing template that contractors must complete to submit their bid for electric motor repair services. Volusia County operates approximately seven wastewater treatment facilities, nine water treatment facilities, and 126 sewer lift stations, with electric motors ranging up to 100 horsepower. The sample job list includes eleven representative motors of varying specifications sourced from different county facilities, including Southwest Regional WWTP, Spruce Creek WTP, Halifax Plantation WTP, and lift stations. Contractors are required to complete all green-shaded fields in the spreadsheet, with failure to do so resulting in a non-responsive bid determination. The award will be based on the lowest total cost across all eleven motors, and contractors must submit the completed Attachment A in the Vendor Questionnaire Section 5.1.
The pricing structure requires contractors to provide an hourly labor rate and a percentage markup over actual parts costs for the proposed repair work, which includes disassembly and inspection, rewinding, baking and dipping, machine work, bearing replacement, heat strip replacement, reassembly, testing, and painting. Contractors must also specify warranty periods (minimum 15 months for both labor and parts), response times for regular orders (minimum 24 hours) and emergency orders (minimum 16 hours), and service availability including normal business hours (8:00 a.m. to 5:00 p.m. Monday through Friday), overtime rates (5:01 p.m. to 7:00 a.m. Monday through Friday), weekend and holiday service, and a flat-rate service call fee to include travel, mileage, and labor. All other fields in the spreadsheet, such as total hours, total labor costs, parts costs, and total repair costs for each motor, are automatically calculated based on the contractor's submitted rates and markup percentage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Electric_Motor_Repair.pdf | ||
| Required_Types_and_Limits_of_Insurance.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample job list Electric Motor Repair Attachment A- Sample Job List
| Vendor Name: | |||||||
| Contractors are required to complete all fields shaded in green. Failure to complete all green shaded fields may deem Contractor non-responsive. All other fields will be automatically calculated. Award will be based on the lowest total cost in the yellow highlighted field. Contractor shall upload completed Attachment A - Sample Job List in Vendor Questionnaire Section 5.1. | |||||||
| Motor 1 | Motor 2 | Motor 3 | Motor 4 | Motor 5 | Motor 6 | ||
| SW Regional WWTP | |||||||
| (reuse pump) | SW Regional WWTP | ||||||
| (RAS pump) | SW Regional & Del North WWTP | ||||||
| (aerators) | SW Regional WWTP | ||||||
| (reuse pump) | Spruce Creek WTP | ||||||
| (HSP #1) | Spruce Creek WTP |
(well #3)
| Manufacturer | General Electric | Baldor/Leeson | Toshiba/US | US | General Electric | General Electric | |
| Model # | WWES-18-184T | BF68 | 5KS286BL215 | 5KS286PTP6034 | |||
| Serial/ID # | ZPG503225 | 10590.GBJ | F207-50-J11U254RO56M | KD8 82001329-001R-07 | NTP 2051MST1A | ||
| Type | Vertical mount hollow shaft KS | Horizontal mount TEFC | Horizontal mount DL | Vertical mount hollow shaft | Horizonal mount | Vertical mount hollow shaft KS | |
| Frame | L326TP16 | 184T | 32544T | 404TP | 286TS | L286TP16 | |
| HP | 50 | 5 | 40 | 100 | 30 | 30 | |
| Phase | 3 | 3 | 3 | 3 | 3 | 3 | |
| Volts | 230/460 | 230/460 | 230/460 | 230/460 | 230/460 | 460 | |
| AMPS | 124.2/62.1 | 13/6.5 | 94.8/47.4 | 237/118 | 73.0/36.5 | 87 | |
| RPM | 1775 | 1750 | 1775 | 1730 | 1765 | 1775 | |
| HZ | 60 | 60 | 60 | 60 | 60 | 60 | |
| Bearing #1 | 6212ZZC3 | 6306ZZ | 6211-2ZJC3 | 6212-J | 50BC03JP | 6210-2ZC3 | |
| Bearing #2 | 235A25ZZA C01 | 6306ZZ | 6311-2ZJC3 | 7222-BEM | 35BC02JP | ||
| VFD | YES | YES | YES | YES | NO | NO | |
| Work to be performed | M1 Repair Cost | M2 Repair Cost | M3 Repair Cost | M4 Repair Cost | M5 Repair Cost | M6 Repair Cost | |
| Sample pricing submitted below shall be based on hourly rate and percentage markup provided below. Proposed work shall include dissasembly and inspection, rewind, bake and dip, machine work, replacement of bearings, replacement of heat strip, reassembly, testing and painting | |||||||
| Total # of Hours | |||||||
| Hourly Rate | |||||||
| Total labor cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Parts Cost | |||||||
| Total Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Motor 7 | Motor 8 | Motor 9 | Motor 10 | Motor 11 | Total for all 11 motors work to be performed | ||
| Spruce Creek WTP | |||||||
| (HSP #4) | Halifax Plantation WTP | ||||||
| (HSP #1) | Halifax Plantation WTP | ||||||
| (HSP #3) | Lift station | Lift station | |||||
| Manufacturer | General Electric | US | US | Smith & Loveless | Smith & Loveless | ||
| Model # | none | none | none | 13695-XX2978 | 12276-XX2977 | ||
| Serial/ID # | 62267 / T05T0680377R-1 | 80697055118-001R-1 | 80697025169-001R-1 | 836116E-3 | 852130A-1 | ||
| Type | Horizonal mount | Horizonal mount | Horizonal mount RE | Vertical mount YONO | Vertical mount YONO | ||
| Frame | 286T TE | 286T | 405TS | AWO-L210 | 215-AWO | ||
| HP | 50 | 50 | 125 | 7.5 | 2 | ||
| Phase | 3 | 3 | 3 | 3 | 3 | ||
| Volts | 230/460 | 230/460 | 460 | 230/460 | 230/460 | ||
| AMPS | 115/57.5 | 114/57 | 140 | 19.2/9.6 | 7.4/3.7 | ||
| RPM | 1775 | 1780 | 1780 | 1800 | 1800 | ||
| HZ | 60 | 60 | 60 | 60 | 60 | ||
| Bearing #1 | 6311-2Z-JC3 | 6311-JC3 | 5213-A | ||||
| Bearing #2 | 6211-2Z-JC3 | 6211-2Z-JC3 | 6212-2Z-J | ||||
| VFD | YES | YES | YES | NO | NO | ||
| Work to be performed | M7 Repair Cost | M8 Repair Cost | M9 Repair Cost | M10 Repair Cost | M11 Repair Cost | Work to be performed | |
| Sample pricing submitted below shall be based on hourly rate and percentage markup provided below. Proposed work shall include dissasembly and inspection, rewind, bake and dip, machine work, replacement of bearings, replacement of heat strip, reassembly, testing and painting | |||||||
| Total # of Hours | $0.00 | ||||||
| Hourly Rate | $0.00 | ||||||
| Total labor cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Parts Cost | $0.00 | ||||||
| Total Cost | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Not used for award purposes - for evaluation only | ||
| Hourly Rates - Per HR | Percentage of Markup Over actual Cost | Warranty |
| Normal Business Hours |
(Labor/Machine)
8:00 a.m. to 5:00 p.m Monday through Friday
Overtime
5:01 p.m. to 7:00 a.m.
Monday through Friday Weekends , and holidays observed by Volusia County Service Call
| Flat Rate - to include travel, milage and labor | Bearings | Parts | Service |
| (Minimun 15 months) | Parts |
(Minimun 15 months)
| Response Time | |
| Regular Order | |
| (minimum 24 hours) | Emergency Order |
(minimum 16 hours)
&"Arial,Regular"Page &P of &N image1.jpeg
File details come from the government source that posted it. Updated .