Attachment A RFP 25-PKS-082 East Synthetic Price Schedule.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- 25-PKS-082
- Issued by
- Jefferson County, Colorado
About this file
The document is a Price Schedule (Attachment A) for Request for Proposal (RFP) 25-PKS-082 issued by the City of Arvada, Colorado, for the Long Lake Regional Park East Synthetic Fields Replacement project. The procurement seeks a contractor to remove and replace the existing synthetic soccer fields, with the proposal requiring detailed pricing for removal, new turf system installation, infill options, and potential additional components like shock pad and backer board. The price schedule allows bidders to specify product names, labor and material costs, total system installation prices, and lead times for various project elements.
The pricing document provides a comprehensive template for vendors to outline their proposed costs, including options for two different infill types (Sand/Crumb Rubber and Organic Infill), with separate pricing for removal, new turf installation, materials, and labor. Bidders are required to specify product lead times, with sections for lead times from order receipt to shipping for different components. The document appears designed to facilitate a transparent and detailed cost comparison among potential contractors, enabling the City of Arvada to evaluate not just price, but also product quality, installation efficiency, and delivery timelines for the synthetic field replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-PKS-082 RFP Long Lake Regional Park E Synthetics Replacement.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
PRICE SCHEDULE
| RFP 25-PKS-082 Long Lake Regional Park East Synthetics Replacement |
| Bid # and Title |
Contractor
Address, City, ZIP
Telephone
| Prepared By | Date |
| Removal | Price |
| Remove and dispose of old Synthetic Turf |
| New Turf System/Installation | Product Name | Price |
| Proposed Synthetic Turf Product | ||
| Total Labor Costs | ||
| Total Material Costs | ||
| Total New System Install |
tc={DC0E41A3-8341-42FD-B034-0549647F099A}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
What's the difference between this and line 26? Should this be Total System/Installation Price?
Total Proposal Price
| Infill Products | Product Name, Estimated Quantity, Price per # | Price |
| Infill Option 1 - Sand/Crumb Rubber | ||
| Infill Option 2 - Organic Infill | ||
| Additional Shock Pad |
| Backer Board Liner Foot Price if Needed | Product Type | Price |
| Proposed Backer Board |
Lead Time tc={F4B8B53A-57A5-4A4C-BE9F-261E1DDF031E}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
Don’t know if this is applicable or not but threw it in, can be deleted.
tc={DC0E41A3-8341-42FD-B034-0549647F099A}: [Threaded comment]
Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924
Comment:
| What's the difference between this and line 26? Should this be Total System/Installation Price? | Product | Days |
| Lead Time from Receipt of Order to Shipping | Infill Option 1 - Sand/Crumb Rubber | |
| Lead Time from Receipt of Order to Shipping | Infill Option 2 - Organic Infill | |
| Lead Time from Receipt of Order to Shipping | Additional Shock Pad | |
| Lead Time from Receipt of Order to Shipping | Proposed Backer Board |
What's the difference between this and line 26? Should this be Total System/Installation Price?
Don’t know if this is applicable or not but threw it in, can be deleted.
Attachment A image1.jpeg
File details come from the government source that posted it. Updated .