This document is an Attachment A Project Specification for an automatic gates project in Adams County, Gettysburg, Pennsylvania, Project #11582574. The project includes the repair, replacement, and installation of a 25-foot cantilever aluminum sliding gate with a 1/2 HP commercial grade operator on the north side, as well as a 20-foot bi-parting cantilever aluminum sliding gate with minimum 1/3 HP master and slave units on the south side. The work also includes installing necessary posts, rollers, latches, and other required materials. The contractor is responsible for verifying the need for Pennsylvania Department of Labor & Industry permits and obtaining them if required. Detailed submittal requirements are provided, including engineered drawings, permits, certifications, warranties, and operation and maintenance manuals.
The document outlines specific material and equipment requirements, including gate frame, track, trucks, posts, latches, and electrical components like keypad access, remotes, ground loops, and safety systems. The contractor is required to provide a one-year warranty on materials and installation, and the manufacturer is required to provide a five-year warranty on the operator motor and controller. Payment terms or pricing information are not provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment D, Partial Site Plan.pdf | ||
| Attachment E, Reference Drawing.pdf | ||
| Attachment B - Green Plan.pdf | ||
| 2-25-14 Pre-Bid Conference.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A Automatic Gates
Adams County, Gettysburg 0810100 Project #11582574
I. Work Included
The following items are site specific requirements of the project.
A. Contractor to repair, replace and install the necessary materials to complete the work identified below.
B. Installation of a sliding gate with an automatic operator and a double sliding gate with automatic operators.
C. Additional earth or backfill required shall be provided by the Contractor and shall be free of boulders, large rocks, frozen clumps and debris.
D. Contractor is responsible to verify and provide documentation as to the determination if PA Department of L&I permits are required. If permits are required, contractor is responsible for providing all documents as needed to acquire.
E. MATERIALS
1. Aluminum Cantilever Slide Gate
a. Gate frames shall be made of 2” square aluminum tubing alloy 6063- T6 weighing .94 pounds per lineal foot and shall be welded at all corners so as to form a rigid one-piece unit. Fabric shall be securely stretched and held in the center of the 2” square tubing by use of hook bolts and tension rods on all four sides of the gate opening frame.
b. The track shall be a combined track and rail aluminum extrusion having a total weight of 3.72 pounds per foot and designed to withstand a reaction load of 1,200 pounds. One additional 2” square lateral support rail shall be welded adjacent to top horizontal rail. The bottom rail will be 2” x 4” tubing weighing 1.71 pounds per foot.
c. Gate leaf shall have a cantilever overhand as per manufacturer’s specifications.
d. All cantilever overhang frames shall have 3/8” brace rods.
e. Two swivel type zinc die cast trucks having four sealed lubricant ball bearing wheels 2” in diameter by 9/16” in width with two side rolling wheels to ensure alignment of truck in track shall be provided for each gate leaf. Trucks shall be held to post brackets by 7/8” diameter ball bolts with ½” shank.
Truck assembly shall be designed to take the same reaction load as the track.
f. Guide wheel assemblies shall be provided for each supporting post. Each assembly shall consist of two rubber wheels 4” in diameter with oil impregnated bearings and shall be attached to post so that the bottom 2”x 4” square horizontal member will roll between the wheels which can be adjusted to maintain plumb gate frames and proper alignment.
Adams County, Gettysburg 0810100 Project #11582574
g. The gate shall be installed on galvanized steel posts. Three 4” od gate posts shall be installed for each single slide gate leaf. Galvanized 4” od posts shall weigh 9.1 pounds per foot.
h. A positive latch shall be provided with provisions for padlocking.
i. All gate hangers, latches, brackets, guide assemblies and stops shall be galvanized pressed steel.
F. SUBSTITUTION OF PIPE
1. The Contractor shall have the option of substituting type SS- 40 pipe as manufactured by Allied Tube and Conduit Corp., Harvey, IL, in lieu of the pipe sizes as specified. The exception will be the 6-5/8” O.D. pipe for the gate posts.
2. All specifications covering the materials and coatings for SS-40 pipe (by Allied) shall be adhered to.
3. The contractor shall promptly remove from the work site all scrap materials and other debris relating to the project.
4. When erection is completed, clean, and touch up any damaged or abraded areas as per manufacturer’s recommendations.
G. GATE DESIGN - Both gate locations will have the following at them
1. Electrical - already exist at each gate locations, contractor to verify existing electrical for project completion
2. Adjustable torque limiter
3. Magnetic solenoid brake
4. Power on/off
5. Emergency stop/reset
6. Time to close
7. Ground loops – all ground loop wires are to be XLPE(cross linked polyethylene) in
PVC and installed with 3M Detector Loop Sealant Black 500 or an approved equal/better based performance properties. Department must approve prior to use. Min depth is to be 2.5” below existing grade
8. Safety loop wired and sealed that will activate an included bell or buzzer at its location
9. One linear thru beam system for safety – installed across opening
10. Surge protection for main power
11. A single pull disconnect adjacent to the operator
12. Wire termination in all supplied equipment and initial operation of gate system
13. Be full system compatible for access controls
14. 6’ High plus barbed wire
15. Onboard lightning protection
16. Operators are to be post mounted with galvanized steel post
17. Programmable auxiliary relays for future expansion to access control system
Adams County, Gettysburg 0810100 Project #11582574
H. 25’ clear opening single slide – North Side gate location, contractor to verify actual opening
1. Install a new cantilever aluminum slide gates with all necessary post, rollers and latches.
2. One 1/2 HP continuous duty commercial grade slide gate operator
3. Keypad access
i. Set back from gate a maximum of 30’, exact location to be determined during design
ii. Unit heights are to be at 7’-0” and 4’-6” vertically with a 4’ horizontal extension
iii. Located at left side of the exterior entrance
iv. Post are to be constructed of 2”square powder coated aluminum
v. Waterproof
vi. Programmable for minimum of 8 - 5 digit codes
vii. Illuminated number pad – each number to be backlit
4. Provide three 2-channel remotes – remotes are to match existing code of the overhead doors at the facility. Current remotes are Multi Code manufactured units
5. Free exit loop wired and sealed – set back 15’ from gate
6. Contractor install new post and fence material as needed to clear electrical conduit on adjacent fence. Post and fence material MUST be installed in a manner that does not allow access when gate is closed
I. 20’ clear opening double slide – South side gate location, contractor to verify
1. Install new bi-parting cantilever aluminum slide gates with all necessary post, rollers and latches
2. Minimum two 1/3 HP Master and slave units with dual gate hardwired communication
i. Existing electrical is to be re-routed directly to the operator which must have a disconnect on it
ii. Contractor is responsible for getting power across the driveway to the slave unit. All wiring is to be in conduit
3. Programmable auxiliary relays
4. High cycle, heavy duty
J. Delivery and Storage
1. Contractor is not to store any material on sight. If contractor is having materials delivered directly to the work site he must have his on representative on site to receive the delivery.
K. Warranty
1. Contractor
Adams County, Gettysburg 0810100 Project #11582574
2. Provide a one (1) year warranty starting once project is accepted as completed
3. Warranty covers materials and installation
4. All repairs/replacement will be at no additional cost to the Department
5. This warranty is to be writing
6. Manufacturer
7. Provide a five (5) year warranty on operator motor and controller
II. Submittals and final Deliverable items
1. The Department will provide the awarded contractor a complete breakdown of the required submittals based off of the “System” identified, I.E. “ Roofing System”
2. Contractor to provide three (3) copies of the entire project documentation in three (3) ring Binders.
3. Binders to include the following items:
a. Bid Documents & Specifications
b. All project meeting minutes (pre-bid, pre-Job, Interim, and Final inspection)
c. Email Correspondence
d. Submittals
e. L&I approved Engineered Drawings (Paper/CD)
f. L&I Building Permits, Inspection Logs, Occupancy Permit, Other correspondence
g. Certifications
h. Certified Payrolls (Prevailing Wage rates) N/A
i. Waste receipts
j. Photos Before, during and after
1) A sufficient amount of Photos is required for all phases of construction on all buildings, based on award.
2) Building Final-Exterior all four sides
k. Operation and Maintenance manuals
l. Contractors Warranty
m. Manufactures Warranty
III. SUBMITTAL PROCEDURE
A. Submit Two (2) copies of all items shown on submittal schedule except for "samples".
B. Identify project number, project name and location, and contractor's name and address on all submittals.
C. Provide space for review stamps of Contractor and Department. Put contractor stamp of approval on each item submitted.
Adams County, Gettysburg 0810100 Project #11582574
D. Revise and resubmit submittals as required, identify all changes made since previous submittal.
E. No work shall be performed until all submittals are approved by the Department.
Work performed prior to submittal approval is performed at the Contractor's risk and may be subject to repair, replacement or other corrective measures as deemed necessary by the Department with no additional contract time or money.
F. Review of shop drawings will be general and for the limited purpose of checking for general conformance with the design; and shall not relieve the Contractor from the responsibility for proper fitting and construction of the work, nor from furnishing materials and work required by the Contract which may not be indicated on the shop drawings when reviewed.
G. The submittals required by this contract are subject to reproduction for the Department's internal use only. By signature on this bid proposal, both the Contractor and the equipment manufacturer authorize the Department to reproduce any materials including printed literature and training aids, submitted in fulfillment of this contract.
IV. MANUFACTURER'S INSTRUCTIONS
A. When specified in individual specification sections, submit manufacturer's printed instructions for delivery, storage, assembly, installation, start-up, adjusting and finishing, and maintenance, in quantities specified for product data.
B. Identify conflicts between manufacturer's instructions and contract documents.
V. MANUFACTURER'S CERTIFICATES
A. When specified in individual specification sections or on submittal schedule, submit manufacturer's certificates to for review.
B. Indicate that material or product conforms to or exceeds specified requirements.
Submit supporting reference date, affidavits and certifications as appropriate.
C. Certificates may be recent or previous test results on material or product, but in all cases must be acceptable to Department.
VI. SUBMITTAL SCHEDULE
A. Abbreviations:
SoSu - Source of Supply CoCh - Color Chart DeDa - Descriptive Data or Catalog Cuts Cert - Certificates ShDr - Shop or Installation Drawings Samp – Samples
B. Schedule: (See next page.)
Adams County, Gettysburg 0810100 Project #11582574
Description of items to be submitted
SoSu DeDa ShDr CoCh Samp Cert
1. Cost Breakdown X X
2. Work Schedule X X
3. Engineered Stamped Drawings
X X X X
4. L&I Permit Documents
– if required
X X X
5. Waste receipts X
6. Digital Photos X
7. Final Deliverable Items 3 ring binder
X
8. Keypad Components X X X
9. Gate and Fence Materials
X X X
10. Concrete and Loop Sealant
X X
11. Warranties X
| H. 25’ clear opening single slide – North Side gate location, contractor to verify actual opening |
| I. 20’ clear opening double slide – South side gate location, contractor to verify |
| J. Delivery and Storage |
| K. Warranty |
| A. Abbreviations: |
| B. Schedule: (See next page.) |