This document is a price schedule for the grounds maintenance services contract at the Fort McClellan Post Cemetery. It lists the contract line item numbers (CLINs), descriptions, units, estimated unit costs, estimated quantities, and total costs for the base year and four option years. The CLINs cover a range of services such as headstone setting and realignment, sunken grave and turf repair, irrigation management, mowing, edging, leaf and debris removal, planting bed maintenance, weed control, and ceremony support. Some CLINs are subject to Davis-Bacon Act wage requirements. The total estimated value for the base year and all four option years is $0. The related federal contract opportunity is for Grounds Maintenance Services at Fort McClellan Post Cemetery, with Solicitation Number QSE--36C78624Q50104.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
955 GM with $0
| BASE YEAR - | ||||||||||||||||
| SOW | CLIN | Description | Unit | Est.Unit Cost | Est Qty | Total | ||||||||||
| 5% | opt 1 | 5% | opt2 | 5% | opt 3 | 5% | opt 4 | |||||||||
| 5b.1.2 | 0001 | Headstone Setting | EA | $0.00 | 3 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Davis Bacon Wages |
| 5b.1.3 | 0002 | Headstone Raise and Realign | EA | $0.00 | 71 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Davis Bacon Wages |
| 5b.1.4 | 0003 | Headstone Fine Tune Alignment (Bump and Run) | EA | $0.00 | 50 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.2.1 | 0004 | Sunken Grave, Grounds and Turf Repair, to include sod (419 Bermuda) Installation - includes spot watering of repaired areas during establishment period | SQFT | $0.00 | 1500 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Davis Bacon Wages |
| 5b.2.2 | 0005 | Floral / Decoration Pickup and Removal (Weekly Occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.1 | 0006 | Underground Sprinkler Irrigation Management, System Operations, Inspection, and Maintenance: 10 Months | MO | $0.00 | 10 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.2 | 0007 | Irrigation- Straight Time Hourly Rate - All labor For Repairs Will Be Charged at The Hourly Rate Indicated in The Schedule and Broken Down Into Quarterly Hour (15 min) Increments as Appropriate. Labor Rates For Irrigation Repairs To Be Provided on an "As-Needed / As-Requested" Basis (See Section 5b.3.2) - All Parts Provided By Government. | EA (15 Min) | $0.00 | 100 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Davis Bacon Wages |
| 5b.3.2 | 0008 | Emergency, Call Back For Repair Of Leaks (Mon – Fri, Duty Hours 8 Hour Response) | EA | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.2 | 0009 | Emergency, Call Back For Repair Of Leaks (Non-Duty Day, After Hours, 6 Hour Response) | EA | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.3 | 0010 | Mowing Turf Area (approx. .75 +/- acres) | WK | $0.00 | 43 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.4 | 0011 | Turf Edging (twice monthly) | WK | $0.00 | 22 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.5 | 0012 | Mowing Non-Turf Area (approx. 1 +/- acres) | WK | $0.00 | 24 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.6 | 0013 | Headstone, Marker, Monument and Other Verticle Surface Trimming (twice monthly) | WK | $0.00 | 22 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.7 | 0014 | Leaf, Trash, and Debris Collection and Removal (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.8 | 0015 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.3.9 | 0016 | Sweeping/Blowing Off Walkways, Roadways and Other Concrete Surfaces (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.4.1 | 0017 | Maintenance of Planting and Mulch Beds, to include tree rings, shrubs, hedges, and bushes, to include Trimming of shrubs, bushes and hedges (as needed, or directed by COR) | MO | $0.00 | 6 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.4.3 | 0018 | Mulching (Red mini pine bark nuggets) - Install and Replenish mulch to include all planting beds, all tree rings, bushes, shrubs, and other designated areas as defined by COR (May, Nov.) | JB | $0.00 | 2 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.5.1 | 0019 | Sod Installation on subsequent interment gravesites - includes spot watering during establishment period | EA | $0.00 | 3 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.5.2 | 0020 | Core Aerification (Aeration)(Approx. .75+/- acres) | JB | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.5.3 | 0021 | Dethatching (if required) | JB | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.5.4 | 0022 | Fetilization - 419 Bermuda - (Approx .75 +/- acres) (Mar, May, Jun, Aug) | JB | $0.00 | 4 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.5.5 | 0023 | Weed Control: Pre-emergent - Turf areas only (Approx. 0.75 +/- acres) (blanket application)- See Flow Chart - | JB | $0.00 | 2 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.5.5 | 0024 | Weed Control: Post-emergent - Turf areas only (Approx. 0.75 +/- acres) - (blanket application) - See flow chart | JB | $0.00 | 4 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.5.5 | 0025 | Weed Control: Mulch Beds and Rocked areas | JB | $0.00 | 4 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.5.6 | 0026 | Gypsum or Dolomitic Lime (Based upon Soil Test Results) | JB | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.6.1 | 0027 | Insecticide treatment/application to include Moles, Shrews, Bees, and Other Pest | JB | $0.00 | 3 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.6.1 | 0028 | Fire Ant control - blanket application - All areas - See Flow Chart | JB | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.6.1 | 0029 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart | JB | $0.00 | 10 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.6.1 | 0030 | Fungicide treatment/application | JB | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.7.1 | 0031 | Headstone and Monument Cleaning (Nov., May) | JB | $0.00 | 2 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.7.2 | 0032 | Pressure Washing / Cleaning of Entrance Ways, Walkways, Curbs, Retainign Walls, Fencing, Signage, Concrete pads/Bases under signs and trash and floral vase receptacles, includes Floral Vase and Trash receptacles (Oct, Feb, May, Aug) | QTR | $0.00 | 4 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.7.4 | 0033 | Painting Walk Bridge, Signage, and Retaining Wall, and Fence | EV | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Davis Bacon Wages |
| 5b.8.1 | 0034 | Ceremony support, to include set-up and take-down; includes providing one (1) ADA Compliant toilet and hand washing station | EV | $0.00 | 1 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.9.3 | 0035 | Committal Service setup and tear down | EA | $0.00 | 3 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 5b.9.1 | 0036 | Gravesite Excavation and Backfilling | EA | $0.00 | 3 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | Davis Bacon Wages |
| 5b.9.2 | 0037 | Transport of Casketed Remains and Floral Arrangements to Gravesite | EA | $0.00 | 3 | $0.00 | $0.00 | $ - 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Base Year - Total Cost | $0.00 | |||||
| OPTION YEAR 1- | ||||||
| SOW | CLIN | Description | Unit | Est.Unit Cost | Min Est Qty | Min Total |
| 5b.1.2 | 10001 | Headstone Setting | EA | $0.00 | 3 | $0.00 | Davis Bacon Wages |
| 5b.1.3 | 10002 | Headstone Raise and Realign | EA | $0.00 | 71 | $0.00 | Davis Bacon Wages |
| 5b.1.4 | 10003 | Headstone Fine Tune Alignment (Bump and Run) | EA | $0.00 | 50 | $0.00 | |
| 5b.2.1 | 10004 | Sunken Grave, Grounds and Turf Repair, to include sod (419 Bermuda) Installation - includes spot watering of repaired areas during establishment period | SQFT | $0.00 | 1500 | $0.00 | Davis Bacon Wages |
| 5b.2.2 | 10005 | Floral / Decoration Pickup and Removal (Weekly Occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.3.1 | 10006 | Underground Sprinkler Irrigation Management, System Operations, Inspection, and Maintenance: 10 Months | MO | $0.00 | 10 | $0.00 | |
| 5b.3.2 | 10007 | Irrigation- Straight Time Hourly Rate - All labor For Repairs Will Be Charged at The Hourly Rate Indicated in The Schedule and Broken Down Into Quarterly Hour (15 min) Increments as Appropriate. Labor Rates For Irrigation Repairs To Be Provided on an "As-Needed / As-Requested" Basis (See Section 5b.3.2) - All Parts Provided By Government. | EA (15 Min) | $0.00 | 100 | $0.00 | Davis Bacon Wages |
| 5b.3.2 | 10008 | Emergency, Call Back For Repair Of Leaks (Mon – Fri, Duty Hours 8 Hour Response) | EA | $0.00 | 1 | $0.00 | |
| 5b.3.2 | 10009 | Emergency, Call Back For Repair Of Leaks (Non-Duty Day, After Hours, 6 Hour Response) | EA | $0.00 | 1 | $0.00 | |
| 5b.3.3 | 10010 | Mowing Turf Area (approx. .75 +/- acres) | WK | $0.00 | 43 | $0.00 | |
| 5b.3.4 | 10011 | Turf Edging (twice monthly) | WK | $0.00 | 22 | $0.00 | |
| 5b.3.5 | 10012 | Mowing Non-Turf Area (approx. 1 +/- acres) | WK | $0.00 | 24 | $0.00 | |
| 5b.3.6 | 10013 | Headstone, Marker, Monument and Other Verticle Surface Trimming (twice monthly) | WK | $0.00 | 22 | $0.00 | |
| 5b.3.7 | 10014 | Leaf, Trash, and Debris Collection and Removal (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.3.8 | 10015 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | |
| 5b.3.9 | 10016 | Sweeping/Blowing Off Walkways, Roadways and Other Concrete Surfaces (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.4.1 | 10017 | Maintenance of Planting and Mulch Beds, to include tree rings, shrubs, hedges, and bushes, to include Trimming of shrubs, bushes and hedges (as needed, or directed by COR) | MO | $0.00 | 6 | $0.00 | |
| 5b.4.3 | 10018 | Mulching (Red mini pine bark nuggets) - Install and Replenish mulch to include all planting beds, all tree rings, bushes, shrubs, and other designated areas as defined by COR (May, Nov.) | JB | $0.00 | 2 | $0.00 | |
| 5b.5.1 | 10019 | Sod Installation on subsequent interment gravesites - includes spot watering during establishment period | EA | $0.00 | 3 | $0.00 | |
| 5b.5.2 | 10020 | Core Aerification (Aeration)(Approx. .75+/- acres) | JB | $0.00 | 1 | $0.00 | |
| 5b.5.3 | 10021 | Dethatching (if required) | JB | $0.00 | 1 | $0.00 | |
| 5b.5.4 | 10022 | Fetilization - 419 Bermuda - (Approx .75 +/- acres) (Mar, May, Jun, Aug) | JB | $0.00 | 4 | $0.00 | |
| 5b.5.5 | 10023 | Weed Control: Pre-emergent - Turf areas only (Approx. 0.75 +/- acres) (blanket application)- See Flow Chart - | JB | $0.00 | 2 | $0.00 | |
| 5b.5.5 | 10024 | Weed Control: Post-emergent - Turf areas only (Approx. 0.75 +/- acres) - (blanket application) - See flow chart | JB | $0.00 | 4 | $0.00 | |
| 5b.5.5 | 10025 | Weed Control: Mulch Beds and Rocked areas | JB | $0.00 | 4 | $0.00 | |
| 5b.5.6 | 10026 | Gypsum or Dolomitic Lime (Based upon Soil Test Results) | JB | $0.00 | 1 | $0.00 | |
| 5b.6.1 | 10027 | Insecticide treatment/application to include Moles, Shrews, Bees, and Other Pest | JB | $0.00 | 3 | $0.00 | |
| 5b.6.1 | 10028 | Fire Ant control - blanket application - All areas - See Flow Chart | JB | $0.00 | 1 | $0.00 | |
| 5b.6.1 | 10029 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart | JB | $0.00 | 10 | $0.00 | |
| 5b.6.1 | 10030 | Fungicide treatment/application | JB | $0.00 | 1 | $0.00 | |
| 5b.7.1 | 10031 | Headstone and Monument Cleaning (Nov., May) | JB | $0.00 | 2 | $0.00 | |
| 5b.7.2 | 10032 | Pressure Washing / Cleaning of Entrance Ways, Walkways, Curbs, Retainign Walls, Fencing, Signage, Concrete pads/Bases under signs and trash and floral vase receptacles, includes Floral Vase and Trash receptacles (Oct, Feb, May, Aug) | QTR | $0.00 | 4 | $0.00 | |
| 5b.7.4 | 10033 | Painting Walk Bridge, Signage, and Retaining Wall, and Fence | EV | $0.00 | 1 | $0.00 | Davis Bacon Wages |
| 5b.8.1 | 10034 | Ceremony support, to include set-up and take-down; includes providing one (1) ADA Compliant toilet and hand washing station | EV | $0.00 | 1 | $0.00 | |
| 5b.9.3 | 10035 | Committal Service setup and tear down | EA | $0.00 | 3 | $0.00 | |
| 5b.9.1 | 10036 | Gravesite Excavation and Backfilling | EA | $0.00 | 3 | $0.00 | Davis Bacon Wages |
| 5b.9.2 | 10037 | Transport of Casketed Remains and Floral Arrangements to Gravesite | EA | $0.00 | 3 | $0.00 |
| Option Year 1 - Total Cost | $0.00 | |||||
| OPTION YEAR 2- | ||||||
| SOW | CLIN | Description | Unit | Est.Unit Cost | Min Est Qty | Min Total |
| 5b.1.2 | 20001 | Headstone Setting | EA | $0.00 | 3 | $0.00 | Davis Bacon Wages |
| 5b.1.3 | 20002 | Headstone Raise and Realign | EA | $0.00 | 71 | $0.00 | Davis Bacon Wages |
| 5b.1.4 | 20003 | Headstone Fine Tune Alignment (Bump and Run) | EA | $0.00 | 50 | $0.00 | |
| 5b.2.1 | 20004 | Sunken Grave, Grounds and Turf Repair, to include sod (419 Bermuda) Installation - includes spot watering of repaired areas during establishment period | SQFT | $0.00 | 1500 | $0.00 | Davis Bacon Wages |
| 5b.2.2 | 20005 | Floral / Decoration Pickup and Removal (Weekly Occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.3.1 | 20006 | Underground Sprinkler Irrigation Management, System Operations, Inspection, and Maintenance: 10 Months | MO | $0.00 | 10 | $0.00 | |
| 5b.3.2 | 20007 | Irrigation- Straight Time Hourly Rate - All labor For Repairs Will Be Charged at The Hourly Rate Indicated in The Schedule and Broken Down Into Quarterly Hour (15 min) Increments as Appropriate. Labor Rates For Irrigation Repairs To Be Provided on an "As-Needed / As-Requested" Basis (See Section 5b.3.2) - All Parts Provided By Government. | EA (15 Min) | $0.00 | 100 | $0.00 | Davis Bacon Wages |
| 5b.3.2 | 20008 | Emergency, Call Back For Repair Of Leaks (Mon – Fri, Duty Hours 8 Hour Response) | EA | $0.00 | 1 | $0.00 | |
| 5b.3.2 | 20009 | Emergency, Call Back For Repair Of Leaks (Non-Duty Day, After Hours, 6 Hour Response) | EA | $0.00 | 1 | $0.00 | |
| 5b.3.3 | 20010 | Mowing Turf Area (approx. .75 +/- acres) | WK | $0.00 | 43 | $0.00 | |
| 5b.3.4 | 20011 | Turf Edging (twice monthly) | WK | $0.00 | 22 | $0.00 | |
| 5b.3.5 | 20012 | Mowing Non-Turf Area (approx. 1 +/- acres) | WK | $0.00 | 24 | $0.00 | |
| 5b.3.6 | 20013 | Headstone, Marker, Monument and Other Verticle Surface Trimming (twice monthly) | WK | $0.00 | 22 | $0.00 | |
| 5b.3.7 | 20014 | Leaf, Trash, and Debris Collection and Removal (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.3.8 | 20015 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | |
| 5b.3.9 | 20016 | Sweeping/Blowing Off Walkways, Roadways and Other Concrete Surfaces (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.4.1 | 20017 | Maintenance of Planting and Mulch Beds, to include tree rings, shrubs, hedges, and bushes, to include Trimming of shrubs, bushes and hedges (as needed, or directed by COR) | MO | $0.00 | 6 | $0.00 | |
| 5b.4.3 | 20018 | Mulching (Red mini pine bark nuggets) - Install and Replenish mulch to include all planting beds, all tree rings, bushes, shrubs, and other designated areas as defined by COR (May, Nov.) | JB | $0.00 | 2 | $0.00 | |
| 5b.5.1 | 20019 | Sod Installation on subsequent interment gravesites - includes spot watering during establishment period | EA | $0.00 | 3 | $0.00 | |
| 5b.5.2 | 20020 | Core Aerification (Aeration)(Approx. .75+/- acres) | JB | $0.00 | 1 | $0.00 | |
| 5b.5.3 | 20021 | Dethatching (if required) | JB | $0.00 | 1 | $0.00 | |
| 5b.5.4 | 20022 | Fetilization - 419 Bermuda - (Approx .75 +/- acres) (Mar, May, Jun, Aug) | JB | $0.00 | 4 | $0.00 | |
| 5b.5.5 | 20023 | Weed Control: Pre-emergent - Turf areas only (Approx. 0.75 +/- acres) (blanket application)- See Flow Chart - | JB | $0.00 | 2 | $0.00 | |
| 5b.5.5 | 20024 | Weed Control: Post-emergent - Turf areas only (Approx. 0.75 +/- acres) - (blanket application) - See flow chart | JB | $0.00 | 4 | $0.00 | |
| 5b.5.5 | 20025 | Weed Control: Mulch Beds and Rocked areas | JB | $0.00 | 4 | $0.00 | |
| 5b.5.6 | 20026 | Gypsum or Dolomitic Lime (Based upon Soil Test Results) | JB | $0.00 | 1 | $0.00 | |
| 5b.6.1 | 20027 | Insecticide treatment/application to include Moles, Shrews, Bees, and Other Pest | JB | $0.00 | 3 | $0.00 | |
| 5b.6.1 | 20028 | Fire Ant control - blanket application - All areas - See Flow Chart | JB | $0.00 | 1 | $0.00 | |
| 5b.6.1 | 20029 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart | JB | $0.00 | 10 | $0.00 | |
| 5b.6.1 | 20030 | Fungicide treatment/application | JB | $0.00 | 1 | $0.00 | |
| 5b.7.1 | 20031 | Headstone and Monument Cleaning (Nov., May) | JB | $0.00 | 2 | $0.00 | |
| 5b.7.2 | 20032 | Pressure Washing / Cleaning of Entrance Ways, Walkways, Curbs, Retainign Walls, Fencing, Signage, Concrete pads/Bases under signs and trash and floral vase receptacles, includes Floral Vase and Trash receptacles (Oct, Feb, May, Aug) | QTR | $0.00 | 4 | $0.00 | |
| 5b.7.4 | 20033 | Painting Walk Bridge, Signage, and Retaining Wall, and Fence | EV | $0.00 | 1 | $0.00 | Davis Bacon Wages |
| 5b.8.1 | 20034 | Ceremony support, to include set-up and take-down; includes providing one (1) ADA Compliant toilet and hand washing station | EV | $0.00 | 1 | $0.00 | |
| 5b.9.3 | 20035 | Committal Service setup and tear down | EA | $0.00 | 3 | $0.00 | |
| 5b.9.1 | 20036 | Gravesite Excavation and Backfilling | EA | $0.00 | 3 | $0.00 | Davis Bacon Wages |
| 5b.9.2 | 20037 | Transport of Casketed Remains and Floral Arrangements to Gravesite | EA | $0.00 | 3 | $0.00 |
| Option Year 2 - Total Cost | $0.00 | |||||
| OPTION YEAR 3- | ||||||
| SOW | CLIN | Description | Unit | Est.Unit Cost | Min Est Qty | Min Total |
| 5b.1.2 | 30001 | Headstone Setting | EA | $0.00 | 3 | $0.00 | Davis Bacon Wages |
| 5b.1.3 | 30002 | Headstone Raise and Realign | EA | $0.00 | 71 | $0.00 | Davis Bacon Wages |
| 5b.1.4 | 30003 | Headstone Fine Tune Alignment (Bump and Run) | EA | $0.00 | 50 | $0.00 | |
| 5b.2.1 | 30004 | Sunken Grave, Grounds and Turf Repair, to include sod (419 Bermuda) Installation - includes spot watering of repaired areas during establishment period | SQFT | $0.00 | 1500 | $0.00 | Davis Bacon Wages |
| 5b.2.2 | 30005 | Floral / Decoration Pickup and Removal (Weekly Occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.3.1 | 30006 | Underground Sprinkler Irrigation Management, System Operations, Inspection, and Maintenance: 10 Months | MO | $0.00 | 10 | $0.00 | |
| 5b.3.2 | 30007 | Irrigation- Straight Time Hourly Rate - All labor For Repairs Will Be Charged at The Hourly Rate Indicated in The Schedule and Broken Down Into Quarterly Hour (15 min) Increments as Appropriate. Labor Rates For Irrigation Repairs To Be Provided on an "As-Needed / As-Requested" Basis (See Section 5b.3.2) - All Parts Provided By Government. | EA (15 Min) | $0.00 | 100 | $0.00 | Davis Bacon Wages |
| 5b.3.2 | 30008 | Emergency, Call Back For Repair Of Leaks (Mon – Fri, Duty Hours 8 Hour Response) | EA | $0.00 | 1 | $0.00 | |
| 5b.3.2 | 30009 | Emergency, Call Back For Repair Of Leaks (Non-Duty Day, After Hours, 6 Hour Response) | EA | $0.00 | 1 | $0.00 | |
| 5b.3.3 | 30010 | Mowing Turf Area (approx. .75 +/- acres) | WK | $0.00 | 43 | $0.00 | |
| 5b.3.4 | 30011 | Turf Edging (twice monthly) | WK | $0.00 | 22 | $0.00 | |
| 5b.3.5 | 30012 | Mowing Non-Turf Area (approx. 1 +/- acres) | WK | $0.00 | 24 | $0.00 | |
| 5b.3.6 | 30013 | Headstone, Marker, Monument and Other Verticle Surface Trimming (twice monthly) | WK | $0.00 | 22 | $0.00 | |
| 5b.3.7 | 30014 | Leaf, Trash, and Debris Collection and Removal (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.3.8 | 30015 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | |
| 5b.3.9 | 30016 | Sweeping/Blowing Off Walkways, Roadways and Other Concrete Surfaces (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.4.1 | 30017 | Maintenance of Planting and Mulch Beds, to include tree rings, shrubs, hedges, and bushes, to include Trimming of shrubs, bushes and hedges (as needed, or directed by COR) | MO | $0.00 | 6 | $0.00 | |
| 5b.4.3 | 30018 | Mulching (Red mini pine bark nuggets) - Install and Replenish mulch to include all planting beds, all tree rings, bushes, shrubs, and other designated areas as defined by COR (May, Nov.) | JB | $0.00 | 2 | $0.00 | |
| 5b.5.1 | 30019 | Sod Installation on subsequent interment gravesites - includes spot watering during establishment period | EA | $0.00 | 3 | $0.00 | |
| 5b.5.2 | 30020 | Core Aerification (Aeration)(Approx. .75+/- acres) | JB | $0.00 | 1 | $0.00 | |
| 5b.5.3 | 30021 | Dethatching (if required) | JB | $0.00 | 1 | $0.00 | |
| 5b.5.4 | 30022 | Fetilization - 419 Bermuda - (Approx .75 +/- acres) (Mar, May, Jun, Aug) | JB | $0.00 | 4 | $0.00 | |
| 5b.5.5 | 30023 | Weed Control: Pre-emergent - Turf areas only (Approx. 0.75 +/- acres) (blanket application)- See Flow Chart - | JB | $0.00 | 2 | $0.00 | |
| 5b.5.5 | 30024 | Weed Control: Post-emergent - Turf areas only (Approx. 0.75 +/- acres) - (blanket application) - See flow chart | JB | $0.00 | 4 | $0.00 | |
| 5b.5.5 | 30025 | Weed Control: Mulch Beds and Rocked areas | JB | $0.00 | 4 | $0.00 | |
| 5b.5.6 | 30026 | Gypsum or Dolomitic Lime (Based upon Soil Test Results) | JB | $0.00 | 1 | $0.00 | |
| 5b.6.1 | 30027 | Insecticide treatment/application to include Moles, Shrews, Bees, and Other Pest | JB | $0.00 | 3 | $0.00 | |
| 5b.6.1 | 30028 | Fire Ant control - blanket application - All areas - See Flow Chart | JB | $0.00 | 1 | $0.00 | |
| 5b.6.1 | 30029 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart | JB | $0.00 | 10 | $0.00 | |
| 5b.6.1 | 30030 | Fungicide treatment/application | JB | $0.00 | 1 | $0.00 | |
| 5b.7.1 | 30031 | Headstone and Monument Cleaning (Nov., May) | JB | $0.00 | 2 | $0.00 | |
| 5b.7.2 | 30032 | Pressure Washing / Cleaning of Entrance Ways, Walkways, Curbs, Retainign Walls, Fencing, Signage, Concrete pads/Bases under signs and trash and floral vase receptacles, includes Floral Vase and Trash receptacles (Oct, Feb, May, Aug) | QTR | $0.00 | 4 | $0.00 | |
| 5b.7.4 | 30033 | Painting Walk Bridge, Signage, and Retaining Wall, and Fence | EV | $0.00 | 1 | $0.00 | Davis Bacon Wages |
| 5b.8.1 | 30034 | Ceremony support, to include set-up and take-down; includes providing one (1) ADA Compliant toilet and hand washing station | EV | $0.00 | 1 | $0.00 | |
| 5b.9.3 | 30035 | Committal Service setup and tear down | EA | $0.00 | 3 | $0.00 | |
| 5b.9.1 | 30036 | Gravesite Excavation and Backfilling | EA | $0.00 | 3 | $0.00 | Davis Bacon Wages |
| 5b.9.2 | 30037 | Transport of Casketed Remains and Floral Arrangements to Gravesite | EA | $0.00 | 3 | $0.00 |
| Option Year 3 - Total Cost | $0.00 | |||||
| OPTION YEAR 4- | ||||||
| SOW | CLIN | Description | Unit | Est.Unit Cost | Min Est Qty | Min Total |
| 5b.1.2 | 40001 | Headstone Setting | EA | $0.00 | 3 | $0.00 | Davis Bacon Wages |
| 5b.1.3 | 40002 | Headstone Raise and Realign | EA | $0.00 | 71 | $0.00 | Davis Bacon Wages |
| 5b.1.4 | 40003 | Headstone Fine Tune Alignment (Bump and Run) | EA | $0.00 | 50 | $0.00 | |
| 5b.2.1 | 40004 | Sunken Grave, Grounds and Turf Repair, to include sod (419 Bermuda) Installation - includes spot watering of repaired areas during establishment period | SQFT | $0.00 | 1500 | $0.00 | Davis Bacon Wages |
| 5b.2.2 | 40005 | Floral / Decoration Pickup and Removal (Weekly Occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.3.1 | 40006 | Underground Sprinkler Irrigation Management, System Operations, Inspection, and Maintenance: 10 Months | MO | $0.00 | 10 | $0.00 | |
| 5b.3.2 | 40007 | Irrigation- Straight Time Hourly Rate - All labor For Repairs Will Be Charged at The Hourly Rate Indicated in The Schedule and Broken Down Into Quarterly Hour (15 min) Increments as Appropriate. Labor Rates For Irrigation Repairs To Be Provided on an "As-Needed / As-Requested" Basis (See Section 5b.3.2) - All Parts Provided By Government. | EA (15 Min) | $0.00 | 100 | $0.00 | Davis Bacon Wages |
| 5b.3.2 | 40008 | Emergency, Call Back For Repair Of Leaks (Mon – Fri, Duty Hours 8 Hour Response) | EA | $0.00 | 1 | $0.00 | |
| 5b.3.2 | 40009 | Emergency, Call Back For Repair Of Leaks (Non-Duty Day, After Hours, 6 Hour Response) | EA | $0.00 | 1 | $0.00 | |
| 5b.3.3 | 40010 | Mowing Turf Area (approx. .75 +/- acres) | WK | $0.00 | 43 | $0.00 | |
| 5b.3.4 | 40011 | Turf Edging (twice monthly) | WK | $0.00 | 22 | $0.00 | |
| 5b.3.5 | 40012 | Mowing Non-Turf Area (approx. 1 +/- acres) | WK | $0.00 | 24 | $0.00 | |
| 5b.3.6 | 40013 | Headstone, Marker, Monument and Other Verticle Surface Trimming (twice monthly) | WK | $0.00 | 22 | $0.00 | |
| 5b.3.7 | 40014 | Leaf, Trash, and Debris Collection and Removal (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.3.8 | 40015 | Extreme Weather Storm Damage and Debris Clean-up | EV | $0.00 | 1 | $0.00 | |
| 5b.3.9 | 40016 | Sweeping/Blowing Off Walkways, Roadways and Other Concrete Surfaces (twice weekly occurrence - Billed Monthly) | MO | $0.00 | 12 | $0.00 | |
| 5b.4.1 | 40017 | Maintenance of Planting and Mulch Beds, to include tree rings, shrubs, hedges, and bushes, to include Trimming of shrubs, bushes and hedges (as needed, or directed by COR) | MO | $0.00 | 6 | $0.00 | |
| 5b.4.3 | 40018 | Mulching (Red mini pine bark nuggets) - Install and Replenish mulch to include all planting beds, all tree rings, bushes, shrubs, and other designated areas as defined by COR (May, Nov.) | JB | $0.00 | 2 | $0.00 | |
| 5b.5.1 | 40019 | Sod Installation on subsequent interment gravesites - includes spot watering during establishment period | EA | $0.00 | 3 | $0.00 | |
| 5b.5.2 | 40020 | Core Aerification (Aeration)(Approx. .75+/- acres) | JB | $0.00 | 1 | $0.00 | |
| 5b.5.3 | 40021 | Dethatching (if required) | JB | $0.00 | 1 | $0.00 | |
| 5b.5.4 | 40022 | Fetilization - 419 Bermuda - (Approx .75 +/- acres) (Mar, May, Jun, Aug) | JB | $0.00 | 4 | $0.00 | |
| 5b.5.5 | 40023 | Weed Control: Pre-emergent - Turf areas only (Approx. 0.75 +/- acres) (blanket application)- See Flow Chart - | JB | $0.00 | 2 | $0.00 | |
| 5b.5.5 | 40024 | Weed Control: Post-emergent - Turf areas only (Approx. 0.75 +/- acres) - (blanket application) - See flow chart | JB | $0.00 | 4 | $0.00 | |
| 5b.5.5 | 40025 | Weed Control: Mulch Beds and Rocked areas | JB | $0.00 | 4 | $0.00 | |
| 5b.5.6 | 40026 | Gypsum or Dolomitic Lime (Based upon Soil Test Results) | JB | $0.00 | 1 | $0.00 | |
| 5b.6.1 | 40027 | Insecticide treatment/application to include Moles, Shrews, Bees, and Other Pest | JB | $0.00 | 3 | $0.00 | |
| 5b.6.1 | 40028 | Fire Ant control - blanket application - All areas - See Flow Chart | JB | $0.00 | 1 | $0.00 | |
| 5b.6.1 | 40029 | Fire Ants Control - Daily as Needed Spot Treatments - See Flow Chart | JB | $0.00 | 10 | $0.00 | |
| 5b.6.1 | 40030 | Fungicide treatment/application | JB | $0.00 | 1 | $0.00 | |
| 5b.7.1 | 40031 | Headstone and Monument Cleaning (Nov., May) | JB | $0.00 | 2 | $0.00 | |
| 5b.7.2 | 40032 | Pressure Washing / Cleaning of Entrance Ways, Walkways, Curbs, Retainign Walls, Fencing, Signage, Concrete pads/Bases under signs and trash and floral vase receptacles, includes Floral Vase and Trash receptacles (Oct, Feb, May, Aug) | QTR | $0.00 | 4 | $0.00 | |
| 5b.7.4 | 40033 | Painting Walk Bridge, Signage, and Retaining Wall, and Fence | EV | $0.00 | 1 | $0.00 | Davis Bacon Wages |
| 5b.8.1 | 40034 | Ceremony support, to include set-up and take-down; includes providing one (1) ADA Compliant toilet and hand washing station | EV | $0.00 | 1 | $0.00 | |
| 5b.9.3 | 40035 | Committal Service setup and tear down | EA | $0.00 | 3 | $0.00 | |
| 5b.9.1 | 40036 | Gravesite Excavation and Backfilling | EA | $0.00 | 3 | $0.00 | Davis Bacon Wages |
| 5b.9.2 | 40037 | Transport of Casketed Remains and Floral Arrangements to Gravesite | EA | $0.00 | 3 | $0.00 |
| Option Year 4 - Total Cost | $0.00 | ||
| CLINs Highlighted in Yellow, use Davis Bacon Wages | |||
| Base Year | $0.00 | ||
| Option Year 1 (if exercised) | $0.00 | ||
| Option Year 2 (if exercised) | $0.00 | ||
| Option Year 3 (if exercised) | $0.00 | ||
| Option Year 4 (if exercised) | $0.00 | ||
| Base + all Options | $0.00 |