Attachment A Price Schedule Alton National Cemetery.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
36C78625Q50235 Grounds Main Alton National Cemetery -- S208
Solicitation number
QSE--36C78625Q50235
Issued by

About this file

This document is a Price Schedule for Grounds Maintenance Services at Alton National Cemetery, covering a base year and four option years. The detailed pricing template includes 22 distinct service line items for maintenance of 5.45 total acres, encompassing tasks such as fertilization, mowing, herbicide applications, cemetery ground maintenance, headstone cleaning, flag services, and various landscaping activities. Specific services include 38 annual mowings, 52 debris collections, 6 snow and ice removal events, 565 headstone cleanings, Memorial Day flag placements, pressure washing of rostrum and sidewalks, and fence debris removal. The opportunity is issued by the Department of Veterans Affairs National Cemetery Administration under solicitation number QSE--36C78625Q50235, with services required for Alton National Cemetery and North Alton Confederate Cemetery.

View the file

Other files

File Type Posted
Attachment B- Grounds Maintenance Performance Work Statement (PWS) .docx DOCX document
36C78625Q50235 Combined Synopsis Solicitation Alton National Cemetery.docx DOCX document
Attachment E SCA WD 2015-5070 Wage Determination Alton National Cemetery.pdf PDF
36C78625Q50235 0002.docx DOCX document
Attachment D- PAST PERFORMANCE QUESTIONAIRE.pdf PDF
36C78625Q50235 0001.docx DOCX document
Attachment C Subcontractor Participation Document.docx DOCX document
Attachment A Price Schedule Alton National Cemetery.xlsx XLSX spreadsheet
36C78625Q50235 0003.docx DOCX document
Attachment B- Grounds Maintenance Performance Work Statement (PWS) .docx DOCX document
Attachment E SCA WD 2015-5070 Wage Determination Alton National Cemetery.pdf PDF
Attachment C Subcontractor Participation Document.docx DOCX document
Attachment A Price Schedule Alton National Cemetery.xlsx XLSX spreadsheet
Attachment D- PAST PERFORMANCE QUESTIONAIRE.pdf PDF
36C78625Q50235 0001.docx DOCX document
36C78625Q50235 Combined Synopsis Solicitation Alton National Cemetery.docx DOCX document
36C78625Q50235 0002.docx DOCX document
Attachment B- Grounds Maintenance Performance Work Statement (PWS) .docx DOCX document
36C78625Q50235 Combined Synopsis Solicitation Alton National Cemetery.docx DOCX document
Attachment E SCA WD 2015-5070 Wage Determination Alton National Cemetery.pdf PDF
36C78625Q50235 0001.docx DOCX document
Attachment D- PAST PERFORMANCE QUESTIONAIRE.pdf PDF
Attachment A Price Schedule Alton National Cemetery.xlsx XLSX spreadsheet
Attachment C Subcontractor Participation Document.docx DOCX document
Attachment B- Grounds Maintenance Performance Work Statement (PWS) .docx DOCX document
36C78625Q50235 Combined Synopsis Solicitation Alton National Cemetery.docx DOCX document
Attachment E SCA WD 2015-5070 Wage Determination Alton National Cemetery.pdf PDF
Attachment D- PAST PERFORMANCE QUESTIONAIRE.pdf PDF
Attachment C Subcontractor Participation Document.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASE

Services
Line ItemDescription (Job, Labor Category)Est. QtyUnitUnit PriceExtended Price
0001Fertilize entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)2EA
0002Over-seed entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
0003Dethatch entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
0004Pre-emergent herbicide application - March (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
0005Post-emergent herbicide application - May (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
0006Post-emergent herbicide application - Oct (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
0007Aerate entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
0008Mowing (ANC = 1.5 acres, NACC = 3.95 acres)38EA
0009Trimming (ANC = 1.5 acres, NACC = 3.95 acres)38EA
0010Edging (ANC = 1.5 acres, NACC = 3.95 acres)9EA
0011Plant material maintenance (ANC = 1.5 acres, NACC = 3.95 acres)1EA
0012Pruning (ANC = 1.5 acres, NACC = 3.95 acres)1EA
0013Leaf, twig and tree limb tree debris collection (ANC = 1.5 acres, NACC = 3.95 acres)52EA
0014Clean sidewalks/driveways and parking area52EA
0015Grounds clean up, trash & debris (ANC = 1.5 acres, NACC = 3.95 acres)52EA
0016Snow & ice removal6EA
0017Clean Headstones (Alton)565EA
0018Placement & removal Memorial Day Gravesite Flags (Alton)565EA
0019Raise & Lower US Flag6EA
0020Pressure wash Rostrum & sidewalks (Alton)1EA
0021Pressure wash entrance, walls & sidewalks (North Alton)1EA
0022Remove brush/limbs/debris from fence (North Alton)1EA
Subtotal (Service)$ - 0
Base Year
Option Year 1
Option Year 2
Option Year 3
Option Year 4
Aggreated Base thru Option Year 4 Total$ - 0

INTERNAL FOR OFFICIAL GOVERNMENT USE ONLY

OY1

Services
Line ItemDescription (Job, Labor Category)Est. QtyUnitUnit PriceExtended Price
1001Fertilize entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)2EA
1002Over-seed entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
1003Dethatch entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
1004Pre-emergent herbicide application - March (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
1005Post-emergent herbicide application - May (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
1006Post-emergent herbicide application - Oct (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
1007Aerate entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
1008Mowing (ANC = 1.5 acres, NACC = 3.95 acres)38EA
1009Trimming (ANC = 1.5 acres, NACC = 3.95 acres)38EA
1010Edging (ANC = 1.5 acres, NACC = 3.95 acres)9EA
1011Plant material maintenance (ANC = 1.5 acres, NACC = 3.95 acres)1EA
1012Pruning (ANC = 1.5 acres, NACC = 3.95 acres)1EA
1013Leaf, twig and tree limb tree debris collection (ANC = 1.5 acres, NACC = 3.95 acres)52EA
1014Clean sidewalks/driveways and parking area52EA
1015Grounds clean up, trash & debris (ANC = 1.5 acres, NACC = 3.95 acres)52EA
1016Snow & ice removal6EA
1017Clean Headstones (Alton)565EA
1018Placement & removal Memorial Day Gravesite Flags (Alton)565EA
1019Raise & Lower US Flag6EA
1020Pressure wash Rostrum & sidewalks (Alton)1EA
1021Pressure wash entrance, walls & sidewalks (North Alton)1EA
1022Remove brush/limbs/debris from fence (North Alton)1EA
Subtotal (Service)$ - 0

OY2

Services
Line ItemDescription (Job, Labor Category)Est. QtyUnitUnit PriceExtended Price
2001Fertilize entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)2EA
2002Over-seed entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
2003Dethatch entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
2004Pre-emergent herbicide application - March (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
2005Post-emergent herbicide application - May (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
2006Post-emergent herbicide application - Oct (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
2007Aerate entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
2008Mowing (ANC = 1.5 acres, NACC = 3.95 acres)38EA
2009Trimming (ANC = 1.5 acres, NACC = 3.95 acres)38EA
2010Edging (ANC = 1.5 acres, NACC = 3.95 acres)9EA
2011Plant material maintenance (ANC = 1.5 acres, NACC = 3.95 acres)1EA
2012Pruning (ANC = 1.5 acres, NACC = 3.95 acres)1EA
2013Leaf, twig and tree limb tree debris collection (ANC = 1.5 acres, NACC = 3.95 acres)52EA
2014Clean sidewalks/driveways and parking area52EA
2015Grounds clean up, trash & debris (ANC = 1.5 acres, NACC = 3.95 acres)52EA
2016Snow & ice removal6EA
2017Clean Headstones (Alton)565EA
2018Placement & removal Memorial Day Gravesite Flags (Alton)565EA
2019Raise & Lower US Flag6EA
2020Pressure wash Rostrum & sidewalks (Alton)1EA
2021Pressure wash entrance, walls & sidewalks (North Alton)1EA
2022Remove brush/limbs/debris from fence (North Alton)1EA
Subtotal (Service)$ - 0

OY3

Services
Line ItemDescription (Job, Labor Category)Est. QtyUnit
3001Fertilize entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)2EA
3002Over-seed entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
3003Dethatch entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
3004Pre-emergent herbicide application - March (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
3005Post-emergent herbicide application - May (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
3006Post-emergent herbicide application - Oct (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
3007Aerate entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
3008Mowing (ANC = 1.5 acres, NACC = 3.95 acres)38EA
3009Trimming (ANC = 1.5 acres, NACC = 3.95 acres)38EA
3010Edging (ANC = 1.5 acres, NACC = 3.95 acres)9EA
3011Plant material maintenance (ANC = 1.5 acres, NACC = 3.95 acres)1EA
3012Pruning (ANC = 1.5 acres, NACC = 3.95 acres)1EA
3013Leaf, twig and tree limb tree debris collection (ANC = 1.5 acres, NACC = 3.95 acres)52EA
3014Clean sidewalks/driveways and parking area52EA
3015Grounds clean up, trash & debris (ANC = 1.5 acres, NACC = 3.95 acres)52EA
3016Snow & ice removal6EA
3017Clean Headstones (Alton)565EA
3018Placement & removal Memorial Day Gravesite Flags (Alton)565EA
3019Raise & Lower US Flag6EA
3020Pressure wash Rostrum & sidewalks (Alton)1EA
3021Pressure wash entrance, walls & sidewalks (North Alton)1EA
3022Remove brush/limbs/debris from fence (North Alton)1EA
Subtotal (Service)$ - 0

OY4

Services
Line ItemDescription (Job, Labor Category)Est. QtyUnitUnit PriceExtended Price
4001Fertilize entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)2EA
4002Over-seed entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
4003Dethatch entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
4004Pre-emergent herbicide application - March (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
4005Post-emergent herbicide application - May (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
4006Post-emergent herbicide application - Oct (ANC = 1.5 acres, NACC = 3.95 acres)5.45AC
4007Aerate entire cemetery (ANC = 1.5 acres, NACC = 3.95 acres)1EA
4008Mowing (ANC = 1.5 acres, NACC = 3.95 acres)38EA
4009Trimming (ANC = 1.5 acres, NACC = 3.95 acres)38EA
4010Edging (ANC = 1.5 acres, NACC = 3.95 acres)9EA
4011Plant material maintenance (ANC = 1.5 acres, NACC = 3.95 acres)1EA
4012Pruning (ANC = 1.5 acres, NACC = 3.95 acres)1EA
4013Leaf, twig and tree limb tree debris collection (ANC = 1.5 acres, NACC = 3.95 acres)52EA
4014Clean sidewalks/driveways and parking area52EA
4015Grounds clean up, trash & debris (ANC = 1.5 acres, NACC = 3.95 acres)52EA
4016Snow & ice removal6EA
4017Clean Headstones (Alton)565EA
4018Placement & removal Memorial Day Gravesite Flags (Alton)565EA
4019Raise & Lower US Flag6EA
4020Pressure wash Rostrum & sidewalks (Alton)1EA
4021Pressure wash entrance, walls & sidewalks (North Alton)1EA
4022Remove brush/limbs/debris from fence (North Alton)1EA
Subtotal (Service)$ - 0

File details come from the government source that posted it. Updated .