Attachment_A-_Past_Perfomance_Evaluation_.pdf

PDF 367 KB Posted

Attached to
REQUEST FOR QUALIFICATIONS FOR PUBLIC UTILITY DESIGN, INSTALLATION, AND INFRASTRUCTURE IMPROVEMENTS
Solicitation number
DCAM-25-CS-RFQ-0011
Issued by
District of Columbia

About this file

This document is a Past Performance Evaluation Form for a Request for Qualifications (RFP) issued by the District of Columbia (DCAM-25-CS-RFP-0011) for Public Utility Design, Installation, and Infrastructure Improvements. The form is designed to comprehensively assess a contractor's performance across five key performance elements: Quality of Services/Work, Timeliness of Performance, Cost Control, Business Relations, and Customer Satisfaction. Evaluators are instructed to rate each performance area on a scale from Unacceptable (0) to Excellent (4), with detailed rating guidelines provided to ensure consistent and objective evaluation.

The evaluation form includes spaces for the evaluator to provide contact information, contract details, and specific remarks about excellent or unacceptable performance. The rating guidelines offer granular criteria for each performance category, focusing on aspects such as contract compliance, cost management, milestone achievement, responsiveness, technical excellence, and business relationship quality. The completed evaluation is to be submitted electronically to concillia.mpof@dc.gov, suggesting this is part of a formal procurement process for assessing and qualifying potential contractors for public utility infrastructure projects in the District of Columbia.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A DCAM-25-CS-RFP-0011,REQUEST FOR QUALIFICATIONS FOR PUBLIC UTILITY DESIGN, Page 1 of 2

INSTALLATION, AND INFRASTRUCTURE IMPROVEMENTS

PAST PERFORMANCE EVALUATION FORM

(Check appropriate box)

OFFEROR __ __________________

Performance Elements Excellent Good Acceptable Poor Unacceptable

Quality of Services/ Work

Timeliness of Performance

Cost Control

Business Relations

Customer Satisfaction

1. Name and Title of Evaluator:

2. Signature of Evaluator:

3. Name of Organization:

4. Telephone Number of Evaluator: _

E-mail address of Evaluator: __________________________

5. State type of service received:

6. State Contract Number, Amount and Period of Performance

7. Remarks on Excellent Performance: Provide data supporting this observation. Continue on separate sheet if needed)

8. Remarks on unacceptable performance: Provide data supporting this observation. (Continue on separate sheet if needed)

Please submit completed evaluation to concillia.mpofu

Attachment A

RATING GUIDELINES

Summarize Contractor performance in each of the rating areas. Assign each area a rating of 0 (Unacceptable), 1 (Poor), 2 (Acceptable), 3 (Good), 4(Excellent), or ++ (Plus). Use the following instructions for guidance in making these evaluations.

Quality Timeless Business Product/Service Cost Control of Performance Relations

-Compliance with contract requirements

-Within budget (over/ under target costs)

-Meet Interim milestones -Reliable

-Effective management -Businesslike correspondence

-Accuracy of reports -Appropriateness of

-Current, accurate, and complete billings

-Responsive to technical directions

-Responsive to contract requirements personnel -Technical excellence

-Relationship of negated costs to actual

-Cost efficiencies

-Completed on time, including wrap-up and

-contract administration

-Prompt notification of contract problems

-Reasonable/cooperative -Change order issue -No liquidated damages assessed -Flexible -Pro-active -effective contractor recommended solutions -Effective snail/small disadvantaged business Subcontracting program

0. Zero Nonconformances are comprises the achievement of contract requirements, despite use of

Cost issues are comprising performance of contract requirements.

Delays are comprising the achievement of contract requirements, Despite use

Response to inquiries, technical/ service/administrative issues is not effective and responsive.

Agency resources of Agency resources.

1. Unacceptable Nonconformances require major Cost issues require major Delays require major response to inquiries, technical/ Agency resources to ensure achievement of contract requirements.

Agency resources to ensure achievement of contract requirements.

Agency resources to ensure achievement of contract requirements.

service/administrative issues is marginally effective and responsive.

2. Poor Nonconformances require minor Agency resources to ensure achievement of contract

Costs issues require minor Agency resources to ensure achievement of contract

Delays require minor Agency resources to ensure achievement of contract

Responses to inquiries, technical/ service/administrative issues is somewhat effective and requirements. requirements. requirements. responsive.

3. Acceptable Nonconformances do not impact Cost issues do not impact Delays do not impact Responses to inquires, technical/ achievement of contract requirements.

achievement of contract requirements.

achievement of contract requirements.

service/administrative issues is usually effective and responsive.

4. Good There are no quality problems. There are no cost issues. There are not delays. Responses to inquiries, technical/ service/administrative issues is effective and responsive,

5. Excellent The contractor has demonstrated an exceptional performance level in some or all of the above categories.

File details come from the government source that posted it. Updated .