Attachment A General Specs~1.pdf
PDF 12 MB Posted
- Attached to
- Senior Center Solar Panel Project
- Solicitation number
- S-KR0970-00000344
- Issued by
- Deschutes County, Oregon
About this file
Attachment A General Specs is a document related to the Senior Center Solar Panel Project, a state and local contract opportunity issued by the City of Redmond Public Works Parks and Facilities Division in Oregon. The City is requesting bids for the turn-key installation of an approximately 60 kW, grid-tied photovoltaic system on the roof of the Redmond Senior Center. The successful bidder will be responsible for developing their own design that provides a system and equipment equivalent to the referenced drawings. The contract will be awarded to qualified and experienced vendors.
The document does not provide any details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial information. The contract opportunity involves the jurisdictions of Deschutes County and the City of Redmond.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH
VICINITY MAP
SITE PLAN
SCALE : 1" = 25'- 0"
PROPERTY LINES
NONE.1.
NOTES:
SHEET # TITLE
GENERAL SPECIFICATIONS; VICINITY & SITE PLANSPV1.0
DRAWING LIST
ISSUE FOR BLUE SKY GRANT
(08-04-20)
SCALE : NONE
ONE LINE DIAGRAM & LOW VOLTAGE DIAGRAM
SHEET :
REVISIONS
PV1.0
D.B./C.B.:
PLAN SIZE:
JTD - JM -
24" x 36"
SUNLIGHT SOLAR ENERGY, INC.
50 SE SCOTT ST. BUILDING 13
BEND, OR 97702
CCB#: 158922
CITY STAMP:
TITLE:
INCENTIVE:
GENERAL SPECIFICATIONS; VICINITY MAP & SITE PLAN
PHOTOVOLTAIC SYSTEM ROOF LAYOUT PV2.0
EQUIPMENT SPECIFICATIONS
PV6.0
PV7.0
UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°----
Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.
SOUTH FACING
ARRAY SPECIFICATIONS:
ARRAY TILT =
ARRAY ORIENTATION =
ROOF SPECIFICATIONS:
COMPOSITION SHINGLE
ROOF TILT =
AVERAGE SOLAR RESOURCE:
AVERAGE PSF =
TOF =
LOWEST TSRF =
99%
98%
89%
26°
26°
180°
ELECTRICAL DETAILS
PV3.0
PV4.0
PLACARD DETAILS (2 OF 2)
PV5.0
SOURCE CIRCUIT CONFIGURATION MAP
PV6.1
PV4.1
I S
S U
E
F
O R
B
L U
E
S
K Y
G
R A
N T
01. Issue for Blue Sky Grant (08-04-20)
PLACARD DETAILS (1 OF 2)
ELECTRICAL SPECIFICATIONS (1 OF 2)
PV5.1 ELECTRICAL SPECIFICATIONS (2 OF 2)
(7) SUB ARRAYS W/
TOTAL OF
(160) REC SOLAR
MODULES -
(REC380TP2SM72) -
PORTRAIT (TYPICAL)
AVERAGE TSRF = 95%
GENERAL SPECIFICATIONS
MODULES :
(160) REC SOLAR
REC380TP2SM72
OPTIMIZER:
(80) SOLAREDGE - P860
INVERTER(S):
(1) SOLAREDGE - 43.2K-US
ARRAY TO BE INSTALLED ON EXISTING
COMMERCIAL BUILDING
SYSTEM SPECS
TOTAL PV SYSTEM - 60.80 kW DC
(1) SOLAREDGE - 14.4K-US
SUB ARRAY SPECIFICATIONS
WEST FACING
ARRAY SPECIFICATIONS:
ARRAY TILT =
ARRAY ORIENTATION =
AVERAGE SOLAR RESOURCE:
AVERAGE PSF =
TOF =
LOWEST TSRF =
99%
78%
77%
26°
270°
AVERAGE TSRF = 77%
SUB ARRAY SPECIFICATIONS
EAST FACING
ARRAY SPECIFICATIONS:
ARRAY TILT =
ARRAY ORIENTATION =
AVERAGE SOLAR RESOURCE:
AVERAGE PSF =
TOF =
LOWEST TSRF =
98%
79%
77%
26°
90°
AVERAGE TSRF = 77%
SUB ARRAY SPECIFICATIONS
BLUE SKY GRANT
ARRAY ROOF COVERAGE
3,454 SQ.FT./ 12,390 SQ.FT.= 27.9%
ROOF AREA SPECIFICATIONS
Attachment A, Senior Center Solar Panel Project
192'-41 2"
7'-83 4" 1'
19'-71 2"
6" 11'-6"
29'-101 2"
20'-10"
1' 7'-83 4"
6"
23'-23 4"29'-101
2"
11'-11"9'-7"
19'-11"21'-1"
3'
3'
SHEET :
TITLE:
REVISIONS
PV2.0
PV ROOF LAYOUT
D.B./C.B.:
PLAN SIZE:
JTD - JM -
SUNLIGHT SOLAR ENERGY, INC.
50 SE SCOTT ST. BUILDING 13
BEND, OR 97702
CCB#: 158922
CITY STAMP:
24" x 36"
UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26° INCENTIVE:
01. Issue for Blue Sky Grant (08-04-20)
(391) SNAP N RACK
UR-40 L - FEET &
COMP KITS
(TYPICAL)
SNAP N RACK
ULTRA RAIL SOLAR
RAIL
(TYPICAL)
6" EXPANSION
GAP
6" EXPANSION
GAP
NORTH
Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.
PV ROOF LAYOUT PLAN
SCALE : 1/8" = 1'- 0"
NONE.1.
NOTES:
BLUE SKY GRANT
EXISTINIG DRY TYPE -
UTILITY
PAD / VAULT MOUNTED
TRANSFORMER
TO UTILITY
EXISTING
FEEDERS
200A/3P/240V NFSS; NEMA 1 - 65 kAIC RATED
"RAPID SHUTDOWN INITIATION SWITCH"
(EXTERIOR MAIN ELECTRICAL ROOM - NORTH
WALL - 4'- 0" ADJACENT TO UTILITY METER)
EXISTING PACIFICORP
METER #74 264 866
(EXTERIOR ELECTRICAL
ROOM - NORTH WALL)
EXISTING
FEEDERS
EXISTING SQUARE D
MAIN DISTRIBUTION
SWITCHBOARD "MDP"
600A BUS RATED - 208/120V -
3Ø - 4W - (INTERIOR
ELECTRICAL ROOM)
150A
3P
EXISTING GEC TO
EXISTING AC
ELECTRODE
(4) #1/0 THWN-2 &
(1) #6 EGC
IN 2" EMT
ROOFTOP
JUNCTION BOX
200A BUS RATING - 480/277V - 3Ø - 4W
200A
3P
ROOFTOP
JUNCTION BOX
(4) #10 600V PV WIRE &
(1) #6 BARE EGC
IN FREE AIR
ROOFTOP
JUNCTION BOX
SUB ARRAY "B" - SOURCE CIRCUITS
#7; #8 & #9
SUB ARRAY "B" - SOURCE CIRCUITS
#5 & #6
ONE LINE DIAGRAM
SCALE : NONE
NOTES:
1. ALL SHOWN IS NEW AND BY PV CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE.
50A
3P
DEDICATED PV
COMBINER PANEL "PV1"
200A MLO - 208/120V -
3Ø - 4W; NEMA 3R
(EXTERIOR - NORTH WALL)
(4) #6 THWN-2 &
(1) #10 EGC
IN 1" EMT
DC
AC
INVERTER #2
SOLAREDGE
SE14.4KUS
INVERTER @208V
(EXTERIOR - NORTH WALL)
(6) #10 600V PV WIRE &
(1) #6 BARE EGC
IN FREE AIR
ROOFTOP
JUNCTION BOX
DC
AC
INVERTER #1
SOLAREDGE
SE43.2KUS
INVERTER @208V
(EXTERIOR - NORTH WALL)
DC
AC
DC
AC
UNIT 1A UNIT 1B UNIT 1C
(4) #3/0 THWN-2 &
(1) #6 THWN-2 EGC
IN 2" EMT
DC
AC
CAT 5E CABLE
(DAISY CHAIN)
IN DEDICATED
3/4" EMT
DC
AC
INVERTER #1
SOLAREDGE
SE43.2K-US
INVERTER @208V
(EXTERIOR - NORTH WALL)
INVERTER #2
SOLAREDGE
SE14.4K-US
INVERTER @208V
(EXTERIOR - NORTH WALL)
LOW VOLTAGE DIAGRAM
SCALE : NONE
#7 - (17) MODULES W/ (9) OPTIMIZERS
#8 - (17) MODULES W/ (9) OPTIMIZERS
#9 - (18) MODULES W/ (9) OPTIMIZERS
MODULES
- REC SOLAR - REC380TP2SM72
OPTIMIZERS
- SOLAREDGE P860
#5 - (18) MODULES W/ (9) OPTIMIZERS
#6 - (18) MODULES W/ (9) OPTIMIZERS
MODULES
- REC SOLAR - REC380TP2SM72
OPTIMIZERS
- SOLAREDGE P860
CAT 5E CABLE -
TO ROUTER IN ADJACENT
ELECTRICAL ROOM
NOTES:
1. PV CONTRACTOR SHALL WIRE SYSTEM TO PREFERRED DATA INPUT LOCATION IN THE DATA
CLOSET.
(4) #3/0 THWN-2 &
(1) #6 THWN-2 EGC
IN 2" EMT
(6) #10 THWN-2 &
(1) #10 THWN-2 EGC
IN 3/4" EMT
2. PV CONTRACTOR SHALL RUN ALL SYSTEM DC CONDUCTORS FROM ROOF TO EXISTING 2" EMT
STEMMED @ WEST WALL ABOVE DATA CLOSET / SECOND FLOOR.
JUNCTION BOX W/ DC FUSING
(2) 25A/600V FUSES W/ BUSSMANN FUSE
HOLDERS - POSITIVE CONDUCTOR OF EACH
SOURCE CIRCUIT (EXTERIOR - NORTH WALL -
ADJACENT TO INVERTER)
SUB ARRAY "B" - SOURCE CIRCUITS
#3 & #4
#3 - (18) MODULES W/ (9) OPTIMIZERS
#4 - (18) MODULES W/ (9) OPTIMIZERS
MODULES
- REC SOLAR - REC380TP2SM72
OPTIMIZERS
- SOLAREDGE P860
SUB ARRAY "B" - SOURCE CIRCUITS
#1 & #2
#1 - (18) MODULES W/ (9) OPTIMIZERS
#2 - (18) MODULES W/ (9) OPTIMIZERS
MODULES
- REC SOLAR - REC380TP2SM72
OPTIMIZERS
- SOLAREDGE P860
M
EXISTING
FEEDERS
(6) #10 THWN-2 &
(1) #10 THWN-2 EGC
IN 3/4" EMT
(4) #10 THWN-2 &
(1) #10 THWN-2 EGC
IN 3/4" EMT
(4) #10 THWN-2 &
(1) #10 THWN-2 EGC
IN 3/4" EMT
(4) #10 600V PV WIRE &
(1) #6 BARE EGC
IN FREE AIR
(4) #10 THWN-2 &
(1) #10 THWN-2 EGC
IN 3/4" EMT
(4) #10 THWN-2 &
(1) #10 THWN-2 EGC
IN 3/4" EMT
(4) #10 600V PV WIRE &
(1) #6 BARE EGC
IN FREE AIR
(4) #10 THWN-2 &
(1) #10 THWN-2 EGC
IN 3/4" EMT
(4) #10 THWN-2 &
(1) #10 THWN-2 EGC
IN 3/4" EMT
JUNCTION BOX W/ DC FUSING
(2) 25A/600V FUSES W/ BUSSMANN FUSE
HOLDERS - POSITIVE CONDUCTOR OF EACH
SOURCE CIRCUIT (EXTERIOR - NORTH WALL -
ADJACENT TO INVERTER)
JUNCTION BOX W/ DC FUSING
(2) 25A/600V FUSES W/ BUSSMANN FUSE
HOLDERS - POSITIVE CONDUCTOR OF EACH
SOURCE CIRCUIT (EXTERIOR - NORTH WALL -
ADJACENT TO INVERTER)
JUNCTION BOX W/ DC FUSING
(3) 25A/600V FUSES W/ BUSSMANN FUSE
HOLDERS - POSITIVE CONDUCTOR OF EACH
SOURCE CIRCUIT (EXTERIOR - NORTH WALL -
ADJACENT TO INVERTER)
SHEET :
TITLE:
REVISIONS
PV3.0
ONE LINE DIAGRAM & LOW VOLTAGE DIAGRAM
D.B./C.B.:
PLAN SIZE:
JTD - JM -
SUNLIGHT SOLAR ENERGY, INC.
50 SE SCOTT ST. BUILDING 13
BEND, OR 97702
CCB#: 158922
CITY STAMP:
24" x 36"
Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.
UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:
01. Issue for Blue Sky Grant (08-04-20)
BLUE SKY GRANT
39.4"
78.9"
REC SOLAR - TWIN
PEAK SERIES
MODULE -
(REC380TP2SM72)
3'
6" MINIMUM
CLEARANCE
THERE SHALL BE A MANDATORY 4'-0" UNOBSTRUCTED CLEARANCE IN FRONT OF ALL ELECTRICAL
EQUIPMENT PER NEC 110.26
1.
NOTES:
ALL ELECTRICAL EQUIPMENT IS SHOWN W/ MANUFACTURERS REQUIRED SPACING. REFER TO
INVERTER INSTALLATION MANUAL FOR FURTHER INFORMATION AS NECESSARY.
2.
115 1/2"
8"8"
6" MINIMUM
CLEARANCE
PV MODULE DETAIL
SCALE : NONE
AC NON FUSED SAFETY SWITCH
ENCLOSURE DETAIL (EATON - DH364
200A/3P/240V)
SCALE : NONE
PV EQUIPMENT LAYOUT - EXTERIOR -
NORTH WALL
SCALE : NONE
37 1/2"32" 30"
PHOTOVOLTAIC EQUIPMENT
LOCATIONS (EXTERIOR - NORTH WALL)
SCALE : NONE
PHOTOVOLTAIC INTERCONNECTION LOCATION
(INTERIOR ELECTRICAL ROOM - "MDP")
SCALE : NONE
SCALE : NONE
27.63"
6.14"
27.63"
16.00"
ON
OFF
UTILITY AC DISCONNECT LOCATION (EXTERIOR
MAIN ELECTRICAL ROOM - NORTH WALL)
SCALE : NONE
PV - COMPOSITION ROOF MOUNTING
ASSEMBLY DETAIL (SNAPNRACK - ULTRA
RAIL COMP KIT)
NOT TO
EXCEED 12"
ELEVATION - FRONT OF BUILDING
SCALE : NONE
SHEET :
TITLE:
REVISIONS
PV4.1
ELECTRICAL DETAILS
D.B./C.B.:
PLAN SIZE:
JTD - JM -
SUNLIGHT SOLAR ENERGY, INC.
50 SE SCOTT ST. BUILDING 13
BEND, OR 97702
CCB#: 158922
CITY STAMP:
24" x 36"
Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.
UTILITY CO: PPL
PANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:
01. Issue for Blue Sky Grant (08-04-20)
BLUE SKY GRANT
AC AMPACITY
(INVERTER MAX AC CURRENT) x (1.25)
120.0 x 1.25 = 150.00 A
150.00 A
WIRE QUANTITY:
SIZE AND TYPE:
RATED AMPACITY:
AMPACITY COMPARISON
WIRE AREA
AC AMPACITY vs. RATED WIRE AMPACITY:
NUMBER OF (#1/0 THWN-2) IN CONDUIT:
4 x 0.1855 + 0.0507 =
(4) #1/0 THWN-2 + (1) #6 EGC
0.7927 sq.in.
CONDUIT SELECTION
PERMITTED AREA FOR OVER 2 WIRES:
SIZE AND TYPE:
1.342 sq.in.
AREA COMPARISON
WIRE AREA vs. PERMITTED AREA:
SITE TEMPRATURE INFORMATION
(AC) AMPACITY & WIRE SIZING -
2" EMT
0.7927 </= 1.342
(AC) VOLTAGE DROP -
#1/0 THWN-2
150.00 </= 150.00
INVERTER #1 - ELECTRICAL CALCULATIONS
INVERTER TO PV COMBINER PANEL "PV1"
(AC) CALCULATIONS - INVERTER(S) TO
PV COMBINER PANEL "PV1"
CITY, ST
AVERAGE HIGH °C:
RECORD LOW °C:
AHREA 0.4% HIGH
BUS AMP RATING (A): 600A
SERVICE VOLTAGE (V): 208/120V - 3Ø -4W
600AMAIN AMP RATING (A):
PV OCPD AMP RATING (A):
RATED VOLTAGE (V)
SERVICE PANEL RATINGS
SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS
400.00 V
INVERTER MANUFACTURER:
INVERTER MODEL:
MAX DC VOLT RATING (V):
MAX AC POWER @ 40°C (W):
NOMINAL AC VOLTAGE (V):
MAX AC CURRENT (A):
MODULE MANUFACTURER:
MODULE MODEL #:
OPERATING CURRENT (Imp):
SHORT-CIRCUIT CURRENT (Isc):
OPERATING VOLTAGE (Vmp):
OPEN-CIRCUIT VOLTAGE (Voc):
MAXIMUM POWER (W):
Vmp TEMP COEFF:
Voc TEMP COEFF:
MAX FUSE RATING (A):
(AMPACITY PER OPTIMIZER SPECIFICATIONS)X(# STRINGS)
18.00 x 6 =
690.53 P.V. POWER SOURCE SIGNAGE ON
REC - TWIN PEAK SERIES
REC380TP2SM72
ARRAY DESIGN
INVERTER RATINGS
PV MODULE RATINGS @ STC:
# OF INVERTERS:
108.00A
25A
9.43A
10.05A
40.3V
48.2V
380.00W
-0.28%/°C
-0.28%/°C
DC DISCONNECT RATED CURRENT (A)
Vmp @ AVERAGE HIGH TEMPRATURE
SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS
400.00 V
NEC TABLE 310.15
(AC) INVERTER OUTPUT CIRCUIT -
CONDUIT SIZING
MAX SYSTEM VOLTAGE (V)
SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS
600.00 V
MAX CIRCUIT CURRENT (A)
(AMPACITY PER OPTIMIZER SPECIFICATIONS)X(# STRINGS)
18.00 x 6 =
108.00A
# OF MODULES PER INVERTER:
SE43.2K-US
SOLAREDGE
600V
43,200W
208V - 3Ø
120A
# OF SOURCE CIRCUITS:
# OF MODULES PER SOURCE CIRCUIT:
WIRE INFORMATION
WIRE LENGTH: 25 ft
WIRE TYPE:
RATED WIRE RESISTANCE
ADJUSTED VOLTAGE DROP
(.1732) x (WIRE LENGTH) x (INVERTER MAX AC CURRENT) x
0.30% Vdrop
#1/0 THWN-2
0.122 Ω/kFT
0.1732 x 25 x 120.0 x 0.122 Ω/kFT / 208 =
(RATED WIRE RESISTANCE) / (AC VOLT.)
(NEC table 8 ch. 9) =
200A NFSS & 200A ECB
(AC) CALCULATIONS - PV COMBINER PANEL "PV1"
THRU AC DISCO TO INTERCONNECTION IN "MDP"
(AC) AMPACITY & WIRE SIZING -
THRU AC DISCO TO INTERCONNECTION IN "MDP"
NEC TABLE 310.15
(AC) PV COMBINER PANEL "PV1" OUTPUT CIRCUIT
CONDUIT SIZING (TYPICAL FOR EACH SET)
AC AMPACITY
(120.0 + 40) x 1.25 =
WIRE QUANTITY:
SIZE AND TYPE:
RATED AMPACITY:
AMPACITY COMPARISON
WIRE AREA
AC AMPACITY vs. RATED WIRE AMPACITY:
NUMBER OF (#3/0 THWN-2) IN CONDUIT:
4 x 0.2679 + 0.0507 =
(4) #3/0 THWN-2 + (1) #6 THWN-2 EGC
1.223 sq.in.
CONDUIT SELECTION
PERMITTED AREA FOR OVER 2 WIRES:
SIZE AND TYPE:
1.342 sq.in.
AREA COMPARISON
WIRE AREA vs. PERMITTED AREA:
2" EMT
1.223 </= 1.342
200.00 </= 200.00
(AC) TOTAL VOLTAGE DROP
(0.30% + 0.51%) = 0.81% Vdrop
200.00 A
200.00 A
#3/0 THWN-2
(TOTAL INVERTERS MAX AC CURRENT) x (1.25)
WIRE INFORMATION
WIRE LENGTH: 50 ft
WIRE TYPE:
RATED WIRE RESISTANCE
ADJUSTED VOLTAGE DROP
(0.1732) x (WIRE LENGTH) x (PANEL MAX AC CURRENT) x
0.51% Vdrop
#3/0 THWN-2
0.0766 Ω/kFT
0.1732 x 50 x (160.00) x (0.0766 Ω/kFT/2) / 208 =
(RATED WIRE RESISTANCE) / (SETS OF CONDUCTORS /
(NEC table 8 ch. 9) =
(AC VOLTAGE)
(DC) CALCULATIONS - ARRAY(S) TO
INVERTER(S)
4 4
NUMBER OF (#10 600V PV WIRE) IN CONDUIT:
WIRE AREA
(4) #10 600V PV WIRE + (1) #10 EGC
0.1055 sq.in.4 x 0.0211 + 0.0211 =
CONDUIT SELECTION
SIZE AND TYPE:
PERMITTED AREA FOR OVER 2 WIRES: 0.213 sq.in.
AREA COMPARISON
WIRE AREA vs. PERMITTED AREA FOR OVER 2 WIRES:
(DC) PHOTOVOLTAIC OUTPUT CIRCUIT -
3/4" EMT
0.1055 </= 0.213
WIRE INFORMATION
WIRE LENGTH:
150 ft
WIRE TYPE:
RATED WIRE RESISTANCE
ADJUSTED VOLTAGE DROP
(.2) x (WIRE LENGTH) x (TOTAL STRING WATTAGE/ 400V )
1.59% Vdrop
(DC) VOLTAGE DROP - ARRAY TO INVERTER
#10 600V PV WIRE
0.2 x 150 x (6,840/400) x 1.24 Ω/kFT / 400.00 = x (RATED WIRE RESISTANCE) / (VMP @ AVG. HIGH TEMP)
CONDUIT SIZING
(NEC TABLE 8 CH. 9) -
1.24 Ω/kFT
DC AMPACITY
(optimizer ampacity) x (1.25)
22.50A
18.00 x 1.25 =
WIRE SELECTION
SIZE AND TYPE:
RATED AMPACITY:
30A
#10 1000V PV WIRE
AMPACITY COMPARISON
AC AMPACITY vs. RATED WIRE AMPACITY: 22.50 </= 30.00
NEC TABLE 310.15
(DC) AMPACITY & WIRE SIZING -
27.7°C
- 19.2°C
35.4°C
REDMOND, OR (ASHRAE)
SHEET :
TITLE:
REVISIONS
PV5.0
ELECTRICAL SPECIFICATIONS ( 1 OF 2)
D.B./C.B.:
PLAN SIZE:
JTD - JM -
SUNLIGHT SOLAR ENERGY, INC.
50 SE SCOTT ST. BUILDING 13
BEND, OR 97702
CCB#: 158922
CITY STAMP:
24" x 36"
Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.
UTILITY CO: PPL
PANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:
01. Issue for Blue Sky Grant (08-04-20)
BLUE SKY GRANT
AC AMPACITY
(INVERTER MAX AC CURRENT) x (1.25)
40.0 x 1.25 = 50.00 A
55.00 A
WIRE QUANTITY:
SIZE AND TYPE:
RATED AMPACITY:
AMPACITY COMPARISON
WIRE AREA
AC AMPACITY vs. RATED WIRE AMPACITY:
NUMBER OF (#6 THWN-2) IN CONDUIT:
4 x 0.0507 + 0.0211 =
(4) #6 THWN-2 + (1) #10 EGC
0.224sq.in.
CONDUIT SELECTION
PERMITTED AREA FOR OVER 2 WIRES:
SIZE AND TYPE:
0.346 sq.in.
AREA COMPARISON
WIRE AREA vs. PERMITTED AREA:
SITE TEMPRATURE INFORMATION
(AC) AMPACITY & WIRE SIZING -
1" EMT
0.224 </= 0.346
(AC) VOLTAGE DROP -
#6 THWN-2
50.00 </= 55.00
INVERTER #2 - ELECTRICAL CALCULATIONS
INVERTER TO PV COMBINER PANEL "PV1"
(AC) CALCULATIONS - INVERTER(S) TO
PV COMBINER PANEL "PV1"
CITY, ST
AVERAGE HIGH °C:
RECORD LOW °C:
AHREA 0.4% HIGH
BUS AMP RATING (A): 600A
SERVICE VOLTAGE (V): 208/120V - 3Ø -4W
600AMAIN AMP RATING (A):
PV OCPD AMP RATING (A):
RATED VOLTAGE (V)
SERVICE PANEL RATINGS
SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS
400.00 V
INVERTER MANUFACTURER:
INVERTER MODEL:
MAX DC VOLT RATING (V):
MAX AC POWER @ 40°C (W):
NOMINAL AC VOLTAGE (V):
MAX AC CURRENT (A):
MODULE MANUFACTURER:
MODULE MODEL #:
OPERATING CURRENT (Imp):
SHORT-CIRCUIT CURRENT (Isc):
OPERATING VOLTAGE (Vmp):
OPEN-CIRCUIT VOLTAGE (Voc):
MAXIMUM POWER (W):
Vmp TEMP COEFF:
Voc TEMP COEFF:
MAX FUSE RATING (A):
(AMPACITY PER OPTIMIZER SPECIFICATIONS)X(# STRINGS)
18.00 x 3 =
690.53 P.V. POWER SOURCE SIGNAGE ON
REC - TWIN PEAK SERIES
REC380TP2SM72
ARRAY DESIGN
INVERTER RATINGS
PV MODULE RATINGS @ STC:
# OF INVERTERS:
54.00A
25A
9.43A
10.05A
40.3V
48.2V
380.00W
-0.28%/°C
-0.28%/°C
DC DISCONNECT RATED CURRENT (A)
Vmp @ AVERAGE HIGH TEMPRATURE
SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS
400.00 V
NEC TABLE 310.15
(AC) INVERTER OUTPUT CIRCUIT -
CONDUIT SIZING
MAX CIRCUIT CURRENT (A)
(AMPACITY PER OPTIMIZER SPECIFICATIONS)X(# STRINGS)
18.00 x 3 =
54.00A
# OF MODULES PER INVERTER:
SE14.4K-US
SOLAREDGE
600V
14,400W
208V - 3Ø
40A
# OF SOURCE CIRCUITS:
# OF MODULES PER SOURCE CIRCUIT:
WIRE INFORMATION
WIRE LENGTH: 25 ft
WIRE TYPE:
RATED WIRE RESISTANCE
ADJUSTED VOLTAGE DROP
(.1732) x (WIRE LENGTH) x (INVERTER MAX AC CURRENT) x
0.41% Vdrop
#6 THWN-2
0.491 Ω/kFT
0.1732 x 25 x 40.0 x 0.491 Ω/kFT / 208 =
(RATED WIRE RESISTANCE) / (AC VOLT.)
(NEC table 8 ch. 9) =
200A NFSS & 200A ECB
(AC) CALCULATIONS - PV COMBINER PANEL "PV1"
THRU AC DISCO TO INTERCONNECTION IN "MDP"
(AC) AMPACITY & WIRE SIZING -
THRU AC DISCO TO INTERCONNECTION IN "MDP"
NEC TABLE 310.15
(AC) PV COMBINER PANEL "PV1" OUTPUT CIRCUIT
CONDUIT SIZING (TYPICAL FOR EACH SET)
AC AMPACITY
(120.0 + 40) x 1.25 =
WIRE QUANTITY:
SIZE AND TYPE:
RATED AMPACITY:
AMPACITY COMPARISON
WIRE AREA
AC AMPACITY vs. RATED WIRE AMPACITY:
NUMBER OF (#3/0 THWN-2) IN CONDUIT:
4 x 0.2679 + 0.0507 =
(4) #3/0 THWN-2 + (1) #6 THWN-2 EGC
1.223 sq.in.
CONDUIT SELECTION
PERMITTED AREA FOR OVER 2 WIRES:
SIZE AND TYPE:
1.342 sq.in.
AREA COMPARISON
WIRE AREA vs. PERMITTED AREA:
2" EMT
1.223 </= 1.342
200.00 </= 200.00
(AC) TOTAL VOLTAGE DROP
(0.41% + 0.51%) = 0.92% Vdrop
200.00 A
200.00 A
#3/0 THWN-2
(TOTAL INVERTERS MAX AC CURRENT) x (1.25)
WIRE INFORMATION
WIRE LENGTH: 50 ft
WIRE TYPE:
RATED WIRE RESISTANCE
ADJUSTED VOLTAGE DROP
(0.1732) x (WIRE LENGTH) x (PANEL MAX AC CURRENT) x
0.51% Vdrop
#3/0 THWN-2
0.0766 Ω/kFT
0.1732 x 50 x (160.00) x (0.0766 Ω/kFT/2) / 208 =
(RATED WIRE RESISTANCE) / (SETS OF CONDUCTORS /
(NEC table 8 ch. 9) =
(AC VOLTAGE)
4 4
(1) @ 18 & (2) @ 17
(DC) CALCULATIONS - ARRAY(S) TO
INVERTER(S)
MAX SYSTEM VOLTAGE (V)
SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS
600.00 V
NUMBER OF (#10 600V PV WIRE) IN CONDUIT:
WIRE AREA
(6) #10 600V PV WIRE + (1) #10 EGC
0.1477 sq.in.6 x 0.0211 + 0.0211 =
CONDUIT SELECTION
SIZE AND TYPE:
PERMITTED AREA FOR OVER 2 WIRES: 0.213 sq.in.
AREA COMPARISON
WIRE AREA vs. PERMITTED AREA FOR OVER 2 WIRES:
(DC) PHOTOVOLTAIC OUTPUT CIRCUIT -
3/4" EMT
0.1477 </= 0.213
WIRE INFORMATION
WIRE LENGTH:
150 ft
WIRE TYPE:
RATED WIRE RESISTANCE
ADJUSTED VOLTAGE DROP
(.2) x (WIRE LENGTH) x (TOTAL STRING WATTAGE/ 400V )
1.59% Vdrop
(DC) VOLTAGE DROP - ARRAY TO INVERTER
#10 600V PV WIRE
0.2 x 150 x (6,840/400) x 1.24 Ω/kFT / 400.00 = x (RATED WIRE RESISTANCE) / (VMP @ AVG. HIGH TEMP)
CONDUIT SIZING
(NEC TABLE 8 CH. 9) -
1.24 Ω/kFT
DC AMPACITY
(optimizer ampacity) x (1.25)
22.50A
18.00 x 1.25 =
WIRE SELECTION
SIZE AND TYPE:
RATED AMPACITY:
30A
#10 1000V PV WIRE
AMPACITY COMPARISON
AC AMPACITY vs. RATED WIRE AMPACITY: 22.50 </= 30.00
NEC TABLE 310.15
(DC) AMPACITY & WIRE SIZING -
27.7°C
- 19.2°C
35.4°C
REDMOND, OR (ASHRAE)
SHEET :
TITLE:
REVISIONS
PV5.1
ELECTRICAL SPECIFICATIONS (2 OF 2)
D.B./C.B.:
PLAN SIZE:
JTD - JM -
SUNLIGHT SOLAR ENERGY, INC.
50 SE SCOTT ST. BUILDING 13
BEND, OR 97702
CCB#: 158922
CITY STAMP:
24" x 36"
Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.
UTILITY CO: PPL
PANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:
01. Issue for Blue Sky Grant (08-04-20)
BLUE SKY GRANT
PV INTERCONNECTION POINT
RATED CURRENT
NOMINAL VOLTAGE
160.00A
208VAC 3Ø
1.
NOTES:
PLACARD SHALL PROVIDE ALL REQUIRED INFORMATION PER NEC 690.53
2. PLACARD SHALL BE ATTACHED DIRECTLY TO INVERTER #2 DC DISCONNECT.
3. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND
MAXIMUM SYSTEM VOLTAGE
MAXIMUM CIRCUIT CURRENT
600.00 VDC
54.00 AMPS
DIRECT CURRENT PHOTOVOLTAIC
POWER SOURCE
DIRECT CURRENT PHOTOVOLTAIC
POWER SOURCE - PERMANENT LABEL
INVERTER #2
SCALE : NONE
FOR SERVICE
CALL
SUNLIGHT SOLAR
ENERGY INC
541 322 1910
SERVICE CALL PLACARD
WARNING: PHOTOVOLTAIC
POWER SOURCE
EMT / CONDUIT RACEWAYS
1.
NOTES:
PLACARD SHALL CONFORM TO NEC 690.31(G)(1)
INTERACTIVE SYSTEM POINT OF
INTERCONNECTION
1.
NOTES:
PLACARD SHALL CONFORM TO NEC 690.54
2. PLACARD SHALL BE PLACED DIRECTLY TO MAIN DISTRIBUTION PANEL & DEDICATED
PV COMBINER PANEL "PV1".
2. PLACARD SHALL BE WHITE LETTERING ON RED BACKGROUND
3. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND.
ARC-FLASH HAZARD WARNING
SCALE : NONE
NOTES:
1. PLACARD SHALL CONFORM TO NEC 110.16
2. TITLE SHALL BE BLACK LETTERING WITH ORANGE BACKGROUND. REMAINING
LETTERS SHALL BE BLACK W/ WHITE BACKGROUND.
Arc Flash Hazard.
Appropriate PPE Required.
Failure To Comply Can Result in Death or Injury.
Refer to NFPA 70 E
RAPID SHUTDOWN SWITCH
FOR SOLAR PV SYSTEM
RAPID SHUTDOWN PLACARD
1.
NOTES:
PLACARD SHALL CONFORM PER NEC ARTICLE 690.56
2. PLACARD SHALL BE ATTACHED DIRECTLY BESIDE PHOTOVOLTAIC SYSTEM AC
DISCONNECT - 600A MCB OF DEDICATED PV COMBINER PANEL .
3. PLACARD SHALL BE REFLECTIVE W/ WHITE LETTERING ON RED BACKGROUND.
WARNING
1.
NOTES:
PLACARD SHALL PROVIDE ALL REQUIRED INFORMATION PER NEC 690.53
2. PLACARD SHALL BE ATTACHED DIRECTLY TO INVERTER #1 DC DISCONNECT.
3. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND
MAXIMUM SYSTEM VOLTAGE
MAXIMUM CIRCUIT CURRENT
600.00 VDC
108.00 AMPS
DIRECT CURRENT PHOTOVOLTAIC
POWER SOURCE
DIRECT CURRENT PHOTOVOLTAIC
POWER SOURCE - PERMANENT LABEL
INVERTER #1
1.
NOTES:
WARNING:
THIS EQUIPMENT FED BY MULTIPLE
POWER SOURCES. TOTAL RATING OF
ALL OVER CURRENT DEVICE
EXCLUDING MAIN SUPPLY OVER
CURRENT DEVICE SHALL NOT EXCEED
AMPACITY OF BUSBAR
PLACARD SHALL CONFORM TO LOCAL AHJ
2. PLACARD SHALL BE ATTACHED DIRECTLY TO DEDICATED PV COMBINER PANEL "PV1"
3. PLACARD SHALL BE BLACK LETTERING ON ORANGE BACKGROUND
PV DISTRIBUTION EQUIPMENT
PLACARD
SCALE : NONE
SCALE : NONE
SCALE : NONE
SCALE : NONE
1.
NOTES:
PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND.
2. PLACARD SHALL BE ATTACHED DIRECTLY TO EACH (2) INVERTERS.
SCALE : NONE
SCALE : NONE
MANUAL
DISCONNECT
FOR PARALLEL
GENERATION
PACIFIC POWER - METER BASE
LABEL
1.
NOTES:
PLACARD SHALL CONFIRM TO ALL PACIFCORP GUIDELINES.
2. PLACARD SHALL BE ATTACHED DIRECTLY TO UTILITY AC
DISCONNECT.
3. PLACARD SHALL BE WHITE LETTERING ON RED BACKGROUND W/ A
MINIMUM TEXT HEIGHT OF 3/8".
3. PLACARD SHALL BE ATTACHED DIRECTLY TO PV COMBINER PANEL "PV1".
SCALE : NONE
SHEET :
TITLE:
REVISIONS
PV6.0
PLACARD DETAILS (1 OF 2)
D.B./C.B.:
PLAN SIZE:
JTD - JM -
SUNLIGHT SOLAR ENERGY, INC.
50 SE SCOTT ST. BUILDING 13
BEND, OR 97702
CCB#: 158922
CITY STAMP:
24" x 36"
Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.
UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:
01. Issue for Blue Sky Grant (08-04-20)
BLUE SKY GRANT
INVERTER #2
WARNING
NOTES:
1. PLACARD SHALL CONFORM TO NEC 110.16
2. TITLE SHALL BE BLACK LETTERING WITH ORANGE BACKGROUND.
REMAINING LETTERS SHALL BE BLACK W/ WHITE BACKGROUND.
MAXIMUM AVAILABLE FAULT CURRENT:
AMPS:
DATE:
1.
INVERTER #1
kAIC WARNING LABEL
SCALE : NONE
EQUIPMENT PLACARD
NOTES:
SCALE : NONE
SCALE : NONE
EQUIPMENT PLACARD
NOTES:
1.
TBD
TBD
PACIFIC POWER SOLAR METER
PARALLEL
GENERATION ON
SITE
PACIFIC POWER - AC DISCONNECT
LABEL
1.
NOTES:
PLACARD SHALL CONFIRM TO ALL PACIFCORP GUIDELINES.
2. PLACARD SHALL BE ATTACHED DIRECTLY TO UTILITY METER.
3. PLACARD SHALL BE WHITE LETTERING ON RED BACKGROUND W/ A
MINIMUM TEXT HEIGHT OF 3/8".
3. PLACARD SHALL BE ATTACHED DIRECTLY TO PV COMBINER PANEL.
RAPID SHUTDOWN & SERVICE
DISCONNECTS MAP PLACARD
1.
NOTES:
PLACARD SHALL CONFORM PER NEC ARTICLE 690.56
2. PLACARD SHALL BE ATTACHED DIRECTLY BESIDE SERVICE DISCONNECTING MEANS & TO MAIN
DISTRIBUTION SWITCHBOARD "FC-1" IN MAIN ELECTRICAL ROOM .
3. TITLE & NOTE SHALL BE BLACK LETTERS ON YELLOW BACKGROUND. REMAINING
LABELING SHALL BE BLACK ON WHITE BACKGROUND
SCALE : NONE
PLACARD SHALL BE ATTACHED DIRECTLY TO INVERTER & NEXT
TO BREAKER FEEDING INVERTER #2.
2. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND.
PLACARD SHALL BE ATTACHED DIRECTLY TO INVERTER & NEXT
TO BREAKER FEEDING INVERTER #1.
2. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND.
YOU ARE
HERE
NORTH
SOLAR PV SYSTEM EQUIPPED
WITH RAPID SHUTDOWN
ALL ARRAY CONDUCTORS WILL DE-ENERGIZE BELOW 80 VOLTS
WITHIN THE ARRAYS WHEN RAPID SHUTDOWN INITIATION
SWITCH IS IN THE "OFF" POSITION.
DISCONNECT SAFETY SWITCH TO INITIATE RAPID
SHUT DOWN AND REDUCE SHOCK HAZARD
WITHIN ROOF TOP SUB ARRAYS.
INVERTERS #1 - #2 W/
DC DISCONNECTS &
DEDICATED PV
COMBINER PANEL
"PV1"
UTILITY METER
LOCATION
SHEET :
TITLE:
REVISIONS
PV6.1
PLACARD DETAILS (2 OF 2)
D.B./C.B.:
PLAN SIZE:
JTD - JM -
SUNLIGHT SOLAR ENERGY, INC.
50 SE SCOTT ST. BUILDING 13
BEND, OR 97702
CCB#: 158922
CITY STAMP:
24" x 36"
Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.
UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:
01. Issue for Blue Sky Grant (08-04-20)
BLUE SKY GRANT
SHEET :
TITLE:
REVISIONS
PV7.0
EQUIPMENT SPECIFICATIONS
D.B./C.B.:
PLAN SIZE:
JTD - JM -
SUNLIGHT SOLAR ENERGY, INC.
50 SE SCOTT ST. BUILDING 13
BEND, OR 97702
CCB#: 158922
CITY STAMP:
24" x 36"
Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.
UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE: BLUE SKY GRANT
01. Issue for Blue Sky Grant (08-04-20)
Solar Access and Shade Report 7/14/2020
For:
Redmond Senior Center-East Roofs
325 NW Dogwood Redmond, OR 97756
By:
Joe Mazzarella
50 SE Scott Street, Suite 13 Bend, OR 97702
541-322-1910, Ext. 303
Measurements made by Solmetric SunEye™ -- www.solmetric.com http://www.solmetric.com
Session Properties Name redmond sr center Creation Date 5/21/2020 11:00 Note (none)
Location 44.3°N, 121.2°W Mag Dec: 14.3°E Time Zone: GMT-08:00
Solar access averages of 3 skylines in this session Skylines Averaged: Sky12, Sky13, Sky14
Annual May-Oct Nov-Apr 97% 98% 95%
TSRF averages of 3 skylines in this session: 77%
Sky12 -- 5/21/2020 11:10 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=90° -- Skyline Heading=178° Solar Access: Annual: 97% -- Summer (May-Oct): 97% -- Winter (Nov-Apr): 95%
TSRF: 77% -- TOF: 79%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky12AnnualAccess.jpg ExportedFiles/Sky12MonthlySolarAccess.jpg
Sky13 -- 5/21/2020 11:11 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=90° -- Skyline Heading=172° Solar Access: Annual: 98% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 96%
TSRF: 78% -- TOF: 79%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky13AnnualAccess.jpg ExportedFiles/Sky13MonthlySolarAccess.jpg
Sky14 -- 5/21/2020 11:12 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=90° -- Skyline Heading=166° Solar Access: Annual: 97% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 94%
TSRF: 77% -- TOF: 79%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky14AnnualAccess.jpg ExportedFiles/Sky14MonthlySolarAccess.jpg
Redmond Senior Center-South Roofs
50 SE Scott Street, Suite 13
Creation Date 5/21/2020 11:00 Note (none)
Location 44.3°N, 121.2°W Mag Dec: 14.3°E Time Zone: GMT-08:00
Solar access averages of 6 skylines in this session Skylines Averaged: Sky01, Sky02, Sky03, Sky04, Sky10, Sky11
Annual May-Oct Nov-Apr 97% 98% 95%
TSRF averages of 6 skylines in this session: 95%
Sky01 -- 5/21/2020 11:02 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=175° Solar Access: Annual: 99% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 97%
TSRF: 97% -- TOF: 98%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky01AnnualAccess.jpg ExportedFiles/Sky01MonthlySolarAccess.jpg
Sky02 -- 5/21/2020 11:03 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=176° Solar Access: Annual: 97% -- Summer (May-Oct): 98% -- Winter (Nov-Apr): 95%
TSRF: 95% -- TOF: 98%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky02AnnualAccess.jpg ExportedFiles/Sky02MonthlySolarAccess.jpg
Sky03 -- 5/21/2020 11:03 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=173° Solar Access: Annual: 91% -- Summer (May-Oct): 95% -- Winter (Nov-Apr): 84%
TSRF: 89% -- TOF: 98%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky03AnnualAccess.jpg ExportedFiles/Sky03MonthlySolarAccess.jpg
Sky04 -- 5/21/2020 11:04 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=178° Solar Access: Annual: 95% -- Summer (May-Oct): 96% -- Winter (Nov-Apr): 94%
TSRF: 93% -- TOF: 98%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky04AnnualAccess.jpg ExportedFiles/Sky04MonthlySolarAccess.jpg
Sky10 -- 5/21/2020 11:09 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=176° Solar Access: Annual: 99% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 98%
TSRF: 97% -- TOF: 98%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky10AnnualAccess.jpg ExportedFiles/Sky10MonthlySolarAccess.jpg
Sky11 -- 5/21/2020 11:09 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=180° Solar Access: Annual: 99% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 98%
TSRF: 97% -- TOF: 98%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky11AnnualAccess.jpg ExportedFiles/Sky11MonthlySolarAccess.jpg
Redmond Senior Center-West Roofs
50 SE Scott Street, Suite 13
Creation Date 5/21/2020 11:00 Note (none)
Location 44.3°N, 121.2°W Mag Dec: 14.3°E Time Zone: GMT-08:00
Solar access averages of 3 skylines in this session Skylines Averaged: Sky06, Sky08, Sky09
Annual May-Oct Nov-Apr 99% 100% 97%
TSRF averages of 3 skylines in this session: 77%
Sky06 -- 5/21/2020 11:05 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=270° -- Skyline Heading=177° Solar Access: Annual: 99% -- Summer (May-Oct): 100% -- Winter (Nov-Apr): 97%
TSRF: 77% -- TOF: 78%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky06AnnualAccess.jpg ExportedFiles/Sky06MonthlySolarAccess.jpg
Sky08 -- 5/21/2020 11:07 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=270° -- Skyline Heading=178° Solar Access: Annual: 99% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 97%
TSRF: 77% -- TOF: 78%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky08AnnualAccess.jpg ExportedFiles/Sky08MonthlySolarAccess.jpg
Sky09 -- 5/21/2020 11:08 -- (no skyline note)
Panel Orientation: Tilt=26° -- Azimuth=270° -- Skyline Heading=176° Solar Access: Annual: 99% -- Summer (May-Oct): 100% -- Winter (Nov-Apr): 96%
TSRF: 77% -- TOF: 78%
Attachment A, Senior Center Solar Panel Project
ExportedFiles/Sky09AnnualAccess.jpg ExportedFiles/Sky09MonthlySolarAccess.jpg
Level 2 Interconnection Review Report
Completed for City of Redmond
(“Applicant”)
Proposed Interconnection On PacifiCorp’s Existing 12.47-kV Circuit, 5D226
(Facility Point: 01415013.0098280)
2/3/2021
TABLE OF CONTENTS
1.0 DESCRIPTION OF THE GENERATING FACILITY
2.0 APPROVAL CRITERIA FOR LEVEL 2 INTERCONNECTION REVIEW
3.0 PROPOSED POINT OF INTERCONNECTION
4.0 TIER 2 INTERCONNECTION REVIEW RESULTS
4.1 860-039-0035(2) (A)
4.2 860-039-0035 (2) (B)
4.3 860-039-0035 (2) (C)
4.4 860-039-0035 (2) (D)
4.5 860-039-0035 (2) (E)
4.6 860-039-0035 (2) (F)
4.7 860-039-0035 (2) (G)
4.8 860-039-0035 (2) (H)
4.9 860-039-0035 (2) (I)
4.10 860-039-0035 (2) (J)
1.0 DESCRIPTION OF THE GENERATING FACILITY
City of Redmond (“Applicant”) has proposed interconnecting 60.8 kW DC of new generation to PacifiCorp’s (“Electric Company”) existing 12.47-kV Circuit, 5D226, located in Redmond, OR.
The Applicant’s generation project will provide a nameplate output of 58 kW of AC generation.
2.0 APPROVAL CRITERIA FOR LEVEL 2 INTERCONNECTION REVIEW
Pursuant to 860-039-0035(1) An Electric Company must apply the following Level 2 interconnection review procedure for an application to interconnect an eligible system that meets the following criteria:
(a) The facility has a capacity of two megawatts or less; and
(b) The facility does not qualify for or failed to meet applicable Level 1 interconnection review procedures.
3.0 PROPOSED POINT OF INTERCONNECTION
The proposed generation facility is to be interconnected to the existing 5D226 Circuit (12.47-kV), out of Redmond Substation. The Applicant is looking to interconnect to facility point number 01415013.0098280.
4.0 TIER 2 INTERCONNECTION REVIEW RESULTS
4.1 860-039-0035(2) (a) The aggregate generation capacity on the distribution circuit to which the net metering facility will interconnect, including the capacity of the net metering facility, will not cause any distribution protective equipment (including, but not limited to, substation breakers, fuse cutouts, and line reclosers), or customer equipment on the electric distribution system, to exceed 90 percent of the short circuit interrupting capability of the equipment. In addition, a net metering facility will not be connected to a circuit that already exceeds 90 percent of the short circuit interrupting capability, prior to interconnection of the facility.
Project fails review criteria?: False These calculations use a generation power factor of 0.95, a single-phase fault current multiplier of 5, a three-phase fault current multiplier of 3, and line-to-line primary voltage of 12.47 kV.
Existing single-phase private generation: 134 kW.
Single-phase current produced on primary during normal operation: 19.59 Amps.
Single-phase current produced on primary during a fault condition: 98.0 Amps.
Existing three-phase private generation: 4.3 kW.
Three-phase current produced on primary during normal operation: 0.21 Amps.
Three-phase current produced on primary during a fault condition: 0.6 Amps.
Current produced by proposed generation system on primary: 2.83 Amps.
Current produced by proposed generation system on primary during a fault condition:
8.5 Amps.
Total fault current: 107.1 Amps.
The limiting distribution protective equipment is a single phase fuse cutout, with a rating of not less than 8000 Amps.
8000 x 0.9 = 7,200.0 Amps.
4.2 860-039-0035 (2) (b) If there are posted transient stability limits to generating units located in the general electrical vicinity of the proposed point of common coupling, including, but not limited to within three or four transmission voltage level busses, the aggregate generation capacity, including the net metering facility, connected to the distribution low voltage side of the substation transformer feeding the distribution circuit containing the point of common coupling will not exceed 10 megawatts.
Project fails review criteria?: False Are there posted transient stability limits to generation?: No
Aggregate single-phase generation on feeder: 134 kW Aggregate three-phase generation on feeder: 4.3 kW Proposed generation system: 58 kW
Total generation on circuit (existing and proposed): 196.3 kW Generation limit: 10 MW
4.3 860-039-0035 (2) (c) The aggregate generation capacity connected to the distribution circuit, including the net metering facility, will not contribute more than 10 percent to the distribution circuit's maximum fault current at the point on the high voltage (primary) level nearest the proposed point of common coupling.
Project fails review criteria?: False Fault current at the point of interconnection without the contribution of customer generation = 3540 Fault current at the point of interconnection with the contribution of customer generation included = 3576
(3576 Amps - 3540 Amps) / 3540 Amps x 100 = 1.02%
4.4 860-039-0035 (2) (d) If a net metering facility is to be connected to a radial distribution circuit, the aggregate generation capacity connected to the electric distribution system by non-public utility sources, including the net metering facility, will not exceed 10 percent (or 15 percent for solar electric generation) of the total circuit annual peak load. For the purposes of this subsection, annual peak load will be based on measurements taken over the 12 months previous to the submittal of the application, measured for the circuit at the substation nearest to the net metering facility.
Project fails review criteria?: False Peak load on circuit 5D226: 4200 kW
Percentage of peak load for comparison (use 15% for solar, 10% for other generation types): 630 kW
Total customer generation on circuit (existing and proposed): 196.3 kW
4.5 860-039-0035 (2) (e) If a net metering facility is to be connected to three-phase, three wire primary public utility distribution lines, a three-phase or single-phase generator will be connected phase-to-phase.
Project fails review criteria?: False Circuit 5D226 is Three-Phase, Four Wire.
Generation is connected phase-to-phase?:
4.6 860-039-0035 (2) (f) If a net metering facility is to be connected to three-phase, four wire primary public utility distribution lines, a three-phase or single-phase generator will be connected line-to-neutral and will be effectively grounded.
Project fails review criteria?: False This review item refers to a customer generation facility’s ability to manage a transient overvoltage condition. This can be accomplished by using a qualified inverter or by effectively grounding the generation system.
IEEE 1547.7 guidelines indicate this review item may be waived if the aggregate customer generation is less than 10% of the circuit’s Light Load (for solar generation, the Daytime Light Load is used).
Light Load = 1600 kW 10% of Light Load = 160 kW Sum of customer generation (existing and proposed): 196.3 kW
Transient overvoltage management has been achieved for this installation, either through the use of a qualified inverter or by the addition of an effective grounding system?: True
4.7 860-039-0035 (2) (g) If a net metering facility is to be connected to a single-phase shared secondary, the aggregate generation capacity on the shared secondary, including the net metering facility, will not exceed 20 kilovolt-amps.
Project fails review criteria?: False Phasing of this installation: Three Phase Existing customer generation on the secondary: 0 kW Review item has been cleared by Engineering?:
4.8 860-039-0035 (2) (h) If a net metering facility is single-phase and is to be connected to a transformer center tap neutral of a 240 volt service, the addition of the net metering facility will not create a current imbalance between the two sides of the 240 volt service that is greater than 20 percent of the nameplate rating of the service transformer.
Project fails review criteria?: False This review item refers to connecting a single-phase 120 V inverter on a single-phase 240 V service.
Phasing of this installation: Three Phase Voltage of this installation: 208V Existing load on service transformer: kW
4.9 860-039-0035 (2) (i) A net metering facility's point of common coupling will not be on a transmission line.
Project fails review criteria?: False This installation will interconnect on distribution circuit 5D226.
4.10 860-039-0035 (2) (j) If an eligible system's proposed point of common coupling is on a spot or area network, the interconnection must meet the following additional requirements:
A) For a net metering facility that will be connected to a spot network circuit, the aggregate generation capacity connected to that spot network from the net metering facilities, and any generating facilities, will not exceed five percent of the spot network's maximum load;
(B) For a net metering facility that utilizes inverter-based protective functions, which will be connected to an area network, the net metering facility, combined with any other generating facilities on the load side of network protective devices, will not exceed 10 percent of the minimum annual load on the network, or 500 kilowatts, whichever is less.
For the purposes of this paragraph, the percent of minimum load for solar electric generation net metering facility will be calculated based on the minimum load occurring during an off-peak daylight period; and
(C) For a net metering facility that will be connected to a spot or an area network that does not utilize inverter-based protective functions, or for an inverter-based net metering facility that does not meet the requirements of paragraphs (A) or (B) of this subsection, the net metering facility will utilize low forward power relays or other protection devices that ensure no export of power from the net metering facility, including inadvertent export (under fault conditions) that could adversely affect protective devices on the network.
Project fails review criteria?: False Circuit 5D226 is a Radial circuit.
Sum of customer generation (existing and proposed): 196.3 kW
Peak load on circuit 5D226: 4200 kW 5% of peak load on circuit : 210.0
Technology type of proposed generating facility: Inverter Light Load = 1600 kW 10% of Light Load = 160 kW
| Redmond_Senior_Center (08-04-20)-PV1.0 |
| Redmond_Senior_Center (08-04-20)-PV2.0 |
| Redmond_Senior_Center (08-04-20)-PV3.0 |
| Redmond_Senior_Center (08-04-20)-PV4.1 |
| Redmond_Senior_Center (08-04-20)-PV5.0 |
| Redmond_Senior_Center (08-04-20)-PV5.1 |
| Redmond_Senior_Center (08-04-20)-PV6.0 |
| Redmond_Senior_Center (08-04-20)-PV6.1 |
| Redmond_Senior_Center (08-04-20)-PV7.0 |
| Solar Access & Shade Report.pdf |
| Solar Access and Shade Report |
| For: |
| By: |
| Session Properties |
| Solar access averages of 3 skylines in this session |
| Sky12 -- 5/21/2020 11:10 -- (no skyline note) |
| Sky13 -- 5/21/2020 11:11 -- (no skyline note) |
| Sky14 -- 5/21/2020 11:12 -- (no skyline note) |
| Redmond Senior Center-South Roofs Report.pdf |
| Solar Access and Shade Report |
| For: |
| By: |
| Session Properties |
| Solar access averages of 6 skylines in this session |
| Sky01 -- 5/21/2020 11:02 -- (no skyline note) |
| Sky02 -- 5/21/2020 11:03 -- (no skyline note) |
| Sky03 -- 5/21/2020 11:03 -- (no skyline note) |
| Sky04 -- 5/21/2020 11:04 -- (no skyline note) |
| Sky10 -- 5/21/2020 11:09 -- (no skyline note) |
| Sky11 -- 5/21/2020 11:09 -- (no skyline note) |
| Redmond Senior Center-West Roofs Report.pdf |
| Solar Access and Shade Report |
| For: |
| By: |
| Session Properties |
| Solar access averages of 3 skylines in this session |
| Sky06 -- 5/21/2020 11:05 -- (no skyline note) |
| Sky08 -- 5/21/2020 11:07 -- (no skyline note) |
| Sky09 -- 5/21/2020 11:08 -- (no skyline note) |
| Pacific Power Report.pdf |
| 1.0 Description of the Generating Facility |
| 2.0 Approval Criteria for Level 2 Interconnection Review |
| 3.0 Proposed Point of Interconnection |
| 4.0 Tier 2 Interconnection Review Results |
| 4.1 860-039-0035(2) (a) |
| 4.2 860-039-0035 (2) (b) |
| 4.3 860-039-0035 (2) (c) |
| 4.4 860-039-0035 (2) (d) |
| 4.5 860-039-0035 (2) (e) |
| 4.6 860-039-0035 (2) (f) |
| 4.7 860-039-0035 (2) (g) |
| 4.8 860-039-0035 (2) (h) |
| 4.9 860-039-0035 (2) (i) |
| 4.10 860-039-0035 (2) (j) |
File details come from the government source that posted it. Updated .