Attachment A General Specs~1.pdf

PDF 12 MB Posted

Attached to
Senior Center Solar Panel Project
Solicitation number
S-KR0970-00000344
Issued by
Deschutes County, Oregon

About this file

Attachment A General Specs is a document related to the Senior Center Solar Panel Project, a state and local contract opportunity issued by the City of Redmond Public Works Parks and Facilities Division in Oregon. The City is requesting bids for the turn-key installation of an approximately 60 kW, grid-tied photovoltaic system on the roof of the Redmond Senior Center. The successful bidder will be responsible for developing their own design that provides a system and equipment equivalent to the referenced drawings. The contract will be awarded to qualified and experienced vendors.

The document does not provide any details on pricing terms, set asides, incumbents, funding requirements and sources, or other salient financial information. The contract opportunity involves the jurisdictions of Deschutes County and the City of Redmond.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTH

VICINITY MAP

SITE PLAN

SCALE : 1" = 25'- 0"

PROPERTY LINES

NONE.1.

NOTES:

SHEET # TITLE

GENERAL SPECIFICATIONS; VICINITY & SITE PLANSPV1.0

DRAWING LIST

ISSUE FOR BLUE SKY GRANT

(08-04-20)

SCALE : NONE

ONE LINE DIAGRAM & LOW VOLTAGE DIAGRAM

SHEET :

REVISIONS

PV1.0

D.B./C.B.:

PLAN SIZE:

JTD - JM -

24" x 36"

SUNLIGHT SOLAR ENERGY, INC.

50 SE SCOTT ST. BUILDING 13

BEND, OR 97702

CCB#: 158922

CITY STAMP:

TITLE:

INCENTIVE:

GENERAL SPECIFICATIONS; VICINITY MAP & SITE PLAN

PHOTOVOLTAIC SYSTEM ROOF LAYOUT PV2.0

EQUIPMENT SPECIFICATIONS

PV6.0

PV7.0

UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°----

Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.

SOUTH FACING

ARRAY SPECIFICATIONS:

ARRAY TILT =

ARRAY ORIENTATION =

ROOF SPECIFICATIONS:

COMPOSITION SHINGLE

ROOF TILT =

AVERAGE SOLAR RESOURCE:

AVERAGE PSF =

TOF =

LOWEST TSRF =

99%

98%

89%

26°

26°

180°

ELECTRICAL DETAILS

PV3.0

PV4.0

PLACARD DETAILS (2 OF 2)

PV5.0

SOURCE CIRCUIT CONFIGURATION MAP

PV6.1

PV4.1

I S

S U

E

F

O R

B

L U

E

S

K Y

G

R A

N T

01. Issue for Blue Sky Grant (08-04-20)

PLACARD DETAILS (1 OF 2)

ELECTRICAL SPECIFICATIONS (1 OF 2)

PV5.1 ELECTRICAL SPECIFICATIONS (2 OF 2)

(7) SUB ARRAYS W/

TOTAL OF

(160) REC SOLAR

MODULES -

(REC380TP2SM72) -

PORTRAIT (TYPICAL)

AVERAGE TSRF = 95%

GENERAL SPECIFICATIONS

MODULES :

(160) REC SOLAR

REC380TP2SM72

OPTIMIZER:

(80) SOLAREDGE - P860

INVERTER(S):

(1) SOLAREDGE - 43.2K-US

ARRAY TO BE INSTALLED ON EXISTING

COMMERCIAL BUILDING

SYSTEM SPECS

TOTAL PV SYSTEM - 60.80 kW DC

(1) SOLAREDGE - 14.4K-US

SUB ARRAY SPECIFICATIONS

WEST FACING

ARRAY SPECIFICATIONS:

ARRAY TILT =

ARRAY ORIENTATION =

AVERAGE SOLAR RESOURCE:

AVERAGE PSF =

TOF =

LOWEST TSRF =

99%

78%

77%

26°

270°

AVERAGE TSRF = 77%

SUB ARRAY SPECIFICATIONS

EAST FACING

ARRAY SPECIFICATIONS:

ARRAY TILT =

ARRAY ORIENTATION =

AVERAGE SOLAR RESOURCE:

AVERAGE PSF =

TOF =

LOWEST TSRF =

98%

79%

77%

26°

90°

AVERAGE TSRF = 77%

SUB ARRAY SPECIFICATIONS

BLUE SKY GRANT

ARRAY ROOF COVERAGE

3,454 SQ.FT./ 12,390 SQ.FT.= 27.9%

ROOF AREA SPECIFICATIONS

Attachment A, Senior Center Solar Panel Project

192'-41 2"

7'-83 4" 1'

19'-71 2"

6" 11'-6"

29'-101 2"

20'-10"

1' 7'-83 4"

6"

23'-23 4"29'-101

2"

11'-11"9'-7"

19'-11"21'-1"

3'

3'

SHEET :

TITLE:

REVISIONS

PV2.0

PV ROOF LAYOUT

D.B./C.B.:

PLAN SIZE:

JTD - JM -

SUNLIGHT SOLAR ENERGY, INC.

50 SE SCOTT ST. BUILDING 13

BEND, OR 97702

CCB#: 158922

CITY STAMP:

24" x 36"

UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26° INCENTIVE:

01. Issue for Blue Sky Grant (08-04-20)

(391) SNAP N RACK

UR-40 L - FEET &

COMP KITS

(TYPICAL)

SNAP N RACK

ULTRA RAIL SOLAR

RAIL

(TYPICAL)

6" EXPANSION

GAP

6" EXPANSION

GAP

NORTH

Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.

PV ROOF LAYOUT PLAN

SCALE : 1/8" = 1'- 0"

NONE.1.

NOTES:

BLUE SKY GRANT

EXISTINIG DRY TYPE -

UTILITY

PAD / VAULT MOUNTED

TRANSFORMER

TO UTILITY

EXISTING

FEEDERS

200A/3P/240V NFSS; NEMA 1 - 65 kAIC RATED

"RAPID SHUTDOWN INITIATION SWITCH"

(EXTERIOR MAIN ELECTRICAL ROOM - NORTH

WALL - 4'- 0" ADJACENT TO UTILITY METER)

EXISTING PACIFICORP

METER #74 264 866

(EXTERIOR ELECTRICAL

ROOM - NORTH WALL)

EXISTING

FEEDERS

EXISTING SQUARE D

MAIN DISTRIBUTION

SWITCHBOARD "MDP"

600A BUS RATED - 208/120V -

3Ø - 4W - (INTERIOR

ELECTRICAL ROOM)

150A

3P

EXISTING GEC TO

EXISTING AC

ELECTRODE

(4) #1/0 THWN-2 &

(1) #6 EGC

IN 2" EMT

ROOFTOP

JUNCTION BOX

200A BUS RATING - 480/277V - 3Ø - 4W

200A

3P

ROOFTOP

JUNCTION BOX

(4) #10 600V PV WIRE &

(1) #6 BARE EGC

IN FREE AIR

ROOFTOP

JUNCTION BOX

SUB ARRAY "B" - SOURCE CIRCUITS

#7; #8 & #9

SUB ARRAY "B" - SOURCE CIRCUITS

#5 & #6

ONE LINE DIAGRAM

SCALE : NONE

NOTES:

1. ALL SHOWN IS NEW AND BY PV CONTRACTOR UNLESS SPECIFICALLY NOTED OTHERWISE.

50A

3P

DEDICATED PV

COMBINER PANEL "PV1"

200A MLO - 208/120V -

3Ø - 4W; NEMA 3R

(EXTERIOR - NORTH WALL)

(4) #6 THWN-2 &

(1) #10 EGC

IN 1" EMT

DC

AC

INVERTER #2

SOLAREDGE

SE14.4KUS

INVERTER @208V

(EXTERIOR - NORTH WALL)

(6) #10 600V PV WIRE &

(1) #6 BARE EGC

IN FREE AIR

ROOFTOP

JUNCTION BOX

DC

AC

INVERTER #1

SOLAREDGE

SE43.2KUS

INVERTER @208V

(EXTERIOR - NORTH WALL)

DC

AC

DC

AC

UNIT 1A UNIT 1B UNIT 1C

(4) #3/0 THWN-2 &

(1) #6 THWN-2 EGC

IN 2" EMT

DC

AC

CAT 5E CABLE

(DAISY CHAIN)

IN DEDICATED

3/4" EMT

DC

AC

INVERTER #1

SOLAREDGE

SE43.2K-US

INVERTER @208V

(EXTERIOR - NORTH WALL)

INVERTER #2

SOLAREDGE

SE14.4K-US

INVERTER @208V

(EXTERIOR - NORTH WALL)

LOW VOLTAGE DIAGRAM

SCALE : NONE

#7 - (17) MODULES W/ (9) OPTIMIZERS

#8 - (17) MODULES W/ (9) OPTIMIZERS

#9 - (18) MODULES W/ (9) OPTIMIZERS

MODULES

- REC SOLAR - REC380TP2SM72

OPTIMIZERS

- SOLAREDGE P860

#5 - (18) MODULES W/ (9) OPTIMIZERS

#6 - (18) MODULES W/ (9) OPTIMIZERS

MODULES

- REC SOLAR - REC380TP2SM72

OPTIMIZERS

- SOLAREDGE P860

CAT 5E CABLE -

TO ROUTER IN ADJACENT

ELECTRICAL ROOM

NOTES:

1. PV CONTRACTOR SHALL WIRE SYSTEM TO PREFERRED DATA INPUT LOCATION IN THE DATA

CLOSET.

(4) #3/0 THWN-2 &

(1) #6 THWN-2 EGC

IN 2" EMT

(6) #10 THWN-2 &

(1) #10 THWN-2 EGC

IN 3/4" EMT

2. PV CONTRACTOR SHALL RUN ALL SYSTEM DC CONDUCTORS FROM ROOF TO EXISTING 2" EMT

STEMMED @ WEST WALL ABOVE DATA CLOSET / SECOND FLOOR.

JUNCTION BOX W/ DC FUSING

(2) 25A/600V FUSES W/ BUSSMANN FUSE

HOLDERS - POSITIVE CONDUCTOR OF EACH

SOURCE CIRCUIT (EXTERIOR - NORTH WALL -

ADJACENT TO INVERTER)

SUB ARRAY "B" - SOURCE CIRCUITS

#3 & #4

#3 - (18) MODULES W/ (9) OPTIMIZERS

#4 - (18) MODULES W/ (9) OPTIMIZERS

MODULES

- REC SOLAR - REC380TP2SM72

OPTIMIZERS

- SOLAREDGE P860

SUB ARRAY "B" - SOURCE CIRCUITS

#1 & #2

#1 - (18) MODULES W/ (9) OPTIMIZERS

#2 - (18) MODULES W/ (9) OPTIMIZERS

MODULES

- REC SOLAR - REC380TP2SM72

OPTIMIZERS

- SOLAREDGE P860

M

EXISTING

FEEDERS

(6) #10 THWN-2 &

(1) #10 THWN-2 EGC

IN 3/4" EMT

(4) #10 THWN-2 &

(1) #10 THWN-2 EGC

IN 3/4" EMT

(4) #10 THWN-2 &

(1) #10 THWN-2 EGC

IN 3/4" EMT

(4) #10 600V PV WIRE &

(1) #6 BARE EGC

IN FREE AIR

(4) #10 THWN-2 &

(1) #10 THWN-2 EGC

IN 3/4" EMT

(4) #10 THWN-2 &

(1) #10 THWN-2 EGC

IN 3/4" EMT

(4) #10 600V PV WIRE &

(1) #6 BARE EGC

IN FREE AIR

(4) #10 THWN-2 &

(1) #10 THWN-2 EGC

IN 3/4" EMT

(4) #10 THWN-2 &

(1) #10 THWN-2 EGC

IN 3/4" EMT

JUNCTION BOX W/ DC FUSING

(2) 25A/600V FUSES W/ BUSSMANN FUSE

HOLDERS - POSITIVE CONDUCTOR OF EACH

SOURCE CIRCUIT (EXTERIOR - NORTH WALL -

ADJACENT TO INVERTER)

JUNCTION BOX W/ DC FUSING

(2) 25A/600V FUSES W/ BUSSMANN FUSE

HOLDERS - POSITIVE CONDUCTOR OF EACH

SOURCE CIRCUIT (EXTERIOR - NORTH WALL -

ADJACENT TO INVERTER)

JUNCTION BOX W/ DC FUSING

(3) 25A/600V FUSES W/ BUSSMANN FUSE

HOLDERS - POSITIVE CONDUCTOR OF EACH

SOURCE CIRCUIT (EXTERIOR - NORTH WALL -

ADJACENT TO INVERTER)

SHEET :

TITLE:

REVISIONS

PV3.0

ONE LINE DIAGRAM & LOW VOLTAGE DIAGRAM

D.B./C.B.:

PLAN SIZE:

JTD - JM -

SUNLIGHT SOLAR ENERGY, INC.

50 SE SCOTT ST. BUILDING 13

BEND, OR 97702

CCB#: 158922

CITY STAMP:

24" x 36"

Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.

UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:

01. Issue for Blue Sky Grant (08-04-20)

BLUE SKY GRANT

39.4"

78.9"

REC SOLAR - TWIN

PEAK SERIES

MODULE -

(REC380TP2SM72)

3'

6" MINIMUM

CLEARANCE

THERE SHALL BE A MANDATORY 4'-0" UNOBSTRUCTED CLEARANCE IN FRONT OF ALL ELECTRICAL

EQUIPMENT PER NEC 110.26

1.

NOTES:

ALL ELECTRICAL EQUIPMENT IS SHOWN W/ MANUFACTURERS REQUIRED SPACING. REFER TO

INVERTER INSTALLATION MANUAL FOR FURTHER INFORMATION AS NECESSARY.

2.

115 1/2"

8"8"

6" MINIMUM

CLEARANCE

PV MODULE DETAIL

SCALE : NONE

AC NON FUSED SAFETY SWITCH

ENCLOSURE DETAIL (EATON - DH364

200A/3P/240V)

SCALE : NONE

PV EQUIPMENT LAYOUT - EXTERIOR -

NORTH WALL

SCALE : NONE

37 1/2"32" 30"

PHOTOVOLTAIC EQUIPMENT

LOCATIONS (EXTERIOR - NORTH WALL)

SCALE : NONE

PHOTOVOLTAIC INTERCONNECTION LOCATION

(INTERIOR ELECTRICAL ROOM - "MDP")

SCALE : NONE

SCALE : NONE

27.63"

6.14"

27.63"

16.00"

ON

OFF

UTILITY AC DISCONNECT LOCATION (EXTERIOR

MAIN ELECTRICAL ROOM - NORTH WALL)

SCALE : NONE

PV - COMPOSITION ROOF MOUNTING

ASSEMBLY DETAIL (SNAPNRACK - ULTRA

RAIL COMP KIT)

NOT TO

EXCEED 12"

ELEVATION - FRONT OF BUILDING

SCALE : NONE

SHEET :

TITLE:

REVISIONS

PV4.1

ELECTRICAL DETAILS

D.B./C.B.:

PLAN SIZE:

JTD - JM -

SUNLIGHT SOLAR ENERGY, INC.

50 SE SCOTT ST. BUILDING 13

BEND, OR 97702

CCB#: 158922

CITY STAMP:

24" x 36"

Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.

UTILITY CO: PPL

PANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:

01. Issue for Blue Sky Grant (08-04-20)

BLUE SKY GRANT

AC AMPACITY

(INVERTER MAX AC CURRENT) x (1.25)

120.0 x 1.25 = 150.00 A

150.00 A

WIRE QUANTITY:

SIZE AND TYPE:

RATED AMPACITY:

AMPACITY COMPARISON

WIRE AREA

AC AMPACITY vs. RATED WIRE AMPACITY:

NUMBER OF (#1/0 THWN-2) IN CONDUIT:

4 x 0.1855 + 0.0507 =

(4) #1/0 THWN-2 + (1) #6 EGC

0.7927 sq.in.

CONDUIT SELECTION

PERMITTED AREA FOR OVER 2 WIRES:

SIZE AND TYPE:

1.342 sq.in.

AREA COMPARISON

WIRE AREA vs. PERMITTED AREA:

SITE TEMPRATURE INFORMATION

(AC) AMPACITY & WIRE SIZING -

2" EMT

0.7927 </= 1.342

(AC) VOLTAGE DROP -

#1/0 THWN-2

150.00 </= 150.00

INVERTER #1 - ELECTRICAL CALCULATIONS

INVERTER TO PV COMBINER PANEL "PV1"

(AC) CALCULATIONS - INVERTER(S) TO

PV COMBINER PANEL "PV1"

CITY, ST

AVERAGE HIGH °C:

RECORD LOW °C:

AHREA 0.4% HIGH

BUS AMP RATING (A): 600A

SERVICE VOLTAGE (V): 208/120V - 3Ø -4W

600AMAIN AMP RATING (A):

PV OCPD AMP RATING (A):

RATED VOLTAGE (V)

SERVICE PANEL RATINGS

SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS

400.00 V

INVERTER MANUFACTURER:

INVERTER MODEL:

MAX DC VOLT RATING (V):

MAX AC POWER @ 40°C (W):

NOMINAL AC VOLTAGE (V):

MAX AC CURRENT (A):

MODULE MANUFACTURER:

MODULE MODEL #:

OPERATING CURRENT (Imp):

SHORT-CIRCUIT CURRENT (Isc):

OPERATING VOLTAGE (Vmp):

OPEN-CIRCUIT VOLTAGE (Voc):

MAXIMUM POWER (W):

Vmp TEMP COEFF:

Voc TEMP COEFF:

MAX FUSE RATING (A):

(AMPACITY PER OPTIMIZER SPECIFICATIONS)X(# STRINGS)

18.00 x 6 =

690.53 P.V. POWER SOURCE SIGNAGE ON

REC - TWIN PEAK SERIES

REC380TP2SM72

ARRAY DESIGN

INVERTER RATINGS

PV MODULE RATINGS @ STC:

# OF INVERTERS:

108.00A

25A

9.43A

10.05A

40.3V

48.2V

380.00W

-0.28%/°C

-0.28%/°C

DC DISCONNECT RATED CURRENT (A)

Vmp @ AVERAGE HIGH TEMPRATURE

SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS

400.00 V

NEC TABLE 310.15

(AC) INVERTER OUTPUT CIRCUIT -

CONDUIT SIZING

MAX SYSTEM VOLTAGE (V)

SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS

600.00 V

MAX CIRCUIT CURRENT (A)

(AMPACITY PER OPTIMIZER SPECIFICATIONS)X(# STRINGS)

18.00 x 6 =

108.00A

# OF MODULES PER INVERTER:

SE43.2K-US

SOLAREDGE

600V

43,200W

208V - 3Ø

120A

# OF SOURCE CIRCUITS:

# OF MODULES PER SOURCE CIRCUIT:

WIRE INFORMATION

WIRE LENGTH: 25 ft

WIRE TYPE:

RATED WIRE RESISTANCE

ADJUSTED VOLTAGE DROP

(.1732) x (WIRE LENGTH) x (INVERTER MAX AC CURRENT) x

0.30% Vdrop

#1/0 THWN-2

0.122 Ω/kFT

0.1732 x 25 x 120.0 x 0.122 Ω/kFT / 208 =

(RATED WIRE RESISTANCE) / (AC VOLT.)

(NEC table 8 ch. 9) =

200A NFSS & 200A ECB

(AC) CALCULATIONS - PV COMBINER PANEL "PV1"

THRU AC DISCO TO INTERCONNECTION IN "MDP"

(AC) AMPACITY & WIRE SIZING -

THRU AC DISCO TO INTERCONNECTION IN "MDP"

NEC TABLE 310.15

(AC) PV COMBINER PANEL "PV1" OUTPUT CIRCUIT

CONDUIT SIZING (TYPICAL FOR EACH SET)

AC AMPACITY

(120.0 + 40) x 1.25 =

WIRE QUANTITY:

SIZE AND TYPE:

RATED AMPACITY:

AMPACITY COMPARISON

WIRE AREA

AC AMPACITY vs. RATED WIRE AMPACITY:

NUMBER OF (#3/0 THWN-2) IN CONDUIT:

4 x 0.2679 + 0.0507 =

(4) #3/0 THWN-2 + (1) #6 THWN-2 EGC

1.223 sq.in.

CONDUIT SELECTION

PERMITTED AREA FOR OVER 2 WIRES:

SIZE AND TYPE:

1.342 sq.in.

AREA COMPARISON

WIRE AREA vs. PERMITTED AREA:

2" EMT

1.223 </= 1.342

200.00 </= 200.00

(AC) TOTAL VOLTAGE DROP

(0.30% + 0.51%) = 0.81% Vdrop

200.00 A

200.00 A

#3/0 THWN-2

(TOTAL INVERTERS MAX AC CURRENT) x (1.25)

WIRE INFORMATION

WIRE LENGTH: 50 ft

WIRE TYPE:

RATED WIRE RESISTANCE

ADJUSTED VOLTAGE DROP

(0.1732) x (WIRE LENGTH) x (PANEL MAX AC CURRENT) x

0.51% Vdrop

#3/0 THWN-2

0.0766 Ω/kFT

0.1732 x 50 x (160.00) x (0.0766 Ω/kFT/2) / 208 =

(RATED WIRE RESISTANCE) / (SETS OF CONDUCTORS /

(NEC table 8 ch. 9) =

(AC VOLTAGE)

(DC) CALCULATIONS - ARRAY(S) TO

INVERTER(S)

4 4

NUMBER OF (#10 600V PV WIRE) IN CONDUIT:

WIRE AREA

(4) #10 600V PV WIRE + (1) #10 EGC

0.1055 sq.in.4 x 0.0211 + 0.0211 =

CONDUIT SELECTION

SIZE AND TYPE:

PERMITTED AREA FOR OVER 2 WIRES: 0.213 sq.in.

AREA COMPARISON

WIRE AREA vs. PERMITTED AREA FOR OVER 2 WIRES:

(DC) PHOTOVOLTAIC OUTPUT CIRCUIT -

3/4" EMT

0.1055 </= 0.213

WIRE INFORMATION

WIRE LENGTH:

150 ft

WIRE TYPE:

RATED WIRE RESISTANCE

ADJUSTED VOLTAGE DROP

(.2) x (WIRE LENGTH) x (TOTAL STRING WATTAGE/ 400V )

1.59% Vdrop

(DC) VOLTAGE DROP - ARRAY TO INVERTER

#10 600V PV WIRE

0.2 x 150 x (6,840/400) x 1.24 Ω/kFT / 400.00 = x (RATED WIRE RESISTANCE) / (VMP @ AVG. HIGH TEMP)

CONDUIT SIZING

(NEC TABLE 8 CH. 9) -

1.24 Ω/kFT

DC AMPACITY

(optimizer ampacity) x (1.25)

22.50A

18.00 x 1.25 =

WIRE SELECTION

SIZE AND TYPE:

RATED AMPACITY:

30A

#10 1000V PV WIRE

AMPACITY COMPARISON

AC AMPACITY vs. RATED WIRE AMPACITY: 22.50 </= 30.00

NEC TABLE 310.15

(DC) AMPACITY & WIRE SIZING -

27.7°C

- 19.2°C

35.4°C

REDMOND, OR (ASHRAE)

SHEET :

TITLE:

REVISIONS

PV5.0

ELECTRICAL SPECIFICATIONS ( 1 OF 2)

D.B./C.B.:

PLAN SIZE:

JTD - JM -

SUNLIGHT SOLAR ENERGY, INC.

50 SE SCOTT ST. BUILDING 13

BEND, OR 97702

CCB#: 158922

CITY STAMP:

24" x 36"

Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.

UTILITY CO: PPL

PANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:

01. Issue for Blue Sky Grant (08-04-20)

BLUE SKY GRANT

AC AMPACITY

(INVERTER MAX AC CURRENT) x (1.25)

40.0 x 1.25 = 50.00 A

55.00 A

WIRE QUANTITY:

SIZE AND TYPE:

RATED AMPACITY:

AMPACITY COMPARISON

WIRE AREA

AC AMPACITY vs. RATED WIRE AMPACITY:

NUMBER OF (#6 THWN-2) IN CONDUIT:

4 x 0.0507 + 0.0211 =

(4) #6 THWN-2 + (1) #10 EGC

0.224sq.in.

CONDUIT SELECTION

PERMITTED AREA FOR OVER 2 WIRES:

SIZE AND TYPE:

0.346 sq.in.

AREA COMPARISON

WIRE AREA vs. PERMITTED AREA:

SITE TEMPRATURE INFORMATION

(AC) AMPACITY & WIRE SIZING -

1" EMT

0.224 </= 0.346

(AC) VOLTAGE DROP -

#6 THWN-2

50.00 </= 55.00

INVERTER #2 - ELECTRICAL CALCULATIONS

INVERTER TO PV COMBINER PANEL "PV1"

(AC) CALCULATIONS - INVERTER(S) TO

PV COMBINER PANEL "PV1"

CITY, ST

AVERAGE HIGH °C:

RECORD LOW °C:

AHREA 0.4% HIGH

BUS AMP RATING (A): 600A

SERVICE VOLTAGE (V): 208/120V - 3Ø -4W

600AMAIN AMP RATING (A):

PV OCPD AMP RATING (A):

RATED VOLTAGE (V)

SERVICE PANEL RATINGS

SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS

400.00 V

INVERTER MANUFACTURER:

INVERTER MODEL:

MAX DC VOLT RATING (V):

MAX AC POWER @ 40°C (W):

NOMINAL AC VOLTAGE (V):

MAX AC CURRENT (A):

MODULE MANUFACTURER:

MODULE MODEL #:

OPERATING CURRENT (Imp):

SHORT-CIRCUIT CURRENT (Isc):

OPERATING VOLTAGE (Vmp):

OPEN-CIRCUIT VOLTAGE (Voc):

MAXIMUM POWER (W):

Vmp TEMP COEFF:

Voc TEMP COEFF:

MAX FUSE RATING (A):

(AMPACITY PER OPTIMIZER SPECIFICATIONS)X(# STRINGS)

18.00 x 3 =

690.53 P.V. POWER SOURCE SIGNAGE ON

REC - TWIN PEAK SERIES

REC380TP2SM72

ARRAY DESIGN

INVERTER RATINGS

PV MODULE RATINGS @ STC:

# OF INVERTERS:

54.00A

25A

9.43A

10.05A

40.3V

48.2V

380.00W

-0.28%/°C

-0.28%/°C

DC DISCONNECT RATED CURRENT (A)

Vmp @ AVERAGE HIGH TEMPRATURE

SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS

400.00 V

NEC TABLE 310.15

(AC) INVERTER OUTPUT CIRCUIT -

CONDUIT SIZING

MAX CIRCUIT CURRENT (A)

(AMPACITY PER OPTIMIZER SPECIFICATIONS)X(# STRINGS)

18.00 x 3 =

54.00A

# OF MODULES PER INVERTER:

SE14.4K-US

SOLAREDGE

600V

14,400W

208V - 3Ø

40A

# OF SOURCE CIRCUITS:

# OF MODULES PER SOURCE CIRCUIT:

WIRE INFORMATION

WIRE LENGTH: 25 ft

WIRE TYPE:

RATED WIRE RESISTANCE

ADJUSTED VOLTAGE DROP

(.1732) x (WIRE LENGTH) x (INVERTER MAX AC CURRENT) x

0.41% Vdrop

#6 THWN-2

0.491 Ω/kFT

0.1732 x 25 x 40.0 x 0.491 Ω/kFT / 208 =

(RATED WIRE RESISTANCE) / (AC VOLT.)

(NEC table 8 ch. 9) =

200A NFSS & 200A ECB

(AC) CALCULATIONS - PV COMBINER PANEL "PV1"

THRU AC DISCO TO INTERCONNECTION IN "MDP"

(AC) AMPACITY & WIRE SIZING -

THRU AC DISCO TO INTERCONNECTION IN "MDP"

NEC TABLE 310.15

(AC) PV COMBINER PANEL "PV1" OUTPUT CIRCUIT

CONDUIT SIZING (TYPICAL FOR EACH SET)

AC AMPACITY

(120.0 + 40) x 1.25 =

WIRE QUANTITY:

SIZE AND TYPE:

RATED AMPACITY:

AMPACITY COMPARISON

WIRE AREA

AC AMPACITY vs. RATED WIRE AMPACITY:

NUMBER OF (#3/0 THWN-2) IN CONDUIT:

4 x 0.2679 + 0.0507 =

(4) #3/0 THWN-2 + (1) #6 THWN-2 EGC

1.223 sq.in.

CONDUIT SELECTION

PERMITTED AREA FOR OVER 2 WIRES:

SIZE AND TYPE:

1.342 sq.in.

AREA COMPARISON

WIRE AREA vs. PERMITTED AREA:

2" EMT

1.223 </= 1.342

200.00 </= 200.00

(AC) TOTAL VOLTAGE DROP

(0.41% + 0.51%) = 0.92% Vdrop

200.00 A

200.00 A

#3/0 THWN-2

(TOTAL INVERTERS MAX AC CURRENT) x (1.25)

WIRE INFORMATION

WIRE LENGTH: 50 ft

WIRE TYPE:

RATED WIRE RESISTANCE

ADJUSTED VOLTAGE DROP

(0.1732) x (WIRE LENGTH) x (PANEL MAX AC CURRENT) x

0.51% Vdrop

#3/0 THWN-2

0.0766 Ω/kFT

0.1732 x 50 x (160.00) x (0.0766 Ω/kFT/2) / 208 =

(RATED WIRE RESISTANCE) / (SETS OF CONDUCTORS /

(NEC table 8 ch. 9) =

(AC VOLTAGE)

4 4

(1) @ 18 & (2) @ 17

(DC) CALCULATIONS - ARRAY(S) TO

INVERTER(S)

MAX SYSTEM VOLTAGE (V)

SEE SOLAR EDGE OPTIMIZER SPECIFICATIONS

600.00 V

NUMBER OF (#10 600V PV WIRE) IN CONDUIT:

WIRE AREA

(6) #10 600V PV WIRE + (1) #10 EGC

0.1477 sq.in.6 x 0.0211 + 0.0211 =

CONDUIT SELECTION

SIZE AND TYPE:

PERMITTED AREA FOR OVER 2 WIRES: 0.213 sq.in.

AREA COMPARISON

WIRE AREA vs. PERMITTED AREA FOR OVER 2 WIRES:

(DC) PHOTOVOLTAIC OUTPUT CIRCUIT -

3/4" EMT

0.1477 </= 0.213

WIRE INFORMATION

WIRE LENGTH:

150 ft

WIRE TYPE:

RATED WIRE RESISTANCE

ADJUSTED VOLTAGE DROP

(.2) x (WIRE LENGTH) x (TOTAL STRING WATTAGE/ 400V )

1.59% Vdrop

(DC) VOLTAGE DROP - ARRAY TO INVERTER

#10 600V PV WIRE

0.2 x 150 x (6,840/400) x 1.24 Ω/kFT / 400.00 = x (RATED WIRE RESISTANCE) / (VMP @ AVG. HIGH TEMP)

CONDUIT SIZING

(NEC TABLE 8 CH. 9) -

1.24 Ω/kFT

DC AMPACITY

(optimizer ampacity) x (1.25)

22.50A

18.00 x 1.25 =

WIRE SELECTION

SIZE AND TYPE:

RATED AMPACITY:

30A

#10 1000V PV WIRE

AMPACITY COMPARISON

AC AMPACITY vs. RATED WIRE AMPACITY: 22.50 </= 30.00

NEC TABLE 310.15

(DC) AMPACITY & WIRE SIZING -

27.7°C

- 19.2°C

35.4°C

REDMOND, OR (ASHRAE)

SHEET :

TITLE:

REVISIONS

PV5.1

ELECTRICAL SPECIFICATIONS (2 OF 2)

D.B./C.B.:

PLAN SIZE:

JTD - JM -

SUNLIGHT SOLAR ENERGY, INC.

50 SE SCOTT ST. BUILDING 13

BEND, OR 97702

CCB#: 158922

CITY STAMP:

24" x 36"

Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.

UTILITY CO: PPL

PANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:

01. Issue for Blue Sky Grant (08-04-20)

BLUE SKY GRANT

PV INTERCONNECTION POINT

RATED CURRENT

NOMINAL VOLTAGE

160.00A

208VAC 3Ø

1.

NOTES:

PLACARD SHALL PROVIDE ALL REQUIRED INFORMATION PER NEC 690.53

2. PLACARD SHALL BE ATTACHED DIRECTLY TO INVERTER #2 DC DISCONNECT.

3. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND

MAXIMUM SYSTEM VOLTAGE

MAXIMUM CIRCUIT CURRENT

600.00 VDC

54.00 AMPS

DIRECT CURRENT PHOTOVOLTAIC

POWER SOURCE

DIRECT CURRENT PHOTOVOLTAIC

POWER SOURCE - PERMANENT LABEL

INVERTER #2

SCALE : NONE

FOR SERVICE

CALL

SUNLIGHT SOLAR

ENERGY INC

541 322 1910

SERVICE CALL PLACARD

WARNING: PHOTOVOLTAIC

POWER SOURCE

EMT / CONDUIT RACEWAYS

1.

NOTES:

PLACARD SHALL CONFORM TO NEC 690.31(G)(1)

INTERACTIVE SYSTEM POINT OF

INTERCONNECTION

1.

NOTES:

PLACARD SHALL CONFORM TO NEC 690.54

2. PLACARD SHALL BE PLACED DIRECTLY TO MAIN DISTRIBUTION PANEL & DEDICATED

PV COMBINER PANEL "PV1".

2. PLACARD SHALL BE WHITE LETTERING ON RED BACKGROUND

3. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND.

ARC-FLASH HAZARD WARNING

SCALE : NONE

NOTES:

1. PLACARD SHALL CONFORM TO NEC 110.16

2. TITLE SHALL BE BLACK LETTERING WITH ORANGE BACKGROUND. REMAINING

LETTERS SHALL BE BLACK W/ WHITE BACKGROUND.

Arc Flash Hazard.

Appropriate PPE Required.

Failure To Comply Can Result in Death or Injury.

Refer to NFPA 70 E

RAPID SHUTDOWN SWITCH

FOR SOLAR PV SYSTEM

RAPID SHUTDOWN PLACARD

1.

NOTES:

PLACARD SHALL CONFORM PER NEC ARTICLE 690.56

2. PLACARD SHALL BE ATTACHED DIRECTLY BESIDE PHOTOVOLTAIC SYSTEM AC

DISCONNECT - 600A MCB OF DEDICATED PV COMBINER PANEL .

3. PLACARD SHALL BE REFLECTIVE W/ WHITE LETTERING ON RED BACKGROUND.

WARNING

1.

NOTES:

PLACARD SHALL PROVIDE ALL REQUIRED INFORMATION PER NEC 690.53

2. PLACARD SHALL BE ATTACHED DIRECTLY TO INVERTER #1 DC DISCONNECT.

3. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND

MAXIMUM SYSTEM VOLTAGE

MAXIMUM CIRCUIT CURRENT

600.00 VDC

108.00 AMPS

DIRECT CURRENT PHOTOVOLTAIC

POWER SOURCE

DIRECT CURRENT PHOTOVOLTAIC

POWER SOURCE - PERMANENT LABEL

INVERTER #1

1.

NOTES:

WARNING:

THIS EQUIPMENT FED BY MULTIPLE

POWER SOURCES. TOTAL RATING OF

ALL OVER CURRENT DEVICE

EXCLUDING MAIN SUPPLY OVER

CURRENT DEVICE SHALL NOT EXCEED

AMPACITY OF BUSBAR

PLACARD SHALL CONFORM TO LOCAL AHJ

2. PLACARD SHALL BE ATTACHED DIRECTLY TO DEDICATED PV COMBINER PANEL "PV1"

3. PLACARD SHALL BE BLACK LETTERING ON ORANGE BACKGROUND

PV DISTRIBUTION EQUIPMENT

PLACARD

SCALE : NONE

SCALE : NONE

SCALE : NONE

SCALE : NONE

1.

NOTES:

PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND.

2. PLACARD SHALL BE ATTACHED DIRECTLY TO EACH (2) INVERTERS.

SCALE : NONE

SCALE : NONE

MANUAL

DISCONNECT

FOR PARALLEL

GENERATION

PACIFIC POWER - METER BASE

LABEL

1.

NOTES:

PLACARD SHALL CONFIRM TO ALL PACIFCORP GUIDELINES.

2. PLACARD SHALL BE ATTACHED DIRECTLY TO UTILITY AC

DISCONNECT.

3. PLACARD SHALL BE WHITE LETTERING ON RED BACKGROUND W/ A

MINIMUM TEXT HEIGHT OF 3/8".

3. PLACARD SHALL BE ATTACHED DIRECTLY TO PV COMBINER PANEL "PV1".

SCALE : NONE

SHEET :

TITLE:

REVISIONS

PV6.0

PLACARD DETAILS (1 OF 2)

D.B./C.B.:

PLAN SIZE:

JTD - JM -

SUNLIGHT SOLAR ENERGY, INC.

50 SE SCOTT ST. BUILDING 13

BEND, OR 97702

CCB#: 158922

CITY STAMP:

24" x 36"

Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.

UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:

01. Issue for Blue Sky Grant (08-04-20)

BLUE SKY GRANT

INVERTER #2

WARNING

NOTES:

1. PLACARD SHALL CONFORM TO NEC 110.16

2. TITLE SHALL BE BLACK LETTERING WITH ORANGE BACKGROUND.

REMAINING LETTERS SHALL BE BLACK W/ WHITE BACKGROUND.

MAXIMUM AVAILABLE FAULT CURRENT:

AMPS:

DATE:

1.

INVERTER #1

kAIC WARNING LABEL

SCALE : NONE

EQUIPMENT PLACARD

NOTES:

SCALE : NONE

SCALE : NONE

EQUIPMENT PLACARD

NOTES:

1.

TBD

TBD

PACIFIC POWER SOLAR METER

PARALLEL

GENERATION ON

SITE

PACIFIC POWER - AC DISCONNECT

LABEL

1.

NOTES:

PLACARD SHALL CONFIRM TO ALL PACIFCORP GUIDELINES.

2. PLACARD SHALL BE ATTACHED DIRECTLY TO UTILITY METER.

3. PLACARD SHALL BE WHITE LETTERING ON RED BACKGROUND W/ A

MINIMUM TEXT HEIGHT OF 3/8".

3. PLACARD SHALL BE ATTACHED DIRECTLY TO PV COMBINER PANEL.

RAPID SHUTDOWN & SERVICE

DISCONNECTS MAP PLACARD

1.

NOTES:

PLACARD SHALL CONFORM PER NEC ARTICLE 690.56

2. PLACARD SHALL BE ATTACHED DIRECTLY BESIDE SERVICE DISCONNECTING MEANS & TO MAIN

DISTRIBUTION SWITCHBOARD "FC-1" IN MAIN ELECTRICAL ROOM .

3. TITLE & NOTE SHALL BE BLACK LETTERS ON YELLOW BACKGROUND. REMAINING

LABELING SHALL BE BLACK ON WHITE BACKGROUND

SCALE : NONE

PLACARD SHALL BE ATTACHED DIRECTLY TO INVERTER & NEXT

TO BREAKER FEEDING INVERTER #2.

2. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND.

PLACARD SHALL BE ATTACHED DIRECTLY TO INVERTER & NEXT

TO BREAKER FEEDING INVERTER #1.

2. PLACARD SHALL BE WHITE LETTERING ON BLACK BACKGROUND.

YOU ARE

HERE

NORTH

SOLAR PV SYSTEM EQUIPPED

WITH RAPID SHUTDOWN

ALL ARRAY CONDUCTORS WILL DE-ENERGIZE BELOW 80 VOLTS

WITHIN THE ARRAYS WHEN RAPID SHUTDOWN INITIATION

SWITCH IS IN THE "OFF" POSITION.

DISCONNECT SAFETY SWITCH TO INITIATE RAPID

SHUT DOWN AND REDUCE SHOCK HAZARD

WITHIN ROOF TOP SUB ARRAYS.

INVERTERS #1 - #2 W/

DC DISCONNECTS &

DEDICATED PV

COMBINER PANEL

"PV1"

UTILITY METER

LOCATION

SHEET :

TITLE:

REVISIONS

PV6.1

PLACARD DETAILS (2 OF 2)

D.B./C.B.:

PLAN SIZE:

JTD - JM -

SUNLIGHT SOLAR ENERGY, INC.

50 SE SCOTT ST. BUILDING 13

BEND, OR 97702

CCB#: 158922

CITY STAMP:

24" x 36"

Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.

UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE:

01. Issue for Blue Sky Grant (08-04-20)

BLUE SKY GRANT

SHEET :

TITLE:

REVISIONS

PV7.0

EQUIPMENT SPECIFICATIONS

D.B./C.B.:

PLAN SIZE:

JTD - JM -

SUNLIGHT SOLAR ENERGY, INC.

50 SE SCOTT ST. BUILDING 13

BEND, OR 97702

CCB#: 158922

CITY STAMP:

24" x 36"

Oregon Signing Supervisor: Robert K Johnson - 6110S ________________________.

UTILITY CO: PPLPANEL ORIENTATION: ROOF PITCH: 26°---- INCENTIVE: BLUE SKY GRANT

01. Issue for Blue Sky Grant (08-04-20)

Solar Access and Shade Report 7/14/2020

For:

Redmond Senior Center-East Roofs

325 NW Dogwood Redmond, OR 97756

By:

Joe Mazzarella

50 SE Scott Street, Suite 13 Bend, OR 97702

541-322-1910, Ext. 303

Measurements made by Solmetric SunEye™ -- www.solmetric.com http://www.solmetric.com

Session Properties Name redmond sr center Creation Date 5/21/2020 11:00 Note (none)

Location 44.3°N, 121.2°W Mag Dec: 14.3°E Time Zone: GMT-08:00

Solar access averages of 3 skylines in this session Skylines Averaged: Sky12, Sky13, Sky14

Annual May-Oct Nov-Apr 97% 98% 95%

TSRF averages of 3 skylines in this session: 77%

Sky12 -- 5/21/2020 11:10 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=90° -- Skyline Heading=178° Solar Access: Annual: 97% -- Summer (May-Oct): 97% -- Winter (Nov-Apr): 95%

TSRF: 77% -- TOF: 79%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky12AnnualAccess.jpg ExportedFiles/Sky12MonthlySolarAccess.jpg

Sky13 -- 5/21/2020 11:11 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=90° -- Skyline Heading=172° Solar Access: Annual: 98% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 96%

TSRF: 78% -- TOF: 79%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky13AnnualAccess.jpg ExportedFiles/Sky13MonthlySolarAccess.jpg

Sky14 -- 5/21/2020 11:12 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=90° -- Skyline Heading=166° Solar Access: Annual: 97% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 94%

TSRF: 77% -- TOF: 79%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky14AnnualAccess.jpg ExportedFiles/Sky14MonthlySolarAccess.jpg

Redmond Senior Center-South Roofs

50 SE Scott Street, Suite 13

Creation Date 5/21/2020 11:00 Note (none)

Location 44.3°N, 121.2°W Mag Dec: 14.3°E Time Zone: GMT-08:00

Solar access averages of 6 skylines in this session Skylines Averaged: Sky01, Sky02, Sky03, Sky04, Sky10, Sky11

Annual May-Oct Nov-Apr 97% 98% 95%

TSRF averages of 6 skylines in this session: 95%

Sky01 -- 5/21/2020 11:02 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=175° Solar Access: Annual: 99% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 97%

TSRF: 97% -- TOF: 98%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky01AnnualAccess.jpg ExportedFiles/Sky01MonthlySolarAccess.jpg

Sky02 -- 5/21/2020 11:03 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=176° Solar Access: Annual: 97% -- Summer (May-Oct): 98% -- Winter (Nov-Apr): 95%

TSRF: 95% -- TOF: 98%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky02AnnualAccess.jpg ExportedFiles/Sky02MonthlySolarAccess.jpg

Sky03 -- 5/21/2020 11:03 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=173° Solar Access: Annual: 91% -- Summer (May-Oct): 95% -- Winter (Nov-Apr): 84%

TSRF: 89% -- TOF: 98%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky03AnnualAccess.jpg ExportedFiles/Sky03MonthlySolarAccess.jpg

Sky04 -- 5/21/2020 11:04 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=178° Solar Access: Annual: 95% -- Summer (May-Oct): 96% -- Winter (Nov-Apr): 94%

TSRF: 93% -- TOF: 98%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky04AnnualAccess.jpg ExportedFiles/Sky04MonthlySolarAccess.jpg

Sky10 -- 5/21/2020 11:09 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=176° Solar Access: Annual: 99% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 98%

TSRF: 97% -- TOF: 98%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky10AnnualAccess.jpg ExportedFiles/Sky10MonthlySolarAccess.jpg

Sky11 -- 5/21/2020 11:09 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=180° -- Skyline Heading=180° Solar Access: Annual: 99% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 98%

TSRF: 97% -- TOF: 98%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky11AnnualAccess.jpg ExportedFiles/Sky11MonthlySolarAccess.jpg

Redmond Senior Center-West Roofs

50 SE Scott Street, Suite 13

Creation Date 5/21/2020 11:00 Note (none)

Location 44.3°N, 121.2°W Mag Dec: 14.3°E Time Zone: GMT-08:00

Solar access averages of 3 skylines in this session Skylines Averaged: Sky06, Sky08, Sky09

Annual May-Oct Nov-Apr 99% 100% 97%

TSRF averages of 3 skylines in this session: 77%

Sky06 -- 5/21/2020 11:05 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=270° -- Skyline Heading=177° Solar Access: Annual: 99% -- Summer (May-Oct): 100% -- Winter (Nov-Apr): 97%

TSRF: 77% -- TOF: 78%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky06AnnualAccess.jpg ExportedFiles/Sky06MonthlySolarAccess.jpg

Sky08 -- 5/21/2020 11:07 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=270° -- Skyline Heading=178° Solar Access: Annual: 99% -- Summer (May-Oct): 99% -- Winter (Nov-Apr): 97%

TSRF: 77% -- TOF: 78%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky08AnnualAccess.jpg ExportedFiles/Sky08MonthlySolarAccess.jpg

Sky09 -- 5/21/2020 11:08 -- (no skyline note)

Panel Orientation: Tilt=26° -- Azimuth=270° -- Skyline Heading=176° Solar Access: Annual: 99% -- Summer (May-Oct): 100% -- Winter (Nov-Apr): 96%

TSRF: 77% -- TOF: 78%

Attachment A, Senior Center Solar Panel Project

ExportedFiles/Sky09AnnualAccess.jpg ExportedFiles/Sky09MonthlySolarAccess.jpg

Level 2 Interconnection Review Report

Completed for City of Redmond

(“Applicant”)

Proposed Interconnection On PacifiCorp’s Existing 12.47-kV Circuit, 5D226

(Facility Point: 01415013.0098280)

2/3/2021

TABLE OF CONTENTS

1.0 DESCRIPTION OF THE GENERATING FACILITY

2.0 APPROVAL CRITERIA FOR LEVEL 2 INTERCONNECTION REVIEW

3.0 PROPOSED POINT OF INTERCONNECTION

4.0 TIER 2 INTERCONNECTION REVIEW RESULTS

4.1 860-039-0035(2) (A)

4.2 860-039-0035 (2) (B)

4.3 860-039-0035 (2) (C)

4.4 860-039-0035 (2) (D)

4.5 860-039-0035 (2) (E)

4.6 860-039-0035 (2) (F)

4.7 860-039-0035 (2) (G)

4.8 860-039-0035 (2) (H)

4.9 860-039-0035 (2) (I)

4.10 860-039-0035 (2) (J)

1.0 DESCRIPTION OF THE GENERATING FACILITY

City of Redmond (“Applicant”) has proposed interconnecting 60.8 kW DC of new generation to PacifiCorp’s (“Electric Company”) existing 12.47-kV Circuit, 5D226, located in Redmond, OR.

The Applicant’s generation project will provide a nameplate output of 58 kW of AC generation.

2.0 APPROVAL CRITERIA FOR LEVEL 2 INTERCONNECTION REVIEW

Pursuant to 860-039-0035(1) An Electric Company must apply the following Level 2 interconnection review procedure for an application to interconnect an eligible system that meets the following criteria:

(a) The facility has a capacity of two megawatts or less; and

(b) The facility does not qualify for or failed to meet applicable Level 1 interconnection review procedures.

3.0 PROPOSED POINT OF INTERCONNECTION

The proposed generation facility is to be interconnected to the existing 5D226 Circuit (12.47-kV), out of Redmond Substation. The Applicant is looking to interconnect to facility point number 01415013.0098280.

4.0 TIER 2 INTERCONNECTION REVIEW RESULTS

4.1 860-039-0035(2) (a) The aggregate generation capacity on the distribution circuit to which the net metering facility will interconnect, including the capacity of the net metering facility, will not cause any distribution protective equipment (including, but not limited to, substation breakers, fuse cutouts, and line reclosers), or customer equipment on the electric distribution system, to exceed 90 percent of the short circuit interrupting capability of the equipment. In addition, a net metering facility will not be connected to a circuit that already exceeds 90 percent of the short circuit interrupting capability, prior to interconnection of the facility.

Project fails review criteria?: False These calculations use a generation power factor of 0.95, a single-phase fault current multiplier of 5, a three-phase fault current multiplier of 3, and line-to-line primary voltage of 12.47 kV.

Existing single-phase private generation: 134 kW.

Single-phase current produced on primary during normal operation: 19.59 Amps.

Single-phase current produced on primary during a fault condition: 98.0 Amps.

Existing three-phase private generation: 4.3 kW.

Three-phase current produced on primary during normal operation: 0.21 Amps.

Three-phase current produced on primary during a fault condition: 0.6 Amps.

Current produced by proposed generation system on primary: 2.83 Amps.

Current produced by proposed generation system on primary during a fault condition:

8.5 Amps.

Total fault current: 107.1 Amps.

The limiting distribution protective equipment is a single phase fuse cutout, with a rating of not less than 8000 Amps.

8000 x 0.9 = 7,200.0 Amps.

4.2 860-039-0035 (2) (b) If there are posted transient stability limits to generating units located in the general electrical vicinity of the proposed point of common coupling, including, but not limited to within three or four transmission voltage level busses, the aggregate generation capacity, including the net metering facility, connected to the distribution low voltage side of the substation transformer feeding the distribution circuit containing the point of common coupling will not exceed 10 megawatts.

Project fails review criteria?: False Are there posted transient stability limits to generation?: No

Aggregate single-phase generation on feeder: 134 kW Aggregate three-phase generation on feeder: 4.3 kW Proposed generation system: 58 kW

Total generation on circuit (existing and proposed): 196.3 kW Generation limit: 10 MW

4.3 860-039-0035 (2) (c) The aggregate generation capacity connected to the distribution circuit, including the net metering facility, will not contribute more than 10 percent to the distribution circuit's maximum fault current at the point on the high voltage (primary) level nearest the proposed point of common coupling.

Project fails review criteria?: False Fault current at the point of interconnection without the contribution of customer generation = 3540 Fault current at the point of interconnection with the contribution of customer generation included = 3576

(3576 Amps - 3540 Amps) / 3540 Amps x 100 = 1.02%

4.4 860-039-0035 (2) (d) If a net metering facility is to be connected to a radial distribution circuit, the aggregate generation capacity connected to the electric distribution system by non-public utility sources, including the net metering facility, will not exceed 10 percent (or 15 percent for solar electric generation) of the total circuit annual peak load. For the purposes of this subsection, annual peak load will be based on measurements taken over the 12 months previous to the submittal of the application, measured for the circuit at the substation nearest to the net metering facility.

Project fails review criteria?: False Peak load on circuit 5D226: 4200 kW

Percentage of peak load for comparison (use 15% for solar, 10% for other generation types): 630 kW

Total customer generation on circuit (existing and proposed): 196.3 kW

4.5 860-039-0035 (2) (e) If a net metering facility is to be connected to three-phase, three wire primary public utility distribution lines, a three-phase or single-phase generator will be connected phase-to-phase.

Project fails review criteria?: False Circuit 5D226 is Three-Phase, Four Wire.

Generation is connected phase-to-phase?:

4.6 860-039-0035 (2) (f) If a net metering facility is to be connected to three-phase, four wire primary public utility distribution lines, a three-phase or single-phase generator will be connected line-to-neutral and will be effectively grounded.

Project fails review criteria?: False This review item refers to a customer generation facility’s ability to manage a transient overvoltage condition. This can be accomplished by using a qualified inverter or by effectively grounding the generation system.

IEEE 1547.7 guidelines indicate this review item may be waived if the aggregate customer generation is less than 10% of the circuit’s Light Load (for solar generation, the Daytime Light Load is used).

Light Load = 1600 kW 10% of Light Load = 160 kW Sum of customer generation (existing and proposed): 196.3 kW

Transient overvoltage management has been achieved for this installation, either through the use of a qualified inverter or by the addition of an effective grounding system?: True

4.7 860-039-0035 (2) (g) If a net metering facility is to be connected to a single-phase shared secondary, the aggregate generation capacity on the shared secondary, including the net metering facility, will not exceed 20 kilovolt-amps.

Project fails review criteria?: False Phasing of this installation: Three Phase Existing customer generation on the secondary: 0 kW Review item has been cleared by Engineering?:

4.8 860-039-0035 (2) (h) If a net metering facility is single-phase and is to be connected to a transformer center tap neutral of a 240 volt service, the addition of the net metering facility will not create a current imbalance between the two sides of the 240 volt service that is greater than 20 percent of the nameplate rating of the service transformer.

Project fails review criteria?: False This review item refers to connecting a single-phase 120 V inverter on a single-phase 240 V service.

Phasing of this installation: Three Phase Voltage of this installation: 208V Existing load on service transformer: kW

4.9 860-039-0035 (2) (i) A net metering facility's point of common coupling will not be on a transmission line.

Project fails review criteria?: False This installation will interconnect on distribution circuit 5D226.

4.10 860-039-0035 (2) (j) If an eligible system's proposed point of common coupling is on a spot or area network, the interconnection must meet the following additional requirements:

A) For a net metering facility that will be connected to a spot network circuit, the aggregate generation capacity connected to that spot network from the net metering facilities, and any generating facilities, will not exceed five percent of the spot network's maximum load;

(B) For a net metering facility that utilizes inverter-based protective functions, which will be connected to an area network, the net metering facility, combined with any other generating facilities on the load side of network protective devices, will not exceed 10 percent of the minimum annual load on the network, or 500 kilowatts, whichever is less.

For the purposes of this paragraph, the percent of minimum load for solar electric generation net metering facility will be calculated based on the minimum load occurring during an off-peak daylight period; and

(C) For a net metering facility that will be connected to a spot or an area network that does not utilize inverter-based protective functions, or for an inverter-based net metering facility that does not meet the requirements of paragraphs (A) or (B) of this subsection, the net metering facility will utilize low forward power relays or other protection devices that ensure no export of power from the net metering facility, including inadvertent export (under fault conditions) that could adversely affect protective devices on the network.

Project fails review criteria?: False Circuit 5D226 is a Radial circuit.

Sum of customer generation (existing and proposed): 196.3 kW

Peak load on circuit 5D226: 4200 kW 5% of peak load on circuit : 210.0

Technology type of proposed generating facility: Inverter Light Load = 1600 kW 10% of Light Load = 160 kW

Redmond_Senior_Center (08-04-20)-PV1.0
Redmond_Senior_Center (08-04-20)-PV2.0
Redmond_Senior_Center (08-04-20)-PV3.0
Redmond_Senior_Center (08-04-20)-PV4.1
Redmond_Senior_Center (08-04-20)-PV5.0
Redmond_Senior_Center (08-04-20)-PV5.1
Redmond_Senior_Center (08-04-20)-PV6.0
Redmond_Senior_Center (08-04-20)-PV6.1
Redmond_Senior_Center (08-04-20)-PV7.0
Solar Access & Shade Report.pdf
Solar Access and Shade Report
For:
By:
Session Properties
Solar access averages of 3 skylines in this session
Sky12 -- 5/21/2020 11:10 -- (no skyline note)
Sky13 -- 5/21/2020 11:11 -- (no skyline note)
Sky14 -- 5/21/2020 11:12 -- (no skyline note)
Redmond Senior Center-South Roofs Report.pdf
Solar Access and Shade Report
For:
By:
Session Properties
Solar access averages of 6 skylines in this session
Sky01 -- 5/21/2020 11:02 -- (no skyline note)
Sky02 -- 5/21/2020 11:03 -- (no skyline note)
Sky03 -- 5/21/2020 11:03 -- (no skyline note)
Sky04 -- 5/21/2020 11:04 -- (no skyline note)
Sky10 -- 5/21/2020 11:09 -- (no skyline note)
Sky11 -- 5/21/2020 11:09 -- (no skyline note)
Redmond Senior Center-West Roofs Report.pdf
Solar Access and Shade Report
For:
By:
Session Properties
Solar access averages of 3 skylines in this session
Sky06 -- 5/21/2020 11:05 -- (no skyline note)
Sky08 -- 5/21/2020 11:07 -- (no skyline note)
Sky09 -- 5/21/2020 11:08 -- (no skyline note)
Pacific Power Report.pdf
1.0 Description of the Generating Facility
2.0 Approval Criteria for Level 2 Interconnection Review
3.0 Proposed Point of Interconnection
4.0 Tier 2 Interconnection Review Results
4.1 860-039-0035(2) (a)
4.2 860-039-0035 (2) (b)
4.3 860-039-0035 (2) (c)
4.4 860-039-0035 (2) (d)
4.5 860-039-0035 (2) (e)
4.6 860-039-0035 (2) (f)
4.7 860-039-0035 (2) (g)
4.8 860-039-0035 (2) (h)
4.9 860-039-0035 (2) (i)
4.10 860-039-0035 (2) (j)