Attachment A - FEMA R9 Presidio - Overview of Furniture Layout Required 002 (PDF).pdf
PDF 2 MB Posted
- Attached to
- Furniture Lease to Support DR4482-CA Operations
- Solicitation number
- 70FBR925Q00000002
About this file
This is a furniture layout diagram titled "FEMA Region 9 Presidio Overview of Furniture Layout Required" showing the planned office configuration for FEMA's leased space in San Francisco. The floor plan depicts an open office layout that accommodates approximately 50 workstations, including a mix of individual offices, cubicle workstations, and collaborative spaces. The layout shows multiple workspace configurations including private offices along the perimeter, open-plan cubicle clusters, a conference room with a large meeting table, and support areas. The furniture is represented in yellow/orange coloring on the floor plan, with clear delineation of walls, doorways, and circulation paths. This diagram appears to be a supporting document for the furniture lease solicitation to outfit FEMA's disaster response office space at the Presidio location.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2'-0"2'-0"2'-0"2'-0"
FEMA Region 9 Presidio Overview of Furniture Layout Required
| FEMA Region 9 Presidio - Overview of Furniture Layout Required 002 (VSDX).vsdx |
| Page-1 |
File details come from the government source that posted it. Updated .