Attachment - A.pdf

PDF 33 KB Posted

Attached to
CONUS - FY 26 Holiday Refrigerated Trailers Federal contract opportunity
Solicitation number
HQC005-25-Q-E021
Issued by
Defense Commissary Agency

About this file

Attachment A is a detailed specification sheet for refrigerated trailer rentals across multiple military commissary locations for the FY 26 Holiday Refrigerated Trailers contract. The document lists 21 military installations requiring 53-foot trailers, with each location specifying unique electrical requirements (either electric or diesel), including voltage specifications ranging from 208V to 480V, and 3-phase configurations with varying amp requirements. The trailers are to be used for storing holiday food items, with delivery dates predominantly set between 10/1/2025 and 11/3/2025, and end dates ranging from 11/30/2025 to 1/9/2026. Most locations require electric trailers with rollup doors, while a few (Fort Gregg-Adams, JB Andrews, Fort Jackson, Lewis Main, and McClellan) require diesel trailers. The quantity for each location is consistently one trailer, and the electrical requirements vary significantly across different military bases, reflecting localized infrastructure differences.

View the file

Other files for this federal contract opportunity

Other files attached to CONUS - FY 26 Holiday Refrigerated Trailers, newest first.
File Type Posted
HQC005-25-Q-E021 Amendment 0002.pdf PDF
HQC005-25-Q-E021 Amendment 0001.pdf PDF
HQC005-25-Q-E021 - Combined Synopsis Solicitation.pdf PDF
Attachment 1.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment A

C o m m is sa ry

D O

D A

A C

Q u a n ti ty

T ra il er

S iz e i n F ee t

Electric or

Diesel

Electrical

Requirement

Doors

Type

D el iv er y D a te

M

/D D

/Y Y

E n d D a te

/D D

/Y Y

FORT GREGG-ADAMS HQCCBC 1 53 DIESEL N/A ROLLUP 10/6/2025 1/9/2026

NORFOLK HQCCBH 1 53 ELECTRIC 220V, 3 Phase, 60 Amp ROLLUP 10/6/2025 1/9/2026

FORT BELVOIR HQCNFF 1 53 ELECTRIC 220V, 3 Phase, 60 Amp ROLLUP 10/6/2025 1/9/2026

FORT MYER HQCNFH 1 53 ELECTRIC 220V, 3 Phase, 60 Amp ROLLUP 10/6/2025 1/9/2026

JB ANDREWS HQCNEK 1 53 DIESEL N/A ROLLUP 10/6/2025 1/9/2026

FORT BRAGG SOUTH HQCCBT 1 53 ELECTRIC 230V, 3 Phase, 60 Amp ROLLUP 10/6/2025 1/9/2026

FORT BRAGG NORTH HQCCAY 1 53 ELECTRIC 230V, 3 Phase, 60 Amp ROLLUP 10/6/2025 1/9/2026

NEW RIVER HQCCA3 1 53 ELECTRIC 230V, 3 Phase, 60 Amp ROLLUP 10/6/2025 1/9/2026

CHARLESTON NWS HQCSKK 1 53 ELECTRIC 230V, 3 Phase, 50 Amp ROLLUP 10/6/2025 1/9/2026

CHERRY POINT HQCCAZ 1 53 ELECTRIC 250V, 3 Phase 60 amp ROLLUP 10/6/2025 1/9/2026

FORT JACKSON HQCSKM 1 53 DIESEL N/A ROLLUP 10/6/2025 11/30/2025

FORT MEADE HQCNEN 1 53 ELECTRIC 230V, 3 Phase, 60 Amp ROLLUP 10/6/2025 1/9/2026

FORT CAVAZOS 1

(Clear Creek) HQCMC2 1 53 ELECTRIC 208V, 3 Phase, 70 Amp ROLLUP 10/3/2025 12/19/2025

LEWIS MAIN HQCWGQ 1 53 DIESEL N/A ROLLUP 11/3/2025 1/9/2026

LEMOORE HQCKLV 1 53 ELECTRIC 480V, 3 Phase, 50 Amp ROLLUP 10/3/2025 1/5/2026

MCCLELLAN HQCKL1 1 53 DIESEL N/A ROLLUP 10/1/2025 1/5/2026

SAN DIEGO HQCKL8 1 53 ELECTRIC 240V, 3 Phase, 40 Amp ROLLUP 10/15/2025 1/5/2026

MCAS MIRAMAR HQCKMQ 1 53 ELECTRIC 208V, 3 Phase, 60 Amp ROLLUP 10/15/2025 1/5/2026

CAMP PENDLETON HQCKLM 1 53 ELECTRIC

210V, 3 Phase, 60 Amp, W/

PIGTAIL

ROLLUP 10/2/2025 1/6/2025

BUCKLEY HQCMCB 1 53 ELECTRIC 230V, 3 Phase, 30 - 40 Amp Rollup 10/13/2025 1/6/2026

File details come from the government source that posted it. Updated .