Attachment A.pdf
PDF 5 MB Posted
- Attached to
- SITE-PREP, PLANTING, & INVASIVE SPECIES
- Solicitation number
- 5400028264
- Issued by
- Charleston County, South Carolina
About this file
The document is a set of four maps prepared by the South Carolina Forestry Commission detailing site treatment and tree planting activities for Sand Hills State Forest during 2025-2026. The maps outline four specific areas for forest management: SH012-0070 (68.8 acres near Lower Alligator Creek), SH015-0068 (25.7 acres near Cow Branch), SH019-0104 (52.2 acres near Boggy Branch Road), and SH015-3158 (26.5 acres near McNair Street in Patrick). Each map provides precise geographic coordinates, road access details, and highlights the designated treatment and planting zones in teal green, with accompanying overview maps showing the broader regional context.
The maps are technical planning documents that demonstrate the South Carolina Forestry Commission's systematic approach to forest management, showing carefully delineated areas for site treatment and reforestation. The documents include detailed road networks (authorized vehicles, forest dirt roads, state and county roads), precise acreage measurements, and geographic references. Each map is dated 2/20/2025, prepared by A. Rabon and K. Sullivan, and includes a standard disclaimer about map accuracy. The maps utilize high-resolution satellite imagery and are scaled between 1:6,000 and 1:11,000, providing precise visual documentation of planned forestry intervention sites within the Sand Hills State Forest region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1.docx | DOCX document | |
| Attachment B.pdf | ||
| Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DISCLAIMER: This is a product of the South Carolina Forestry Commission.
Reasonable efforts have been made to ensure the accuracy of this map.
The SCFC expressly disclaims responsibility for damages or liability that may arise from the use of this map.
Highway 1
McBee
SC 145
TT-8
TT
-2
US 1
Overflow Road
Overview
Sand Hills State Forest
Site Treatment and Tree Planting 2025-2026
Date: 2/20/2025
Site Treatement and Planting Areas
Roads
Authorized Vehicles Only
Forest Road - Dirt
0 0.150.07
Miles ¯
Prepared By: A. Rabon, K. Sullivan
1:8,000
Lo wer Alligator Creek
R o a d
T T
R o a d
T T
Lower Allig a tor
Cr ee k
Lower Alligator Creek
R o ad T T
Lower Alligator Creek
SH012-0070
68.8 Acres
T T-8
C
Center: 80°13'2"W 34°29'28"N
The SCFC expressly disclaims responsibility for damages or liability that may arise from the use of this map.
Highw ay
Sand Hills State Forest
PatrickSC 102
SC 102
TT
-1
TT-109
TT-15 R
ut hv en
S tr ee t
McNair Street
US
Wire Road
Turnage Road
Overview
Sand Hills State Forest
Site Treatment and Tree Planting 2025-2026
Date: 2/20/2025
Site Treatement and Planting Areas
Roads
Authorized Vehicles Only
Forest Road - Dirt
0 0.10.05
Miles ¯
Prepared By: A. Rabon, K. Sullivan
1:6,000
Cow Branch
Road T T 10
Cow Branch
Cow Branch
R oad
T T
Road T T 10
SH015-0068
25.7 Acres
TT-110
Center: 80°3'55"W 34°34'20"N
The SCFC expressly disclaims responsibility for damages or liability that may arise from the use of this map.
Society HillPatrick Society Hill
Byrd Road
Toney M ill R oad
Harris Creek Church
Overview
Sand Hills State Forest
Site Treatment and Tree Planting 2025-2026
Date: 2/20/2025
Site Treatement and Planting Areas
E Gates
Roads
State Road
Forest Road - Dirt
0 0.20.1
Miles ¯
Prepared By: A. Rabon, K. Sullivan
1:11,000
E
E
Patrick Society
H ill R d
B oggy
B ran ch R d
B o g g y B ra n c h
R d
SH019-0104
52.2 Acres
B og gy B ra nc h R oa d
Patrick Society Hill
Center: 79°53'58"W 34°30'57"N
The SCFC expressly disclaims responsibility for damages or liability that may arise from the use of this map.
Highw ay
Highway 1
PatrickSC 102
SC 102
TT-15
McLain Street
R ut hv en
S tr ee t
McNair Street
US 1
Wire Road Is sa c
Ro ad
Kr is tie R oa d
Wire RoadOverview
Sand Hills State Forest
Site Treatment and Tree Planting 2025-2026
Date: 2/20/2025
Site Treatement and Planting Areas
Roads
County Road - Pavement
State Road
US Highway
Forest Road - Dirt
0 0.10.05
Miles ¯
Prepared By: A. Rabon, K. Sullivan
1:6,000
C oke r Branch
P ar ks S t
H ig h w a y
McNair St
P ar ks S t
Turnage Rd
Patrick Baptist Church
Tolson Auto
Coker Branch
W in burn St
M ars h a ll S t
SH015-3158
26.5 Acres
S C
McNair Street
P ar k S tre et
Turnage Road
US 1
Brown Stre et
Center: 80°3'W 34°34'47"N
File details come from the government source that posted it. Updated .