CUI//SP-EXPT
LSP-F-333.01-COMMON-LSSP
Revision: Basic December 2022
Attachment A.1
Common LSSP
Spacecraft Processing Operations Contract (SPOC) for National Aeronautics and Space Administration Launch Services Program
Launch Services Program
COMMON
Launch Site Support Plan
EAR 99 -- NO LICENSE REQUIRED
This information or item is controlled under the Export Administration Regulations (EAR) as EAR99. It may be exported without a license, except to countries subject to embargoes and other special controls or general prohibitions per 15 CFR Parts 736 and 746. The designation of EAR99 does not constitute approval for public release.
CUI//SP-EXPT
LSP-F-333.01-COMMON-LSSP
Approval Page
Scope of Agreement
The National Aeronautics and Space Administration (NASA) Launch Services Program (LSP) is tasked with the management of the integration and launch of spacecraft aboard commercial launch vehicles. This Launch Site Support Plan (LSSP) documents the common products and services for launch site processing provided for LSP spacecraft customers. These common requirements represent the minimum requirements for LSP spacecraft and may be supplemented by a spacecraft LSSP.
Complimentary to the requirements, the applicable policies that govern launch site processing are documented in the LSP-UG-332.01, Guide for NASA Spacecraft Processing at Kennedy Space Center (KSC) or LSP-UG-332.02, Guide for NASA Spacecraft Processing at Vandenberg Space Force Base (VSFB).
Signature
Mark Shugg Chief, Launch Site Integration Branch
Authority
The decision authority of whether or not to create and release a Launch Site Support Plan (LSSP) resides with the Chief, Launch Site Integration Branch (Ref. Section 3.7 of KDP-B-1028).
Revision and Control
Publication of this LSSP is controlled in the NASA Technical Documentation System. Revisions to this LSSP are tracked on page 4 in the LSSP revision log. For the latest version of this LSSP or for comments, corrections, and updates direct your inquiry to the following:
Mark Shugg Chief, Launch Site Integration Branch National Aeronautics and Space Administration Telephone: 321-867-6368 E-Mail address: mark.d.shugg@nasa.gov
Common LSSP Revision Log
| Revision |
| Date Published |
| Pages Affected |
| Change Description |
| Approval |
Basic
All
Publication of Common LSSP
See document
Table of Contents
| Approval Page | 2 | |
| Common LSSP Revision Log | 4 | |
| Abbreviations and Acronyms | 6 | |
| Reference Documents | 9 | |
| 1 | Spacecraft Project Description | 10 |
| 2 | Launch Site Processing | 10 |
| 2.1 Common Spacecraft Launch Site Processing | 10 | |
| Figure 2.1 Common Launch Site Processing Flow | 11 | |
| 2.2 Launch Vehicle Processing Requiring LSP Support | 11 | |
| 3 | RESERVED | 11 |
| 4 | Common Support Requirements And Communication Support Requirements Matrixes | 12 |
| Table 4.1 Common Support Requirements | 15 | |
| Table 4.2 Common Communication Support Requirements | 73 | |
Abbreviations and Acronyms
The following abbreviations and acronyms are used in this document.
µg Microgram
| ACS | American Chemical Society |
| Amp | Ampere |
| ANSI | American National Standards Institute |
| ASTM | American Society for Testing and Materials |
| BIS | Bureau of Industry and Security |
| BNC | Bayonet Navy Connector |
| C | | Celsius |
| CCSFS | Cape Canaveral Space Force Station | |
| CFM or cfm | Cubic Feet per Minute | |
| cm | | Centimeter |
| COFR | | Certificate of Facility Readiness |
| COMM | | Communication |
| CPSM | | Customer Processing Support Manager |
| DHCP | Dynamic Host Configuration Protocol |
| DMZ | Demilitarized Zone |
| DNS | Domain Name System |
| DVI | Digital Visual Interface |
| EB | | Encapsulation Bay |
| EGSE | | Electrical Ground Support Equipment |
| EI | | End Instrument |
| EIA | | Electronic Industries Alliance |
| ELSA | | Emergency Life Support Apparatus |
| ESD | | Electrostatic Discharge |
| ENVIRON | Environment | |
| F | Fahrenheit |
| ft | foot or feet |
| Gbps | Gigabyte per second |
| GHz | Gigahertz |
| GMT | Greenwich Mean Time (UTC, Zulu) |
| GPS | Global Positioning System |
| GSE | Ground Support Equipment |
| HDMI | High-Definition Multimedia Interface |
| HEPA | High Efficiency Particle Arrestor |
| HPF | Hazardous Processing Facility |
| HVAC | Heating, Ventilation, Air Conditioning |
| Hz | Hertz |
| IEST | Institute of Environmental Sciences and Technology |
| IONET | IP Operational Network |
| IP | Internet Protocol |
| IPA | Isopropyl Alcohol (same as 2-Propanol) |
| IRIG | Inter-Range Instrumentation Group |
| ISO | International Organization for Standardization |
| ISP | Internet Service Provider |
| IT | Information Technology |
KSC Kennedy Space Center
| L | Launch |
| LCD | Liquid Crystal Display |
| LOC | Location |
| LMR | Low Loss Cable Trademark Brand of Times Microwave |
| LSC | Launch Service Contractor |
| LSIM | Launch Site Integration Manager |
| LSP | Launch Services Program |
| LSSC | Launch Site Support Coordinator |
| LSSE | Launch Site Support Engineer |
| LSSP | Launch Site Support Plan |
| LV | Launch Vehicle |
| M | Meter |
| MBPS | Megabits per Second |
| MCE | Mission Comm Engineer |
| MDR | Mission Dress Rehearsal |
| MISC | Miscellaneous |
| ml | Millimeter |
| N/A | Not Applicable |
| NASA | National Aeronautics and Space Administration |
| NAT | Network Address Translation |
| NEMA | National Electrical Manufacturers Association |
| NISN | NASA Integrated Services Network |
| NVR | Non-Volatile Residue |
OSHA Operational Safety and Health Administration
| PAC or %AC | Percent Area Coverage | |
| PID | | Photoionization Detector |
| POTS | | Plain Old Telephone Service |
| PPF | | Payload Processing Facility |
| ppm | | Parts Per Million |
| PTZ | | Point, Tilt, Zoom |
| RF | Radio Frequency |
| RH | Relative Humidity |
| RJ | Registered Jack |
| SC or S/C | Spacecraft | |
| SCAPE | Self Contained Atmospheric Protective Ensemble | |
| STD | | Standard |
| TAA | Technical Assistance Agreement |
| TBD | To Be Determined |
| TBP | To Be Provided |
| TIA | Telecommunications Industry Association |
| UG | User Guide |
| UPS | Uninterruptable Power Supply |
| V | Volt |
| VAC | Volts Alternating Current |
| VAFB | Vandenberg Air Force Base |
| VGA | Video Graphics Adapter |
| VPN | Virtual Private Network |
| VSFB | Vandenberg Space Force Base |
| WEP | Wired Equivalent Privacy |
| WPA | Wi-Fi Protected Access |
Reference Documents
The following is the list of documents referenced in this LSSP:
| 1. |
| ANSI/TIA-568-A |
| Commercial Building Telecommunications Cabling Standard |
| 2. |
| ASTM-E-1234 |
| Standard Practice for Handling, Transporting, and Installing Nonvolatile Residue (NVR) Sample Plates Used in Environmentally Controlled Areas for Spacecraft |
| 3. |
| ASTM-E-1235 |
| Standard Test Method for Gravimetric Determination of Nonvolatile Residue (NVR) in Environmentally Controlled Areas for Spacecraft |
| 4. |
| IEST-STD-CC1246 |
| Product Cleanliness Levels - Applications, Requirements, and Determination |
and 14644-2 Airborne Particulate Cleanliness Classes in Cleanroom and Clean Zones
| 6. |
| LSP-UG-332.01 |
| Guide for NASA Spacecraft Processing at the Kennedy Space Center (KSC) and Cape Canaveral Space Force Station (CCSFS) |
| 7. |
| LSP-UG-332.02 |
| Guide for NASA Spacecraft Processing at Vandenberg Space Force Base (VSFB) |
1 Spacecraft Project Description
This LSSP reflects the most common processing flow and requirements for a LSP spacecraft. The common spacecraft configuration is a scientific or robotic spacecraft, with mono propellant, and with some contamination sensitive surfaces.
2 Launch Site Processing
A spacecraft project has prime responsibility for spacecraft assembly, test, and servicing while processing at the launch site. LSP provides support services to the spacecraft program and personnel at the launch site. The LSP Launch Site Integration Manager (LSIM) is responsible for arranging, coordinating, and verifying these launch site support services for LSP missions. An overview of the processing for a common LSP spacecraft is listed in section 2.1.
The Launch Service Contractor (LSC) has prime responsibility for launch vehicle hardware assembly, test, and servicing while processing in LSP provided facilities. LSP provides support services to the LSC at LSP provided facilities for the work necessary for the spacecraft to launch vehicle (LV) integration activities. An overview of the common processing for launch vehicles is listed in section 2.2.
The spacecraft processing facility provider has prime responsibility for providing, operating, and maintaining the facility, along with providing the support and services necessary and agreed to allow the spacecraft and LSC to successfully prepare for launch.
2.1 Common Spacecraft Launch Site Processing
The detailed launch site processing products and services requested for LSP spacecraft are listed in the Common Support Requirements and Common Communication Support Requirements (Tables 4.1 and 4.2, respectively).
The common processing for a LSP spacecraft includes:
· ground support equipment (GSE) arrival at the processing facility
· setup of support areas at the processing facility including control rooms and office space
· spacecraft arrival, setup, and inspection
· spacecraft assembly and/or instrument integration (if required)
· spacecraft aliveness testing and system performance testing
· propellant loading/decontamination activities (if required)
· battery installation and charging
· final cleaning
· ordnance installation (if required)
A diagram of the most common launch site processing flow activities for LSP spacecraft is included as Figure 2.1.
Figure 2.1 Common Launch Site Processing Flow
2.2 Launch Vehicle Processing Requiring LSP Support
Common launch site processing products and services requested by the LSC are included in the attached Common Support Requirements and Common Communication Support Requirements (Tables 4.1 and 4.2, respectively). This LSSP expects the encapsulation of the spacecraft to occur in the processing facility, whether it be a payload processing facility (PPF), hazardous processing facility (HPF) or encapsulation bay (EB), and the requirements for encapsulation are included.
LSC activities may include the following:
· ground support equipment (GSE) arrival at the processing facility
· setup of support/office areas at the processing facility
· element cleaning
· mating of spacecraft to payload attach fitting
· system performance testing
· encapsulating spacecraft into fairing
· ordnance installation (if necessary)
· moving encapsuled spacecraft onto transporter
3 RESERVED
4 Common Support Requirements And Communication Support Requirements Matrixes
The following Support Requirements Matrix contains items that shall be provided by the facility contractor to meet the requirements of a common LSP spacecraft customer, the LSC, and the launch site team in order to implement a successful launch site flow.
The facility contractor shall indicate their commitment to provide the required items in the commitment column.
If a facility contractor cannot meet a particular requirement, the Comments/Implementation column should address how the intent of the requirement will be met. When specific information is requested in the Comments/Implementation column the facility contractor shall provide the information for the offered standard service. For example, in requirement 0001 the contractor shall provide the square footage of available cleanroom(s) being offered as a standard service:
| 0001 |
| Cleanroom |
| Facility/ Space |
| Cleanroom Processing |
Area Exclusive and secure ISO 14644-1 Class 8 cleanroom for spacecraft processing.
Spacecraft LSSPs will list the size and specifications.
| Facility Contractor |
| TBP |
| Square Footage:TBP |
Location Descriptions:
The processing facility minimum requirements for a LSP spacecraft mission are dedicated use of one cleanroom with an airlock (shared use of airlock is acceptable) and a garment change room, one control room, two dedicated LSP offices, and two Spacecraft Customer office areas, as long as those facilities are able to meet the full set of requirements. The Contractor shall also provide access to conference areas and storage facilities.
Spacecraft non-hazardous processing, hazardous processing and encapsulation may occur in a single location capable of all the processing, or they may involve separate spaces for each phase subject to the dimensions, capabilities, and features of the facility offered for use.
A HPF is processing space outfitted to support spacecraft propellant loading or operations with other hazardous substances. If a facility contractor is not offering HPF capabilities for hazardous processing, all [HPF Only] designated requirements would be N/A.
An EB is an area for spacecraft mating to the LV adapter and encapsulation into the LV fairings. The EB requirements include the minimum requirements for preparing the launch vehicle adapter and fairing for encapsulating the spacecraft, as well as for encapsulation itself. The EB requirements are additive to the PPF or HPF requirements in either square footage, time, or both.
An airlock, or equivalent space, is required for hardware entry to a cleanroom from outside.
Control room space and office space are required for the duration of the processing through launch. If a spacecraft processing is conducted in multiple locations, the supporting facilities (control room, airlock, and offices) may be the same while the spacecraft is in each location or may also change with each change in spacecraft location.
Common Support Requirements Table Numbering Key:
Location (LOC)
| Number Range |
| Location (LOC) |
| 3000-3999 |
| Encapsulation Bay Requirements (EB) |
Including LSC facility requirements for encapsulation
| 4000-4999 |
| Office Areas (OFFICE) |
| 5000-5999 |
| General – Requirements not specific to the above defined areas |
| 10000 + |
| Communication & Telemetry (COMM) |
Category (CAT)
| 0001 – 0099 |
| Facility Physical Space Requirements and Dimensions (Facility/Space) |
| 0100 – 0199 |
| Power/Electrical |
| 0200 – 0299 |
| Environment (Environ) |
| 0300 – 0399 |
| Equipment/Platforms |
| 0500 – 0599 |
| Gases & Liquids |
| 0600 – 0699 |
| Non-Fluid Consumables, Garments and Wearable Equipment |
| 0700 – 0799 |
| Safety/Security |
| 0800 – 0899 |
| Miscellaneous Support & Services (MISC) |
Table 4.1 Common Support Requirements
| Req No. |
| Location |
| Category |
| Item |
| Requirement Description |
| Supplier/ Commit Source |
| Commitment |
| Comments/ Implementation |
| 0001 |
| Cleanroom |
| Facility/ Space |
| Cleanroom Processing |
Area Exclusive and secure ISO 14644-1 Class 8 cleanroom for spacecraft processing.
Spacecraft LSSPs will list the size and specifications.
| Facility Contractor |
| TBP |
| Square Footage:TBP |
| 0005 |
| Cleanroom |
| Facility/ Space |
| Cleanroom |
Door Size Cleanroom door sized to allow entry and exit of the spacecraft hardware.
Spacecraft LSSPs will list the size and specifications.
| Facility Contractor |
| TBP |
| Dimensions: TBP |
| 0010 |
| Cleanroom |
| Facility/ Space |
| Garment Change Room |
| Personnel airlock/garment change room at the entrance to the cleanroom. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0020 |
| Cleanroom |
| Facility/ Space |
| Purge Gas Source Access |
| Pass-throughs or plumbing for bringing purge gases into the cleanroom from an outside source. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0050 |
| Cleanroom |
| Facility/ Space |
| Propellant Equipment Preparation Area |
| [HPF Only] |
Clean work area in or near the cleanroom for the stowing and preparation of the propellant loading equipment to fuel the spacecraft. Area also to be used for propellant storage during the thermal acclimation period for a minimum 3 days prior to sampling/loading.
This space should be separate but contiguous with the spacecraft processing area.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0052 |
| Cleanroom |
| Facility/ Space |
| Propellant Equipment Decon Space |
| [HPF Only] |
Space for initial decontamination and safing of propellant GSE.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0054 |
| Cleanroom |
| Facility/ Space |
| Fueling Island |
| [HPF Only] |
Fueling island with spill containment.
| Facility Contractor |
| TBP |
| Dimensions: TBP |
| 0056 |
| Cleanroom |
| Facility/ Space |
| Space for Bubbler Tank |
| [HPF Only] |
Space adjacent to, but outside of the building used for fueling the spacecraft, and pass-throughs, to place a bubbler tank for the vent if the facility does not have a fuel scrubber system.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0058 |
| Cleanroom |
| Facility/ Space |
| Breathing Air Accommodation |
| [HPF Only] |
Air regulation and distribution panel system or pass-throughs from the outside into the fueling area for breathing air lines to support fueling operations.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0100 |
| Cleanroom |
| Power/ Electrical |
| Power |
| 208 VAC electrical power the cleanroom: |
· 1 each 208 volts, 3 phase, 60 Hz circuit
· on uninterruptible power supply (UPS)
Cleanroom circuits to be separate from Control room equipment.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0105 |
| Cleanroom |
| Power/ Electrical |
| Power |
| 120 VAC electrical power within the cleanroom: |
· 5 each 120 VAC, 1 phase, 60 Hz, 15 Amp circuits with wall receptacle NEMA 5-20
· on UPS
Cleanroom circuits to be separate from control room equipment.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0110 |
| Cleanroom |
| Power/ Electrical |
| Phase Check |
| Proper phasing verification for all 3-phase electrical outlets (Delta-Clockwise) with the Certificate of Facility Readiness (COFR). |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0115 |
| Cleanroom |
| Power/ Electrical |
| Conductive Floor |
| Static dissipative cleanroom floor. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0120 |
| Cleanroom |
| Power/ Electrical |
| UPS |
| UPS for all cleanroom circuits providing power to the spacecraft or critical spacecraft electrical ground support equipment (EGSE) until a generator backup can be brought online, to allow a controlled shutdown of the spacecraft and spacecraft EGSE. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0130 |
| Cleanroom |
| Power/ Electrical |
| Generator |
| Backup Power Generator for all Cleanroom circuits providing power to spacecraft or EGSE (both UPS and Non-UPS circuits), that will autostart in the event of loss of commercial power and will assume the load within less than 50% of UPS rated limit. |
If autostart/autotransfer of the backup power generator is not available, the facility will provide support to manually perform these operations during all spacecraft critical operations.
Pre-arrival test and checkout of the backup generator and any autostart/autotransfer functions to be performed within 30-days of arrival.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0140 |
| Cleanroom |
| Power/ Electrical |
| Grounding |
| Ground points in the cleanroom. All ground points to be clearly marked “Technical Ground” or “Facility Ground”. |
To the maximum extent practical, technical grounds shall be separate or shielded from facility grounds.
| Facility Contractor |
| TBP |
| TBP, if needed |
Electrical
| Personnel Grounding Points |
| Attach points for personnel grounding to the facility technical ground. |
| Facility Contractor |
| TBP |
| TBP, if needed |
Electrical
| Grounding |
| Grounding plate inspection and certifications of the ground system before arrival. |
Copy of the certification to be provided with the COFR.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0200 |
| Cleanroom |
| Environ |
| Cleanroom Cleanliness Certification |
| Cleanroom fully cleaned and certified to the following levels 7 days prior to first hardware arrival to the cleanroom. |
· Particles verified to ISO 14644-1 and ISO 14644-2 Class 8
· Non-volatile residue (NVR) levels verified by exposing NVR plates/foils for one month and analyzed to 0.5 µg/cm2/month per ASTM-E-1235.
· Verification of particulate fallout to Level 750 per IEST-STD-CC-1246D for a 24-hour period.
· Verification of hydrocarbon levels at or less than 15 ppm.
Facility cleanroom to be maintained in an operational state from the point of this certification forward through the end of spacecraft occupancy (Temp/RH and particle counts maintained at LSSP levels).
Certification and verification data to be provided with the COFR.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0220 |
| Cleanroom |
| Environ |
| Clean |
Room Air Supply Cleanliness Maintain cleanroom to ISO 14644-1 Class 8 for spacecraft processing.
The facility air supply shall have High Efficiency Particle Arrestor (HEPA) and charcoal filters and a positive pressure to the surrounding work areas (except when prohibited due to hazardous operations).
NOTE: if this area is shared with any other hardware, including that on the same launch, the strictest environmental requirements for cleanliness will apply for the full duration.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0225 |
| Cleanroom |
| Environ |
| Cleanliness – Airborne Particles |
| After initial certification, all clean work areas shall be continuously monitored for airborne particles by the use of particle counters (1.0 or 0.1 CFM) and monitored in accordance with ISO 14644-1 / ISO 14644-2 Class 8, using particle count size categories at ≥0.5 and ≥5.0 microns. |
Provide reports of the cleanroom particulate environment to the spacecraft daily.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0230 |
| Cleanroom |
| Environ |
| Cleanliness - Particulate Fallout |
| Ongoing monitoring and verification of particulate fallout levels throughout the spacecraft occupancy to Level 750 per IEST-STD-CC1246E. |
Particulate fallout will be measured as percent area coverage, %AC or PAC, per IEST-STD-CC-1246D using particulate fallout collectors exposed for one month each.
Analyze 2 filters per month, staggered every two weeks, so that every two weeks one filter is removed for analysis and replaced.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0235 |
| Cleanroom |
| Environ |
| Cleanliness-NVR |
| Ongoing monitoring and verification of cleanroom NVR levels throughout the spacecraft occupancy to 0.5 µg/cm2/month per ASTM-E-1234 and ASTM-E-1235. |
Two (2) NVR plates/foils will be exposed for one month each. Plates will be staggered such that every two weeks one plate is removed for analysis and replaced. Each NVR plate will be analyzed per ASTM-E-1235. Provide enough plates to allow for rotation through occupancy.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0240 |
| Cleanroom |
| Environ |
| Cleanliness - Hydrocarbons |
| Monitoring to verify hydrocarbon levels remain at or below 15 ppm (measured as methane gas) in the vicinity of the spacecraft throughout the spacecraft occupancy. |
A Portable Hydrocarbon Monitor, photoionization detector (PID) or melon samples may be used to satisfy hydrocarbon measurements.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0250 |
| Cleanroom |
| Environ |
| Temp |
| Maintain cleanroom temperature to 65°F to 75°F (18° to 24°C) with the cleanroom doors closed throughout the spacecraft occupancy period. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0255 |
| Cleanroom |
| Environ |
| Relative Humidity (RH) |
| Maintain cleanroom relative humidity to 30% to 60% (non-condensing) with the cleanroom doors closed throughout the spacecraft occupancy period. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0260 |
| Cleanroom |
| Environ |
| Cleanroom Monitoring and Alarms |
| Continuous monitoring of temperature, humidity, and particle count in the cleanroom. |
Record same on intervals not to exceed 15 minutes.
Provide an immediate notification method (ALARM) per guidelines below.
Report all alarms to the LSIM, Customer Processing Support Manager (CPSM) or Launch Site Support Engineer (LSSE) or project leader/test conductor per established Project call lists within 60 minutes of an alarm.
Set up particle counter warning system threshold to 75% of the cleanliness limit.
Set up particle counter alarm system threshold to 100% of the cleanliness limit.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0270 |
| Cleanroom |
| Environ |
| Cleanliness Reports |
| Cleanroom daily reports, which shall show the previous day’s hourly history for temperature, humidity, and cleanliness with details on any discrepancies from the stated requirements and status of corrective actions. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0280 |
| Cleanroom |
| Environ |
| Daily Cleaning |
| Daily cleaning services for the spacecraft operational assigned areas to maintain cleanliness conditions within limits. |
Additional cleaning of the floor &/or affected wall areas anytime major movements or door openings have occurred.
Electrostatic discharge (ESD) HEPA vacuuming, and mopping will be performed daily or as required (timing to be coordinated with spacecraft), up to the limit line established around the Spacecraft and Instrument EGSE.
The cleanroom floor will be vacuumed and wet mopped by spacecraft personnel around the critical zone defined by the spacecraft.
Provide daily waste removal, as necessary.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0290 |
| Cleanroom |
| Environ |
| Contamination prevention |
| Verification that all GSE entering the cleanroom is cleaned to a level to maintain the required environment before being brought into the cleanroom. GSE must be kept clean for the duration the equipment is located in the cleanroom. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0300 |
| Cleanroom |
| Equipment |
| Crane |
| Crane in the cleanroom, equipped with a debris/drip shield interposed between the crane and the hardware to be lifted. |
Crane to be on backup power system to power the crane in the event of power loss during lifting.
Spacecraft LSSPs will list the size and specifications.
| Facility Contractor |
| TBP |
| Capacity/hook height:TBP |
| 0305 |
| Cleanroom |
| Equipment |
| Crane Certification |
| Crane certificate of compliance/ inspection with the COFR confirming that the cleanroom crane is in compliance with applicable safety requirements and all required inspections/maintenance have been completed (to include recorded maintenance dates). |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0310 |
| Cleanroom |
| Equipment |
| Forklift |
| Cleanroom compatible forklift for use in the cleanroom. |
Spacecraft LSSPs will list the size and specifications.
| Facility Contractor |
| TBP |
| Lift Capability:TBP |
| 0315 |
| Cleanroom |
| Equipment |
| Pallet Jack |
| Cleanroom compatible pallet jack for moving equipment into the facility. |
Spacecraft LSSPs will list the size and specifications.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0320 |
| Cleanroom |
| Equipment |
| Mobile Platforms/ Ladders |
| Mobile platforms and ladders for spacecraft use. |
Alternate access methods may be acceptable (folding or extending structural platforms, etc.).
| Facility Contractor |
| TBP |
| Reach: TBP, if needed |
| 0330 |
| Cleanroom |
| Equipment |
| ESD Workbench |
| One (1) ESD workbench or a table with an ESD mat for use in cleanroom. |
ESD workbench to be verified grounded and functioning properly.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0335 |
| Cleanroom |
| Equipment |
| ESD |
Wrist strap tester
| Wrist strap tester in the garment change room. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0340 |
| Cleanroom |
| Equipment |
| Facility Vacuum |
| One (1) facility vacuum or portable ESD HEPA vacuum for use in the cleanroom. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0342 |
| Cleanroom |
| Equipment |
| Shoe Cleaners |
| Shoe cleaner at the personnel entrance to the garment change room. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0344 |
| Cleanroom |
| Equipment |
| Rack for Outside Garments |
| Garment hanging rack, outside of the garment change room, to keep jackets/outer garments exposed to dust and rain, etc., out of the changing area. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0346 |
| Cleanroom |
| Equipment |
| Change Room Garment Storage Equipment |
| A minimum of 15 storage lockers or bins for project member garment storage. |
Garment hanging rack.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0348 |
| Cleanroom |
| Equipment |
| Cleaning Equipment |
| Cleanroom compatible supplies for use by spacecraft personnel in cleaning the cleanroom floor close into the spacecraft. Supplies to include: |
· Mop (1)
· Bucket (1)
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0350 |
| Cleanroom |
| Equipment |
| Solvent Bottles |
| Six (6) 500-ml graduated Teflon solvent bottles with graduated marks and two fill funnels. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0360 |
| Cleanroom |
| Equipment |
| Telephones |
| Minimum of one long distance capable telephone in the cleanroom. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0370 |
| Cleanroom |
| Equipment |
| Chemical Storage Cabinet |
| One chemical storage cabinet or locker in the garment change room or cleanroom to store alcohol and other approved solvents and chemicals used in the cleanroom. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0372 |
| Cleanroom |
| Equipment |
| Ordnance Storage |
Locker Locker for storage of small ordnance.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0380 |
| Cleanroom |
| Equipment |
| Blast Shield |
| [HPF Only] |
One blast shield or equivalent protection for operator’s protection against splinters or explosion during fueling and pressurization activities.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0382 |
| Cleanroom |
| Equipment |
| Spill Containment |
| [HPF Only] |
Cleaning supplies to support the response activities for any credible hydrazine spill, including a mop and sop kit and a drip pan.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0400 |
| Cleanroom |
| Furnishings |
| Tables |
| Minimum of two (2) stainless steel cleanroom compatible tables for spacecraft use in the cleanroom. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0410 |
| Cleanroom |
| Furnishings |
| Chairs |
| Minimum of four (4) stainless steel adjustable cleanroom compatible stools/chairs for spacecraft use in the cleanroom. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0500 |
| Cleanroom |
| Liquids & Gases |
| Isopropyl Alcohol (IPA) for GSE |
| Twenty (20) liters (5.3 gallons) of IPA to be used for cleaning GSE and miscellaneous spacecraft equipment. |
IPA for GSE cleaning shall be >99.5% purity and <0.001% residue (e.g., ACS or ACS Spectrophotometric grade).
Vendor certification provided at time of use.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0550 |
| Cleanroom |
| Liquids & Gases |
| Pneumatic air for air pallets |
| Cleanroom compatible pneumatic air supply for use with air pallet systems. |
Air supply flow rate, pressure, quality, and fitting will be in the spacecraft LSSP.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0600 |
| Cleanroom |
| Non-Fluid Consumables |
| Cleanroom Entrance |
Tacky Mats
| Tacky mats at all entrances to the garment change room and cleanroom areas, replaced as necessary. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0610 |
| Cleanroom |
| Non-Fluid Consumables |
| Cleanroom Wipes |
| Lint free cleanroom wipes for cleaning GSE. |
100 wipes
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0620 |
| Cleanroom |
| Non-Fluid Consumables |
| Zip Lock Bags |
| Clean polyethylene zip lock bags (~25” x 14”) for garment and boot storage (booties and smocks to be stored separately). |
Qty 100
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0640 |
| Cleanroom |
| Garments and Wearable Equipment |
| Cleanroom Body Garments |
| ISO Class 8 compatible silicone free cleanroom non-static generating cleanroom garments to support 40 spacecraft personnel with a twice weekly change out during spacecraft processing. |
Sizes ranging from S to XXXL are required.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0645 |
| Cleanroom |
| Garments and Wearable Equipment |
| Cleanroom Garment |
Boots ISO Class 8 compatible silicone free cleanroom non-static generating cleanroom garment boots for 40 spacecraft personnel with a twice weekly change out during spacecraft processing.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0650 |
| Cleanroom |
| Garments and Wearable Equipment |
| Cleanroom |
Garment Head Covers ISO Class 8 compatible silicone free cleanroom non-static generating cleanroom garment head covers for 40 spacecraft personnel with a twice weekly change out during spacecraft processing.
Sizes ranging from S to XL are required.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0655 |
| Cleanroom |
| Garments and Wearable Equipment |
| Cleanroom Garment Face Covers |
| ISO Class 8 compatible silicone free cleanroom face covers for 40 spacecraft personnel. twice daily change out. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0660 |
| Cleanroom |
| Garments and Wearable Equipment |
| Cleanroom |
Gloves Cleanroom gloves (IEST STD-CC1246, Level 100 compliant) for 40 spacecraft personnel. twice daily change out.
Sizes ranging from S to XL are required.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0665 |
| Cleanroom |
| Garments and Wearable Equipment |
| Cleanroom Tape (Cuff Sealer) |
| Cleanroom tape and a dispenser (or scissors) in change room for securing of gloves to sleeves of cleanroom suits. |
QTY 20 rolls
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0670 |
| Cleanroom |
| Garments and Wearable Equipment |
| Cleanroom Garment Laundering |
| Laundry service for all cleanroom garments provided by the Facility Contractor. |
Garment replenishment shall be at the rate of at least two garment sets per person per week.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0700 |
| Cleanroom |
| Safety/ Security |
| Fire Extinguishers |
| Minimum two Class A/B/C fire extinguishers in the cleanroom and at least one in any adjacent annexes or bays. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0705 |
| Cleanroom |
| Safety/ Security |
| Fire Sensors |
| Fire sensors/detectors in all spacecraft areas with local and remote alarms. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0710 |
| Cleanroom |
| Safety/ Security |
| Fire Suppression |
| Fire suppression system in all spacecraft areas. |
The cleanroom system shall be at least single fault tolerance to inadvertent activation (e.g., a “dry-pipe” system requiring a two-stage activation prior to discharging water).
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0715 |
| Cleanroom |
| Safety/ Security |
| Oxygen Monitoring |
| Oxygen level monitoring throughout operations involving asphyxiants or toxic chemicals. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0720 |
| Cleanroom |
| Safety/ Security |
| Portable Hydrazine Vapor Detection |
| [HPF Only] |
Portable hydrazine detector to alarm at 0.01 ppm while hydrazine is present in the HPF.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0721 |
| Cleanroom |
| Safety/ Security |
| Vapor Detector Certification |
| [HPF Only] |
Provide certification of handheld propellant vapor detectors to the 0.1 ppm hydrazine level with the COFR.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0722 |
| Cleanroom |
| Safety/ Security |
| Hydrazine Vapor Detection |
| [HPF Only] |
Continuous detection and alarm for hydrazine vapor detection monitoring in affected HPF work areas to the 0.01 ppm sensitivity level when hydrazine is present.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0723 |
| Cleanroom |
| Safety/ Security |
| Vapor Detector Certification |
| [HPF Only] |
Provide certification of fixed propellant vapor detectors to the 0.1 ppm hydrazine level with the COFR.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0724 |
| Cleanroom |
| Safety/ Security |
| Safety Hazard Warning |
| [HPF Only] |
Ensure the spacecraft fueling area is a safety restricted area when performing hazardous operations, indicated by flashing lights.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0730 |
| Cleanroom |
| Safety/ Security |
| Lightning |
Protection
| Lightning protection for the cleanroom facility. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0732 |
| Cleanroom |
| Safety/ Security |
| Cleanroom Facility Emergency Lighting |
| Emergency area lighting which will activate immediately upon power failure and illuminate until standby power can assume the normal lighting load. |
This requirement applies in all areas where personnel will be working, including the change room and cleanroom.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0734 |
| Cleanroom |
| Safety/ Security |
| Emergency Eyewash & Shower |
| Emergency eyewash and shower in the cleanroom or nearby in case of an accident with chemicals during processing. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0740 |
| Cleanroom |
| Safety/ Security |
| First Aid Kits |
| Courtesy first aid kits in or near all areas where spacecraft personnel will be working, including the change room. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0745 |
| Cleanroom |
| Safety/ Security |
| Emergency Breathing Apparatus |
| [HPF Only] |
A quantity of Emergency Life Support Apparatus (ELSA) or equivalent packs to support cleanroom operations after hydrazine has entered the facility if required by Facility Safety Plan. ELSA pack quantity to be determined by maximum occupancy in the workspaces where ELSA packs will be staged.
Additional 2 ELSA packs per personnel lift (scissor lift or other) or platform are required to support personnel working on elevated platforms and lifts.
Spacecraft LSSPs will specify the quantity.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0750 |
| Cleanroom |
| Safety/ Security |
| Access Control |
| Security system 24 hours/7 days per week to the spacecraft occupied cleanroom that limits access to only authorized personnel and allows access 24 hours/7 days per week by the authorized spacecraft personnel. |
Only personnel on an authorized access list, provided by the LSIM, will be granted unescorted access to the cleanroom.
Access control can be via swipe card, cipher code or guard.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0755 |
| Cleanroom |
| Safety/ Security |
| Badging |
| Badging services, as needed, for personnel entry to the cleanroom. |
Spacecraft LSSPs will list the quantity.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0760 |
| Cleanroom |
| Safety/ Security |
| Access Logs |
| Daily access logs to the controlled areas, provided to LSP upon request. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0780 |
| Cleanroom |
| Safety/ Security |
| Facility Safety Training |
| Facility safety training necessary for badging and operating in the cleanroom areas. |
This training shall be performed ahead of or immediately upon personnel arrival at the processing facility.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0782 |
| Cleanroom |
| Safety/ Security |
| Crane Training |
| Crane familiarization training for all spacecraft personnel who need to operate the cleanroom cranes. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0784 |
| Cleanroom |
| Safety/ Security |
| Forklift/ |
Personnel lift Training Forklift and personnel lift familiarization training, as necessary, for spacecraft personnel to operate the processing facility provided forklifts and personnel lifts.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0786 |
| Cleanroom |
| Safety/ Security |
| ELSA Training |
| [HPF Only] |
ELSA training for all spacecraft, LSP and LSC personnel as necessary.
Training to be available at multiple times/days to accommodate traveling team members.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0820 |
| Cleanroom |
| Misc. Services and Support |
| Hazardous waste disposal |
| Hazardous waste disposal and waste management from arrival to L+3 days |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0825 |
| Cleanroom |
| Misc. Services and Support |
| Decon Procedure |
| [HPF Only] |
Decontamination procedure to be followed in the clean work area in the event of a minor or a major fuel spill.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 0860 |
| Cleanroom |
| Misc. Services and Support |
| Fire & Rescue Service |
| [HPF Only] |
Scheduling of Fire & Rescue support on alert during scheduled hydrazine operations.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1000 |
| Airlock |
| Facility/ Space |
| Airlock |
| Cleanroom airlock, or equivalent space, adjacent to any cleanroom used by the spacecraft for receiving spacecraft flight hardware and ground support equipment (GSE) with a clear transfer path to the cleanroom for the GSE and Spacecraft. |
Any rooms that the spacecraft must transit through before reaching their assigned cleanroom will be treated as airlock space and must meet all LSSP airlock (1000-1999) requirements for the environment and those requirements supporting the transit of the hardware (clean compressed air, etc.).
Spacecraft LSSPs will list the area size and door size required.
| Facility Contractor |
| TBP |
| Square Footage:TBP |
| 1005 |
| Airlock |
| Facility/ Space |
| Airlock |
Door Size Airlock door sized to allow entry and exit of the spacecraft hardware.
Spacecraft LSSPs will list the size and specifications.
| Facility Contractor |
| TBP |
| Dimensions: TBP |
| 1020 |
| Airlock |
| Facility/ Space |
| Airlock Exterior Pad |
| Exterior pad at the airlock to stage the shipping container, power wash it before entry to the airlock, dry it with compressed air and configure for entry. |
Size to accommodate a standard flatbed trailer and the equipment for cleaning and drying.
| Facility Contractor |
| TBP |
| Square Footage:TBP |
| 1100 |
| Airlock |
| Power/ Electrical |
| Power |
| 208 VAC electrical power the airlock: |
· 1 each 208 volts, 3 phase, 60 Hz circuit
· on uninterruptible power supply (UPS)
Spacecraft LSSPs will list the number and plug.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1105 |
| Airlock |
| Power/ Electrical |
| Power |
| 120 VAC electrical power within the airlock: |
· 5 each 120 VAC, 1 Ø, 60 Hz, 15 Amp circuits with wall receptacle NEMA 5-20
· on uninterruptible power supply (UPS)
Spacecraft LSSPs will list the number and plug.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1110 |
| Airlock |
| Power/ Electrical |
| Phase Check |
| Verification of proper phasing for all 3-phase electrical outlets (Delta-Clockwise) with the COFR. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1115 |
| Airlock |
| Power/ Electrical |
| Conductive Floor |
| Static dissipative cleanroom floor. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1120 |
| Airlock |
| Power/ Electrical |
| UPS |
| UPS for all airlock circuits providing power to the spacecraft or critical spacecraft EGSE until a generator backup can be brought online, to allow a controlled shutdown of the spacecraft and spacecraft EGSE. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1130 |
| Airlock |
| Power/ Electrical |
| Generator |
| Backup Power Generator for all airlock circuits providing power to spacecraft or EGSE (both UPS and Non-UPS circuits), that will autostart in the event of loss of commercial power and will assume the load within less than 50% of UPS rated limit. |
If autostart/autotransfer of the backup power generator is not available, the Facility Contractor will provide support to manually perform these operations during all spacecraft critical operations.
Pre-arrival test and checkout of the backup generator and any autostart/autotransfer functions to be performed within 30-days of arrival.
| Facility Contractor |
| TBP |
| TBP, if needed |
Electrical
| Grounding |
| Facility grounding plate(s) and sufficient flexible grounding cable for grounding the shipping container while in the Airlock and on the apron outside the Airlock. |
Location of the grounding plate(s) shall allow for transition of the Shipping container from the exterior apron to the Airlock without breaking the ground connection.
To the maximum extent practical, technical grounds shall be separate or shielded from facility grounds.
| Facility Contractor |
| TBP |
| TBP, if needed |
Electrical
| Personnel Grounding Points |
| Attach points for personnel grounding to the facility technical ground. |
| Facility Contractor |
| TBP |
| TBP, if needed |
Electrical
| Grounding |
| Grounding plate inspection and certification before arrival. |
Copy of the certification to be provided prior with the COFR.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1200 |
| Airlock |
| Environ |
| Airlock Cleanliness Certification |
| Certification that the Airlock has been cleaned and certified to a minimum of ISO 14644-1 Class 8 prior to the arrival of spacecraft hardware. A certification report certifying the Airlock to ISO Class 8 requirements is required. |
If the shipping container is to be opened in the Airlock, then the Airlock will be cleaned after the doors are closed and prior to opening shipping container, then recertified to ISO 8. Removal of the shipping container lid will not commence in the Airlock until the room meets ISO Class 8, at a minimum.
A designated facility representative shall verify particle count and environmental conditions in the Airlock are within baseline contract requirements prior to opening any Airlock door into the cleanroom.
Certification and verification data to be provided with the COFR.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1220 |
| Airlock |
| Environ |
| Clean |
Room Air Supply Cleanliness Maintain the airlock to ISO 14644-1 Class 8 for all periods the spacecraft is in the airlock.
The facility air supply shall have HEPA and charcoal filters and a positive pressure to the surrounding work areas (except when prohibited due to hazardous operations).
NOTE: if this area is shared with any other hardware, including that on the same launch, the strictest environmental requirements for cleanliness will apply for the full duration.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1225 |
| Airlock |
| Environ |
| Cleanliness – Airborne Particles |
| After initial certification, all clean work areas shall be continuously monitored for airborne particles by the use of particle counters (1.0 or 0.1 CFM) and monitored in accordance with ISO 14644-1 / ISO 14644-2 Class 8, using particle count size categories at ≥0.5 and ≥5.0 microns. |
Provide reports of the cleanroom particulate environment to the spacecraft daily when the spacecraft is in the airlock.
Excursions from Class 8 are allowed when the door to the outside is opened as long there is not any unprotected spacecraft flight hardware/GSE present. The nominal time required for the airlock to return to Class 8, after outside doors are closed, will be provided by the Facility Contractor.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1235 |
| Airlock |
| Environ |
| Cleanliness/ |
NVR Certification Verification of airlock NVR levels. Provide 30 days of measurements no later than 7 days prior to arrival.
Data collection will be for 7 days prior to spacecraft arrival and continue during spacecraft occupancy in the airlock. Collection and analysis of 1 plate every 4 weeks at a maximum.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1240 |
| Airlock |
| Environ |
| Cleanliness - Hydrocarbons |
| Monitoring to verify hydrocarbon levels remain at or below 15 ppm (measured as methane gas) in the vicinity of the spacecraft throughout the spacecraft occupancy in the airlock. |
A Portable Hydrocarbon Monitor, PID or melon samples may be used to satisfy hydrocarbon measurements.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1250 |
| Airlock |
| Environ |
| Temp |
| Maintain airlock temperature to 65°F to 75°F (18° to 24°C) with the airlock doors closed throughout the spacecraft occupancy period. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1255 |
| Airlock |
| Environ |
| Relative Humidity |
| Maintain airlock relative humidity of 30% to 60% (non-condensing) with the airlock doors closed throughout the spacecraft occupancy period. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1260 |
| Airlock |
| Environ |
| Alarms |
| Continuous monitoring of temperature, humidity, and particle count in the airlock, recording in 15-minute intervals while the spacecraft is present in the airlock. |
While Flight Hardware is present in the Airlock, provide notification method (ALARM) per guidelines below.
Report all alarms to the LSIM, CPSM, or LSSE or project leader/test conductor per established Project call lists within 60 minutes of alarm.
Set up particle counter warning system threshold to 75% of the cleanliness limit.
Set up particle counter alarm system threshold to 100% of the cleanliness limit.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1280 |
| Airlock |
| Environ |
| Airlock Cleaning |
| Daily cleaning of all airlock work areas. |
Provide additional cleaning of the floor &/or affected wall areas anytime major movements or door openings have occurred.
Spacecraft personnel will perform cleaning within 1-meter (3.3 feet) of the spacecraft, if present.
Provide daily waste removal, as necessary.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1300 |
| Airlock |
| Equipment |
| Crane |
| Crane in the airlock equipped with a debris/drip shield interposed between the crane and the hardware to be lifted. |
Crane to be on backup power system to power the crane in the event of power loss during lifting.
Spacecraft LSSPs will list the size and specifications.
| Facility Contractor |
| TBP |
| Capacity/hook height: TBP |
| 1302 |
| Airlock |
| Equipment |
| Crane Certification |
| Crane certificate of compliance/ inspection confirming that the cleanroom crane is in compliance with applicable safety requirements and all required inspections/maintenance have been completed (to include recorded maintenance dates). |
Certification to be provided with the COFR.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1304 |
| Airlock |
| Equipment |
| Compressed |
Air Source of compressed air with sufficient filtration and enough hose to reach the container while it is on the apron with a trigger operated wand with fan nozzle, appropriate for blowing off excess water (blow drying) off of the shipping container and equipment following power washing.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1306 |
| Airlock |
| Equipment |
| Airlock |
Exterior Power Washer Power washer to be used on airlock apron for shipping container cleaning.
System should include a water source and enough hose to reach the container while it is on the apron.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1308 |
| Airlock |
| Equipment |
| Exhaust Recovery System |
| Diesel exhaust recovery hose/system and exhaust pipe interface adapter for the container transport tractor and all diesel transport tractors when backing into the airlock if the container offload occurs inside the airlock. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1310 |
| Airlock |
| Equipment |
| Forklift – Interior |
| Cleanroom compatible forklift for use inside the airlock. |
| Facility Contractor |
| TBP |
| Lift Capability:TBP |
| 1312 |
| Airlock |
| Equipment |
| Forklift - Exterior |
| Forklift for use outside the airlock. |
| Facility Contractor |
| TBP |
| Lift Capability:TBP |
| 1315 |
| Airlock |
| Equipment |
| Pallet Jack |
| Cleanroom compatible pallet jack for moving equipment into the facility. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1320 |
| Airlock |
| Equipment |
| Airlock Exterior ladders |
| Two (2) Occupational Safety and Health Administration (OSHA) approved ladders for use outside while cleaning the shipping container. Minimum height 10 feet. |
| Facility Contractor |
| TBP |
| Reach:TBP |
| 1325 |
| Airlock |
| Equipment |
| Ladders |
| Two (2) each of 12-foot (3.7 m) OSHA approved, cleanroom compatible ladders, or equivalent scaffolding/scissor lift/access stands, that allows access up to 12 ft (3.7 m) for work on the spacecraft. |
| Facility Contractor |
| TBP |
| Reach:TBP |
| 1342 |
| Airlock |
| Equipment |
| Shoe Cleaners |
| Shoe cleaner at the personnel entrance to the airlock when not entering through the cleanroom or change room. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1350 |
| Airlock |
| Equipment |
| Solvent Bottles |
| Two (2) 500-ml graduated Teflon solvent bottles with graduated marks and two fill funnels. These can be shared with the cleanroom. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1360 |
| Airlock |
| Equipment |
| Telephones |
| Minimum of one long distance capable telephone in the airlock. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1500 |
| Airlock |
| Liquids & Gases |
| IPA for GSE |
| Twenty (20) liters (5.3 gallons) of IPA to be used for cleaning GSE and miscellaneous SC equipment. |
IPA for GSE cleaning shall be >99.5% purity and <0.001% residue (e.g., ACS or ACS Spectrophotometric grade).
Vendor certification provided at time of use.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1550 |
| Airlock |
| Liquids & Gases |
| Pneumatic Air for air pallets |
| Cleanroom compatible pneumatic air supply for use with air pallet system to move handling fixtures. |
Air supply flow rate, pressure, quality, and fitting will be in the spacecraft LSSP.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1610 |
| Airlock |
| Non-Fluid Consumables |
| Cleanroom Wipes |
| ISO Class 8 cleanroom compatible silicone free wipes for cleaning GSE. |
QTY 100 wipes
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1615 |
| Airlock |
| Non-Fluid Consumables |
| Floor protection film and tape |
| Non-shedding film (does not have to be hydrazine or flame resistant) and cleanroom tape to protect the floor when the spacecraft shipping container is in the Airlock. |
The film should cover the complete footprint of the vehicle/hardware brought into the airlock.
Use of tire covers is also acceptable.
Spacecraft LSSPs will list the specifications.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1640 |
| Airlock |
| Garments and Wearable Equipment |
| Cleanroom Garments |
| ISO Class 8 compatible silicone free non-static generating cleanroom garments to support 40 spacecraft processing in the airlock. |
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1646 |
| Airlock |
| Garments and Wearable Equipment |
| Cleanroom Garments |
Shoe Covers ISO Class 8 compatible silicone free non-static generating cleanroom garment boots or disposable cleanroom 100 shoe covers to support spacecraft processing in the airlock.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1660 |
| Airlock |
| Garments and Wearable Equipment |
| Cleanroom Gloves |
| Cleanroom gloves (IEST STD-CC1246, Level 100 compliant) for use in exterior cleaning of spacecraft shipping container and GSE. |
Sizes ranging from S to XL are required.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1670 |
| Airlock |
| Garments and Wearable Equipment |
| Cleanroom Garment Laundering |
| Laundry service for all cleanroom garments provided by the processing facility. |
Garment replenishment shall be at the rate of at least two garment sets per person per week.
| Facility Contractor |
| TBP |
| TBP, if needed |
| 1700 |
| Airlock |
| Safety/ Security |
| Fire Extinguishers |
| Minimum one Class A/B/C fire extinguishers in the airlock. |