Attachment_A-_Boiler_Schedule.pdf
PDF 214 KB Posted
- Solicitation number
- ITB 25-062
- Issued by
- Citrus County, Florida
About this file
This Equipment Schedule document is a technical attachment prepared by Hanson Professional Services Inc. for the Citrus County Detention Center HVAC Replacement project located in Lecanto, Florida. The schedule specifies detailed equipment specifications for the HVAC system overhaul, including three components: Indoor Air Handling Units, Variable Volume Air Terminal Boxes (VAV), and Hot Water Boilers with associated pumps. The Indoor Air Handling Unit schedule identifies three primary units (1A, 1B, and 1C) serving the Admin Building and Kitchen with cooling capacities ranging from 8,555 to 9,845 CFM and heating capacities from 169 to 352 MBH, all manufactured by Trane. The VAV schedule lists 40 individual terminal boxes (VAV-A-1 through VAV-B-19) distributed throughout various facility areas including holding cells, offices, corridors, and support spaces, with airflow capacities ranging from 60 to 3,000 CFM and manufactured by Trane. The Hot Water Boiler schedule specifies two identical Lochinvar/Powerfin PBN1501 condensing boilers (B-1 and B-2), each with 1,275 MBH output capacity, 50 GPM flow rate, and associated secondary heating pumps (P-9 and P-10), with primary pumps to be provided by the boiler manufacturer. All equipment is rated for 460-volt, three-phase power, with boilers requiring natural gas input of 1,500 CFH and incorporating modbus or native bacnet communication for building automation system integration.
The equipment specifications include comprehensive technical requirements for all HVAC components, with boiler units requiring condensate neutralization kits, pressure relief valves, low water cut-off switches, and integrated controllers for sequence operation. The boiler design specifications mandate double-walled, insulated construction with stainless steel interiors and proper condensate drainage per ASHRAE 62.1 standards, while VAV boxes are specified with single-point power connections and noise criteria not exceeding NC-30 at maximum inlet static pressure. The document establishes minimum performance standards for all equipment, including air handling unit filter specifications (2-inch pleated filters in sizes ranging from 16x25 to 20x24 inches), pump capabilities for operation at an additional 10 feet of total dynamic head, and specific electrical clearances and base-rail requirements. Primary pump specifications for the heating system are designated to be provided by the boiler manufacturer, while secondary circulation pumps operate at 217 GPM with 110-foot total dynamic head and 73% water efficiency. The schedule was prepared as of June 10, 2022, and represents the detailed mechanical specifications necessary for the boiler replacement project at the detention center facility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering | Planning | Allied Services
Offices Nationwide www.hanson-inc.com
Hanson Professional Services Inc.
CONSULTANTS
EB0007061
AA0003116
IB0001058
SHEET TITLE
REVIEWED BY:
DRAWN BY:
DESIGN BY:
PROJECT NO:
ISSUE:
© Copyright Hanson Professional Services Inc. 2022
54321 6
E
D
C
B
A
54321 6
SEAL
MARK DATE DESCRIPTION
/1
/2
:2 :1
P
M
C
U s e rs
\r y a n \D o c u m e n ts
\M E
P -2
G
-2 p ry a n E
C .r v t
2300 Maitland Center Pkwy, Suite 310 Maitland, FL 32751
(407) 622-2050
Citrus County Detention Center - HVAC Replacement
2604 W. Woodland Ridge Drive Lecanto, FL 34461
EQUIPMENT
SCHEDULES
M-601
6/10/2022
21G0013
PR
PR
SN
95% CD
3. UNIT SHALL BE FURNISHED WITH A MINIMUM 6" BASE-RAIL OR THE REQUIREMENTS MET FOR PROPER CONDENSATE P-TRAP.
2. UNIT SHALL BE DOUBLE-WALL CONSTRUCTION, STAINLESS STEEL INTERIOR, AND CONDENSATE DRAIN PAN PER ASHRAE 62.1.
1. UNIT SHALL BE DRAW-THRU FAN CONFIGURATION.
NOTES:
1C KITCHEN 3,125 1,250 1.8 1 5.0 3.2 3,125 4 169 145 84.2 69.1 52.0 51.4 42.0 56.0 24 16.6 1,875 1 89 46.0 90.0 190.0 170.0 9 0.3 460/3/60 8.2 10.3 15 97.5-50.5-37.8 1217 2" PLEAT 20x24, 24x24 TRANE CSAA008 1, 2, 3
1B ADMIN BUILDING 9,845 1,405 2.8 4 12.0 (3.0 EA) 9.7 9,845 4 352 277 79.6 65.3 54.0 53.3 42.0 56.0 50 7.8 - - - - - - - - - 460/3/60 19.2 20.4 25 83.6-80-52.8 2132 2" PLEAT 16x25, 20X25 TRANE CSAA021 1, 2, 3
1A ADMIN BUILDING 8,555 1,470 2.8 4 8.0 (2.0 EA) 7.7 8,555 4 319 246 80.1 65.7 54.0 53.3 42.0 56.0 45 6.5 - - - - - - - - - 460/3/60 13.6 14.5 15 83.6-80-52.8 1958 2" PLEAT 16x25, 20x25 TRANE CSAA021 1, 2, 3
(MBH) (MBH) DB (°F) WB (°F) DB (°F) WB (°F) (IN) (LBS)
SUPPLY AIR
(CFM)
OUTSIDE AIR
(CFM)
ESP (IN
H2O)
NO. OF
FANS
MOTOR
NAMEPLATE HP
MOTOR
BHP
AIRFLOW
(CFM)
COIL ROWS
(EACH)
TOTAL
COOLING
SENSIBLE
COOLING
EAT LAT EWT
(°F)
LWT
(°F)
GPM
(EACH)
COIL PD
(FT. H20)
(EACH)
AIRFLOW
(CFM)
COIL ROWS
(EACH)
HEATING
CAPACITY
(MBH)
EAT
(°F)
LAT
(°F)
EWT
(°F)
LWT
(°F)
GPM
COIL PD
(FT. H20)
V/PH/HZ FLA MCA MOCP
L-W-H WEIGHT
TYPE FILTER SIZE
TAG LOCATION SERVED
FAN DATA COOLING COIL DATA HOT WATER COIL DATA ELECTRICAL PHYSICAL DATA FILTER DATA
MANUFACTURER MODEL NOTES
INDOOR AIR HANDLING UNIT SCHEDULE
6. UNIT SHALL BE PROVIDED WITH STEP-DOWN TRANSFORMER FOR CONTROLS.
5. UNIT SHALL BE DOUBLE-WALLED, INSULATED.
4. UNIT NOISE CRITERION (NC) LEVEL SHALL NOT EXCEED NC-30 AT MAXIMUM INLET STATIC PRESSURE.
3. PRIMARY AIR INLET STATIC PRESSURE SHALL NOT EXCEED 1.2 IN. WG.
2. MAINTAIN ALL UNIT ELECTRICAL CLEARANCES.
1. UNIT SHALL BE SINGLE POINT POWER CONNECTION.
NOTES:
VAV-B-19 KITCHEN OFFICE 4 8 x 10 165 44 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-B-18 CORRIDOR 14 18 x 19 2,400 720 320 55.0 0.20 2,400 55 83.8 22.0 SCR 108 42.5 x 19.5 x 26.5 480 3 TRANE VCEF14 ALL
VAV-B-17 LAUNDRY 14 18 x 19 3,000 900 320 55.0 0.20 900 55 93.4 11.0 SCR 108 42.5 x 19.5 x 26.5 480 3 TRANE VCEF14 ALL
VAV-B-16 MAINTENANCE OFFICE 4 8 x 10 135 41 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-B-15 MAINTENANCE SHOP 5 8 x 10 240 72 40 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF05 ALL
VAV-B-14 MECHANICAL/ELECTRICAL 8 10 x 11 715 105 105 55.0 0.20 157 55 85.1 1.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF08 ALL
VAV-B-13 CORRIDOR 5 8 x 10 300 125 40 55.0 0.20 125 55 92.7 1.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF05 ALL
VAV-B-12 WAREHOUSE / COMMISSARY 8 10 x 11 630 189 105 55.0 0.20 189 55 96.6 2.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF08 ALL
VAV-B-11 127 LOUNGE 5 8 x 10 235 90 40 55.0 0.20 90 55 90.0 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF05 ALL
VAV-B-10 129 OFFICE 6 8 x 10 490 147 60 55.0 0.20 166 55 92.9 2.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF06 ALL
VAV-B-9 OFFICES 4 8 x 10 170 51 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-B-8 CHAPEL 8 10 x 11 540 190 105 55.0 0.20 190 55 96.4 2.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF08 ALL
VAV-B-7 SICK CELLS 6 8 x 10 385 154 60 55.0 0.20 166 55 92.9 2.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF06 ALL
VAV-B-6 CHAPLAIN'S OFFICE 4 8 x 10 120 36 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-B-5 STAFF LOCKERS - FEMALE 4 8 x 10 60 25 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-B-4 CORRIDOR & STORAGE 4 8 x 10 100 86 25 55.0 0.20 86 55 91.6 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-B-3 QUARTERMASTER & OFFICE 4 8 x 10 190 58 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-B-2 STAFF LOCKERS - MALE 4 8 x 10 140 42 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-B-1 JAIL ADIMINSTRATOR 4 8 x 10 215 65 25 55.0 0.20 100 55 86.5 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-A-20 CONFERENCE 5 8 x 10 250 135 25 55.0 0.20 135 55 90.0 1.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-A-19 ASST. JAIL ADMINISTRATOR 4 8 x 10 100 30 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-A-18 RECEPTIONIST / WORK AREA 6 8 x 10 370 130 60 55.0 0.20 130 55 91.3 1.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF06 ALL
VAV-A-17 OFFICES 4 8 x 10 220 66 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-A-16 OFFICES 5 8 x 10 235 71 40 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF05 ALL
VAV-A-15 LOBBY 10 12 x 14 1,330 399 165 55.0 0.20 399 55 90.5 4.5 SCR 81 42.5 x 13.5 x 21.5 277 1 TRANE VCEF10 ALL
VAV-A-14 ATT / INMATE VISITATION 4 8 x 10 140 80 25 55.0 0.20 80 55 94.3 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-A-13 VISITATION 8 10 x 11 615 300 105 55.0 0.20 300 55 91.7 3.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF08 ALL
VAV-A-12 CORRIDOR 5 8 x 10 255 115 40 55.0 0.20 124 55 93.1 1.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF05 ALL
VAV-A-11 RECORDS OFFICES 6 8 x 10 425 128 60 55.0 0.20 128 55 91.9 1.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF06 ALL
VAV-A-10 SHERIFF'S OFFICE 8 10 x 11 580 300 105 55.0 0.20 300 55 91.7 3.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF08 ALL
VAV-A-9 SE OFFICES 6 8 x 10 455 300 60 55.0 0.20 300 55 91.7 3.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF06 ALL
VAV-A-8 172 OFFICE 4 8 x 10 165 50 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-A-7 STRIP SEARCH / SHOWER 4 8 x 10 85 30 25 55.0 0.20 83 55 92.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-A-6 CORRIDORS 4 8 x 10 220 109 25 55.0 0.20 109 55 83.9 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
VAV-A-5 PROPERTY STORAGE & OFFICES 8 10 x 11 525 300 105 55.0 0.20 300 55 91.7 3.5 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF08 ALL
VAV-A-4 EAST HOLDING CELLS 6 8 x 10 380 235 60 55.0 0.20 235 55 95.2 3.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF06 ALL
VAV-A-3 BOOKING & WORK AREA 10 12 x 14 1,230 369 165 55.0 0.20 369 55 93.4 4.5 SCR 81 42.5 x 13.5 x 21.5 277 1 TRANE VCEF10 ALL
VAV-A-2 WEST HOLDING CELLS 8 10 x 11 785 251 105 55.0 0.20 251 55 92.6 3.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF08 ALL
VAV-A-1 CONTROL ROOM, VESTIBULE 4 8 x 10 175 88 25 55.0 0.20 88 55 90.7 1.0 SCR 67 42.5 x 11.5 x 18.5 277 1 TRANE VCEF04 ALL
TOTAL CFM
EAT
(DEG F)
LAT
(DEG F)
KW STEPS WEIGHT (LBS) LxWxH (IN.)
VOLTAGE PHASE MANUFACTURER MODEL
TAG SERVES
PRIMARY AIR
INLET SIZE (IN.)
DISCHARGE SIZE
(IN. x IN.)
PRIMARY AIR
MAXIMUM
(CFM)
PRIMARY AIR
MINIMUM
(CFM)
BOX MINIMUM
(CFM)
PRIMARY AIR
EAT (DEG F)
AIR INLET PD @
MAXIMUM CFM
(IN WG)
ELECTRIC HEAT DATA UNIT DIMENSIONS
ELECTRICAL SELECTION
NOTES:
VARIABLE VOLUME AIR TERMINAL BOX SCHEDULE (VAV)
wt
7. PUMP SHALL BE CAPABLE OF OPERATING AT AN ADDITIONAL 10 FEET OF TOTAL DYNAMIC HEAD WITH THE CORRECT FLOW RATE AND NAMEPLATE MOTOR HORSEPOWER AS SHOWN.
6. REFER TO MECHANICAL DETAILS FOR HYDRONIC ACCESSORIES AROUND PUMP.
5. REFER TO MECHANICAL DETAILS FOR INSULATION REQUIREMENTS.
4. REFER TO MECHANICAL DETAILS FOR ANY BASE SUPPORT REQUIREMENTS.
3. IMPELLER DIAMETER SHALL NOT EXCEED 85% OF THE CUTWATER DIAMETER.
2. PROVIDE AEGIS SHAFT GROUNDING RINGS FOR ALL PUMPS CONTROLLED BY A VARIABLE FREQUENCY DRIVE.
1. REFER TO SPECIFICATIONS FOR ADDITIONAL MANUFACTURERS AND REQUIREMENTS.
NOTES:
P-10 YES HEATING - SECONDARY 217 110 73 460/3 15 27 21 48 3 / 2.5 19x15x39 467 TACO SFI 1-7
P-9 YES HEATING - SECONDARY 217 110 73 460/3 15 27 21 48 3 / 2.5 19x15x39 467 TACO SFI 1-7
P-8 NO HEATING - PRIMARY PROVIDED BY BOILER MANUFACTURER 1
P-7 NO HEATING - PRIMARY PROVIDED BY BOILER MANUFACTURER 1
SERVICE
FLOW
RATE
(GPM)
TOTAL
DYNAMIC
HEAD (FT)
VOLTAGE TO
WATER EFFICIENCY
(%) @ DUTY POINT
VOLTAGE/
PHASE
NAMEPLATE
HP
MCA (A) FLA (A) MOCP (A)
INLET/
OUTLET
(IN)
HxWxL (IN)
OPERATING
WEIGHT
(LBS)
MANUFACTURER MODEL
TAG VFD
PUMP PERFORMANCE UNIT DIMENSIONS UNIT SELECTION
NOTES
PUMP SCHEDULE:
6. BOILER MANUFACTURER TO PROVIDE PRIMARY PUMP AT EACH BOILER.
5. PROVIDE UNIT WITH CONDENSATE NEUTRALIZATION KIT.
4. PROVIDE BOILER CONTROLLER CAPABLE OF MODBUS OR NATIVE BACNET COMMUNICATION FOR INTEGRATION TO THE BUILDING AUTOMATION SYSTEM.
3. BOILER MANUFACTURER TO PROVIDE CONTROLLER AND COMPONENTS. TEMPERATURE CONTROL CONTRACTOR TO INSTALL AND WIRE COMPONENTS REQUIRED FOR SEQUENCE.
2. THE PRESSURE RELIEF VALVE, LOW WATER CUT-OFF SWITCH, PRESS./TEMP. GAUGE, AND AQUA STAT SHALL BE SUPPLIED BY BOILER MANUFACTURER FOR FIELD INSTALLATION.
NOTES: 1. REFER TO SPECIFICATION 235216 FOR ADDITIONAL MANUFACTURERS AND REQUIREMENTS.
B-2 MECHANICAL ROOM 1,275 84 160 170 190 90 5:1 50 1,500 1-1/2" 120-1 LOCHINVAR / POWERFIN PBN1501 ALL
B-1 MECHANICAL ROOM 1,275 84 160 170 190 90 5:1 50 1,500 1-1/2" 120-1 LOCHINVAR / POWERFIN PBN1501 ALL
(MBH) (%) (PSI) (GPM) RATIO (IN)
CAP FIRE EFF PRESSURE RATE MOD INPUT
(CFH)
INLET VOLT -
PHASE
TAG LOCATION
OUTPUT MIN FULL DESIGN
EWT
(DEG)
LWT
(DEG)
FLOW BURNER RELIEF
VALVE
(PSI)
NATURAL GAS ELECTRICAL
MANUFACTURER / MODEL NOTES
HOT WATER BOILER SCHEDULE
File details come from the government source that posted it. Updated .