Attachment A - AFRH-WaterSewer Replacement.pdf
PDF 802 KB Posted
- Solicitation number
- RFP-AFRCRO-FAC-23-0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B - Water Pipe Replacement.xls | XLS spreadsheet | |
| RFP-AFRCRO-FAC-23-003.pdf | ||
| Attachment C - SF 1019A - Subcontracting Plan (3-22).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
jseffens Line jseffens Line jseffens Line jseffens Line jseffens Line jseffens Line jseffens Line jseffens Line jseffens Line jseffens Line jseffens Text Box Recently replaced 12 " Line jseffens Text Box Recently replaced 8" line jseffens Text Box Recently replaced 4" line jseffens Callout Cut existing 12" C900 pipe line running north install appropriate 90 fitting with thrust block jseffens Callout connect to existing 4" line with jseffens Callout Replace pipe up to primary meter and the by-pass meter jseffens Distance Measurement
200.01 ft jseffens Text Box Attachment A jseffens Line jseffens Text Box new 8" Line
Bellatoris Polygonal Line
Bellatoris Polygonal Line jseffens Callout install valve, meter box, and sub-meter and connect to existing 3/4" Water line going into Quarters #90 jseffens Callout install valve, meter box, and sub-meter and connect to existing 3/4" Water line going into Toilet Building jseffens Callout install valve, meter box, and sub-meter and connect to existing 3/4"Water line going into golf club house jseffens Oval jseffens Callout Install 12" x 12" x 4" Tee with one 4" water valve
Bellatoris Line
Bellatoris Line
Bellatoris Line
Bellatoris Polygonal Line
Bellatoris Polygonal Line
Bellatoris Oval
Bellatoris Oval
Bellatoris Oval jseffens Oval jseffens Callout Install 12" x 12" x 8" Tee with two 12" water valve and one 8" valve
Bellatoris Oval
Bellatoris Line
Bellatoris Line
Bellatoris Line
Bellatoris Line
Bellatoris Line
Bellatoris Line
Bellatoris Line
Bellatoris Line
Bellatoris Line
Bellatoris Line
Bellatoris Line jseffens Callout Replace pipe up to primary meter and the by-pass meter jseffens Callout connect to existing 8" line with jseffens Callout For each of the Quarters # 3,4,5, and 6 install a valve, a meter box, and a sub-meters and connect to existing 3/4" Water lines going into the Quarters
Bellatoris Line
Bellatoris Line
Bellatoris Line jseffens Oval jseffens Callout Install 12" x 12" x 4" Tee with one 4" water valve. In addition install meter box, and sub-meter and connect to building #10 jseffens Callout For Quarters # 9, Building 8, and Eagle Guard House install a valve, a meter box, and a sub-meters for each and connect them to the existing 3/4" Water lines going into the Quarters
Bellatoris Line
Bellatoris Line jseffens Callout install valve, meter box, and sub-meter and connect to existing 3/4" Water line going into Lincoln Cottage jseffens Oval jseffens Oval jseffens Callout For each of the Quarters # 1 and 2 install a valve, a meter box, and a sub-meters and connect to existing 3/4" Water lines going into the Quarters
Bellatoris Line
Bellatoris Line jseffens Text Box new 12" Line
Bellatoris Polygonal Line
Bellatoris Line
Bellatoris Line jseffens Text Box new 4" Line jseffens Text Box new 3/4" Line jseffens Callout install valve, meter box, and sub-meter and connect to existing 4" Water line going into Sherman Building jseffens Callout install valve and connect to existing 8" riser going to Fire Hydrant. NOTE: there are five (5) fire hydrants total that are to be reconnected in this project. They are indicated on drawing by a red dot. Each shall have a new cut off valve.
Bellatoris Text Box NOTE: Piping crosses the road 14 times. The road and curb are to be patched.
jseffens Callout Splice into existing 12" Water Main
Bellatoris Polygonal Line
Bellatoris Polygonal Line
Bellatoris Line
Bellatoris Line
Bellatoris Polygonal Line
Bellatoris Line jseffens Callout Install 8" x 8" x 4" Tee with two 8" water valve and one 4" valve
Bellatoris Line
Bellatoris Line
Bellatoris Polygonal Line
Bellatoris Line jseffens Line
Bellatoris Line jseffens Oval
Bellatoris Line jseffens Oval
Bellatoris Line jseffens Callout install valve, meter box, and sub-meter and connect to existing 2" Water line going into Stanley Building jseffens Callout install valve, meter box, and sub-meter and connect to existing 4" Water line going into Sherman Building jseffens Callout Install 12" x 12" x 4" Tee with one 4" water valve jseffens Line jseffens Text Box new 10" Line
Bellatoris Line
Bellatoris Oval jseffens Polygonal Line jseffens Oval
Bellatoris Line
Bellatoris Line jseffens Callout Splice into existing 8" Water Main into new 10" jseffens Oval
Bellatoris Line jseffens Callout install valve, meter box, and sub-meter and connect to existing 2" Water line going into Security Building jseffens Callout install valve, meter box, and sub-meter and connect to existing 3/4" Water line going into Quarters #21 jseffens Callout install valve, meter box, and sub-meter and connect to existing 4" Water line going into North Converter (Building #28)
Bellatoris Line jseffens Callout install valve, meter box, and sub-meter and connect to existing 3/4" Water line going into Quarters #90 jseffens Oval
Bellatoris Line jseffens Text Box new 2" Line
Bellatoris Line jseffens Callout Install 4" x 4" x 2" Tee with one 2" water valve and two 4" water valves jseffens Oval jseffens Line jseffens Callout Install 12" x 12" x 8" Tee with two 12" water valve and one 8" valve