STATEMENT OF WORK (SOW)

For

F100-PW-220/229 Liner-Convergent Segment Seal F100-PW-220 Augmentor Convergent Nozzle Segment Liner F100-PW-229 Liner-Convergent Segment

PR # FD20301901920-00

REV. 0

DATE: 13 MAR 2019

PREPARING ORGANIZATION:

AFLCMC/LPSEA

TINKER AFB OK 73145-3030

FOR OFFICIAL USE ONLY

TABLE OF CONTENTS Page

TABLE OF CONTENTS 2

SECTION I

SCOPE 3

SECTION II

APPLICABLE DOCUMENTS 8

SECTION III

WORK REQUIREMENTS 12

APPENDIX 1

ACRONYMS 15

APPENDIX 2

NOTES 16

APPENDIX 3

PRODUCT VERIFICATION AUDIT PROCEDURES 17

APPENDIX 4

CAVAF CFM REPORTING REQUIREMENTS…………………………………………………...23

SECTION I

SCOPE

1.0 SCOPE

This Statement of Work (SOW) provides the requirements necessary to ensure that the items listed below by National Stock Number (NSN) and Part Number (P/N), are restored to a like-new/remanufactured condition.

NOUN
PART

NUMBER

INPUT

NSN

OUTPUT

NSN

APPLICABLE TO

Liner Convergent Segment

4070107

2840-01-308-4467

2840-01-308-4467

2J-F100-53-10

Convergent Segment Liner Assembly

4084791 4057394 4048787

2840-01-455-9138 2840-01-180-2941 2840-01-017-7757

2840-01-455-9138

2J-F100-13-10

Liner-Convergent Segment Seal
4078304

4071130

2840-01-308-4469
2840-01-308-4469
2J-F100-53-10

The instructions stipulated are brief, concise statements providing general requirements for receiving, cleaning, inspection, remanufacturing, and test/inspection of the above listed NSN. These instructions are dependent upon the contractor having remanufacturing capabilities to include appropriate technical data/and inspection/testing equipment. The work accomplished shall meet the requirements of the Technical Orders (TOs) listed within this SOW (latest change/updates). The contractor is responsible for remanufacturing and delivering a quality product.

1.1 DATA

1.1.1 Reporting Requirements

1.1.1.1 Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

1.1.1.2 Product Quality Deficiency Report (PQDR): The contractor shall prepare a PQDR in the Joint Deficiency Reporting System (JDRS) on all design and quality control (material) deficiencies found IAW the procedures of TO 00-35D-54. Applicable portions of TO 00-35D-54 relative to quality defects will apply. The contractor shall hold exhibits of reported deficient items pending disposition from the ACO representative. Report preparation, distribution, holding and tagging of exhibits shall be IAW TO 00-35D-54.

1.1.1.3 TO System Publication Improvement Report (AFTO Form 22): The contractor shall prepare an AFTO Form 22 when an error or improvement changes the meaning of the instructions or information contained in technical directives and will prevent the adequate performance intended. The contractor shall accomplish an AFTO Form 22 IAW TO 00-5-1 and submit one copy to AFLCMC/ENR. Minor discrepancies of non-technical nature such as improper sequence of pages, typographical errors, transportation errors, misspelled words, etc., shall not be reported. The contractor shall report omissions of pertinent technical data, correction of remanufacture procedures in TOs, or desired changes to TO data shall likewise use the AFTO Form 22.

1.1.1.4 Teardown Deficiency Report (TDR): A TDR shall be accomplished on any item delivered under this contract that a PQDR exhibit is received for investigation. The report shall be completed IAW the procedures established on DD Form 1423 as set forth in the contract.

1.1.2 Other Records, Forms and Reports

1.1.2.1 The contractor shall make available to the appropriate ACO representative the required information to enable him to review and/or verify monthly production status reports on end items and to enable him to complete his records or to complete other such reports as may be required.

1.1.2.2 Commercial Asset Visibility (CAV) AF End Item Production Report (End Item Activity Report): The report shall be completed IAW the procedures established on DD Form 1423, as set forth in the contract and the Appendix 2.

1.1.2.3 Completed DD Form 1574 Serviceable Tags are required IAW MIL-STD-129P, paragraph 5.2.21.a.

1.1.2.4 Comprehensive Engine Management System (CEMS) Reporting: N/A. CEMS reporting is not required for the parts referenced in this SOW.

1.1.3 Technical Data

1.1.3.1 TOs listed in this specification are the basic directives to be used in accomplishing the remanufacture requirements of the contract.

1.1.3.2 TO illustrated parts breakdowns (IPBs) listed in this SOW shall be used in the part replacement requirements of the contract. Replacement parts shall conform to the configurations stipulated in the applicable TO IPB as supplemented by other applicable directives and instructions in this SOW. All parts are required to be restored to a like-new/remanufactured condition per the applicable TO.

1.1.3.3 Instructions listed in this SOW as “Changes” or “Revisions” to a TO represent publication changes to the Technical Order System. The sub-paragraphs contain the location of changes as designated and the deletion, change or addition of technical information to be accomplished.

1.1.3.4 In the event of a conflict between the instructions in this SOW and the applicable technical directive, the following order of override precedence applies: 1) this SOW, 2) the end item TO, 3) other directives.

1.2 SECURITY

1.2.1 Contractor’s Security Controls: Equipment and materials covered by this SOW are not classified.

1.3 QUALITY

1.3.1 The contractor shall provide and utilize an inspection & quality system IAW ISO 9001: 2015, AS 9100, and NATO AQAP 2070.

1.3.2 The contractor shall investigate, take corrective action if necessary, and reply to user initiated PQDR forwarded to them by the ACO. This applies to all PQDRs submitted against products overhauled by the contractor and/or their subcontractor or vendors. Sufficient priority shall be given to PQDR investigation to allow timely corrective action and to meet requirements of TO 00-35D-54.

1.4 DELIVERY SCHEDULES

1.4.1 The delivery schedules shall be IAW the contract delivery schedules.

1.5 CONDEMNATION

1.5.1 Contractor’s Scrap Procedures: The contractor shall prepare and submit to the Government Property Administrator (GPA) for approval, a written plan that sets forth procedures for handling scrap materials/component parts. These procedures shall include the requirements stipulated in the Federal Acquisition Regulation (FAR) 45.1, titled “General”. Disposition of condemned component parts containing critical alloys and/or precious metals shall be IAW TO 00-25-113, 00-25-153-F100-ENG and FAR 45.6 titled “Reporting, Reutilization, and Disposal”.

1.5.2 Condemnation: The contractor shall not condemn End Items, all End Items shall be restored to a like-new/remanufactured condition. End Items determined by the contractor and verified by the ACO to be beyond economical remanufacture shall be disposed of as directed by the ACO in writing. End Items determined to be beyond economical repair shall not be remanufactured by the contractor unless authorized in writing by the ACO.

1.5.2.1 The serial number and part number of any life-limited item, which is condemned, must be condemned IAW CEMS CDRL.

1.6 HANDLING

1.6.1 The contractor shall have physical custody of end items and parts received at their facility and shall be responsible for their constant care during such custody.

1.6.1.1 The receipt and status of all serialized components or accessories, which are tracked in CEMS, must be reported IAW Para 1.1.2.3 of the SOW and CDRL.

1.7 INVENTORY

1.7.1 Each end item shall be inspected by the contractor upon receipt to determine its condition and to ensure that its item identification corresponds to that shown on the contract schedule. Non-conforming end items shall be reported to the appropriate ACO representative.

1.8 PRESERVATION

1.8.1 All Government assets shall be stored in an enclosed and covered area and shall be adequately protected against loss by fire, theft, and physical damage by the elements.

1.9 SAFETY AND HEALTH

1.9.1 While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the Government Representative (GR), within eight (8) hours of any damage to government property where the dollar value exceeds $500,000.00 and within two workdays, for any damage to government property less than $500,000.00 during the execution of the contract.

1.9.1.1 Mishap notifications shall contain, as a minimum, the following information:

1.9.1.1.1 Contract, Contract Number, Name and Title of Person(s) Reporting

1.9.1.1.2 Date, Time and exact location of accident/incident

1.9.1.1.3 Brief Narrative of accident/incident (Events leading to accident/incident)

1.9.1.1.4 Cause of accident/incident, if known

1.9.1.1.5 Estimated cost of accident/incident (material and labor to repair/replace)

1.9.1.1.6 Nomenclature of equipment and personnel involved in accident/incident

1.9.1.1.7 Corrective actions (taken or proposed)

1.9.1.1.8 Other pertinent information

1.9.2 If requested by the designated GR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

APPLICABLE DOCUMENTS

2.1 Technical Publication Compliance

2.1.1 Compliance with all TOs, Directives, Government Specifications, Drawings, etc., listed herein is mandatory, unless otherwise specified in this SOW, when:

2.1.1.1 They have not been previously accomplished

2.1.1.2 They are pertinent to the end item.

2.1.1.3 They prescribe Air Force Policies, use of materials and procedures for remanufacture.

2.1.2 For solicitation purposes, the contractor may contact USAF F100 Engineering Source Authority for instructions for viewing or purchasing technical data required for maintenance of this contract. Upon contract award, the contractor shall establish and maintain a TO distribution account IAW TO 00-5-1; and be placed on initial distribution for one copy each of the TOs and TCTOs listed in this SOW. The contractor shall contact the TOMA office at AFLCMC.LPSAA.TOMA@us.af.mil within five (5) working days after contract award for guidance in obtaining a TODO account. Once the contractor’s TODO account is in operation, the contractor shall maintain all TOs and TCTOs and other technical directives listed in the SOW in an updated and current status IAW TO 00-5-1. The contractor is required to comply with the latest dated TO; TCTO and other technical directives issued and will be contractually covered during the time the work is accomplished. For example, an item already in work will continue to be worked under the existing contractual scope of work until such time that the latest TO revisions can be negotiated as to price and scheduled incorporation. The contractor shall submit a monthly review of changes to TOs, TCTOs, and other applicable directives received during that period. However, if a change is received that has a cost impact greater than 10% and/or is critical to safety of flight, the contractor shall notify the ACO within ten (10) calendar days of receipt of that change and also shall provide the cost impact with his backup data within 30 calendar days of receipt of the change. If evaluation of the cost impact will require more than 30 calendar days, the contractor shall request an exception from the ACO/PCO. These exceptions will be handled on a case by case basis. The contractor shall not begin working with new publication until authorization has been granted by the ACO/PCO.

2.1.3Copies of other Air Force publications required in the performance of work outlined in this SOW will be requisitioned through the ACO. Submit requests to appropriate ACO representative for review. TO 00-5-1 provides an explanation of the Technical Order System and for pertinent distribution, requisition and storage information.
2.1.4In the event a follow-on to this contract is awarded, the “Package File” at the contract facility as of the end of the previous contract will be applicable to the follow-on contract and will be updated through amendments to the new SOW of the new contract. This procedure will ensure continuity of the publication data from one contract to another.

2.2 APPLICABLE TECHNICAL ORDERS

This is a preliminary list of Technical Orders. The contractor is responsible for ensuring they are using the latest edition.

TECH ORDER
BASIC
CG
CHANGE
NUMBER
DATE
NO
DATE
SHORT TITLE
00-5-1
DIGITAL
23
6 MAY 11
AF TECH ORDER SYSTEM
00-5-15
DIGITAL
9
1 JAN 10
TIME COMPLIANCE TECH ORDER SYSTEM
00-20-1
DIGITAL
3
15 JUN 11
PREV MAINT PROG
00-20-2
DIGITAL
27
1 SEP 10
MAINT DATA COLLECTION SYS
00-20-3
DIGITAL
11
1 JAN 09
MAINT PROC OF REPARABLE PROP
00-25-113
DIGITAL
49
01 DEC 13
CRITICAL ALLOY AND PRECIOUS METAL
00-25-113-F100-ENG
DIGITAL
0
1 FEB 07
CONS SEQ & DIS CRITICAL ALLOY
00-25-254-1
DIGITAL
7
15 AUG 12
SYS MANUAL COMPREHENSIVE ENGINE MGT. SYS. (CEMS)
00-35D-54
DIGITAL
5
1 NOV 11
MATERIAL DEF REPORT & INVEST SYSTEM
2-1-111
15 FEB 90
61
01 JUL 14
STAND MAINT PROCEDURES
2J-F100-9
DIGITAL
55
01 JUL 14
NONDESTRUCTIVE INSPECTION
2J-F100-13-1
DIGITAL
11
15 MAR 15
MAINT INSTR – DEPOT

GENERAL INFO

2J-F100-94
DIGITAL
55
15 FEB 14
I.P.B. SUPPORT

EQUIPMENT

2J-F100-13-1
1 FEB 07
11
15 MAR 15
MAINT INSTR-DEPOT
2J-F100-13-2
1 FEB 07
11
15 MAR 15
MAINT INSTR – DEPOT OCM
2J-F100-13-10
1 FEB 07
11
15 MAR 15
MAINT INSTR – DEPOT AUG MODULE
2J-F100-24
31 MAR 08
31
01 JUL 14
IPB
33B-1-1
DIGITAL
8
15 SEP 10
NONDESTRUCTIVE INSP. METHODS

1.10 APPLICABLE DIRECTIVES

MILITARY STANDARDS
CHANGE DATE
TITLE

MIL-STD-129R

18 FEB 14
U.S. MILITARY MARKING FOR SHIPMENT AND STORAGE
MIL-STD-130N
17 DEC 07
ID MARKING OF U.S. MILITARY PROP.

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ISO 9001
15 SEP 15
QUALITY MANAGEMENT SYSTEMS – REQUIREMENTS – THIRD EDITION

2.3 APPLICABLE DOCUMENTS

2.3.1 LPF-QAR-001: “GENERAL QUALITY ASSURANCE DOCUMENTS FOR F100 ENGINE FC/DC BREAKOUT COMPONENTS”

2.3.2 LPF-QAR-002: “CHANGE PROCEDURES FOR PROCESS ORDERS”

2.3.3 LPF-QAR-004: “LPFR QUALITY ASSURANCE REQUIREMENTS FOR F100 ENGINE COMPONENTS”

2.3.4 LPF-QAR-006: “LPFR QUALITY ASSURANCE REQUIREMENTS FOR PRODUCT VERIFICATION AUDIT (PVA) TEST PLANS AND REPORTS

2.3.5 LPF-QPR-004: “LPFR QUALITY PLAN REQUIREMENTS FOR WELDED ASSEMBLIES”

2.3.6 LPF-QPR-007: “LPFR QUALITY PLAN REQUIREMENTS FOR PLASMA SPRAYED COATINGS”

2.3.7 LPF-QPR-009: “LPFR QUALITY PLAN REQUIREMENTS FOR VACUUM BRAZED ASSEMBLIES”

2.3.8 LPF-QPR-016: “LPFR QUALITY PLAN REQUIREMENTS FOR DURABILITY CRITICAL PARTS

2.3.9 LPF-QPR-017: “LPFR QUALITY PLAN REQUIREMENTS FOR CAST HONEYCOMB RING SEGMENTS AND RING ASSEMBLIES”

2.3.10 LPF-QPR-018: “LPFR QUALITY PLAN REQUIREMENTS FOR NONDESTRUCTIVE INSPECTION”

2.3.11 LPF-QR-001: “BASIC TECHNICAL DATA REQUIREMENTS FOR FRACTURE CRITICAL AND DURABILITY CRITICAL PARTS”

2.3.12 LPF-QR-002: “CONDITIONS OF WAIVER FOR FRACTURE CRITICAL AND DURABILITY CRITICAL PARTS”

2.3.13 EI FOR RQR-1: “GENERIC ENGINEERING INSTRUCTIONS FOR REMANUFACTURE OF F100 PARTS IN RQR-1”

WORK REQUIREMENTS

3. GENERAL WORK REQUIREMENTS

3.1 The instructions for the remanufacture of items stipulated in this SOW shall be performed IAW the applicable TOs and the below exceptions.

3.1.1 The contractor is authorized to inspect per part drawing and part QAD (Quality Assurance Document).

3.1.2 The contractor shall use protective equipment to protect items from damage as they are processed through the plant. Special protection shall be placed over the machined surfaces of end items per 2-1-111.

3.1.3 The contractor shall inspect the various disassembled components or parts of the end item and restore to a like-new/remanufactured condition. Subsequent remanufacture shall be accomplished IAW the applicable portion of the applicable technical order and supplementary instructions specified herein.

3.1.4 The contractor shall replace condemned component parts of the end item with like serviceable parts listed in the applicable technical order IPB, unless otherwise specified in this SOW. Replacement parts must be purchased from a USAF qualified source.

3.1.5 When overhaul kits are available for the remanufacture of an end item, such kits shall be IAW the applicable technical order and changes there to or the specific instructions contained in this SOW.

3.1.6 Where the contractor is directed to hold an item for AFLCMC disposition by any cited publication herein or by any statement made within this SOW, such items shall be reported to the ACO through the GPA for disposition.

3.1.7 Remanufacturing to the maximum extent is required. The contractor is encouraged to submit new or improved remanufacture procedures to the Government whenever practical. Procedures may be submitted on an AFTO Form 22 as specified in this SOW or by any other means authorized under this contract.

3.1.8 All of the contractor’s operators of special processes, such as X-ray, radiography machines, Fluorescent Penetrate and Magnetic Particle Inspection Equipment, as well as welders moralizers, PMEL, etc., shall be qualified and certified for operation IAW applicable specifications when listed in the SOW.

3.1.9 Fit and tolerance limits shall be IAW applicable TO and procedures unless otherwise specified.

3.1.10 Fluids, oil, greases and compounds shall conform to and be used as directed in the TO and instructions contained in this SOW.

3.2 SPECIFIC WORK REQUIREMENTS

3.2.1 Removal

3.2.1.1 Not Applicable.

3.2.2 Disassembly

3.2.2.1 Should be accomplished IAW the applicable portion of the applicable technical order.

3.2.3 Cleaning

3.2.3.1 F100-PW-229 Convergent Segment Seal Liner and Convergent Segment Liner shall be cleaned IAW TO 2J-F100-53-10. F100-PW-220 Convergent Segment Liner shall be cleaned IAW TO 2J-F100-13-10.

3.2.3.2 The contractor shall ensure that cleaning and preserving materials meet the requirements specified in TO 2J-F100-13-1, TO 2J-F100-13-2, TO 2J-F100-53-1, TO 2J-F100-53-2 or TO 2-1-111 and that such materials are properly used during application.

3.2.4 Inspection

3.2.4.1 Inspection of F100-PW-229 Convergent Segment Seal Liner and Convergent Segment Liner shall be IAW TO 2J-F100-53-10. Inspection of F100-PW-220 Convergent Segment Liner shall be IAW TO 2J-F100-13-10.

3.2.5 Corrosion Control

3.2.5.1 The corrosion control of F100-PW-229 Convergent Segment Seal Liner and Convergent Segment Liner shall be accomplished IAW TO 2-1-111. The corrosion control of F100-PW-220 Convergent Segment Liner shall be accomplished IAW TO 2-1-111.

3.2.6 Remanufacture

3.2.6.1 Remanufacture of F100-PW-229 Convergent Segment Seal Liner and Convergent Segment Liner shall be accomplished IAW TO 2J-F100-53-10 and any Pratt and Whitney (P&W) proprietary processes. Remanufacture of F100-PW-220 Convergent Segment Liner shall be accomplished IAW TO 2J-F100-13-10 and any Pratt and Whitney (P&W) proprietary processes.

3.2.6.2 The contractor shall identify all remanufactured F100-PW-229 Convergent Segment Seal Liner and Convergent Segment Liner with the contractor’s CAGE IAW MIL-STD-130N. The contractor shall identify all remanufactured F100-PW-220 Convergent Segment Liner with the contractor’s CAGE IAW MIL-STD-130N.

3.2.7 Installation

3.2.7.1 Not applicable.

3.2.8 Test And Government Acceptance

3.2.8.1 Inspect, test and check each remanufactured item IAW TO 2-1-111 and P&W proprietary processes.

3.2.8.2 The Government shall accomplish acceptance.

3.2.9 Product Verification Audit (PVA)

3.2.9.1 Remanufactured items shall be subject to PVA if requested by the government.

3.2.9.2 To perform PVA, the government shall be permitted to select at random such quantities of items as may be necessary to determine quality of workmanship and materials.

3.2.9.3 After notification by the ACO that a PVA is required, the contractor will follow the procedures of Appendix 3 - Product Verification Audit Procedures.

APPENDIX 1

1.1 ACRONYMS

ACO
Administrative Contracting Officer
AFMC
Air Force Material Command
ALC
Air Logistics Center
CAGE
Contractor and Government Entity
CAO
Contract Administration Office
CAV
Commercial Asset Visibility
CEMS
Comprehensive Engine Management System
DoD
Department of Defense
EC
Engineering Change
ESA
Engineering Source Authority
FAR
Federal Acquisition Regulation
GFM
Government Furnished Material
GFP
Government Furnished Property
GPA
Government Property Administrator
IAW
In Accordance With
IPB
Illustrated Parts Breakdown
MRB
Material Review Board
NDI
Nondestructive Inspection
OC-ALC
Oklahoma City Air Logistics Center
OEM
Original Equipment Manufacturer
PCO
Procurement Contracting Officer
PIR
Publication Improvement Report
PQDR
Product Quality Deficiency Report
PVA
Product Verification Audit
QAD
Quality Assurance Document
QAR
Quality Assurance Representative
QCD
Quality Control Deficiency
SL:
Salvage Layout
SR
Service Remanufacture
TO
Technical Order
USAF
United States Air Force
WP
Work Package

APPENDIX 2

A2.1 NOTES

A2.1.1 The contractor is authorized to establish and convene a Material Review Board (MRB) to evaluate and determine disposition on non-conforming material or parts. Board members shall consist of representatives from the Contractor’s Quality Production Control, Engineering (Industrial, Product Support or Design) and the Government QAR. The MRB shall be convened when the contractor identifies non-conformance of material or parts during and after assembly. The MRB is not authorized to violate any TO limit. When MRB action is required on material or parts during and after assembly, the contractor shall provide information, to include part number, serial number and statement of non-conformance and corrective action taken, to AFLCMC/LPSA via email within (5) working days after approval of the MRB.

APPENDIX 3

A3.1 PRODUCT VERIFICATION AUDIT PROCEDURES

A3.1.1 This attachment contains procedures and instructions for contractual accomplishment of Product Verification Audits (PVAs). This attachment does not supersede instructions contained in the contract remanufacture work requirements or other contractual provisions. In instances of conflict, the latter applies. The contractual issuance of this attachment and performance of PVAs does not relieve the contractor of the responsibility for maintaining a Quality Control System that will assure productions of items that conform to contractual requirements. PVAs are management tools used to independently evaluate and validate the conformance of a remanufactured item and contractor compliance to contractual requirements as well as the adequacy of the Government's contractually stipulated requirements.

A3.2 TERMS EXPLAINED

A3.2.1 PVA. The physical examination, functional testing and complete disassembly of an item to determine conformance to contractual requirements as well as adequacy of the contractual requirements which may require in excess of the original contractor remanufacture effort. The audit includes correction of defects, reassembly, retesting, repackaging, remarking, update of records and correction of contractual requirements as required.

A3.2.2 Cognizant Quality Assurance Element. The DoD contract administration service element having direct responsibility for implementing the Government Quality Assurance Program at the contractor's plant.

A3.2.3 Remanufacture Work Requirement. Any contract instrument, TO, drawing, specification or directive which contains instructions and requirements for remanufacture and rehabilitation of a reparable/unserviceable item.

A3.2.4 Procedural Deficiency. A deficiency which is noted during the audit and which results from either:

A3.2.4.1 Failure by contractor to establish processes/procedures in conformity with contractual requirements; or, A3.2.4.2 Failure by contractor to follow established processes or procedures.

A3.3 RESPONSIBILITIES

A3.3.1 The contractor shall:

A3.3.1.1 Perform audit functions under the surveillance of the cognizant DoD CAO and Air Logistics Center (ALC) representative(s).

A3.3.1.2 Provide technical personnel, tooling, measuring/test equipment, work areas, forms and clerical assistance, as required, to perform the PVA.

A3.3.2 The cognizant DoD QAR shall:

A3.3.2.1 Be designated as audit team chairman, unless otherwise directed by the Procuring Contracting Officer (PCO).

A3.3.2.2 Schedule the product verification audit and select the item(s) to be audited.

A3.3.2.3 Notify the PCO and the contractor when the PVA will begin. Notification shall be provided at least 15 working days prior to the audit date. Scheduled audits may be waived by the PCO on a case-by-case basis.

A3.4 AUDIT PROCEDURES

A3.4.1 Classifying Defects. Defects observed in the audited item(s) will be classified according to the following:

A3.4.1.1 Category I - Critical Defect. Defect that judgment and experience indicates likely to result in hazardous/unsafe conditions for individuals using, maintaining or depending upon the product; or a defect that judgment and experience indicates is likely to prevent performance of the tactical function of a major end item such as an aircraft, engine communication system, surveillance system or major part thereof. Critical defects are further identified as follows:

A3.4.1.1.1 Category IA - Defect attributable to the contractor's failure to comply with contractual requirements.

A3.4.1.1.2 Category IB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirement or defective Government Furnished Property (GFP).

A3.4.1.2 Category II - Major Defect. Defect other than critical that is likely to result in failure or reduce materially the usability of unit or product for its intended purpose. Major defects are further identified as follows:

A3.4.1.2.1 Category IIA - Defect attributable to the contractor's failure to comply with contractual requirements.

A3.4.1.2.2 Category IIB - Defect not attributable to contractor's failure to comply with contractual requirements such as a design deficiency, inadequate or omitted requirements or defective GFP.

A3.4.1.3 Category III - Minor Defect. Defect that is not likely to reduce materially the usability of the unit or product for its intended purposes or is a departure from established standards having little bearing on the effective use or operation of the unit. Minor defects are further identified as follows:

A3.4.1.3.1 Category IIIA - Defect attributable to the contractor's failure to comply with contractual requirements.

A3.4.1.3.2 Category IIIB - Defect not attributable to the contractor.

A3.4.1.4 Category IV - Defect caused during accomplishment of the audit disassembly or inspection process which would not have occurred had the contractor exercised proper care of the audit item, i.e., improper handling, improper disassembly technique.

A3.4.1.5 Procedural Defect – Reference paragraph A3.2.4.

A3.4.2 Scheduling/Frequency

A3.4.2.1 During the initial production phase, one of the first five items may be audited. The frequency for performing subsequent audits will be as specified in the schedule of the contract or by the PCO.

A3.4.2.2 The contractor may be directed by the PCO to extend or increase the frequency of the audits or to increase or decrease the scope thereof pursuant to the "changes" clause of the contract.

A3.4.2.3 Like or similar items may be grouped for audit purposes when the concurrence of the PCO or his designated representative has been obtained.

A3.4.3 Inspection and Test

A3.4.3.1 Audit candidates shall be randomly selected by the cognizant DoD QAR from all items currently available. It shall be the responsibility of the ACO to assure that an adequate number of items from which a random selection can be made are on hand at the time of the audit. Selection, except as specified in paragraph A3.4.3.2 below, shall be made from items which have been accepted by the Government but have not been shipped.

A3.4.3.2 The first five items of the initial production phase shall be set aside after having been tendered by the contractor as in conformity with the contract and inspected by the Government and not rejected for failure to comply with contractual requirements. Upon completing the testing and disassembly portion of the audit of the selected candidate and if no Category I or II defects are found during the audit, the other four items will be accepted by the Government. In any Category I or II defect is found in the audit candidate, the contractor shall satisfy the Government that such defect does not exist in the other four items prior to Government acceptance thereof. The audit candidate shall be accepted by the Government upon compliance with paragraph A3.4.4.6 below.

A3.4.3.3 The items selected for audit shall be inspected for adherence to preservation, packing, packaging and marking requirements prior to removal from the shipping container. A visual inspection and functional test shall be performed prior to disassembly.

A3.4.3.4 Disassembly shall be performed in a secure area accessible only to audit participants. Normally, audit participation will be limited to specified contractor production and quality control personnel, the cognizant DoD QAR and ALC personnel.

A3.4.3.5 Visual inspection, dimensional checks (such as backlash, end clearance and running clearance) and non-destructive testing will be accomplished during and after disassembly IAW applicable technical directives. Audit findings will be recorded for comparison with contractual requirements and the contractor's production/inspection records. Measuring and test equipment shall be reviewed for current calibration prior to use.

A3.4.3.6 Applicable accessories and components will be functionally tested and inspected to contractual specifications. This action may require disassembly in excess of the original contractor effort as determined necessary by the Government.

A3.4.4 Corrective Actions

A3.4.4.1 In the event a critical or major defect is observed, Government acceptance of further production will be withheld until the Government has either inspected other items for the observed defect(s) or has received suitable evidence from the contractor that the cause of such defect(s) has been corrected and the defect does not exist in other items. In the case where there is a probability of such defect existing in previously shipped items, the contractor will promptly advise the Government of the identity and destination of such previously shipped items.

A3.4.4.2 When Category IA, IIA or IIIA defects are found, the contractor shall implement measures in the remanufacture process which will preclude recurrence.

A3.4.4.3 When Category IB, IIB or IIIB defects are found, actions will be taken as directed by the Government pursuant to the contract.

A3.4.4.4 When Category IV defects are noted, the contractor shall take those actions necessary to preclude recurrence.

A3.4.4.5 When Procedural Deficiencies are noted, the contractor shall take those actions necessary to correct the procedures or operations concerned.

A3.4.4.6 Upon completion of the audit, all defects attributable to failure to comply with contractual requirements or attributable to the performance of the PVA shall be corrected. All noted defects shall be corrected and the item assembled and functionally tested IAW applicable remanufacture specifications including preservation, packing, packaging, marking and update of records.

A3.4.4.7 After the audit is completed, the DoD QAR shall conduct a critique attended by contractor personnel and ALC representative(s). Findings, classifications and corrective actions shall be discussed and determination of defect cause(s) established (e.g. workmanship, tooling, technical requirements, etc.). The contractor shall take immediate action to correct and preclude recurrence of all defects or deficiencies attributable to failure to comply with contractual requirements, subject to the provisions of paragraph A3.5.1.10 below.

A3.5 AUDIT RESULTS

A3.5.1 The quality office of the CAO activity shall prepare and forward to the responsible PCO the finalized audit findings within 10 working days after completion of the audit. Finalized findings will contain the following information:

A3.5.1.1 Name and address of the contractor.

A3.5.1.2 Contract number.

A3.5.1.3 Descriptive noun, Federal Stock Number, part number and serial number of the item audited.

A3.5.1.4 Summary of total defects.

A3.5.1.4.1 Category IA

A3.5.1.4.2 Category IB

A3.5.1.4.3 Category IIA

A3.5.1.4.4 Category IIB

A3.5.1.4.5 Category IIIA

A3.5.1.4.6 Category IIIB

A3.5.1.4.7 Category IV

A3.5.1.5 A complete listing of audit findings.

A3.5.1.6 A description of defects listed by category (commencing with critical). The defective item will be identified by part number and standard nomenclature.

A3.5.1.7 Cause(s) for each noted defect.

A3.5.1.8 Corrective action(s) taken on each classified defect attributable to failure to comply with contractual requirements, or a projected target date for completion when not otherwise immediately corrected.

A3.5.1.9 Procedural deficiencies noted and the corrective actions applied.

A3.5.1.10 The signature of the DoD QA participants, contractor management personnel and ALC representative(s). Non-concurrence with the findings shall be specifically annotated in the vicinity of the applicable signatures. Non-concurrence by the contractor as to the existence or classification of a defect or as to whether or not a defect is attributable to failure to comply with contractual requirements shall be subject to the procedures set forth in the clause entitled "Dispute."

APPENDIX 4

A4.1 CAVAF REPORTING REQUIREMENTS

The purpose of this attachment is to provide Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the Commercial Asset Visibility Air Force (CAV AF) system. CAV AF shall be the primary system of record for providing daily status of all Government owned assets located at contractor repair facilities. Reporting within CAV AF shall not be limited to end items subject to repair but are to include assets stored at a contractor Inventory Control Point (ICP). Any CAV AF system down-time will be identified on the CAV AF home page banner. Contractors are responsible for ensuring current User Guides are utilized by their CAV AF reporters. NOTE: Contractor User’s Guide may be accessed from the CAV AF homepage.

CAVAF FAMILIARIZATION TRAINING:

1. Familiarization training for CAV AF reporting will be requested by the contractor via the applicable ICP CAV AF system administrator (SA). For assistance, guidance or questions to specific contract transactionsl reporting requirements may be addressed to the CAV AF contract monitor (CM). ICP CAV AF (SA and/or CM) points of contact (See Contractor Responsibility Item #4).

CONTRACTOR RESPONSIBILITY:

1. Contractor CAV AF reporting requirements shall be accomplished daily and/or within one (1) business day of a maintenance action occurrence IAW the applicable CAV AF CDRL and CAV AF system, version 8.0.1 or higher. Accurate and timely reporting of maintenance transactions into CAV AF is critical to the management of repair requirements and the management of world-wide asset distribution. Contractor shall ensure asset record in CAV AF is an accurate reflection of physical assets on hand at all times. (note a valid PKI is required prior to accomplishing # 2 and #3 of contractor responsibilities)

2. Each CAV AF reporter shall submit a completed System Authorization Access Request, DD Form 2875, per instructions within 10 days after contract award date. All DD Form 2875(s) shall be digitally signed. There “must be two CAV AF reporters” for the contractual reporting requirements to ensure there is no possibility of a lapse in reporting coverage.

3. User(s) shall complete initial DoD Information Assurance (IA) Cyberawareness Challenge training and submit a course completion certificate with the DD Form 2875. IA Cyberawareness Challenge course completion certification shall be accomplished annually. Users shall access IA training on the CyberAwareness Challenge website, under the Department of Defense Employees section, click hyperlink; “Launch New CyberAwareness Challenge Department of Defense Version” using the following website: https://iase.disa.eta/cyberchallenge/launchPage.htm

a. First time CAV AF users will email initial IA Cyberawareness Challenge course completion certificates, AF Form 4394, AF User Agreement Statement, and completed DD Form 2875 to point of contact at applicable ICP (see item #4).

b. All following annual course completion certificates shall be completed before lapse in certification occurs and will be emailed to respective ICP identified in paragraph 4a, 4b, and 4c below.

c. Product Functionality Caution: To meet technical functionality requirements, this awareness product was developed to function with Windows operating systems (Wingdow 7, VISTA, and XP), when configured correctly) using either the Internet Explorer (IE) or Firefox browsers. Users employing other operating systems or browser may experience difficulties and may not be able to complete the training or print the certificate of completion. The Cyber Awareness Challenge course completion is a contractual requirement and the contractor must comply.

4. Reporters requiring the default password or password resets should contact their applicable ICP CAV AF System Administrator POC listed below:

a. Robins AFB, GA, call (478) 327-6602 or 327-6603, or send email request to: 406scms.cav.af.ar@us.af.mil

b. Hill AFB, UT, call (801) 586-3736, or send email request to:

420scms.cdm@us.af.mil

c. Tinker AFB, OK, call (405) 739-3229, or send email request to: 420.scms.tinker.cdm.workflow@us.af.mil

5. To access the CAV AF system, contractor and subcontractor reporters shall follow “initial log-in procedures” as prescribed within the Contractors User’s Guide.

6. Contractor shall ensure accountability of all Government Furnished Property (GFP) within their Enterprise Resource Planning (ERP) or Commercial Off-the-Shelf (COTS) system, which must be reported accurately for same GFP records within CAV AF at all times.

7. Contractual Induction-at-Risk of end items is prohibited on all repair contracts.

8. Contract/Delivery Order Closure Disposition– Government will provide disposition instructions to contractor’s reporter. Contractor shall begin shipping assets within 10 days of receiving government disposition instructions and have completed all shipping actions 30 days thereafter. Contractor shall be fully responsible to ensure all corresponding CAV AF reporting actions associated with disposition occur within one (1) business day of related shipment action.

9. All NSNs identified as Nuclear Weapon Related Materiel (NWRM) shall require contractor CAV AF reporting for production management, to track and report NWRM end items in repair with Serial Number identification within one (1) business day for asset visibility and serial number tracking. When receipted, Contractor’s reporter shall capture each NWRM asset’s Serial Number when reparable is received. Contractors shall follow all NWRM management requirements outlined in AFI 20-110, NWRM Management, to include, but not limited to packaging, marking, labeling, storage, transportation and receipt of all NWRM assets, with emphasis on Positive Inventory Control (PIC) and records management by the contractor and government to assure compliance. The successful application of these procedures requires the full cooperation of all personnel associated with the storage, shipping, transshipping and receiving of all NWRM assets.

SPECIFIC CAVAF CONTRACTOR TRANSACTIONAL REPORTING REQUIREMENTS:

1. “Not-on-Contract” (NOC) receipt transactions apply to assets which are associated to a contractor facility DoDAAC and not an active contract delivery order. Regardless of asset condition code status, Not-on-contract shall be used for the following reporting actions:

a. Discrepancy Items – Are identified as misrouted shipments, misidentified shipments, or damaged end items. Contractor’s reporter will verify resolution weekly to acquire resolution to discrepancy within 30-days of receipt transaction. The contractor shall comply with disposition instructions provided by the Government within 10-days and complete all associated reporting actions within same period. Contractor reporting actions shall be resolved using reversals of individual record control document numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.

b. Inventory Control Point Items – are identified as assets stored at contractor facility and are not repair end items or discrepancies items. Movement of assets from “Not-on-Contract” category shall be resolved using reversals of individual record control document numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.

NOTE: Contractor is responsible for all “Not-on-Contract” assets ensuring physical asset balances are reflected and CAV AF reporting actions occur within one (1) business day of occurrence.

2. CAV AF receipt or reporting actions will not be utilized for quality deficiency report (QDR) items, as there is a separate process and tracking mechanism for them.

3. All Contract Line Item Number (CLIN) repairable assets shall be receipted in CAV AF under Receipt Type: On Contract (F). CAV AF generates an RCDN for each unit receipted and allows the reporter to assign a reference or serialization number for tracking purposes. Where no reference or serialization numbers are utilized,the oldest RCDNs (listed first) shall always be processed first. Any reversal actions shall be accomplished using the last RCDNs processed.

4. The “Complete Date” entered into CAV AF cannot be dated prior to the DD250 date entered in the same screen. Contractor will validate that the DD250 shipment number and date entered into CAVAF are accurate. This requirement is also applicable to Condition Code H (Condemned) only when specifically directed by the contract.

5. Proper usage of DD Form 1348-1A, Issue Release/Receipt Document in relation to CAV AF reporting requirements.

a. Receipt Actions: Contractor’s reporter will use government issued shipment document numbers for CAV AF end item receipt transaction reporting only in the absence of missing DD Form 1348-1A or shipment document number. Contractors are not authorized to generate pseudo shipment document numbers for receipt transactions because this creates disconnects in shipment tracking within government inventory systems. Note: If the DD Form 1348-1A is missing or no shipment document number is available, contractors are to immediately contact Production Management Specialist (PMS), who will acquire government issued shipment document number from the Inventory Management Specialist (IMS).

b. Shipping Actions: DD Form 1348-1A shall be used as the shipping document for shipment transactions of all end items. A DD Form 1348-1A is also applicable to all Consolidated Serviceable Inventory/Consolidated Reparable Inventory (CSI/CRI) assets regardless of tracking or reporting purposes. A Material Inspection and Receiving Report, DD Form 250 or Requisition and Invoice/Shipping Document, DD Form 1149 are not authorized as a shipment document, and shall not accompany any material shipments on repair contracts. CAVAF provides a DD Form 1348-1A in a Portable Document Format (PDF). DD Form 1348-1A shipping documents will be prepared for each NSN shipment from contractor’s facility, regardless of destination. The entire form, complete with bar coding, will be printed on a laser printer as specified under technical considerations. It is recommended the PDF be saved at the contractor’s facility prior to printing (note: The DD1348-1A forms are not saved/stored in CAV AF and cannot be reproduced by the system). The Contractor shall print three copies as required for shipping. Place one copy on the outside of the shipment container, one copy inside the shipment container, and upload a copy in Wide Area Workflow (WAWF) as part of the Receiving Report (DD Form 250). Retain a copy for the contractor’s records. For end item shipments the DD Form 1348-1A shipment document number shall be comprised as one of the following actions:

i. Back to Depot Shipments:

(1) For a “single” unit NSN shipment, the default shipment document number will be the CAV AF record control document number (RCDN) of item being shipped.

(2) For “multiple” quantity shipments, it is recommended the CAV AF RCDN of the lead item of the shipment be used as the shipment document number.

ii. Ammended Shipping Instructions (ASI): Are used to divert material that is due-in from a contractor to a requisitioner. Government disposition instructions will provide a shipment document number to the contractor to be utilized for CAV AF shipment transaction reporting and the DD Form 1348-1A.

c. In the event CAV AF system is inoperable or is on a scheduled downtime:

i. The DD Form 1348-1A shall be manually completed and generated (printed) by contractor, using the AFPUBS website.

ii. When CAV AF is again operational, the contractor shall resume with transactional reporting actions in a timely and accurate manner, including completing a DD Form 1348-1A (printing not required if manual DD1348-1A PDF file utilized) and the shipment process in CAV AF.

6. Upon contract expiration and/or becoming production complete, the contractor will complete a 100% physical inventory inspection. Any assets remaining at the facility within 30-days must be noted in an email request to the contracting officer (CO) and PMS for disposition instructions by the government. If none is provided, assets are to be returned to the depot and reported within CAV AF, shipping to the following addresses according to each national stock number (NSN) inventory management location by source of supply (SOS) code:

a. FHZ – Tinker AFB, the ship for disposition address to SW3211:

TYPE/CODE: A SW3211

DEF DISTRIBUTION DEPOT OF OKLAHOMA

CEN REC 3301 F AVE

BLDG 506, DR 22

TINKER AFB, OK, 73145-8000

b. FGZ – Ogden AFB, the ship for disposition address to SW3210:

TYPE/CODE: A SW3210

DLA DISTRIBUTION DEPOT HILL

7537 WARDLEIGH RD

BLDG 849W

HILL AFB, UT 84056-5734

c. FLZ – Robins AFB, the ship for disposition address to SW3119:

TYPE/CODE: A SW3119

DLA DISTRIBUTION WARNER ROBINS

455 BYRON STREET

BLDG 376

ROBINS AFB, GA 31098-1887

7. Systemic data problems created by contractor’s failure to report data accurately or in a timely manner are subject to immediate Program Management Review (PMR). Examples of documented system data problems include but are not limited to:

a. Timely reporting means compliance with 24 hour requirement for all contractor CAV AF reporting of maintenance transactions. Actual date information is required for all reporting actions. Contractor’s are not authorized to report all receipt, induction, complete and ship transactions the same day to ‘catch-up’ due to periodic reporting. This affects government inventory management systems and balances creating D035 Stock Control Supply System (SCSS) controlled exceptions (associated with same day reporting issue).

b. Contractors not using government issued DD Form 1348-1A document numbers on CAV AF contractor reporting on end item receipt transactions. This creates a data variance disconnect with government inventory D035 Stock Control System (SCS). Contractors are required to use DD Form 1348-1A document numbers for end item receipt transactions. NOTE: If the DD Form 1348-1A is missing or no shipment document number is available, contractors are to immediately contact Production Management Specialist (PMS) and acquire government issued shipment document number from Inventory Management Specialist (IMS).

c. Overages and shortages, for items which are part of this contract shall be reported by the contractor into CAV AF as received “On-Contract” with actual quantities received. Any items which are not part of this contract shall be receipted as “Not-on-Contract”, which represents misdirected or misidentified assets.

8. RCDNs are systemically generated in CAV AF and should not be duplicated or fabricated with a suffix for shipment document numbers. RCDN is comprised of the CAV AF Contractors DoDAAC, the Julian date the RCDN was produced, and a four digit serial number (begins with 0001 each day). This affects government inventory management systems D035 SCSS controlled exceptions.

DISCREPANCIES INCIDENT TO SHIPMENT:

1. There are transportation and item discrepancies, each having different reporting requirements. Detailed information for each report is in the pertinent service publications.

2. Discrepancies incident to shipment include misidentified items, variations in quantity, non-requisitioned items, lost or damaged parcel post, and items in dubious condition. These discrepancies shall be reported and resolved using the DoD web-based application WebSDR link is https://www2.transactionservices.dla.mil/websdr/home.asp This system of reporting a Supply Discrepancy Report (SDR), formerly called Report of Discrepancy (ROD), has been developed in compliance with DoD regulations 4140.1-Vol 6 and DLM 4000.25, Vol 2, Ch 17 which requires automated SDR processing. In those situations where the SDR initiator is unable to gain access to the AF WebSDR, continued use of manual forms is permitted. A copy of the form will be forwarded through the CAO and Quality Assurance (QA) activity for corrective action.

3. Transportation discrepancies and item transaction discrepancies shall be coordinated with the DCMA Property Administrator and Administrative Contracting Officer (ACO) immediately upon discovery for corrective action in addition to AF WebSDR submittal.

4. Contract line items received with missing components (Missing On Induction, (MOI)) the contractor shall process a SDR (SF Form 364) immediately upon discovery in accordance with AFJMAN 23-215 and provide a copy of submitted MOI SDR form to the ACO within 2 days of discovery.

5. All misdirected shipments of GFP shall be reported to…