About this file

This document contains qualification requirements for potential sources to become approved repair sources for various components of the AN/TPS-75 radar transmitter system, including a back fill radiator antenna, regulator, trigger amplifier, power supply, memory circuit card assembly, and others. Sources must certify facilities and repair capabilities, verify a complete technical data package, conduct testing and evaluations to demonstrate meeting performance and quality standards, and comply with other requirements outlined. Waivers may be granted for sources that have previously supplied such items to the government or original equipment manufacturer.

The related solicitation seeks test, teardown and repair services for the listed national stock numbered components, with the requirement restricted to only qualified sources. All non-qualified vendors submitting a proposal must comply with the attached source qualification statement and requirements to be considered, though award will not be delayed to allow new sources to qualify. The solicitation was issued by the Air Force Sustainment Center on behalf of the Department of the Air Force Materiel Command.

View the file

Other files

File Type Posted
FA825021R0220_______0001.pdf PDF
Attachment 2_IUIDs.pdf PDF
Attachment 10_CAVAF.pdf PDF
Attachment 11_Proposal Instructions.pdf PDF
Attachment 12_EvaluationFactors.pdf PDF
FA825021R0220.pdf PDF
Attachment 6_Transportation.pdf PDF
Attachment 4_ PackagingSOW.pdf PDF
Attachment 8_CDRLs.pdf PDF
Attachmen 3_Packaging.pdf PDF
Attachment 1_Item_Descriptions.pdf PDF
Attachment 7_RDLs.pdf PDF
Attachment 5_PWS.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

REPAIR QUALIFICATION REQUIREMENTS

NSN: 5985-01-027-0040

P/N: 349D822G01 Noun: Back Fill Radiator Antenna Application: AN/TPS-75

7 Feb 2019 Section C 1/3

SECTION C:

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Back Fill Radiator Antenna.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test using a AN/TPS-75 transmitter or equivalent, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

c. Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Westinghouse/Northrop Grumman (CAGE 97942) drawing 349D822, USAF Technical Order 31P3-2TPS75-2-2 and associated documents. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

d. Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 415 SCMS/GUMBB. The offeror shall also identify its sources for materials and its standards for internally used processes

e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 415 SCMS/GUMBB for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by TOs 31P3-2TPS75-2-2, 31P3- 2TPS75-9 and 31P3-2TPS75-12 which requires in system testing to verify correct function of the Back Fill Radiator Antenna.

f. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 30 days. This is based on complexity of the Back Fill Radiator Antenna and other factors.

g. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can

P/N: 349D822G01

7 Feb 2019 Section C 2/3 meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

h. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved repair source for this item. Approval, however, does not guarantee subsequent contract award.

P/N: 349D822G01

7 Feb 2019 Section C 3/3

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.

c. QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

d. QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

e. QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

f. QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the repair process.

NSN: 5840-01-483-0555

P/N: 1366839 Noun: (PFN) Regulator contracting office, of intent to qualify as a source for this PFN Regulator.

including change notices, in the offeror’s possession including, at a minimum Raytheon (CAGE 2F259) drawing 1366839, USAF Technical Order 31P3-2TPS75-2-2 and associated documents.

The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the mechanical, and quality assurance requirements identified by TO 31P2-2TPS75-2-2 table 6-43 which requires in system testing to verify correct function of the PFN Regulator.

of the (PFN) Regulator and other factors.

P/N: 1366839

P/N: 1366839 waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify minimum, the source shall provide a complete set of drawings for the similar item and written

NSN: 5996-01-475-1564

P/N: 1366838 Noun: Trigger Amplifier contracting office, of intent to qualify as a source for this Trigger Amplifier.

they have, or have access to, the required facilities and equipment to repair, inspect, test using an AN/TPS-75 transmitter or equivalent, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the including change notices, in the offeror’s possession including, at a minimum Westinghouse (CAGE 89661) drawing 345D585, USAF Technical Order 31P3-2TPS75-2-2 and associated documents. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the mechanical, and quality assurance requirements identified by Drawing TO 31P2-2TPS75-2-2 table 6-59 which requires in system testing to verify correct function of the Trigger Amplifier.

of the Trigger Amplifier and other factors.

P/N: 1366838

P/N: 1366838 waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify minimum, the source shall provide a complete set of drawings for the similar item and written

NSN: 5996-00-572-1617

P/N: 345D585G01 contracting office, of intent to qualify as a source for this Trigger Amplifier.

including change notices, in the offeror’s possession including, at a minimum Westinghouse (CAGE 89661) drawing 345D585, USAF Technical Order 31P3-2TPS75-2-2 and associated documents. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the mechanical, and quality assurance requirements identified by Drawing TO 31P2-2TPS75-2-2 table 6-59 which requires in system testing to verify correct function of the Trigger Amplifier.

of the Trigger Amplifier and other factors.

P/N: 345D585G01

P/N: 345D585G01 waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify minimum, the source shall provide a complete set of drawings for the similar item and written

NSN: 6130-00-826-8284

P/N: 336D468G01 Noun: Power Supply contracting office, of intent to qualify as a source for this Power Supply.

Westinghouse/Northrop Grumman (CAGE 97942) drawing 336D468, USAF Technical Order

DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the mechanical, and quality assurance requirements identified by TO 31P2-2TPS75-2-2 table 6-33 which requires in system testing to verify correct function of the Power Supply.

of the Power Supply and other factors.

P/N: 336D468G01

P/N: 336D468G01 waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify minimum, the source shall provide a complete set of drawings for the similar item and written

NSN: 5998-01-157-9336

P/N: 1D18183G01 Noun: Memory CCA contracting office, of intent to qualify as a source for this Memory CCA.

Westinghouse/Northrop Grumman (CAGE 89661) drawing 1D18183, USAF Technical Order

DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the mechanical, and quality assurance requirements identified by TOs 31P3-2TPS75-2-2, 31P3- 2TPS75-9 and 31P3-2TPS75-12 which requires in system testing to verify correct function of the Memory CCA.

of the Memory CCA and other factors.

P/N: 1D18183G01

P/N: 1D18183G01 waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify minimum, the source shall provide a complete set of drawings for the similar item and written

File details come from the government source that posted it. Updated .