Attachment 9 C and D Waste Ticket for Construction Project.xls

XLS spreadsheet 72 KB Posted

Attached to
NSSC FENCE & REAR GATES REPAIRS
Solicitation number
W911QY-22-R-0155
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION WASTE MANAGEMENT MONTHLY PROJECT PROGRESS REPORT
Project Address:NSSC-FENCE & REAR GATES REPAIRSContractor:
Natick Soldier System Center, Natick MA
Container or ticket numberHaul DateTotal Tonnage (sum of concrete, metal, wood, other and residual)Concrete Tonnage (diverted)Brick Tonnage (diverted)Asphault Tonnage (diverted)Metal Tonnage (diverted)Gypsum Tonnage (diverted)Wood Tonnage (diverted)Cardboard Tonnage (diverted)Comingled Tonnage (diverted)Total Diverted TonnageResidual or Trash Tonnage% Recycled/ Diverted MaterialName and location material was sent to. (If Other Recycled Material please also include description of material (IE Clean Green, Drywall, Glass, Etc.)Comments. If landfilled, please explain why material was not diverted. If large amount appears as "Other" please explain contents.
TOTALS0.000.000.000.000.000.000.000.000.000.000.000.00%
MaterialDivertedWaste
CONCRETE0.000%
BRICK0.00
ASPHAULT0.000%
METAL0.00
GYPSUM0.00
WOOD0.000%
CARDBOARD0.00
COMINGLED0.000%
SUBTOTAL DIVERTED0.00
RESIDUAL/TRASH0.00
SUBTOTAL0.00
% of Recycled Material0.00%

&LAll State Waste, Inc.&CPage &P&R&D

File details come from the government source that posted it. Updated .