ATTACHMENT 9 - Base Offer Price Breakdown.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Y1DZ--FY26 NRM (PROJ 675-22-106) BB Address Lake Baldwin Site Deficiencies
Solicitation number
36C24826Q0585
Issued by

About this file

This file is a pricing template for a base offer cost breakdown for a federal construction project. The spreadsheet is formatted to capture labor costs, material costs, and total costs organized by the 16 standard construction divisions (General Requirements, Concrete, Masonry, HVAC, Electrical, etc.), with a subtotal row for all divisions. Offerors must populate labor and material costs for each applicable division, with the template automatically calculating the division totals. The form includes fields for calculating overhead as a percentage of division costs, profit as a percentage of division costs plus overhead, and bond costs as a percentage of the combined subtotal plus overhead and profit, ultimately generating a total base offer cost.

The template is associated with solicitation 36C24826Q0585 for "Y1DZ--FY26 NRM (PROJ 675-22-106) BB Address Lake Baldwin Site Deficiencies" issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The project magnitude is between $1,000,000 and $5,000,000. Offerors must submit quotes by the deadline specified on the SF1442 form. A mandatory site visit is scheduled for May 13, 2026, at 10:00 AM EST. Requests for Information must be submitted by May 18, 2026, at 11:00 AM EST via email to elizabeth.romero@va.gov. Offerors must be registered in SAM.GOV, certified as SDVOSB, and verified in the SBA's VetCert program. A payment and performance bond equal to 100% of the contract price is required. The government requires a minimum 120-calendar-day acceptance period after offer submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Base Offer Cost Breakdown

Project Number:

Edward L Roy: VA assigned project #

Date:
Project Title
Edward L Roy: VA assigned Project TitleProject Location
Offeror Name
Offeror Street
Offeror CityStateZip

Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division

Material Cost
Edward L Roy: Enter all Material Costs by DivisionTotal Cost

Edward L Roy: This Column is the sum of the Division's Labor and Material Costs

Division 1General Requirements$ - 0$ - 0$ - 0
Division 2Existing Conditions- 0- 0- 0
Division 3Concrete- 0- 0- 0
Division 4Masonry- 0- 0- 0
Division 5Metals- 0- 0- 0
Division 6Wood and Plastic- 0- 0- 0
Division 7Thermal & Moisture Protect- 0- 0- 0
Division 8Doors and Windows- 0- 0- 0
Division 9Finishes- 0- 0- 0
Division 10Specialties- 0- 0- 0
Division 11Equipment- 0- 0- 0
Division 12Furnishings- 0- 0- 0
Division 13Special Construction- 0- 0- 0
Division 14Conveying Equipment- 0- 0- 0
Division 21Fire Suppression- 0- 0- 0
Division 22Plumbing- 0- 0- 0
Division 23HVAC- 0- 0- 0
Division 26Electrical- 0- 0- 0
Division 27Communications- 0- 0- 0
Division 28Electronic Safety & Security- 0- 0- 0
Division 31Earthwork- 0- 0- 0
Division 32Exterior Improvements- 0- 0- 0
Division 33Utilities- 0- 0- 0
Division 34Transportation Subtotal- 0- 0- 0
Division Subtotals :$ - 0$ - 0$ - 0

Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).

Edward L Roy: Date Offer Prepared/Submitted

- 0
Profit %0.00%
Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38).- 0
Bond %0.00%

Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).

Edward L Roy: Enter all Labor Costs by Division

- 0
Overhead/Profit Subtotals :$ - 0

Edward L Roy: Sum of Overhead, Profit and Bond %.

Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0

Offerors shall provide additional price breakdown to avoiding lump sum, etc. This price offer breakdown is the overall base offer price for Government price analysis

File details come from the government source that posted it. Updated .