Attachment 8 SitePlan_Water Lines.pdf
PDF 10 MB Posted
- Solicitation number
- 1282B125R0029
- Issued by
-
Department of Agriculture Forest Service
About this file
This image is an electrical wiring site plan for the South Fork YCC project, created for the Rocky Mountain Region of the U.S. Forest Service. The detailed schematic shows the electrical infrastructure layout, including transformer locations, distribution boards, overhead lines, security lighting, and multiple tent areas. Key elements include:
Electrical Infrastructure Details:
- Existing transformer pole to be relocated
- Distribution board installations
- Electrical connections for office, security lighting, and tent areas
- Multiple wire gauge specifications (2-4/0 AWG aluminum/copper underground distribution)
- Specifications for well, pump, and electrode installations
- Detailed legend indicating water lines, sewer lines, fencing, and utility pole placements
The site plan provides a comprehensive blueprint for electrical system design, including precise positioning of electrical components, grounding systems, and interconnections across the site, with a focus on supporting the infrastructure for the South Fork YCC location in the Rio Grande National Forest.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .