Attachment 8 Geothermal Drawings Project MTZ.pdf

PDF 14 MB Posted

Attached to
Y1LZ--36C26124R0004 | Project 612-23-003 | Design Build, Create Martinez Parking Lot and Access
Solicitation number
36C26124R0004
Issued by

About this file

This document provides details for a federal contract opportunity to design and build a parking lot and access at the Martinez Park located within Veterans Integrated Service Network 21. The solicitation number is 36C26124R0004 and is seeking proposals for Project 612-23-003 to design and construct a new parking lot and improve site access. The opportunity is available through the Department of Veterans Affairs Veterans Health Administration. Proposals are due by the date listed in the solicitation and the contract will be awarded shortly after to the selected offeror. The project involves preparing construction drawings and managing the build out of the parking area and related infrastructure improvements at the Veterans Affairs medical center campus in Martinez, California.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

meline

P.O. Box 276665 Sacramento, CA 95827 ph: 916.366.3458 fax: 916.366.3958 email: lisa@meline.com

Sacramento, CA 95827 ph: 916.366.3458 fax: 916.366.3958

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458 fax: 916.366.3958

NOTES :

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458 fax: 916.366.3958 email: lisa@meline.com

°F WATER

FROM DHW

BOILERS.

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

Sacramento, CA 95827 ph: 916.366.3458

DEVICE MOUNTING SCHEDULE

LA

A

N

I OS N

K.Y

EP R O F S

M

Y

IC

LAE L E

No. E 15980 Exp. 06-30-15

EL L E

A

NEER

G I

N

ILF CO A F O RE NTC R I

E R I

RE

G

S

TS

E D

K E

AT

T

L

ENGINEERINGKM

9216 KIEFER BLVD, #3 SACRAMENTO, CA (916) 362-3779

ELECTRICAL CONSULTANTS

OVERALL POWER PLAN

A

N

I OS N

K.Y

EP R O F S

M

Y

IC

LAE L E

No. E 15980 Exp. 06-30-15

EL L E

A

NEER

G I

N

ILF CO A F O RE NTC R I

E R I

RE

G

S

TS

E D

K E

AT

T

L

ENGINEERINGKM

PARTIAL ROOF DEMO PLANPARTIAL ROOF DEMO PLAN

A

N

I OS N

K.Y

EP R O F S

M

Y

IC

LAE L E

No. E 15980 Exp. 06-30-15

EL L E

A

NEER

G I

N

ILF CO A F O RE NTC R I

E R I

RE

G

S

TS

E D

K E

AT

T

L

ENGINEERINGKM

PARTIAL ROOF POWER PLANPARTIAL ROOF POWER PLAN

A

N

I OS N

K.Y

EP R O F S

M

Y

IC

LAE L E

No. E 15980 Exp. 06-30-15

EL L E

A

NEER

G I

N

ILF CO A F O RE NTC R I

E R I

RE

G

S

TS

E D

K E

AT

T

L

ENGINEERINGKM

9216 KIEFER BLVD, #3 SACRAMENTO, CA (916) 362-3779

ELECTRICAL CONSULTANTS

ITEM NO. QTY DESCRIPTION MANUFACTURER / MODEL VOLTS PH LOAD (FLA) LOAD (VA)

CIRCUIT

DESIGNATION

CONDUCTORS CONDUIT

AHU-1 1 ROOF TOP AIR HANDLING UNIT 460 3 61.0 50714 EDPA 3#4, #8G (E) 3"C

AHU-2 1 ROOF TOP AIR HANDLING UNIT 460 3 61.0 50714 EDPA 3#4, #8G (E) 3"C

AHU-3 1 ROOF TOP AIR HANDLING UNIT 460 3 55.0 45726 EDPA 3#4, #8G (E) 2"C

AHU-4 1 ROOF TOP AIR HANDLING UNIT 460 3 92.0 76487 MSB 3#2/0, #6G (E) 4"C

WHP-1 1 ROOF TOP HEAT RECOVERY 460 3 52.0 43232 EDPA 3#6, #8G 1"

P-6 1 ROOF TOP PUMP 460 3 4.8 3991 EDPA 3#12, #12G 3/4"

NOTES:

1. PROVIDE WEATHER PROOF, NEMA-3R ENCLOSURES FOR ALL DISCONNECT SWITCHES.

2. PROVIDED W/ FACTORY WIRED AND INSTALLED VFDS FOR RETURN AND SUPPLY FANS.

BUILDING 20 - MECHANICAL EQUIPMENT SCHEDULE

MECHANICAL BLDG LIGHTING PLAN

B U

I L

D I

N G

B U

I L

D I

N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B

LD

G

Concrete

Concrete

Concrete

Concrete

Concrete

Concrete

Fence

Fence

Area Under Construction

Fe nc e

C on cr et e V al le y G ut te r

Concrete Curb, Gutter & Sidewalk

AC Paving

C oncrete C urb, G utter & Sidew alk

Wall

Wall

Fence w\Concrete

Wall

Wall

AC

Paving

Campus Drive

C am pus D rive

E-Cab

E-Cab

E-C ab

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

SHED

B U I L D I N G

B U

I L

D I

N G

BUILDING

Dock

Trash

Concrete

Overhang w\Columns

Stairs

C on cr et e

AC Parking Lot

Concrete

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

B U I L D I N G

Shed

AC Parking Lot

AC Parking Lot

AC Parking Lot

AC Parking Lot

AC Parking Lot

AC Parking Lot

AC Parking Lot

AC Parking Lot

W ood Ram p W ood Ram p

W ood Ram p

Is la nd

Is la nd

Is la nd

Is la nd

Is la nd

So la r P an el C ol um n( Ty pi ca l)

So la r P an el C ol um n( Ty pi ca l)

So la r P an el C ol um n( Ty pi ca l)

Con cr et e

Concrete

Bridge

Concrete Ditch

Wall

Wall

Wall

W all

AC Paving

Shed

A C

P atch

AC Patch

Fen ce

Fe nc e

OVERALL KEY PLAN

MECHANICAL BLDG POWER PLAN

A

N

I OS N

K.Y

EP R O F S

M

Y

IC

LAE L E

No. E 15980 Exp. 06-30-15

EL L E

A

NEER

G I

N

ILF CO A F O RE NTC R I

E R I

RE

G

S

TS

E D

K E

AT

T

L

ENGINEERINGKM

N

I OS N

K.Y

EP R O F S

M

Y

IC

LAE L E

No. E 15980 Exp. 06-30-15

EL L E

A

NEER

G I

N

ILF CO A F O RE NTC R I

E R I

RE

G

S

TS

E D

K E

AT

T

L

ENGINEERINGKM

N

I OS N

K.Y

EP R O F S

M

Y

IC

LAE L E

No. E 15980 Exp. 06-30-15

EL L E

A

NEER

G I

N

ILF CO A F O RE NTC R I

E R I

RE

G

S

TS

E D

K E

AT

T

L

ENGINEERINGKM

PARTIAL ONE LINE DIAGRAM - MECHANICAL BLDG

DISTRIBUTION PANEL "DPM"

600A DIST. SECTION

FEEDER SCHEDULE(E) SWBD - BLDG 12

(E) SWBD -"MSBA"

LA

A

N

I OS N

K.Y

EP R O F S

M

Y

IC

LAE L E

No. E 15980 Exp. 06-30-15

EL L E

A

NEER

G I

N

ILF CO A F O RE NTC R I

E R I

RE

G

S

TS

E D

K E

AT

T

L

ENGINEERINGKM

N

I OS N

K.Y

EP R O F S

M

Y

IC

LAE L E

No. E 15980 Exp. 06-30-15

EL L E

A

NEER

G I

N

ILF CO A F O RE NTC R I

E R I

RE

G

S

TS

E D

K E

AT

T

L

ENGINEERINGKM

9216 KIEFER BLVD, #3 SACRAMENTO, CA (916) 362-3779

ELECTRICAL CONSULTANTS

PANELBOARD NO: "LM"

SECTION: ONE VOLTAGE: 120/208 BUS 225 AMP

MOUNTING: RECESSED PHASE: 3 MAIN 125 MCB

LINE TO LINE VOLTAGE 208 (208 OR 480) WIRE: 4 A.I.C.

TYPE: LIGHTING AND APPLIANCE

LOAD CIRCUIT CIRCUIT LOAD

CKT DESCRIPTION (VA) BREAKER BREAKER (VA) DESCRIPTION CKT

NO. LTS REC M/A MISC AMPS POLES AMPS POLES LTS REC M/A MISC NO

1 MECHANICAL BLDG - LTG 472 20 1 A 20 1 MECHANICAL BLDG - RECEPS 2

3 SPARE 20 1 B 20 1 SPARE 4

5 SPACE C SPARE 6

7 SPACE A SPARE 8

9 SPACE B SPARE 10

11 SPACE C SPARE 12

13 SPACE A SPARE 14

15 SPACE B SPARE 16

17 SPACE C SPARE 18

19 SPACE A SPARE 20

21 SPACE B SPARE 22

23 SPACE C SPARE 24

TOTAL 472 0 0 0 0 0 0 0 TOTAL

2 (1 for hospital, 2 for normal TOTAL (VA) DEMAND FACTOR MIN NEC (VA)

LIGHTING LOAD 472 1.25 590 FEEDER OC PROTECTION 100

RECEPTACLE LOAD 0 CODE 0 FEEDER (CODE NUMBER) 12

MECH/APPL LOAD 0 1 0 LINE AMPS 2.0 ( MINIMUM NEC AMPS)

MISC LOAD 0 1.25 0

CKT LNGH 20

SUB TOTAL 590 VOLTAGE DROP 0.0

% VOLTAGE DROP 0.01

SPARE 148 1 148

TOTAL 620 738

NORMAL POWER LOAD CALCULATIONS

NAME: Dist. Panel "DPM" MOUNTING: Floor AMPS: 600A MAIN

LINE TO LINE VOLTAGE: 480 PHASE: 3

TYPE: MCB WIRE: 3

LOADS

CKT DESCRIPTION LTS REC MOTORS &

NO. (LABEL) APPLIANCES

1 PUMP "P-1" (50hp) 54.0

2 PUMP "P-2" (50hp,redundant) 54.0

3 PUMP "P-3"(25hp) 28.3 4 PUMP "P-4" (25hp, redundant) 28.3

5 PUMP "P-5" (1hp) 1.5

6 FLUID COOLER "FC-1" FAN (15hp) 17.5

7 FLUID COOLER "FC-1" FAN (15hp) 17.5

8 FLUID COOLER "FC-1" PUMP (17.5hp) 19.9

9 PANEL "LM" VIA XFMR "TM" 0.5

10 CHILLER "CH-1" 148.0

11 CHILLER "CH-2" 148.0

TOTAL CONNECTED LOAD 0.5 0.0 517.0

DEMAND FACTOR 1.25 CODE 0.80

TOTAL EMD (KVA) 0.6 0.0 413.6

SUMMARY

TOTAL CONNECTED LOAD KVA 517.5

TOTAL EMD KVA 414.2

TOTAL EMD AMPS 498.4

CONNECTED LOAD (KVA)

GENERATOR POWER LOAD CALCULATIONS

NAME: Dist. Panel "DPM" MOUNTING: Floor AMPS: 600A MAIN

LINE TO LINE VOLTAGE: 480 PHASE: 3

TYPE: MCB WIRE: 3

LOADS

CKT DESCRIPTION LTS REC MOTORS &

NO. (LABEL) APPLIANCES

1 PUMP "P-1" (50hp) 54.0

2 PUMP "P-2" (50hp,redundant) 0.0

3 PUMP "P-3"(25hp) 28.3

4 PUMP "P-4" (25hp, redundant) 0.0

5 PUMP "P-5" (1hp) 1.5

6 FLUID COOLER "FC-1" FAN (15hp) 17.5

7 FLUID COOLER "FC-1" FAN (15hp) 17.5

8 FLUID COOLER "FC-1" PUMP (17.5hp) 19.9

9 PANEL "LM" VIA XFMR "TM" 0.5

10 CHILLER "CH-1" 148.0

11 CHILLER "CH-2" 0.0

TOTAL CONNECTED LOAD 0.5 0.0 286.7

DEMAND FACTOR 1.25 CODE 1.00

TOTAL EMD (KVA) 0.6 0.0 286.7

SUMMARY

TOTAL CONNECTED LOAD KVA 287.2

TOTAL EMD KVA 287.3

TOTAL EMD AMPS 345.7

CONNECTED LOAD (KVA)

STANDBY GENERATOR LOAD SUMMARY

NAME: 750KW/937.5KVA GENERATOR LOAD CALCULATIONS

LINE TO LINE VOLTAGE: 480

LOAD DESCRIPTION Total

NO. (LABEL) KVA

1 (E) GENERATOR LOADS (325 KVA X 125%) 406.3

2 (N) PANEL "DPM" GENERATOR LOADS 287.3

TOTAL LOAD 693.5

DEMAND FACTOR 1.0

TOTAL EMD (KVA) 693.5

TOTAL EMD AMPS 835

5123-010F 100% Design Dwgs 1 of 2 Transmitttal DESIGN 3-21-2014.pdf 1-10
Submittal transmittal
5123-010F 100% Design Dwgs 1 of 2 Transmitttal DESIGN 3-21-2014.pdf 11-20
5123-010F 100% Design Dwgs 2 of 2 Transmitttal DESIGN 3-21-2014
Submittal transmittal