Drilling RFQ 69056720Q000028
Project Name: Upper Sunken Grade Slide Repair -
OR DOT20(3)
Offer Due By:
Mobilization/Demobilization Truck mounted drill Mile
Mobilization/Demobilization Track mounted drill Mile
Mobilization/Demobilization Portable drill Mile
Casing Advancer Drilling (4 or 5-inch diameter) Ft
Casing Advancer Drilling (port. rig) (2 ½ - 4-inch) Ft
HQ3 and PQ3 core drilling Ft
NQ3 core drilling (portable drill rig) Ft
Asphalt Cores 4-inch diameter, through roadway Each
Hollow stem auger drilling 4 ¼" ID (8 ¼" OD ) Ft
Hollow stem auger drilling 3 ¼" ID (portable drill rig) Ft
2.5 & 3 inch Split Spoon Drive Samples samples Each
SPT samples (2") Each
Shelby Tube Samples 3-inch Each
Per Diem Drill Crew per person per day at Gov rate for area: Sweet Home Day
On Project Moves Hour
Water Haul (Identify Source: Contactor Idenified ) Homꞏ
2.75-Inch Inclinometer Casing Installed Lnft
2-inch Slotted Piezometer Casing Installed Lnft
2-inch Solid Piezometer Casing Installed Lnft
Crane Mob/Demob (each) (highly variable with location-neg) Lmup
Crane Use (highly variable with location) (Hour/Day/Week) Hour
Standby Time (crane and operator) (hour) (Neg) Hour
Subgrade Drilling (includes crew, all materials and equipment) Each
Monitoring Well Cover Flush Mount Each
Monitoring Well Cover, above surface, with Locking Cap Installed Each
Flagger Per Diem Per Person (Day) (Neg) Day
Flagging Personnel (hr) (not subject to wage detenuination) (Neg) Hour
Flagging Personnel OT (hr) (not subject to wage determination) (Neg) Hour
Mob/Demob for flagging personnel (Each ) (Neg) Each
Flagging Equipment (Day /Week) (Negotiated at time) Day
Shipping Samples (Lump) (variable for each project) (Neg)in labor tab Lmup
Standby Time (if any) for drill crew and equipment Hour
Monitoring Well Penuit (variable by jurisdiction) (neg) Each
Helicopter Use, highly variable with location and helicopter size Hour
Drill Crew Work (site preparation, skidding drill rig,) Homꞏ
Construct Drill Access (Bulldozer or Excavator) (Hour) Hour
Drill Access Equipment Mob/Demob (Lmup) Lmup
Ream Casing to Install Instnuuent Ft
Crew Breaks (10 days on; 4 days off) Negotiated at Time Each
Water Level Testing Homꞏ
Utility Locate Lump
3.34" Inclinometer Casing Installed Lnft
Furnish and install vibrating wire piezometer Each
OTHER:
TOTAL (BASE CONTRACT)
QTY Price Unit Sub Total
OR DOT 20(3) Upper Sunken Grade RFQ # 69056720Q000028 Attachment 8