Drilling RFQ 69056720Q000028

Project Name: Upper Sunken Grade Slide Repair -

OR DOT20(3)

Offer Due By:

Mobilization/Demobilization Truck mounted drill Mile

Mobilization/Demobilization Track mounted drill Mile

Mobilization/Demobilization Portable drill Mile

Casing Advancer Drilling (4 or 5-inch diameter) Ft

Casing Advancer Drilling (port. rig) (2 ½ - 4-inch) Ft

HQ3 and PQ3 core drilling Ft

NQ3 core drilling (portable drill rig) Ft

Asphalt Cores 4-inch diameter, through roadway Each

Hollow stem auger drilling 4 ¼" ID (8 ¼" OD ) Ft

Hollow stem auger drilling 3 ¼" ID (portable drill rig) Ft

2.5 & 3 inch Split Spoon Drive Samples samples Each

SPT samples (2") Each

Shelby Tube Samples 3-inch Each

Per Diem Drill Crew per person per day at Gov rate for area: Sweet Home Day

On Project Moves Hour

Water Haul (Identify Source: Contactor Idenified ) Homꞏ

2.75-Inch Inclinometer Casing Installed Lnft

2-inch Slotted Piezometer Casing Installed Lnft

2-inch Solid Piezometer Casing Installed Lnft

Crane Mob/Demob (each) (highly variable with location-neg) Lmup

Crane Use (highly variable with location) (Hour/Day/Week) Hour

Standby Time (crane and operator) (hour) (Neg) Hour

Subgrade Drilling (includes crew, all materials and equipment) Each

Monitoring Well Cover Flush Mount Each

Monitoring Well Cover, above surface, with Locking Cap Installed Each

Flagger Per Diem Per Person (Day) (Neg) Day

Flagging Personnel (hr) (not subject to wage detenuination) (Neg) Hour

Flagging Personnel OT (hr) (not subject to wage determination) (Neg) Hour

Mob/Demob for flagging personnel (Each ) (Neg) Each

Flagging Equipment (Day /Week) (Negotiated at time) Day

Shipping Samples (Lump) (variable for each project) (Neg)in labor tab Lmup

Standby Time (if any) for drill crew and equipment Hour

Monitoring Well Penuit (variable by jurisdiction) (neg) Each

Helicopter Use, highly variable with location and helicopter size Hour

Drill Crew Work (site preparation, skidding drill rig,) Homꞏ

Construct Drill Access (Bulldozer or Excavator) (Hour) Hour

Drill Access Equipment Mob/Demob (Lmup) Lmup

Ream Casing to Install Instnuuent Ft

Crew Breaks (10 days on; 4 days off) Negotiated at Time Each

Water Level Testing Homꞏ

Utility Locate Lump

3.34" Inclinometer Casing Installed Lnft

Furnish and install vibrating wire piezometer Each

OTHER:

TOTAL (BASE CONTRACT)

QTY Price Unit Sub Total

OR DOT 20(3) Upper Sunken Grade RFQ # 69056720Q000028 Attachment 8