Attachment (8) Contractor Production Report Form.docx
DOCX document 23 KB Posted
- Attached to
- Bldg's 4 & 1000 Fence Installation Project Federal contract opportunity
- Solicitation number
- N6449825Q4018
About this file
This is a blank Contractor Production Report form template that contractors must complete to document daily construction activities. The form captures key information including weather conditions, work performed, safety incidents, equipment/materials received, and construction equipment used on site. The form requires contractors to report total work hours, any accidents or hazardous material releases, safety actions taken, and whether specialized work (crane, scaffolding, etc.) was performed that day.
This template appears to be Attachment 8 of a broader solicitation package for a fence installation project at Buildings 4 and 1000 at the Philadelphia Navy Yard, being managed by the Naval Surface Warfare Center Philadelphia Division (NSWCPD). The related opportunity (N6449825Q4018) is a 100% small business set-aside for a firm-fixed-price construction contract, with a site visit scheduled for March 11, 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003 N6449825Q4018.pdf | ||
| Amendment 0002 N6449825Q4018.pdf | ||
| Amendment 0001 N6449825Q4018.pdf | ||
| Attachment (5) Activity Hazard Analysis Form.docx | DOCX document | |
| Attachment (12) PPQ Past Performance Questionnaire.docx | DOCX document | |
| Attachment (2) ENG FORM 4025R Transmittal Form_rev1.pdf | ||
| Attachment (3) SECNAV 5512.pdf | ||
| Attachment (10) Fence Floorplans.pdf | ||
| RFQ N6449825Q4018.pdf | ||
| Attachment (1) Site Map.pdf | ||
| Attachment (4) Schedule of Values.xlsx | XLSX spreadsheet | |
| Attachment (6) Requirements for Contractor Lift Operations.pdf | ||
| Attachment (7) Mobile Construction Equipment Checklist.pdf | ||
| Attachment (9) Current Base Guidelines - NSWCPD.docx | DOCX document | |
| Attachment (11) Photographs.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
Building 1000 and 4 –Fence Project
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
| |_| YES |
| |_| NO |
| TOTAL WORK HOURS ON JOB SITE, |
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
| |_| YES |
| |_| NO |
| CUMULATIVE TOTAL OF WORK |
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
| |_| YES |
| |_| NO |
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
| |_| YES |
| |_| NO |
Schedule Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| |_| |
| SAFETY REQUIREMENTS HAVE BEEN MET. |
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
Standard SOW Attachment (8) Contractor Production Report Form Sheet 1 of 1