Attachment (5) Activity Hazard Analysis Form.docx
DOCX document 25 KB Posted
- Attached to
- Bldg's 4 & 1000 Fence Installation Project Federal contract opportunity
- Solicitation number
- N6449825Q4018
About this file
This is an Activity Hazard Analysis (AHA) form template related to a fence installation project at Buildings 4 and 1000 at the Philadelphia Navy Yard. The template is based on EM385-1-1 standards and UFGS 013526 requirements, providing a structured format for contractors to document work sequences, anticipated hazards, and control measures.
The form includes a Risk Assessment Code (RAC) matrix for evaluating probability and severity of hazards, signature requirements for key personnel (SSHO, QC Manager, Prime Superintendent), and sections for documenting job steps, specific hazards, controls, equipment usage, training requirements, and inspection requirements. The form is a standard template that does not contain any specific hazard analysis information for the fence installation project itself.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003 N6449825Q4018.pdf | ||
| Amendment 0002 N6449825Q4018.pdf | ||
| Amendment 0001 N6449825Q4018.pdf | ||
| Attachment (12) PPQ Past Performance Questionnaire.docx | DOCX document | |
| Attachment (3) SECNAV 5512.pdf | ||
| Attachment (10) Fence Floorplans.pdf | ||
| Attachment (2) ENG FORM 4025R Transmittal Form_rev1.pdf | ||
| RFQ N6449825Q4018.pdf | ||
| Attachment (1) Site Map.pdf | ||
| Attachment (4) Schedule of Values.xlsx | XLSX spreadsheet | |
| Attachment (6) Requirements for Contractor Lift Operations.pdf | ||
| Attachment (7) Mobile Construction Equipment Checklist.pdf | ||
| Attachment (8) Contractor Production Report Form.docx | DOCX document | |
| Attachment (9) Current Base Guidelines - NSWCPD.docx | DOCX document | |
| Attachment (11) Photographs.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EM385-1-1 (30NOV14) UFGS 103526 11/15
Activity Hazard Analysis (AHA)
Contractor Name ( Performing the Work):
Overall Risk Assessment Code (RAC) (Use highest code )
Foreman Signature (Pe r forming the Wor k):
AHA Prepared by (Name/Title):
| Activity/Work Task: |
| Risk Assessment Code (RAC) Matrix |
AHA Signature Log #
Probability
| Contract Number: |
| Severity |
| Frequent |
| Likely |
| Occasional |
| Seldom |
| Unlikely |
| Date Prepared: |
| Catastrophic |
| E |
| E |
| H |
| H |
| M |
| Project Location: |
| Critical |
| E |
| H |
| H |
| M |
| L |
| PRIME CONTRACTOR SECTION: REV IEW ED BY: SIGNATUR E REQUIRED |
| Marginal |
| H |
| M |
| M |
| L |
| L |
| SSHO Signature: |
| Negligible |
| M |
| L |
| L |
| L |
| L |
| QC Manager Signature: |
| Step 1: Review each Hazard with identified |
"Controls". Determine RAC (see above).
Prime Superintendent Signature:
RAC CHART
| Notes: |
| Probability: Likelihood the activity will cause a Mishap (Near Miss, Incident, or Accident). Identify as Frequent, Likely, Occasional, Seldom or Unlikely |
E = Extremely High Risk
| Identify as Catastrophic, Critical, Marginal, or Negligible |
| H = High Risk |
Step 2: Identify the RAC (probability vs. severity) as E, H, M, or L for each "Hazard" on AHA.
Annotate the overall highest RAC at the top of the AHA
M= Moderate Risk
L = Low Risk
| Job Steps (Work Sequences) |
| Specific Anticipated Hazards |
| Controls |
| RAC |
| Job Steps (Work Sequences) |
| Specific Anticipated Hazards |
| Controls |
| RAC |
| Equipment to be used |
| Training Requirements & Competent or Qualified Personnel Name(s) |
| Inspection Requirements |
UFGS 013526 11/15 1.9 Government reserves the right to require the Contractor to revise and resubmit the AHA if it f ails to ef f ectively identif y the w ork sequences; specific anticipated hazards, site conditions, equipment, materials, personnel and the control measures to be implemented.
UFGS 013526 1.9.1 Review the AHA list periodically (at least monthly) at supervisory safety meetings, update w hen procedures, scheduling or hazards change.
UFGS 013526 1.9.2 Each employee perf orming w ork...must review the AHA and sign a signature log f or that AHA prior to starting w ork. The SSHO must maintain a signature log on site f or every AHA
Standard SOW Attachment (5) Activity Hazard Analysis Form
File details come from the government source that posted it. Updated .